ML19327B973: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = 89-003, 89-3, NUDOCS 8911140288 | | document report number = 89-003, 89-3, NUDOCS 8911140288 | ||
| document type = REPORTABLE OCCURRENCE REPORT (SEE ALSO AO | | document type = REPORTABLE OCCURRENCE REPORT (SEE ALSO AO LER), TEXT-SAFETY REPORT | ||
| page count = 2 | | page count = 2 | ||
}} | }} | ||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:,,. _ - | {{#Wiki_filter:,,. _ - | ||
1 | 1 s. | ||
Alabama Power Company | |||
( ; inverness Center Parkway Post OffSe Box 1295 i | |||
( ; inverness Center Parkway Post OffSe Box 1295 | Birmingham. Atabama 35201 letophone L'05 8%4501 l | ||
W. G. Heireton, lil i | |||
W. G. Heireton, lil | Senior Vice Prenloent Nuclear Oswations g3h3g g,g t% scuttwn thctrc $> stem i | ||
Senior Vice Prenloent Nuclear Oswations | 1 i,' | ||
t% scuttwn thctrc $> stem i | November 1, 1989 i | ||
1 i,' | l Docket No. 50-348 i | ||
l Docket No. 50-348 | |||
U. S. Nuclear Regulatory Commission ATTN Document Control Desk Vashington, D. C. 20555 | U. S. Nuclear Regulatory Commission ATTN Document Control Desk Vashington, D. C. 20555 | ||
! j i | |||
l Joseph H. Farley b'uclear Plant - Unit 1 Special Report No. 89-003, Fire Barrier Penetration Open For More Than Seven Days | l Joseph H. Farley b'uclear Plant - Unit 1 Special Report No. 89-003, Fire Barrier Penetration Open For More Than Seven Days 8 | ||
t l | |||
Gentlemen In accordance with the requirements of Technical Specification 3.7.12, the l | |||
Fi ,I Respectfully submitted, WPd .k | L., | ||
f VGH,III/JARied 10.59 | enclosed Special Report No. 89-003, Unit 1, is submitted. | ||
Fi,I Respectfully submitted, WPd.k r o | |||
I l, | |||
f VGH,III/JARied 10.59 l | |||
Enclosure cc Mr. S. D. Ebneter Mr. E. A. Reeves t | |||
Mr. G. F. Maxvell I | |||
r | |||
$12$$$$$ In '.7 fGO II g 1 | |||
i | i | ||
e.. | e.. | ||
l | l s. | ||
Enclosure l | |||
Special Report No. 89-003, l' nit 1 | Special Report No. 89-003, l' nit 1 | ||
Tire Barrier Penetration | [ | ||
Tire Barrier Penetration j | |||
Open For Here Than Seven ' Jays The containment personnel and equipment hatches vere open for more than seven days during the ninth refueling outage. The hatches vete opened to t | |||
support outage activities. | |||
Technical Specification 3.7.12 requires that, within one hour, either | The seven-day time limit for the personnel and equipment hatches was exceeded on October 13, 1989. | ||
establish a continuous fire watch or verify the operability of fire detectors and establish an hourly fire watch patrol. Technical Specification action statement requirements vere met in that personnel vere present continuously when the hatches were open. Technical Specification | Since the containment vall is considered to be a fire barrier, opening these hatches constitutes breaching a fire barrier. | ||
vere closed on October 14, 1989. | Technical Specification 3.7.12 requires that, within one hour, either establish a continuous fire watch or verify the operability of fire detectors and establish an hourly fire watch patrol. Technical Specification action statement requirements vere met in that personnel vere present continuously when the hatches were open. Technical Specification l | ||
3.7.12 also requires that breached fire barriers be restored to functional i | |||
status within seven days or a Special Report must be submitted Within the following 30 days. | |||
Due to the scope of the work in progress, it was not practical to close these hatches within seven days: therefore, this Special Report is being submitted. | |||
The containment personnel and equipment hatches vere closed on October 14, 1989. | |||
l l | |||
i k | i k | ||
l I | l I | ||
P}} | P | ||
- - - -}} | |||
Latest revision as of 07:28, 31 December 2024
| ML19327B973 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/01/1989 |
| From: | Hairston W ALABAMA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 89-003, 89-3, NUDOCS 8911140288 | |
| Download: ML19327B973 (2) | |
Text
,,. _ -
1 s.
Alabama Power Company
( ; inverness Center Parkway Post OffSe Box 1295 i
Birmingham. Atabama 35201 letophone L'05 8%4501 l
W. G. Heireton, lil i
Senior Vice Prenloent Nuclear Oswations g3h3g g,g t% scuttwn thctrc $> stem i
1 i,'
November 1, 1989 i
l Docket No. 50-348 i
U. S. Nuclear Regulatory Commission ATTN Document Control Desk Vashington, D. C. 20555
! j i
l Joseph H. Farley b'uclear Plant - Unit 1 Special Report No.89-003, Fire Barrier Penetration Open For More Than Seven Days 8
t l
Gentlemen In accordance with the requirements of Technical Specification 3.7.12, the l
L.,
enclosed Special Report No.89-003, Unit 1, is submitted.
Fi,I Respectfully submitted, WPd.k r o
I l,
f VGH,III/JARied 10.59 l
Enclosure cc Mr. S. D. Ebneter Mr. E. A. Reeves t
Mr. G. F. Maxvell I
r
$12$$$$$ In '.7 fGO II g 1
i
e..
l s.
Enclosure l
Special Report No.89-003, l' nit 1
[
Tire Barrier Penetration j
Open For Here Than Seven ' Jays The containment personnel and equipment hatches vere open for more than seven days during the ninth refueling outage. The hatches vete opened to t
support outage activities.
The seven-day time limit for the personnel and equipment hatches was exceeded on October 13, 1989.
Since the containment vall is considered to be a fire barrier, opening these hatches constitutes breaching a fire barrier.
Technical Specification 3.7.12 requires that, within one hour, either establish a continuous fire watch or verify the operability of fire detectors and establish an hourly fire watch patrol. Technical Specification action statement requirements vere met in that personnel vere present continuously when the hatches were open. Technical Specification l
3.7.12 also requires that breached fire barriers be restored to functional i
status within seven days or a Special Report must be submitted Within the following 30 days.
Due to the scope of the work in progress, it was not practical to close these hatches within seven days: therefore, this Special Report is being submitted.
The containment personnel and equipment hatches vere closed on October 14, 1989.
l l
i k
l I
P
- - - -