ML19325F414: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML19325F414
| number = ML19325F414
| issue date = 10/31/1989
| issue date = 10/31/1989
| title = Monthly Operating Rept for Oct 1989 for Milestone Unit 2.W/ 891113 Ltr
| title = Monthly Operating Rept for Oct 1989 for Milestone Unit 2.W/
| author name = Gibson J, Scace S
| author name = Gibson J, Scace S
| author affiliation = NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
| author affiliation = NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = MP-13718, NUDOCS 8911210226
| document report number = MP-13718, NUDOCS 8911210226
| title reference date = 11-13-1989
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 5
| page count = 5
Line 16: Line 17:


=Text=
=Text=
{{#Wiki_filter:'
{{#Wiki_filter:!
          ".        MWM
MWM
                        ,          m_.
]
                                  . . . _ _      _-._ _              .__                                            ]          ,
m_.
v B8[1VQ8LI dWA1989 FOIWLfl 0048P488T b'
B8[1VQ8LI dWA1989 FOIWLfl 0048P488T v
{       ,
b'
W3AMASI Na(S $EW WAfff w use me                   ovww                                                                 I oc                                                                                                                 _
{
4.
W3AMASI Na(S $EW WAfff w use me ovww oc 4.
J             '
J November 13, 1989 MP-13'i10 Re:
November 13, 1989                   '
10CFR50 '/1(a)
MP-13'i10 Re:   10CFR50 '/1(a)
.U.S. Nuclear Regulatory Commission
                          .U.S. Nuclear Regulatory Commission                                                                     ;
': Document Control Desk Washington, D. C. 20555
            ,          ': Document Control Desk Washington, D. C. 20555 i,                         


==Reference:==
==Reference:==
Facility Operating License No. DPR 65                                             ,
Facility Operating License No. DPR 65 i,
Docket No. 50-336 f
Docket No. 50-336 f


==Dear Sir:==
==Dear Sir:==
 
This letter is forwarded to provide the report of operating snd shutdown experience relacing to Millstone Unit 2 for the month of October 1989, in accordance with Appendix A Technical Specifications, Seccion 6.9.1.6.
This letter is forwarded to provide the report of operating snd shutdown experience relacing to Millstone Unit 2 for the month of October 1989, in                             ,
One additional copy of the report is enclosed.
accordance with Appendix A Technical Specifications, Seccion 6.9.1.6. One additional copy of the report is enclosed.                                                           ;
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPAN'?
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPAN'?                 3 Y
3 Y
4       p                     l.
4 p
Step en     Sca
l Step en Sca Station Su erintendent g,
,    g,                                                                                Station Su erintendent l'                                                                               Millstone Nuclear Power Sta. Loa                 [
l' Millstone Nuclear Power Sta. Loa
[
l.,
l.,
l-SES/JG                                                                                             .,
l-SES/JG cc: W. T. Russel, Region I Administrator l
cc: W. T. Russel, Region I Administrator l                               G. S. Vissing, NRC Project Manager, Millstone Unit No. 2 l-                             W. J. Raymond, Senior Resident Inspector, Millstone Unit Nos.1, 2 & 3                           .
G. S. Vissing, NRC Project Manager, Millstone Unit No. 2 l-W. J. Raymond, Senior Resident Inspector, Millstone Unit Nos.1, 2 & 3 1
1                                                                                                                               >
l.
: l.                                                                                                                               f l^
f l^
i l'
il' i
8911210226 891031                                                     A             i PDR R
8911210226 891031 A
ADOCK 05000336 PNV
PDR ADOCK 05000336
                                                                                                                // f
// f i
                                                                                                                //
R PNV
i l
//
osio nav.s-es ,
I \\
I
jg e
                                                                                                                      \    .-
osio nav.s-es,
e jg
++
        ++           .


