ML19329E921: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:m -          -      -
{{#Wiki_filter:m -
NONCON FORMANCE . REPC           4 LOG & STATUS BOOK                         '-''"                          '
NONCON FORMANCE. REPC 4 LOG & STATUS BOOK u
u j
/
                    /
Fil # Y-j
                            )                                                   (   ;                                            nEPoHT D ATE Fil # Y-    -
)
                                                                                  ~
(
nEPoHT D ATE
~
PAGE CoMPL.
PAGE CoMPL.
                                                                                                                                    . . ENo. sten
.. ENo. sten
: 1. PROJECT NO       7220
: 1. PROJECT NO 7220 STATUS
                                                ~
~
NCR         ORIG.                                                                                                             STATUS NONCON FORf.1AN CE                         __
NCR ORIG.
PREPARED BY l NO.       DATE                                           DESCRIPTION / REM /.RKS C
NONCON FORf.1AN CE PREPARED BY C
hc:; e 7 xNTE      N         c00 SED           CLOSED BY
l NO.
                                                                                                                                ^
DATE DESCRIPTION / REM /.RKS hc:; e 7 NTE N
352   10-29         R. A. Moray         R-2n$. cirnuit Brnnienrn, unmnpinton; anmngna,               Ficid
c00 SED x
CLOSED BY 352 10-29 R. A. Moray R-2n$. cirnuit Brnnienrn, unmnpinton; anmngna, Ficid
^
_7
_7
              -75                               Identificatinn                               3 101     10-39-75       .
-75 Identificatinn 3 101 10-39-75 l
l 353 11-4           H. D. Foster         _C-111. Denp impnvenntinnn nntna nn n 111 11:               Field     No       11-5       11-18       H.D. Foster
353 11-4 H. D. Foster
              -75                             during coating work                           1.109 1 1-h-75                   -75           -75 354     11-5     C. F. Clark             0-111. Dome liner plate broken. c-111-15                 Field       No     11-6                                           i
_C-111. Denp impnvenntinnn nntna nn n 111 11:
                -75                     e                                                      1.109 1 1-5-75                   -75 m                                                                                     1-23 1-26                L. R. Albert 355   11-10     D. L. osborn 9        C-230. Flyash below weight on one ticket, pour Fiold                 12--8
Field No 11-5 11-18 H.D. Foster
              -75                     m      a(614)b                                           1.205 "- 0-75         -75         76 356   11-14       L.R. Albert         C-230. Air content. Pours AIG9911' & A(487)b' T'l ald-
-75 during coating work 1.109 1 1-h-75
                                                                            ~
-75
12-8           -76
-75 354 11-5 C. F. Clark 0-111. Dome liner plate broken. c-111-15 Field No 11-6 i
                                                                                                                                            ~
-75 1.109 1 1-5-75
                                                                                                                                                          '  *^
-75 e
              -75~                     Q                                                     '1.205     44--+h-7!G -75 357   11-17         R.A. Moray N       P-1-193. M-92 Mntnrn hnntarn dinnnnnontna                 Pield       No     12-8
m 355 11-10 D. L. osborn C-230. Flyash below weight on one ticket, pour Fiold 12--8 1-23 1-26 L. R. Albert 9
                -75                 vy                                                       4.001 ; 4175                     -75 358   11-17       H. Boleen           4-117. vn1vn 'Paccing requiro n. nt" viole ted             Field     No       11-25
-75 a(614)b 1.205 "- 0-75
              -75                                                                     ASME           /if/ /$                 -75 1-23         1-26       L. R. Albert 359   11-2h       E. Dutton           %230. Air content hi% Pour 81(fi14)n                       hld       12                                                                                                                                   -76           -7f
-75
                -75                                                                         1.205   -u-26-75           -75                                                 ,
-76
                                                                                                                                -3         1-26 L. R. Albert 360   11-25         R. Bennett         1-231. Curin.- temnerature below 600         3 hrs.       Pi ol a 12-8
-76 m
              -75                           Pour #A(619)a                                 1.205                             -76            -76 1
*^
4 25 75       -75
356 11-14 L.R. Albert C-230. Air content. Pours AIG9911' & A(487)b' T'l ald-12-8
                                                                                                                            .m 1-27 361   11-26       D.C. Thompson       2-} 32. cnnanit npnning. Any B1dg Slnh Puni Pnni F* eld             12-12     1-30'f
-76
              -75                           _ lab                                           3 006     22 2 -75       76 362   12-1         D.C. Thompson       3-h2. Conduit size reduced. Aux Blde slab.             -Eicid-         12-5
~
              -75                                         '
-75~
3 006     t2-2-75         -75 puow;        ei ns        L t<'
Q
12-1                                                                                                                           12_18-75.g. 2R.        7  Albert 363                L.R. Albert           c-230 Pailinc vntne unnv test.                           Wlt       12-1-75 12-16
'1.205 44--+h-7!G -75
                -75_                                                                   1.105,1.205     m
~
* 75                     -75
357 11-17 R.A. Moray N P-1-193. M-92 Mntnrn hnntarn dinnnnnontna Pield No 12-8
  .o.103 09/74 OC                                                                                                                                   11. #A           QC C31 p
-75 vy 4.001 ; 4175
        .           F. -         .      .                    .
