ML19327B441: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 14: | Line 14: | ||
| document type = TECHNICAL SPECIFICATIONS, TECHNICAL SPECIFICATIONS & TEST REPORTS | | document type = TECHNICAL SPECIFICATIONS, TECHNICAL SPECIFICATIONS & TEST REPORTS | ||
| page count = 2 | | page count = 2 | ||
| project = | |||
| stage = Other | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:. . . . | {{#Wiki_filter:.... | ||
: /(; ? | A | ||
4' | ,6 v,v~ ~o w | ||
: /(; ? | |||
4' | |||
'.'l -, | |||
i ,, | i | ||
'y 4, | |||
, 3.c i,, | |||
5 | 5 | ||
(. | (. | ||
h.'. | h.'. | ||
J- | J-gI | ||
\\ | |||
' 4 4 | |||
i PROPOSED TECHNICAL SPECIFICATION CHANGE 9 | i PROPOSED TECHNICAL SPECIFICATION CHANGE 9 | ||
1. | 1. | ||
i m;. , | i m;., | ||
?- | ?- | ||
3. | 3. | ||
1. | 1. | ||
2910310205 691019 PDR | 2910310205 691019 PDR ADOCK 05000368 t-P PDC J. | ||
_m t | _m t | ||
i. | n i. | ||
: p., | |||
p.,.- | |||
PLANT SYSTEMS | PLANT SYSTEMS 3/4.7.12 SPENT FUEL POOL STRUCTURAL INTEGRITY | ||
~ | |||
3/4.7.12 SPENT FUEL POOL STRUCTURAL INTEGRITY | LIMITING CONDITION FOR OPERATION c | ||
in accordance with Specification 4.7.12. | 3.7.12'.The structural integrity of the spent fuel pool shall be maintained in accordance with Specification 4.7.12. | ||
APPLICABILITY: Whenever irradiated fuel assemblies are in the spent fuel pool. | APPLICABILITY: Whenever irradiated fuel assemblies are in the spent fuel pool. | ||
ACTION: | ACTION: | ||
: a. . With the structural integrity of the spent fuel pool not conforming to the above requirements, in lieu of any other report, prepare and submit a Special . Report to.the Commission pursuant to Specification 6.9.2 within 30 days of a determination of suen | : a.. | ||
non-conformity, | With the structural integrity of the spent fuel pool not conforming to the above requirements, in lieu of any other report, prepare and submit a Special. Report to.the Commission pursuant to Specification 6.9.2 within 30 days of a determination of suen non-conformity, b. | ||
The provisions of Specification 3.0.3 are not applicable. | |||
SURVEILLANCE REOUIREMENTS l | SURVEILLANCE REOUIREMENTS l | ||
l | l 4.7.12.1 Inspection Frequencies - The structural integrity of the spent I | ||
fuel pool shall be determined per the acceptance criteria of Specificaticn l | |||
4.7.12.2 at the following frequencies: | |||
a. | |||
l should have actuated tne seismic monitoring Instrumentation of | At least'once per 92 days after the pool is filled with water. | ||
4.7.12.2 Acceptance Criteria - The structural integrity of the spent fuel | If no abnormal degradation or other indications of structural distress are detected during five consecutive inspections, the inspection internal may be extended to at least once per 5 years. | ||
j b. | |||
Within 24 hours following any seismic event which actuater o.' | |||
l should have actuated tne seismic monitoring Instrumentation of Specification 3.3.3.3. | |||
i 4.7.12.2 Acceptance Criteria - The structural integrity of the spent fuel i. | |||
pool shall be determined by a visual inspection of at least the interior and l | |||
exterior surfaces of the pool, the struts in the tilt pit, the surfaces of L | |||
the separation walls, and the structural slabs adjoining the pool walls. | |||
This visual inspection shall verify no changes in the concrete crack patterns, no abnormal degradation or other signs of structural distress (i.e, cracks, bulges, out of plumbness, leakage, discolorations, L | |||
efflorescence, etc.). | |||
l l | l l | ||
l l | l l | ||
ARKANSAS - UNIT 2 | ARKANSAS - UNIT 2 3/4 7-38 Amendment No. 91 | ||
...}} | |||
Latest revision as of 07:46, 31 December 2024
| ML19327B441 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 10/19/1989 |
| From: | ARKANSAS POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML19327B440 | List: |
| References | |
| NUDOCS 8910310205 | |
| Download: ML19327B441 (2) | |
Text
....
A
,6 v,v~ ~o w
- /(; ?
4'
'.'l -,
i
'y 4,
, 3.c i,,
5
(.
h.'.
J-gI
\\
' 4 4
i PROPOSED TECHNICAL SPECIFICATION CHANGE 9
1.
i m;.,
?-
3.
1.
2910310205 691019 PDR ADOCK 05000368 t-P PDC J.
_m t
n i.
- p.,
p.,.-
PLANT SYSTEMS 3/4.7.12 SPENT FUEL POOL STRUCTURAL INTEGRITY
~
LIMITING CONDITION FOR OPERATION c
3.7.12'.The structural integrity of the spent fuel pool shall be maintained in accordance with Specification 4.7.12.
APPLICABILITY: Whenever irradiated fuel assemblies are in the spent fuel pool.
ACTION:
- a..
With the structural integrity of the spent fuel pool not conforming to the above requirements, in lieu of any other report, prepare and submit a Special. Report to.the Commission pursuant to Specification 6.9.2 within 30 days of a determination of suen non-conformity, b.
The provisions of Specification 3.0.3 are not applicable.
SURVEILLANCE REOUIREMENTS l
l 4.7.12.1 Inspection Frequencies - The structural integrity of the spent I
fuel pool shall be determined per the acceptance criteria of Specificaticn l
4.7.12.2 at the following frequencies:
a.
At least'once per 92 days after the pool is filled with water.
If no abnormal degradation or other indications of structural distress are detected during five consecutive inspections, the inspection internal may be extended to at least once per 5 years.
j b.
Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following any seismic event which actuater o.'
l should have actuated tne seismic monitoring Instrumentation of Specification 3.3.3.3.
i 4.7.12.2 Acceptance Criteria - The structural integrity of the spent fuel i.
pool shall be determined by a visual inspection of at least the interior and l
exterior surfaces of the pool, the struts in the tilt pit, the surfaces of L
the separation walls, and the structural slabs adjoining the pool walls.
This visual inspection shall verify no changes in the concrete crack patterns, no abnormal degradation or other signs of structural distress (i.e, cracks, bulges, out of plumbness, leakage, discolorations, L
efflorescence, etc.).
l l
l l
ARKANSAS - UNIT 2 3/4 7-38 Amendment No. 91
...