e                                                         ._                                          .
e A
      -          A l*         A''
l*
A''
l G;[ ?* ? ~
l G;[ ?* ? ~
H} :.-      '
H}
h M ,,                  ,
h M,,
OPERATING DATA REPORT is         ..t DOCKET NO.     50 336
OPERATING DATA REPORT is
: i.                                                                                             DATF. 11/07/89 COMPLETED BY     J _QJbson.
..t DOCKET NO.
TELEPHONE   (203) 447-1791 EXT. 4431 L
50 336 i.
                            ^       ^
DATF.
Notes: Items 21 and 22         l
11/07/89 COMPLETED BY J _QJbson.
  ,              1. Unit Name:                       Millstone Unit'2                 cumulative are wei hted.
TELEPHONE (203) 447-1791 EXT.
b
4431 L
: 2. Reporting Period:                     October 1989               averages. Unit operated
^
: 3.   ' Licensed Thermal Power (MWt):               2700                 at 2560 MWTH prior to its
^
: 4. Nameplate Rating (Gross MWe):                 909               uprating to the current
Notes: Items 21 and 22 l
: 5. Desigr Electrical Rating (Net MWe):           870               2700 MWTH power level.
1.
                '6. . Maximum Dependable Capacity (Gross MWe):       891 EE
Unit Name:
                .7. Maximum Dependable Capacity (Net MWe):         862.88 g 8.         If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
Millstone Unit'2 cumulative are wei hted.
b 2.
Reporting Period:
October 1989 averages. Unit operated 3.
' Licensed Thermal Power (MWt):
2700 at 2560 MWTH prior to its 4.
Nameplate Rating (Gross MWe):
909 uprating to the current 5.
Desigr Electrical Rating (Net MWe):
870 2700 MWTH power level.
'6..
Maximum Dependable Capacity (Gross MWe):
891 EE
.7.
Maximum Dependable Capacity (Net MWe):
862.88 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, g
Give Reasons:
N/A 9.
Power Level To Which Restricted, If any (Net MWe):
N/A
N/A
: 9. Power Level To Which Restricted, If any (Net MWe):            N/A
: 10. Reasons For Restrictions, If Any:
: 10. Reasons For Restrictions, If Any:             N/A This Month       Yr.-To-Date       Cumulative
N/A This Month Yr.-To-Date Cumulative
: 11. Hours In Reporting Period                               _Z41 Q             7296.0           121416.0
: 11. Hours In Reporting Period
: 12. Number Of Hours Reactor Was Critical               _,
_Z41 Q 7296.0 121416.0
485.3       __
: 12. Number Of Hours Reactor Was Critical 485.3
5079.7            894JJ 1
: 13. Reactor Reserve Shutdown Hours 0.0 5079.7 894JJ 1 0.0 2205.5
: 13. Reactor Reserve Shutdown Hours                             0.0               0.0             2205.5
'14. Hours Generator On-Line 482.8 4962.4 85027.8
                '14. Hours Generator On-Line                                   482.8             4962.4             85027.8
: 15. Unit Reserve Shutdown Hours 0.Q 0.0 468.2
: 15. Unit Reserve Shutdown Hours                               0.Q               0.0               468.2
: 16. Gross Thermal Energy Generated (MWH)
: 16. Gross Thermal Energy Generated (MWH)               _1139086.4       13022162.4         235673442<4
_1139086.4 13022162.4 235673442<4
: 17. Gross Electrical Energy Generated (MWH)               393928.5         4280884.5         71111405.0
: 17. Gross Electrical Energy Generated (MWH) 393928.5 4280884.5 71111405.0
                ~18. Not Electrical Ene gy Generated (MWH)                 378049.5         4112065.5         68221212.0
~18. Not Electrical Ene gy Generated (MWH) 378049.5 4112065.5 68221212.0
                '19. Unit Service Factor                                       64.8               68 Q_               70.0
'19. Unit Service Factor 64.8 68 Q_
: 20. Unit Availability Factor                                 64.8               68.0               70.4
70.0
: 21. Unit Capacity Factor (Using MDC Net)                     58.8               65.3               66.R
: 20. Unit Availability Factor 64.8 68.0 70.4
: 22. Unit Capccity Factor (Using DER Net)                     58.3               64.8               65.2
: 21. Unit Capacity Factor (Using MDC Net) 58.8 65.3 66.R
: 23. Unit Forced Outage Rate                                   .Q g               0.0               14.1 L24. Shut,4wns Scheduled Over Nent 6 Months (Type, Date, and Duraticn of Each):
: 22. Unit Capccity Factor (Using DER Net) 58.3 64.8 65.2
: 23. Unit Forced Outage Rate
.Q g 0.0 14.1 L24. Shut,4wns Scheduled Over Nent 6 Months (Type, Date, and Duraticn of Each):
Gntrantly shutdown for the Eddy Current examination of Stear Generator tubes.
Gntrantly shutdown for the Eddy Current examination of Stear Generator tubes.
Anoroximatelv 4-5 weeks.
Anoroximatelv 4-5 weeks.
: 25. If Unit Shutdown At End Of Report Period, Estimated Date of Startup: Novembev 22. 1989 l                 26. Units In Teet Status (Prior to Commercial Operation):
: 25. If Unit Shutdown At End Of Report Period, Estimated Date of Startup: Novembev 22. 1989 l
l-                                                                                               For1 cast     Achieved
: 26. Units In Teet Status (Prior to Commercial Operation):
l-For1 cast Achieved
?'
?'
INITIAL CRITICALITY                                   N/A         __N/A INITIAL ELECTRICITY                                   N/A           N/A l                                           COMMERCIAL OPERATION                                   N/A           N/A 1
INITIAL CRITICALITY N/A
__N/A INITIAL ELECTRICITY N/A N/A l
COMMERCIAL OPERATION N/A N/A 1
l t
l t
!9                                                                                                                       -- --
!9 b
b        l
l