-75 358 11-17 H. Boleen 4-117. vn1vn 'Paccing requiro n. nt" viole ted Field No 11-25
                                                                              '. A                                                                            b
-75 ASME
/if/ /$
-75 1-23 1-26 L. R. Albert 359 11-2h E. Dutton
%230. Air content hi% Pour 81(fi14)n hld 12 -76
-7f
-75 1.205
-u-26-75
-75
-3 360 11-25 R. Bennett 1-231. Curin.- temnerature below 600 3 hrs.
Pi ol a 12-8 1-26 L. R. Albert
-76
-75 Pour #A(619)a 1.205 1
4 25 75
-75
-76
.m 1-27 361 11-26 D.C. Thompson 2-} 32. cnnanit npnning. Any B1dg Slnh Puni Pnni F* eld 12-12 1-30'f
-75
_ lab 3 006 22 2 -75 76 362 12-1 D.C. Thompson 3-h2. Conduit size reduced. Aux Blde slab.
-Eicid-12-5
-75 3 006 t2-2-75
-75 363 12-1 L.R. Albert c-230 Pailinc vntne unnv test.
Wlt 12-1-75 12-16 12_18-75.g. 2 7 puow; ei ns L
t<'
R. Albert
-75_
1.105,1.205 m
* 75
-75
.o.103 09/74 OC
: 11. #A QC C31 p
'. A b
F. -


N                             NONCON FORMANCE - REP             OG & STATUS BOOK                     12 dl                  ,
N NONCON FORMANCE - REP OG & STATUS BOOK 12 N'
REPORT DATE    N'             I* *I<
I*
PAGE COMPL.
*I<
dl REPORT DATE PAGE COMPL.
l
l
(                                   1. PROJECT NO.                   7')20
(
                                                                                                                                                                              ~
: 1. PROJECT NO.
NCR         ORIG.
7')20
STAWS NONCONFORMANCE DATE        PREPARED BY l NO.                                                             DESCRIPTION / REMARKS                 6' ROUTE X T                     CLOSED         CLOSED BY 1                                                                                                                                                                     #
~
3 614     12-1-4    D.L. Osborn           C-208. Concrete cylinder curiIg. Pour A(61 hlb                   FieM     12           76
STAWS NCR ORIG.
                                                                                                                                            ~         *
NONCONFORMANCE PREPARED BY l NO.
* 75                                                                                 1.205     +3-k45       75                   -76 365       12     u. Shawl             C-38.       Aux. Bldg. columns cut short.                       FieM     12       1     1-19     A. L. Boulden 75                                                                                 1.201     43-845       75 76       -76 l                                                                                                                                 1-23     1-26   L* R* Albert [
DATE DESCRIPTION / REMARKS 6' ROUTE X T CLOSED CLOSED BY 1 #
166 3          12 R. Bennett               0.2'41. Curing Temperature. A(j90)n' & 1.105. & FieM                       12         ,74     -76 l           75                                                                   cc'635)b'   1.205     12 " 70 75
3 614 12 D.L. Osborn C-208. Concrete cylinder curiIg. Pour A(61 hlb FieM 12 76
                                                                                                                    .<:: 1 367       12 H. Boleen               b10hA. Da2naged pipe spool u 3on receipt.                     -FieM- -lw i s - ( G1 16
~
                                                                                                                                    -76 75                                                                     A5iE 4 10h         -
4 75 1.205
G.16-79 ''//s 368       1     E. Dutton             C-2'11. Curine temperature. Poor A(626.25)n'                   m ld-- 1-9-76 76                                                                               1.205     T-t-46 =
+3-k45 75
369       l-13     L. R. Albert         C-230. Fly A sh finene n n nnt-pa'- ^ RT M                 -
-76 365 12 u. Shawl C-38.
Rield       1-15
Aux. Bldg. columns cut short.
            -76                             C-618-72.                                   1.105,1.205       7 6       -76 370     1-19     E. Dutton             C 230. Slumn hirrh. Pnur A(5 99)1'                           M54d=
FieM 12 1 1-19 A. L. Boulden 75 1.201 43-845 75 76
                                                                    ^    ~~
-76 l
1.205       4:20:76           -76
1-23 1-26 L* R* Albert [
            -76 L-Li 371     1-20     T. Lieb               C-231. Field evlinder curint temp e ratu re,               jfffff6-       -76                                                 .
