| number = ML19317G564 | | number = ML19317G564 | ||
| issue date = 03/23/1973 | | issue date = 03/23/1973 | ||
| title = Responds to AEC | | title = Responds to AEC Re Violations Noted in Insp Rept 50-302/73-01.Corrective Actions:Welds to Be Inspected, Procedures Revised,Checks Tightened & Film Recalled for Penetrameter Location Review & Listing of Inadequacies | ||
| author name = Rodgers J | | author name = Rodgers J | ||
| author affiliation = FLORIDA POWER CORP. | | author affiliation = FLORIDA POWER CORP. | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 8003191137 | | document report number = NUDOCS 8003191137 | ||
| title reference date = 03-02-1973 | |||
| package number = ML19317G562 | | package number = ML19317G562 | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| Line 18: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:('') | {{#Wiki_filter:('') | ||
v em J | v em J,Q. m;?,% | ||
8?il o'. | P 8?il J''Idb v | ||
o'. | |||
') > | |||
W Sq,. j.,, | |||
blNoaas D | |||
4 Florida Po..w..e.,r m. | |||
. March 23, 1973-i Mr. Norm'an Moseley, Director ti.S. Atomic Energy Commi.ssion i | |||
i | |||
1 | 1 | ||
, Directorate of. Regulatory Op.erations. | |||
Region II, Suite 818 230 Peachtree Street N.W. | Region II, Suite 818 230 Peachtree Street N.W. | ||
Atlanta, Georgia 30303 | Atlanta, Georgia 30303 | ||
==Subject:== | ==Subject:== | ||
Crystal River Unit #3 Refer: R0: II: EJV 50-302/73-1 | Crystal River Unit #3 Refer: R0: II: EJV 50-302/73-1 | ||
==Dear Mr. Moseley:== | ==Dear Mr. Moseley:== | ||
In. response to Mr. J. G. Dasis' iletter:of M' arch 2, l'973, concerning the - | |||
inspection 'of our Crystal River Uni.t #3 fac.ility conducted by your | |||
In . response to Mr. J. G. Dasis' iletter:of M' arch 2, l'973, concerning the - | . Mr. Herdt on Janua'y 23-25,'1973, we submit the following reply to the | ||
inspection 'of our Crystal River Uni.t #3 fac.ility conducted by your | ~ indicated apparen.t.noncoinpliances with Appendix B to-10 CFR50. | ||
With ' respect t'o Item No. 73 l'/A'1 Decay -Heat and Makeup ~ arid Purificat' ion k | |||
Systems Welding, the fol.l.owing a'ction was taken: | |||
) | |||
1. | |||
A review of 730 completed Fiel'd Wel'd Data Sheets was made. | |||
Results of the review show that nineteen (19) welds were e | |||
completed to Procedure SS-1-Tig using the wrong rod size for part of the weld. | |||
With ' respect t'o Item No. 73 l'/A'1 | These nineteen welds will be 100% | ||
radiography inspected to provide evidence that the welds are acceptable. | |||
2. | |||
Welding procedure SS-1-Tig has since been revised to allow the use of 3/32" filler metal for the first pass. | |||
3. | |||
FPC Work Procedure No. W-21 has also been revised to require the applicable welding procedure number to be stated on the Walding Rod Withdrawal. Order. Only rod sizes called for by the procedure will be issued to the welder. | |||
4. | |||
the use of 3/32" filler metal for the first pass. | The welding inspectors have been instructed to check to see | ||
") | |||
for by the procedure will be issued to the welder. | that weld rod size in use is in accorAnce witn the procedure in addition to other inspection checks. | ||
g g31 | |||
that | |||
Mr. florman Moseley March 23, 1973 5. | |||
Piping supervision issued instructions to the foremen in charge | |||
. of welding, stressing the importance of strict adherence to welding procedures, including proper rod size. | |||
6. | |||
Quality control has added a Q.C. Inspector whose primary duty is to perform in-process inspections of welding operations. | |||
With respect.to I. tem Nd: 73-1/A2 Decay Heat and' Make'up and Purification Systems Radiographs, the 'f.ollowing action was.taken: | |||
. l., In'structed the' radiographers to keep tbe penetrameter located.irt | |||
..accordance_with_thelprocedure. | |||