E     .      . p I 0 I.'                   ~,
E I
          , . 4_l ,
. p 0 I.'
b , .: ,.
4_l,
~,
b,.:,.
y
y
                      ,                                                                                                [
[
                                                                                                                      ;
AVERAGE DAILY UNIT POWER LEVEL i!,
AVERAGE DAILY UNIT POWER LEVEL i! ,
. DOCKET NO.
                                                                              . DOCKET NO. 50 336                 i UNIT:
50 336 i
                                                                                                                        ~
UNIT:
Millstone Unit 2 o'
Millstone Unit 2
DATE:     11/07/89 COMPLETED BY       A Gibson TELEPHONE:     (2031447-1791 EXT       4431                     !
~
M0!;TH:   OCTOBER 1989 DAY     AVG. DAILY POWER LEVEL             DAY   AVO. DAILY F01.'ER LEVEL (MWe-Net)                                 (MWe-Net) 1                 790                   17               789 2                 791                   18               789 3                 791                   19               788                           >
o' DATE:
                                                                                                                      ?
11/07/89 COMPLETED BY A Gibson TELEPHONE:
4                 789                   20               774                           '
(2031447-1791 EXT 4431 M0!;TH:
5                  790                   21                 18                         I 6                 790                   22                 0                         ,
OCTOBER 1989 DAY AVG. DAILY POWER LEVEL DAY AVO. DAILY F01.'ER LEVEL (MWe-Net)
7                 790                   23                 0 8                 7 ';0                 24                 0
(MWe-Net) 1 790 17 789 2
                            .9                 791                   25                 0 10                 791                   26                 0                         .
791 18 789 3
11                 790                   27                 0         ,
791 19 788
l 12   ._          791                   28                 0       _.
?
: i.                           13                 791                   29                 0 1
4 789 20 774 5
,'                            14                 790                   30                 0 g
790 21 18 I
L                            15                 7 'O                   31                 0 l
6 790 22 0
l                            16                 791 l-1                               INSTRUCTIONS l'
7 790 23 0
On this format- list the average daily unit power level in MWe-Net for each L
8 7 ';0 24 0
I day in the reporting month. Compute to the nearest whole inegawatt.
.9 791 25 0
i l'
10 791 26 0
11 790 27 0
l 12 791 28 0
i.
13 791 29 0
1 14 790 30 0
g L
15 7 'O 31 0
l l
16 791 l-1 INSTRUCTIONS l'
On this format-list the average daily unit power level in MWe-Net for each L
day in the reporting month.
Compute to the nearest whole inegawatt.
I i
l'