166 12 R. Bennett 0.2'41. Curing Temperature. A(j90)n' & 1.105. &
            -76                             pour A(614)h                                   1.205 L72       1-27     G. E. Depew           C-50A. Liner Plate slab numbers not match-                     Field
FieM 12,74
            -76           .              ing.                                             1.109   l- 28-76
-76 3
,73 IQ9     T. R. Lieb       C-208. Concrete cylinder curing. pour                             Field A(614)1                                           1.205     1-2 L74 1-29   E. Dutton             C-230.         Concrete slump test frequencv. pour             Field
l 75 cc'635)b' 1.205 12 " 70 75
              -76                         A (6 3 3. 2 5)a'                                   1.205       2-2-76 D-103 09/74 OC                                                                     ,g                                                           11. PAf* 3       GC-G31
.<:: 1 367 12 H. Boleen b10hA. Da2naged pipe spool u 3on receipt.
                \>                                                                 '1
-FieM- -lw i s - ( G1 16
                                                                                    .                                                                    s a
-76 75 A5iE 4 10h
- G.16-79 ''//s 368 1 E. Dutton C-2'11. Curine temperature. Poor A(626.25)n' m ld-- 1-9-76 76 1.205 T-t-46 =
369 l-13 L. R. Albert C-230. Fly A sh finene n n nnt-pa'- ^ RT M
- Rield 1-15
-76 C-618-72.
1.105,1.205 7 6
-76 370 1-19 E. Dutton C 230. Slumn hirrh. Pnur A(5 99)1' M54d=
-76 1.205 4:20:76
-76
^
~~
L-Li 371 1-20 T. Lieb C-231. Field evlinder curint temp e ratu re, jfffff6-
-76
-76 pour A(614)h 1.205 L72 1-27 G. E. Depew C-50A. Liner Plate slab numbers not match-Field
-76 ing.
1.109 l-28-76
,73 IQ9 T. R. Lieb C-208. Concrete cylinder curing. pour Field A(614)1 1.205 1-2-76 1-29 E. Dutton C-230.
L74 Concrete slump test frequencv. pour Field
-76 A (6 3 3. 2 5)a' 1.205 2-2-76 D-103 09/74 OC
,g
: 11. PAf* 3 GC-G31
\\>
'1 s a


                                                                                                              ~
~
            '' $                                                      NONCONFORMANCtf REPORP''s                 '
#^"'
L _._ _ .. ___ /'                       ._ _ __. I       or
NONCONFORMANCtf REPORP''s L _._ _.. ___ /'
                                                                                                                                                                                #^"'
._ _ __. I or 1
1 3b.
3b.
: 3. 0 " ^ --     ""'"'''D.                   s EG V. F. P4 oJ JC r N *.J.                           d  II.      '
3 d
                                                                                                                                            /                3 3        35. 06brosaraoM C%NCUN8 tele -
II.
Spec. C-230                             I5          7220                                                                               ,!p          7f  ' ~- -              -    ~-        --        --
/
                . irem DesC .r 1.oM i
3
                                                                    .. ircu oCar. "                   pour # A[ G )_
: 35. 06brosaraoM C%NCUN8 tele -
a Mc D = v            ~ ~ ' da 6                        p 4                M" " l
i
                                                                                                                                                                                - Sb[Indd Concrete                                         A..un_J31dgmSlab_.Egur                 S-4                     b gtaCrucNr eaar H i           7d                                        /O[3
,!p 7f ' ~- -
              .. .a       ac Muu.cn                                   sr anrue srsrc= No.                              .                                          j acV.          .
p 4 M" " l
g-N/A                                                   N/A                                                       N/A                             I           -m               ...                    ....
: 3. 0 " ^ --
              .. eunCNass onDen No.                                 ... oC r a tp .Nse CrioN reaN No.                   i . =c es.a Cr u s Nr se n sai''No.                         ]                               /. 26 7[.,
""'"'''D.
C-708--1=l? ?                                             N/A
s EG V.
__N /JL
F. P4 oJ JC r N *.J.
              .. CoNr n aCr o nia.oCarioH                                                       .. ue O vr5             ''*ouacs                                               ..,,,,,,,,,,,,,,,,,_                  ".'.".
Spec. C-230 I 5 7220 Mc D = v
__Chamnion             ln.c.._ Midland._Mtchinon                                         .'== 0 Lao                  rwhrolu;
~ ~ ' da 6
                ... nou r.No NsrauCr oNs, g=our c ro ,.ctD           No.N er n.N.               O nourc to marca.            ractor_
~-
usuran   m on 9 9. NONCoNFoRM8NG CoND$ r foNs Section 9.2.1 of Spec. C-230 Rev,. 5 requires that all concrete materials be menured in ac. card-ance with ASTM C-94-72 states in part that powdered .idmixtures weinhina accuracy shall be witlLi p + 3 percent of                                                                                              ,
pour # A[ G )_
I the design weight.                   Contrary to the above Batch Tickist No. 06594 representing concrete placed in Pour No. A(614 on 10/30/75 shows the f1vash content to be 3 lbs. be:.ow the minimum allowable weight of 310 lbs. Nonconformance noted during QC review of Batch Tickets.                                     "Q" No. is 7 DOLUM 1.206.
