ML19310A891: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML19310A891 | | number = ML19310A891 | ||
| issue date = 05/23/1980 | | issue date = 05/23/1980 | ||
| title = Responds to NRC | | title = Responds to NRC Re Violations Noted in IE Insp Repts 50-498/80-07 & 50-499/80-07.Corrective Actions:Site Mechanical QA Instructed to Perform Surveillance of Installed Penetrations/Sleeves on Weekly Basis | ||
| author name = Turner E | | author name = Turner E | ||
| author affiliation = HOUSTON LIGHTING & POWER CO. | | author affiliation = HOUSTON LIGHTING & POWER CO. | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = ST-HL-AE-468, NUDOCS 8006300644 | | document report number = ST-HL-AE-468, NUDOCS 8006300644 | ||
| title reference date = 04-30-1980 | |||
| package number = ML19310A889 | | package number = ML19310A889 | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| Line 26: | Line 27: | ||
==Dear Mr. Seidle:== | ==Dear Mr. Seidle:== | ||
The following is our response to the item of noncompliance identified in IE Inspection Report Nos. 50-498/80-07 and 50-499/80-07, dated April 30, 1980. | The following is our response to the item of noncompliance identified in IE Inspection Report Nos. 50-498/80-07 and 50-499/80-07, dated April 30, 1980. | ||
Failure to Follow Procedure for Storage of Material Corrective Action Nonconformance Report No. S-M3645 was generated to provide disposition for repairs to penetration M-39 in Unit 2 Reactor Containment Building (RCB-2). Further surveillance of RCB-2 revealed other penetrations / | Failure to Follow Procedure for Storage of Material Corrective Action Nonconformance Report No. S-M3645 was generated to provide disposition for repairs to penetration M-39 in Unit 2 Reactor Containment Building (RCB-2). | ||
Further surveillance of RCB-2 revealed other penetrations / | |||
sleeves without proper end cover protection. Corrective Action Request No. S-285 was issued to Brown S Root Construction for violation of A040KPGCP-35, Revision 3, paragraph 3.6(6). | sleeves without proper end cover protection. Corrective Action Request No. S-285 was issued to Brown S Root Construction for violation of A040KPGCP-35, Revision 3, paragraph 3.6(6). | ||
Recurrence Control Procedure A040KPMECP-4 will be revised to delineate specific surveil-lance requirements for mechanical penetrations / sleeves which require protection of machined end preps. The anticipated date for release of this revision is July 15, 1980. | Recurrence Control Procedure A040KPMECP-4 will be revised to delineate specific surveil-lance requirements for mechanical penetrations / sleeves which require protection of machined end preps. | ||
The anticipated date for release of this revision is July 15, 1980. | |||
8006300 N | 8006300 N | ||
.. o | |||
'Houdon Lighting & Power Company Mr. Seidle May 23, 1980 Page Two In the interim, Site Mechanical QA has been instructed by correspondence no. SQA-3708 to perform surveillance of installed mechanical penetra-tions/ sleeves which require protection of machined end preps on a once weekly basis. The once weekly surveillances will be documented on an Examination Check Form. | |||
Very truly yours, A | Very truly yours, A | ||
h E. A. Turner, Vice President Power Plant Construction | |||
& Technical Services EAT:rka cc: Messrs. G. W. Oprea, Jr. | |||
M. L. Borchelt (CPL) | M. L. Borchelt (CPL) | ||
R. L. Range (CPLJ J. B. Poston (CPS) | R. L. Range (CPLJ J. B. Poston (CPS) | ||
| Line 49: | Line 52: | ||
STP RMS BSR DCC i | STP RMS BSR DCC i | ||
l | l | ||
..}} | |||
Latest revision as of 01:53, 2 January 2025
| ML19310A891 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 05/23/1980 |
| From: | Eric Turner HOUSTON LIGHTING & POWER CO. |
| To: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML19310A889 | List: |
| References | |
| ST-HL-AE-468, NUDOCS 8006300644 | |
| Download: ML19310A891 (2) | |
Text
['
(_)
The Light COmpy seastoa i.igating & Power R O. Box 1700 Houston. Texas 77001 (713) 228-9211 May 23, 1980 ST-HL-AE-468 SFN: C-0570 Mr. W. C. Seidle, Chief Reactor Construction 6 Engineering Support Branch U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
SUBJECT:
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION RESPONSE TO NRC INSPECTION FINDINGS DOCKET NOS. 50-498/80-07 AND 50-499/80-07
Dear Mr. Seidle:
The following is our response to the item of noncompliance identified in IE Inspection Report Nos. 50-498/80-07 and 50-499/80-07, dated April 30, 1980.
Failure to Follow Procedure for Storage of Material Corrective Action Nonconformance Report No. S-M3645 was generated to provide disposition for repairs to penetration M-39 in Unit 2 Reactor Containment Building (RCB-2).
Further surveillance of RCB-2 revealed other penetrations /
sleeves without proper end cover protection. Corrective Action Request No. S-285 was issued to Brown S Root Construction for violation of A040KPGCP-35, Revision 3, paragraph 3.6(6).
Recurrence Control Procedure A040KPMECP-4 will be revised to delineate specific surveil-lance requirements for mechanical penetrations / sleeves which require protection of machined end preps.
The anticipated date for release of this revision is July 15, 1980.
8006300 N
.. o
'Houdon Lighting & Power Company Mr. Seidle May 23, 1980 Page Two In the interim, Site Mechanical QA has been instructed by correspondence no. SQA-3708 to perform surveillance of installed mechanical penetra-tions/ sleeves which require protection of machined end preps on a once weekly basis. The once weekly surveillances will be documented on an Examination Check Form.
Very truly yours, A
h E. A. Turner, Vice President Power Plant Construction
& Technical Services EAT:rka cc: Messrs. G. W. Oprea, Jr.
M. L. Borchelt (CPL)
R. L. Range (CPLJ J. B. Poston (CPS)
A. vonRosenberg (CPS)
R. L. Hancock (COA)
M. C. Nitcholas (C0A)
H. R. Dean R. L. Waldrop C. L. McNeese D. G. Barker R. A. Frazar W. N. Phillips L. D. Wilson G. B. Painter M. D. Schwarz (Baker & Bott::)
C. G. Thrash (Baker S Botts)
H. S. Phillips (NRC)
J. R. Geurts (BSR)
C. W. Vincent (BSR)
l
..