i ... -
i... -
                                                                                                                                  ~
~
                                                                                      ~
~
                                                                                                                                                    ?
?
  ;                                                                              -
DOCKET'NO.
                                                                                                                                      ~ ~
50-3k6
    ,                                                                                                                  ~
~
                                                                                                                                ~
~ ~
DOCKET'NO.       50-3k6                    . ,
~
f                                                                                                UNIT.NAME'       Millste m 2           -
f UNIT SHUTDOWNS AND POWER REDUCTIONS.
UNIT SHUTDOWNS AND POWER REDUCTIONS.
UNIT.NAME' Millste m 2 DATE' 11/07/89-i,
DATE'     11/07/89-               -
COMPLFTED BY J. Gibson TELF';tt0NE (203) 447-17911 REPORT MONTH October 1989 EKT.
i, COMPLFTED BY       J. Gibson TELF';tt0NE     (203) 447-17911 October 1989                           EKT.     4431 REPORT MONTH Component      Cause & Corrective No. Date   Type l    Duration   Reason2    Method of       License       Systgm Shutting         Event         Code     Code'             Action to (Hours)                              3                                         Prevent Recurrer ce -
4431 No.
Down Reactor     Report #
Date Type Duration Reason Method of License Systgm Component Cause & Corrective l
On Octob r 21, 1989,.
2 (Hours)
3        262.2         D             1           N/A           N/A     N/A 02    891021                                                                                          '? nit 2 t annenced a controlled shutdcwn from 92 percent power for the inspection of Steam Generator tubes.
Shutting Event Code Code' Action to 3
0 Exhibit G - Instructions 2 Reason:                                       3 Method 1:F Forced                                                          1-Manual                 for Preparation of Data S: Scheduled       A-Equipment Failure (Explain)                                             Entry Sheets for License B-Maintenance or Test                           2-Manual Scram 3-Automatic Scram       Evenc Report (LER) File C-Refueling D-Regulatory Restriction.                        4-Cont.inued from       (NUREG-0161)
Prevent Recurrer ce -
E-Operator Training & License Exanination         Previous month 5-Power Reduction        5 Exhibit 1 -Same Source F-Administrative G-Operational Error (Explain)                     (Duration -0)
Down Reactor Report #
H- Other (Explain)                               6-Other (Explain)
02 891021 3
262.2 D
1 N/A N/A N/A On Octob r 21, 1989,.
'? nit 2 t annenced a controlled shutdcwn from 92 percent power for the inspection of Steam Generator tubes.
0 3 Method Exhibit G - Instructions 2
1: Forced Reason:
F 1-Manual for Preparation of Data S: Scheduled A-Equipment Failure (Explain)
B-Maintenance or Test 2-Manual Scram Entry Sheets for License 3-Automatic Scram Evenc Report (LER) File C-Refueling 4-Cont.inued from (NUREG-0161)
D-Regulatory Restriction.
Previous month E-Operator Training & License Exanination 5 Exhibit 1 -Same Source 5-Power Reduction F-Administrative G-Operational Error (Explain)
(Duration -0)
H-Other (Explain) 6-Other (Explain)
[h.
[h.


  +         .
' +
e d'        ''
e d'
l
REFUELING INFORMATION REOUEST.
                ,.-*                REFUELING INFORMATION REOUEST.                       )
l.-
l.-   Name of facility:' Millstone 2
Name of facility:'
: 2. Scheduled date for next. refueling shutdown:     _ october 1990       I
Millstone 2 2.
: 3. Scheduled date for restart following refueling:       N/A 1
Scheduled date for next. refueling shutdown:
4.:   Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
_ october 1990 3.
Not at this time
Scheduled date for restart following refueling:
: 5. Scheduled date(s) for submitting licensing action and supporting information:
N/A 1
None                                                               ;
4.:
i
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
: 6. Important licensing considerations associated with refueling, e.g.,
Not at this time 5.
Scheduled date(s) for submitting licensing action and supporting information:
None i
6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
Not at this time
Not at this time
: 7. . The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
: 7.. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
l                       In Core: (a) 112       In Spent Fuel Pool:   (b)   412
l In Core:
: 8. The present licensed spent fuel pool storege capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:             t Currently 1277
(a) 112 In Spent Fuel Pool:
: 9. The projected date of the last refueling that can be discharged to '
(b) 412 8.
the spent fuel pool assuming the present licensed capacity:
The present licensed spent fuel pool storege capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
1994. Soent Fue: Pool Full, core off load caDacity is reached (with
t Currently 1277 9.
                    -out consolidat:.on).
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1998. Core Full. Soent Fuel Pool Full 2p19. Scent Fuel Pool Full. corc off load caDacity is reached-continuent uoon full scale storace of consolidated fuel in the Feent Fuel Pool.}}
1994. Soent Fue:
Pool Full, core off load caDacity is reached (with
-out consolidat:.on).
1998. Core Full. Soent Fuel Pool Full 2p19. Scent Fuel Pool Full. corc off load caDacity is reached-continuent uoon full scale storace of consolidated fuel in the Feent Fuel Pool.
.}}