a
One tag applied.                                                                                                                                                                 ' ' - ;e . ,
. irem DesC.r 1.oM
: 30.                                                 F4 ELD RECoMMENDArgoN/RourE ro PReBJECr ENGINEERING                                                       2 9. F8ELo Dt.PostreoM #c EsuLrst O FIELD De PostreoM
.. ircu oCar. "
                -Recommend acceptance on the basis that a reduction of 3 lbs. of flyash below the minimum should not significantly affect the required strength of the concrete.                                                                       For                                           -
b 7d - Sb[Indd
project engineerinn's evaluation the average of 5 sets of 28 day cylinder breaks was 4420 psi. the lowest avercne _of one set of two cylind er breaks was 4045 psi. Re-quired fc' is 4000 psi,                           h jdan.osd     -
/O[3 Concrete A..un_J31dgmSlab_.Egur S-4 gtaCrucNr eaar H j acV.
                                                                                                                  /2 cP- 7[f)/     -
g-i
...a ac Muu.cn sr anrue srsrc= No.
N/A N/A N/A I
-m
.. eunCNass onDen No.
... oC r a tp.Nse CrioN reaN No.
i. =c es.a Cr u s Nr se n sai''No.
]
/. 26 7[.,
__N /JL C-708--1=l? ?
N/A
.. CoNr n aCr o nia.oCarioH
.. ue O vr5
''*ouacs 0 Lao rwhrolu;
__Chamnion ln.c.._ Midland._Mtchinon O nourc to marca. ractor_
. ' = =
g=our c ro,.ctD No.N er n.N.
usuran m on
... nou r.No NsrauCr oNs, 9 9. NONCoNFoRM8NG CoND$ r foNs Section 9.2.1 of Spec. C-230 Rev,. 5 requires that all concrete materials be menured in ac. card-shall be witlL p + 3 percent of i
ance with ASTM C-94-72 states in part that powdered.idmixtures weinhina accuracy I
the design weight.
Contrary to the above Batch Tickist No. 06594 representing concrete placed in Pour No. A(614 on 10/30/75 shows the f1vash content to be 3 lbs. be:.ow the minimum allowable weight of 310 lbs.
Nonconformance noted during QC review of Batch Tickets.
"Q" No. is 7 DOLUM 1.206.
One tag applied.
' ' - ;e.,
30.
O FIELD De PostreoM F4 ELD RECoMMENDArgoN/RourE ro PReBJECr ENGINEERING 2 9. F8ELo Dt.PostreoM #c EsuLrst
-Recommend acceptance on the basis that a reduction of 3 lbs. of flyash below the minimum should not significantly affect the required strength of the concrete.
For project engineerinn's evaluation the average of 5 sets of 28 day cylinder breaks was 4420 psi. the lowest avercne _of one set of two cylind er breaks was 4045 psi.
Re-quired fc' is 4000 psi, h jdan.osd
/2 cP-7[f)/
2 3. cNo.NacN.NG o.srosir.oM na suurs,
2 3. cNo.NacN.NG o.srosir.oM na suurs,
                  . .N o.N e s N No D.5,o s.r .oM For pour A(614)b a C-1 mir.'containing 3 lb less than the required amount of flyash
..N o.N e s N No D.5,o s.r.oM For pour A(614)b a C-1 mir.'containing 3 lb less than the required amount of flyash for a 4 c.y. batch will have an insignificant impact upon affected properties.
          -      for a 4 c.y. batch will have an insignificant impact upon affected properties.                                                                                                                                     1 Based on the 28 day cylinder breaks                                     as shown -above, Engineering concurs with
1 Based on the 28 day cylinder breaks as shown -above, Engineering concurs with NJhM/[M HU&a/Jn Unh
                                                                                                            ,il    f :..Aj M ) [
,i f :..Aj M ) [
Field recommendation to "use'as is."                                                                                                             ,    _
l Field recommendation to "use'as is."
NJhM/[M      U                 HU&a/Jn Unh 2.. R EJECTED mat EHI AL'd.sPo.IreoM                 Q.. w.=,eOwreba.         gy gg g                                 -
U 2.. R EJECTED mat EHI AL'd.sPo.IreoM Q.. w.=,eOwreba.
a4. es OEstGN CH ANGc HEQueNED             o                                                                                       o.a...                       y' }g]g7                          j          (,
gy y' }g]g7 j
O ves. sac avv4CNro,                .,_..,
(,
                                                                                                                                                                              ,,- ag. ,                               s, DR AW6MG                         REV.               DCN
gg g a4. es OEstGN CH ANGc HEQueNED o
                                                                                                                                                                              .w3.......     .... ..                  ..,,
o.a...
REV-               ADD.
O ves. sac avv4CNro,
SPEC.                                                                                              "
,,- ag.,
White Copy        - Originator                                        GC-G3 a 8 e. . .-8 Cenery Copy       - Field Engineer Pink Copy         - POAE Goldenrod Copy - OC
s, DR AW6MG REV.
