ML19309H803: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
StriderTol Bot change
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML19309H803
| number = ML19309H803
| issue date = 04/15/1980
| issue date = 04/15/1980
| title = Forwards Response to NRC 800414 Ltr Re Violations Noted in IE Insp Repts 50-416/79-34 & 50-417/79-30.Corrective Actions:Review of Unit 1 Radiographs for Piping Spools Supplied by NSSS sub-tier Vendor Has Been Conducted
| title = Forwards Response to NRC Re Violations Noted in IE Insp Repts 50-416/79-34 & 50-417/79-30.Corrective Actions:Review of Unit 1 Radiographs for Piping Spools Supplied by NSSS sub-tier Vendor Has Been Conducted
| author name = Mcgaughy  J
| author name = Mcgaughy  J
| author affiliation = MISSISSIPPI POWER & LIGHT CO.
| author affiliation = MISSISSIPPI POWER & LIGHT CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8005190739
| document report number = NUDOCS 8005190739
| title reference date = 04-14-1980
| package number = ML19309H795
| package number = ML19309H795
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
Line 17: Line 18:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:-._
-O
~
MISSISSlPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B OX 164 0, J A C K S O N, MIS SIS SIP PI 3 9 2 05 PRODUCTION DEPARTMENT
^
l t i."' Ap115,1980 Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW Suite 3100 Atlanta, Georgia 30303 Attention:
Mr. J. P. O'Reilly, Director
 
==Dear Mr. O'Reilly:==
==SUBJECT:==
Grand Gulf Nuclear Station Bechtel Job No. 9645 File 0290/0494/15521 RII:
PkT 50-416, 417/79-34/30 Supplemental Response for IE Inspection Report AECM-80/77
 
==Reference:==
AECM-80/67, dated April 4,1980 As requested by your Mr. P. K. Van Doorn on April 14, 1980, the attached information is submitted to supplement and clarify Mississippi Power & Light's previous response transmitted by the referenced letter.
Yours tr ly, k
a
. P. McGaughy, Jr.
Director of Power Production ATR:1b Attachment cc:
Mr. N. L. Stampley Mr. R. B. McGehee Mr. T. B. Conner Mr. Victor Stello, Jr., Director Division of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555
.I OFMCIAL COP'Y Member Middle South Utilities System
 
~~~
--~
r e
D ATTACHMENT TO AECM-80/77 Page 1 of 1 -
1
\\
Supplemental Response to NRC Item 50-416/79-34 01 i
(1) Corrective Steps Taken and Results Achieved This response is supplemented as follows:
A review of the Unit I radiog~aphs for the piping spools supplied by the NSSS sub-tier vendor in question has been conducted. This review revealed density ranges were in excess of T-262.3 and a review of the area of interest on adjacent film was not possible as the flash card film identification on a few films had been positioned so as to obscure a small percentage of the overall weld.
(2) Correctiss Steps Taken to Avoid Further Noncompliance (a) This tisponse applies to the Recirculation System piping as well.
(b) This response applies to the Recirculation System piping as well.
(c) This response requires no change.
(3) Date to Achieve Full Cc=pliance This response applies to the Recirculation System piping as belle WW}}

Latest revision as of 02:08, 2 January 2025

Forwards Response to NRC Re Violations Noted in IE Insp Repts 50-416/79-34 & 50-417/79-30.Corrective Actions:Review of Unit 1 Radiographs for Piping Spools Supplied by NSSS sub-tier Vendor Has Been Conducted
ML19309H803
Person / Time
Site: Grand Gulf  
Issue date: 04/15/1980
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19309H795 List:
References
NUDOCS 8005190739
Download: ML19309H803 (2)


Text

-._

-O

~

MISSISSlPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B OX 164 0, J A C K S O N, MIS SIS SIP PI 3 9 2 05 PRODUCTION DEPARTMENT

^

l t i."' Ap115,1980 Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW Suite 3100 Atlanta, Georgia 30303 Attention:

Mr. J. P. O'Reilly, Director

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Bechtel Job No. 9645 File 0290/0494/15521 RII:

PkT 50-416, 417/79-34/30 Supplemental Response for IE Inspection Report AECM-80/77

Reference:

AECM-80/67, dated April 4,1980 As requested by your Mr. P. K. Van Doorn on April 14, 1980, the attached information is submitted to supplement and clarify Mississippi Power & Light's previous response transmitted by the referenced letter.

Yours tr ly, k

a

. P. McGaughy, Jr.

Director of Power Production ATR:1b Attachment cc:

Mr. N. L. Stampley Mr. R. B. McGehee Mr. T. B. Conner Mr. Victor Stello, Jr., Director Division of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555

.I OFMCIAL COP'Y Member Middle South Utilities System

~~~

--~

r e

D ATTACHMENT TO AECM-80/77 Page 1 of 1 -

1

\\

Supplemental Response to NRC Item 50-416/79-34 01 i

(1) Corrective Steps Taken and Results Achieved This response is supplemented as follows:

A review of the Unit I radiog~aphs for the piping spools supplied by the NSSS sub-tier vendor in question has been conducted. This review revealed density ranges were in excess of T-262.3 and a review of the area of interest on adjacent film was not possible as the flash card film identification on a few films had been positioned so as to obscure a small percentage of the overall weld.

(2) Correctiss Steps Taken to Avoid Further Noncompliance (a) This tisponse applies to the Recirculation System piping as well.

(b) This response applies to the Recirculation System piping as well.

(c) This response requires no change.

(3) Date to Achieve Full Cc=pliance This response applies to the Recirculation System piping as belle WW