Latest revision as of 17:55, 31 December 2024

Monthly Operating Rept for Oct 1989 for Milestone Unit 2.W/
ML19325F414
Person / Time
Site: Millstone 
Issue date: 10/31/1989
From: Gibson J, Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
MP-13718, NUDOCS 8911210226
Download: ML19325F414 (5)


Text

!

MWM

]

m_.

B8[1VQ8LI dWA1989 FOIWLfl 0048P488T v

b'

{

W3AMASI Na(S $EW WAfff w use me ovww oc 4.

J November 13, 1989 MP-13'i10 Re:

10CFR50 '/1(a)

.U.S. Nuclear Regulatory Commission

': Document Control Desk Washington, D. C. 20555

Reference:

Facility Operating License No. DPR 65 i,

Docket No. 50-336 f

Dear Sir:

This letter is forwarded to provide the report of operating snd shutdown experience relacing to Millstone Unit 2 for the month of October 1989, in accordance with Appendix A Technical Specifications, Seccion 6.9.1.6.

One additional copy of the report is enclosed.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPAN'?

3 Y

4 p

l Step en Sca Station Su erintendent g,

l' Millstone Nuclear Power Sta. Loa

[

l.,

l-SES/JG cc: W. T. Russel, Region I Administrator l

G. S. Vissing, NRC Project Manager, Millstone Unit No. 2 l-W. J. Raymond, Senior Resident Inspector, Millstone Unit Nos.1, 2 & 3 1

l.

f l^

il' i

8911210226 891031 A

PDR ADOCK 05000336

// f i

R PNV

//

I \\

jg e

osio nav.s-es,

++

e A

l*

A

l G;[ ?* ? ~

H}

h M,,

OPERATING DATA REPORT is

..t DOCKET NO.

50 336 i.

DATF.

11/07/89 COMPLETED BY J _QJbson.

TELEPHONE (203) 447-1791 EXT.

4431 L

^

^

Notes: Items 21 and 22 l

1.

Unit Name:

Millstone Unit'2 cumulative are wei hted.

b 2.

Reporting Period:

October 1989 averages. Unit operated 3.

' Licensed Thermal Power (MWt):

2700 at 2560 MWTH prior to its 4.

Nameplate Rating (Gross MWe):

909 uprating to the current 5.

Desigr Electrical Rating (Net MWe):

870 2700 MWTH power level.

'6..

Maximum Dependable Capacity (Gross MWe):

891 EE

.7.

Maximum Dependable Capacity (Net MWe):

862.88 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, g

Give Reasons:

N/A 9.

Power Level To Which Restricted, If any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr.-To-Date Cumulative

11. Hours In Reporting Period

_Z41 Q 7296.0 121416.0

12. Number Of Hours Reactor Was Critical 485.3
13. Reactor Reserve Shutdown Hours 0.0 5079.7 894JJ 1 0.0 2205.5

'14. Hours Generator On-Line 482.8 4962.4 85027.8

15. Unit Reserve Shutdown Hours 0.Q 0.0 468.2
16. Gross Thermal Energy Generated (MWH)

_1139086.4 13022162.4 235673442<4

17. Gross Electrical Energy Generated (MWH) 393928.5 4280884.5 71111405.0

~18. Not Electrical Ene gy Generated (MWH) 378049.5 4112065.5 68221212.0

'19. Unit Service Factor 64.8 68 Q_

70.0

20. Unit Availability Factor 64.8 68.0 70.4
21. Unit Capacity Factor (Using MDC Net) 58.8 65.3 66.R
22. Unit Capccity Factor (Using DER Net) 58.3 64.8 65.2
23. Unit Forced Outage Rate

.Q g 0.0 14.1 L24. Shut,4wns Scheduled Over Nent 6 Months (Type, Date, and Duraticn of Each):

Gntrantly shutdown for the Eddy Current examination of Stear Generator tubes.