DCN
.w3.......
SPEC.
REV-ADD.
GC-G3 a 8 e...-8 White Copy
- Originator Cenery Copy
- Field Engineer j
Pink Copy
- POAE Goldenrod Copy - OC


                                                                                                                                                                                '#^"''                                      '~'
'~'
NONCONFORMANCE REPOR n       __1                         '''356                          .
'''356
IJ ** # '-G -   -,-1 ~JJ.                         I Ol V.       T.PhOJECTNO.                                         3 2. N E POR T E D EV                   DATE           2s. D airusIT a ".N CO NCu,.H L re Spgc. 7220-C-230                                !5            _
'#^"''
07220                                                      m (bM                        !'////y'n                            "'"f''; ""'~ lK
NONCONFORMANCE REPOR n
                                                                .S. 0T E M LOC A TeO                {                  A        a.rD AT E D                  I DdTE Q )tj Mev cf, l///cy/g ,""*"                                           W L..r..
__1 Spgc. 7220-C-230
: 2. gT EM DEsCRarf SON                 ,                                                y Concrete                                                     Pour No. A(
!5 07220 m (bM
                                                                  ...raaTue sysTE u N O.
!'////y'n IJ ** # '-G -
J         A(587)b' N .       i ' E V.
-,-1
                                                                                                                                                                                    ,. u . . u .
~JJ.
u./ - /. 2 34):,
I Ol V.
  .. sE =.a c Nuu.E n                                                                                                   g, . n E rt.C Eu EN T ,..
T.PhOJECTNO.
A
3 2. N E POR T E D EV DATE 2s. D airusIT a ".N CO NCu,.H L re
  .til,unC,.asEO.oEnNO.                                                 NLA                                                       N/A                                             [.                         7d                         ~7h ^'
"'"f''; ""'~ lK
                                                                  . .. O C r.E oD .N s,E C T.ON et. N NO.               . .. .E rt.CE M E N T sE n ,. u MG.
,""*" W L..r..
                                                                                                                                                                                  ~
- /. 2 34):,
: f. 2 2 -74 Rev. O                     N/A                                                       I"''"*"'"'                         -          ""
I DdTE y
N/A                                                                  C-231-3-665
{
  .. CON r a a C7OnicOCa T.ON                                                                   ... ME   [j 4 Es      .,.sOunCE
A a.rD AT E D
                                                                                                    ''E-    G__, O               subsontractor
: 2. gT EM DEsCRarf SON
  .C.hamnimIncE t . ROUTING SNsTRUCTIONs;_His11and 111chinan                HOUT E TO     FIELD ENGIN EE RING                   O aouTE To aATEa         A' s u rE a v iso a 8 9. HONCONFO R M4NG CONOeTIO N :
.S. 0T E M LOC A TeO Concrete Pour No. A(
Spec. 7220-C-230 Rev. 5 Section 9.1.5 requires that amount of entrained air in the concrete shall be not less than three percent and not more thaa six percent of the total volume at the point of placement.
J A(587)b' Q )tj Mev cf, l///cy/g u./
N.
i ' E V.
~7h ^'
g,. n E rt.C Eu EN T,..
,. u.. u.
.. sE =.a c Nuu.E n
...raaTue sysTE u N O.
.til,unC,.asEO.oEnNO.
NLA N/A
[.
7d A
: f. 2 2 -74
... O C r.E oD.N s,E C T.ON et. N NO.
....E rt.CE M E N T sE n,. u MG.
N/A C-231-3-665 Rev. O N/A
~
I"''"*"'"'
[j 4 Es
.,.sOunCE
.. CON r a a C7OnicOCa T.ON ME G__, O subsontractor
.C.hamnimIncE _His11and 111chinan
''E-t. ROUTING SNsTRUCTIONs; HOUT E TO FIELD ENGIN EE RING O aouTE To aATEa A' s u rE a v iso a 8 9. HONCONFO R M4NG CONOeTIO N :Spec. 7220-C-230 Rev. 5 Section 9.1.5 requires that amount of entrained air in the concrete shall be not less than three percent and not more thaa six percent of the total volume at the point of placement.
Contrary tc, the above Batch Ticket No's. 06651, 06655 and 06656 had a measured air content of 2.0%, 2.7% and 2.; [
Contrary tc, the above Batch Ticket No's. 06651, 06655 and 06656 had a measured air content of 2.0%, 2.7% and 2.; [
  .refinectlyely at_ the nd of the numpline in Aux. Bldg.__ Wall Placements A(599)J' and A(587)b' placed on 11/12/75.
.refinectlyely at_ the nd of the numpline in Aux. Bldg.__ Wall Placements A(599)J' and A(587)b' placed on 11/12/75.
  "n" u n ,- Mo. 1 ?ns. Monconformance noted_during routLne_QC_ Testing _of_. concrete-                                                                                     Z hI' Y :                                   -
"n" u n,- Mo. 1 ?ns.