,'2. " Recalled all' film for review of pe.netrameter' location. | |||
Preiently' compfling a list of all film that'does not het 3. | |||
Mr. florman Moseley | |||
With respect .to I. tem Nd: 73-1/A2 Decay Heat and' Make'up and Purification Systems Radiographs , the 'f.ollowing action was .taken: | |||
Preiently' compfling a list of all film that'does not het | |||
3. | |||
penetrameter location requirement. | penetrameter location requirement. | ||
Documents concerning the above will be maintained at the site for review by your inspectors during their next visit. | Documents concerning the above will be maintained at the site for review by your inspectors during their next visit. | ||
Please advise if further response is required. | Please advise if further response is required. | ||
Very truly.yours,, | |||
~ | |||
Very truly .yours ,, | ~J. T. Rodge s'. | ||
' Asst.. Vice President JTR/iw e | |||
6. | |||
.n.,__.. | |||
.-}} | |||
JTR/iw | |||
Latest revision as of 21:25, 1 January 2025
| ML19317G564 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 03/23/1973 |
| From: | Rodgers J FLORIDA POWER CORP. |
| To: | Moseley N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19317G562 | List: |
| References | |
| NUDOCS 8003191137 | |
| Download: ML19317G564 (2) | |
Text
()
v em J,Q. m;?,%
P 8?il JIdb v
o'.
') >
W Sq,. j.,,
blNoaas D
4 Florida Po..w..e.,r m.
. March 23, 1973-i Mr. Norm'an Moseley, Director ti.S. Atomic Energy Commi.ssion i
1
, Directorate of. Regulatory Op.erations.
Region II, Suite 818 230 Peachtree Street N.W.
Atlanta, Georgia 30303
Subject:
Crystal River Unit #3 Refer: R0: II: EJV 50-302/73-1
Dear Mr. Moseley:
In. response to Mr. J. G. Dasis' iletter:of M' arch 2, l'973, concerning the -
inspection 'of our Crystal River Uni.t #3 fac.ility conducted by your
. Mr. Herdt on Janua'y 23-25,'1973, we submit the following reply to the
~ indicated apparen.t.noncoinpliances with Appendix B to-10 CFR50.
With ' respect t'o Item No. 73 l'/A'1 Decay -Heat and Makeup ~ arid Purificat' ion k
Systems Welding, the fol.l.owing a'ction was taken:
)
1.
A review of 730 completed Fiel'd Wel'd Data Sheets was made.
Results of the review show that nineteen (19) welds were e
completed to Procedure SS-1-Tig using the wrong rod size for part of the weld.
These nineteen welds will be 100%
radiography inspected to provide evidence that the welds are acceptable.
2.
Welding procedure SS-1-Tig has since been revised to allow the use of 3/32" filler metal for the first pass.
3.
FPC Work Procedure No. W-21 has also been revised to require the applicable welding procedure number to be stated on the Walding Rod Withdrawal. Order. Only rod sizes called for by the procedure will be issued to the welder.
4.
The welding inspectors have been instructed to check to see
")
that weld rod size in use is in accorAnce witn the procedure in addition to other inspection checks.
g g31
Mr. florman Moseley March 23, 1973 5.
Piping supervision issued instructions to the foremen in charge
. of welding, stressing the importance of strict adherence to welding procedures, including proper rod size.
6.
Quality control has added a Q.C. Inspector whose primary duty is to perform in-process inspections of welding operations.
With respect.to I. tem Nd: 73-1/A2 Decay Heat and' Make'up and Purification Systems Radiographs, the 'f.ollowing action was.taken:
. l., In'structed the' radiographers to keep tbe penetrameter located.irt
..accordance_with_thelprocedure.
,'2. " Recalled all' film for review of pe.netrameter' location.
Preiently' compfling a list of all film that'does not het 3.
penetrameter location requirement.
Documents concerning the above will be maintained at the site for review by your inspectors during their next visit.
Please advise if further response is required.
Very truly.yours,,
~
~J. T. Rodge s'.
' Asst.. Vice President JTR/iw e
6.
.n.,__..
.-