Anoroximatelv 4-5 weeks.

25. If Unit Shutdown At End Of Report Period, Estimated Date of Startup: Novembev 22. 1989 l
26. Units In Teet Status (Prior to Commercial Operation):

l-For1 cast Achieved

?'

INITIAL CRITICALITY N/A

__N/A INITIAL ELECTRICITY N/A N/A l

COMMERCIAL OPERATION N/A N/A 1

l t

!9 b

l

E I

. p 0 I.'

4_l,

~,

b,.:,.

y

[

AVERAGE DAILY UNIT POWER LEVEL i!,

. DOCKET NO.

50 336 i

UNIT:

Millstone Unit 2

~

o' DATE:

11/07/89 COMPLETED BY A Gibson TELEPHONE:

(2031447-1791 EXT 4431 M0!;TH:

OCTOBER 1989 DAY AVG. DAILY POWER LEVEL DAY AVO. DAILY F01.'ER LEVEL (MWe-Net)

(MWe-Net) 1 790 17 789 2

791 18 789 3

791 19 788

?

4 789 20 774 5

790 21 18 I

6 790 22 0

7 790 23 0

8 7 ';0 24 0

.9 791 25 0

10 791 26 0

11 790 27 0

l 12 791 28 0

i.

13 791 29 0

1 14 790 30 0

g L

15 7 'O 31 0

l l

16 791 l-1 INSTRUCTIONS l'

On this format-list the average daily unit power level in MWe-Net for each L

day in the reporting month.

Compute to the nearest whole inegawatt.

I i

l'

i... -

~

~

?

DOCKET'NO.

50-3k6

~

~ ~

~

f UNIT SHUTDOWNS AND POWER REDUCTIONS.

UNIT.NAME' Millste m 2 DATE' 11/07/89-i,

COMPLFTED BY J. Gibson TELF';tt0NE (203) 447-17911 REPORT MONTH October 1989 EKT.

4431 No.

Date Type Duration Reason Method of License Systgm Component Cause & Corrective l

2 (Hours)

Shutting Event Code Code' Action to 3

Prevent Recurrer ce -

Down Reactor Report #

02 891021 3

262.2 D

1 N/A N/A N/A On Octob r 21, 1989,.

'? nit 2 t annenced a controlled shutdcwn from 92 percent power for the inspection of Steam Generator tubes.

0 3 Method Exhibit G - Instructions 2

1: Forced Reason:

F 1-Manual for Preparation of Data S: Scheduled A-Equipment Failure (Explain)

B-Maintenance or Test 2-Manual Scram Entry Sheets for License 3-Automatic Scram Evenc Report (LER) File C-Refueling 4-Cont.inued from (NUREG-0161)

D-Regulatory Restriction.

Previous month E-Operator Training & License Exanination 5 Exhibit 1 -Same Source 5-Power Reduction F-Administrative G-Operational Error (Explain)

(Duration -0)

H-Other (Explain) 6-Other (Explain)

[h.

' +

e d'

REFUELING INFORMATION REOUEST.

l.-

Name of facility:'

Millstone 2 2.

Scheduled date for next. refueling shutdown:

_ october 1990 3.

Scheduled date for restart following refueling:

N/A 1

4.:

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Not at this time 5.

Scheduled date(s) for submitting licensing action and supporting information:

None i

6.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

Not at this time

7.. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

l In Core:

(a) 112 In Spent Fuel Pool:

(b) 412 8.

The present licensed spent fuel pool storege capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

t Currently 1277 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

1994. Soent Fue:

Pool Full, core off load caDacity is reached (with

-out consolidat:.on).

1998. Core Full. Soent Fuel Pool Full 2p19. Scent Fuel Pool Full. corc off load caDacity is reached-continuent uoon full scale storace of consolidated fuel in the Feent Fuel Pool.

.