                                                                                                                                                                                                                                -8 r M eu r n 2 8. FlELE' 90sPO.BTeON RESULT 54
Monconformance noted_during routLne_QC_ Testing _of_. concrete-Z hI' Y :
: 20. O FIE LD DisPosBTION                             QFaELD RECOMMENDATsON/ ROUTE TO PR 3 AECT ENGSNEENtNG Field recommends acceptance on the basis that these r.re interior walls, below grade,
-8 r M u r n e
_and will_not be sublect to a freezing - thawing cycle. Results of 7 day cylinder breaks were 4245, 4365, and 3390 psi. Required 90 day strength is 5000 psi.
2 8. FlELE' 90sPO.BTeON RESULT 54 20.
w&rg)                         /z -J ~7)f
O FIE LD DisPosBTION QFaELD RECOMMENDATsON/ ROUTE TO PR 3 AECT ENGSNEENtNG Field recommends acceptance on the basis that these r.re interior walls, below grade,
: 72. E NG.N E E..NG Dis,Os.v ON                                                                                                                                               2 3. E NG.,c_ ;.           .NG o.s,0s.T.ON n E so uT.,
_and will_not be sublect to a freezing - thawing cycle.
Project Engineering concurs with the Field recommendation that low air content is                                                                                                                                                                 _
Results of 7 day cylinder breaks were 4245, 4365, and 3390 psi.
acceptable for the subject pour because:                                                                                                                                                                                                            :
Required 90 day strength is 5000 psi.
: 1) These are interior walls not subject to freeze-thaw cycles, and
w&rg)
: 2)       . Low air content will not' reduce strength._ Engineering concurs /}) 9,[                                                                                 ,
/z -J ~7)f
with Field recommendation to "use as is "Qf6,Q)-f) , f                                                                   . u, [[// d,fg4M^.' f///e                                                                           ,
: 72. E NG.N E E..NG Dis,Os.v ON 2 3. E NG.,c_ ;.
24.15 DESIGN CH ANGE HFOutHED         NO
.NG o.s,0s.T.ON n E so uT.,
                                                                                              ~
Project Engineering concurs with the Field recommendation that low air content is i
O vEs. sEE aTTaC ED.                               . . . . .                                                                                          m-~                                   j ,,
acceptable for the subject pour because:
D     -O                     -E-                               oc~
: 1) These are interior walls not subject to freeze-thaw cycles, and 1
SPEC.                       REV.                           . ADO.
2)
                                                                                                                  ~
. Low air content will not' reduce strength._ Engineering concurs /}) 9,[
s oe s s-a                                                                                                                                           White copy       - Orig nator                                                         Es C G 8 2 Canary Copy       - Field Engineer Pink Copy         - POAE Goldenrod Copy - OC
with Field recommendation to "use as is "Qf6,Q)-f), f u, ((// d,fg4M^.' f///e 24.15 DESIGN CH ANGE HFOutHED NO
* e
~
O vEs. sEE aTTaC ED.
m-~
j,,
D
-O
-E-oc~
SPEC.
REV.
. ADO.
~
s oe s s-a White copy
- Orig nator Es C G 8 2 Canary Copy
- Field Engineer Pink Copy
- POAE Goldenrod Copy - OC e


                                                                                                                                                                                                                                  -a.
-a.
NONCONFORMANCE REPORT 1_         "' "'y ^       *
NONCONFORMANCE REPORT 1_ "' "'y ^
71 D r.'& WING /P ALT NO.
3 GM V.
T. PR OJECT N i),
t2 64 E PO LT IV CA
: 25. DISPOSITION ChNCURRCHC1
: 25. DISPOSITION ChNCURRCHC1
                                                                                                              ~
~
71 D r.'& WING /P ALT NO.                  3 GM V. T. PR OJECT N i),                                      t2 64 E PO LT    IV                  I CA
I
                                                                                                                                                                                                    ~~ ~
!5 01220
Spec.__1220-c-210                          !5             01220                                     __ O/wr$                                     3 DATE f/74     " ~ * "
__ O/wr$
[ *~" ',,'             N ""
f/74
                                                                                                                                ~ L gQ*-[ [(/ !//-2f6 _*..asesdeE                  M brbu
[ *~" ',,'
  . . 3. eTEM DEsCR 8PTION                  . , , ,        S. S TEM LOC AT8ON                             .              a.n4TEDSV Concrete                                          Pour #A(619)a Aux. Bldg.
N ""
o.mo ~. ee
" ~ * "
                                                                                                                                                                                                                  / .1.3 [//d D.Te
~~ ~
: 9. ST ARTuP SYSTE M NO.                               A #dPL ACE MEN T PAR T                     ' R E V.
Spec.__1220-c-210 3 DATE Concrete Pour #A(619)a Aux. Bldg.
ed. SE RI AL NUMBER                                                                                                                          ,
~ L gQ*-[ [(/ !//-2f6 _ M brbu
l m g g...i                 g pg             1. f t,- 7(,
/.1.3 //d S. S TEM LOC AT8ON a.n4TEDSV
d/A                                            (-          UlA                             I                       .        .
.. 3. eTEM DEsCR 8PTION
        .N/A                                               . .. O C r.E Lo .N s,E C T.O N ,L A N O.        _ ,' .. R E Pi. A C E M E N T sE R. A L N O.                                                              f.- 2 6 -7/.
~.
: e. PuRCN AsE ORoER NO.                                                                                                                                                                                         ~'=
D.Te
C-231-3-652.               Rev. O                               N/A                                           ~ "" '
[
ed. SE RI AL NUMBER
: 9. ST ARTuP SYSTE M NO.
A #dPL ACE MEN T PAR T
' R E V.
*..asesdeE o.mo ee
(-
m g g...i g pg l
: 1. f t,- 7(,
UlA I
.N/A d/A f.- 6 -7/.
2
_,'.. R E Pi. A C E M E N T sE R. A L N O.
: e. PuRCN AsE ORoER NO.
... O C r.E Lo.N s,E C T.O N,L A N O.
~ "" '
* a '- a -* *- # -
* a '- a -* *- # -
N/A                                                                                               -
N/A
mCONTRAmOR,OCAT.oM
~'=
                                                                                        ...AsM;,
N/A C-231-3-652.
a os           n.     oRCE                                            ,,,,,,,,,,,,,,,,,,,                  . ,,,,
Rev. O n.
        .Chaminion_Inc.             . MidlanL_llithiann                                   ITEM    UI NO                  Subcontra.ctor 0 8. ROUT SNG SNsT RUCT BONO                     f.OUTE TO F8 ELD ENGINEERING                   ] RO* ATE TO M AT ental suPERwasOR 8 9. NONCONFORMING CONOGTIOMs Snec. C-230 B_ev. 5 Ssction 9.1.5 states in_part. "That the amount of entrained air in the concrete shall not be less than three percent and not mare than six percent of the total volume at point of place-5 ment". Contrary to the above Batch Ticket No. 06686 ha-1 a measured air content of 6.2% at the end of the pump-line in Aux. Bldg. Slab Pour A(619)a on 11/20/75. Six compressive strength cylinder's made (Set #673), ("Q" No.
oRCE
is 1.205.           Nonconformance noted during routing QC Testiag of concrete.
...AsM; a os mCONTRAmOR,OCAT.oM ITEM UI NO Subcontra.ctor
          ' Pun t n cm n nnl i ed .                                                                                                                                       an. r ELo oisPOs TION aEsuLTsi so-    O Pii'a onskosiviON                     GriE'o aECOMMENoaTiON/Rouv E TO rescas CT ENoiHEER No Field recommends acceptance on the basis that an increase of 0.2% over the upper limit will not significantly affect the strength and di.rability of the concrete.
.Chaminion_Inc.. MidlanL_llithiann 0 8. ROUT SNG SNsT RUCT BONO f.OUTE TO F8 ELD ENGINEERING
_The_Iesults_of_two 7 day cylinder breaks were 3850 and 3880 psi.                                                           This is an average of 77% of the required 90 day strength of 5000 psi.
] RO* ATE TO M AT ental suPERwasOR Snec. C-230 B_ev. 5 Ssction 9.1.5 states in_part. "That the amount of entrained air in the 8 9. NONCONFORMING CONOGTIOMs concrete shall not be less than three percent and not mare than six percent of the total volume at point of place-5 ment".
We a n. E gN E E a.M. o.sros.T.O N
Contrary to the above Batch Ticket No. 06686 ha-1 a measured air content of 6.2% at the end of the pump-line in Aux. Bldg. Slab Pour A(619)a on 11/20/75.
                                                                /L-8 70F                                                                                                   =>.ENo. EER.No           ..,0s T,0N REsuLTs, Iliph air content tends to reduce strength while increasing durability of the concret(                                                                         .
Six compressive strength cylinder's made (Set #673), ("Q" No.
i 28 day cylinder breaks rec.eived on 1-7-76 give an average strength of 5605 psi.                                                                               _
is 1.205.
          . Engineering concurs with Field recommendation to "use as is" because the subject con; crete with an air conter c of 6.2% meets: speci$1catidn strength requirements.
Nonconformance noted during routing QC Testiag of concrete.
c .' /. WDI-s . 1G l1[. Ab g.gs-w $ N & J)-ls, W $ /O-O ]las waa's*=**6*a=
' Pun t n cm n nnl i ed.
: 36. R EJECTro M ATE RI AL DisPostT40N as as oEssoN CHff6GE REQuaHED
an. r ELo oisPOs TION aEsuLTsi O Pii'a onskosiviON GriE'o aECOMMENoaTiON/Rouv E TO rescas CT ENoiHEER No so-Field recommends acceptance on the basis that an increase of 0.2% over the upper limit will not significantly affect the strength and di.rability of the concrete.
_The_Iesults_of_two 7 day cylinder breaks were 3850 and 3880 psi.
This is an average of 77% of the required 90 day strength of 5000 psi.
We
/L-8 70F
=>.ENo.
EER.No
..,0s T,0N REsuLTs, a n. E gN E E a.M. o.sros.T.O N Iliph air content tends to reduce strength while increasing durability of the concret(
28 day cylinder breaks rec.eived on 1-7-76 give an average strength of 5605 psi.
i
. Engineering concurs with Field recommendation to "use as is" because the subject con; crete with an air conter c of 6.2% meets: speci$1catidn strength requirements.
c.' /. WDI-s. 1G l1[. Ab g.gs-w $ N & J)-ls, W $ /O- ]l a, N, : J E7)"5 k-a/
/,/zc,,/74
: 36. R EJECTro M ATE RI AL DisPostT40N O as waa's*=**6*a=
as as oEssoN CHff6GE REQuaHED
* A"*
* A"*
o u s.5 - .TTAC .Eo, a.....                    a, N, : J E7)"5 k-a/ /,/zc,,/74 OR AwsNG                   REV                   DCN SPEC                       E V.                 ADO.
a.....
White Copy       - Originator                                               GC4 3-2 seess a                                                                                         .
o u s.5 -.TTAC.Eo, OR AwsNG REV DCN SPEC E V.
Canary Copy       - Field Engineer Pink Copy         - PoAE Goldenrod Copy - OC
ADO.
GC4 3-2 White Copy
- Originator seess a Canary Copy
- Field Engineer Pink Copy
- PoAE Goldenrod Copy - OC


F                                                                                                                                                             '#^""'                         ""
F
G
'#^""'
: 2. ha.~. W4NG/P ART H A                   e .' M V.
G NONCONFORMANCE REPOT
NONCONFORMANCE REPOT
\\
t
: 2. ha.~. W4NG/P ART H A e ' M V.
: 7. PAoJE r.T No.
: 7. PAoJE r.T No.
                                                                                                        \
I2
I2      'PCMTCo av                       'CATE
'PCMTCo av
                                                                                                                                                                          *'          t
'CATE
: 25. os5PosaisoM CoNCU fA E S            7770-C-7 31                  !A               n7770                                I       , fATEo n,_Mt@f i                                  W6               *"
: 25. os5PosaisoM CoNCU fA E
                                                                                                                                                                                        ," * '"]
!A I
                                                                                                                                                                                                      ~~~
W6
Y/267f ,""f(8 /k/
," * '"]
      . 3. Ne-M oEscaerTioN                                   e. sT EM ooc ATtoM                               s.                           j         oATE Concrete Slab                                         Pour # A(619)a                                     l' y            (,(4
: 3. Ne-
: o.                                                    s.
, fATEo n,_Mt@f
__ , _    / . 2-3.q
,""f(8 /k/
                                                                                                                                                                                                                        . e ,a
/. 2-3.q
: 4. 5E NI A L HUMBE R                                 9. ST ART UP SYST EM No.                             $PL ACEMEr4T PAR
~~~
                                                                                                                                                                                                *=6*=
n7770 i
                                                                                                                                                                                                          - A"d    I /~/I[~ M, N/A                                                          N/A                                              N/A                                lRE      V.* * ** 8 C ' F.~'M* * *
S 7770-C-7 31 M oEscaerTioN
: n. euncN AsE onoE n No.                               s e. oc r.Eto .NsPEcTioN co AN No.           '". .. = E et A c c M E N T s E N. A t No.                                                               / ~2.2. - 7d N/A                                                         C-231-4-653                                       N/A
: e. sT EM ooc ATtoM s.
        .. co N T n A cTo nfooc A f ion                                               si.AsME   O vr5       'r5ovact                                                   ... ..,w ,,, m ,..                             ....
j oATE y
11 / 3
(,(4 Y/267f Concrete Slab Pour # A(619)a l'
                                                                                          ""M
N/A N/A N/A l R E V.* * ** 8 C ' F 'M* * *
                                                                                                @ No                  Can.strurJ.ipn t o. Rout ONG ONSTRUCTioNSs                         440UT E To F#E Lo ENGiNEEMtNG             Q route To M ATENG AL SUPENvison 9 9. NONCONFORMING CoNolTeoNs Spec. 7220-C-2 31- Rev. 8 Sectior. 13.2.4 states in part that, during the curin_g period, the concrete members shall be adequately protected to maintain concrete temperature of no less than ~50 degrees.                                                                                                               __
*=6*=
Contrary to the above. concrete surface temperature fell below 50 decrees for approx. 3 hours for placemcht                                                                                                             i A(619)a. "O" List No. is 1.205.                                  co- c .2 - ,--       <mgo a rz                             - o_dru.e e De ove's W ~4 5                                                 ko'2-A       _
- A"d I /~/I[~ M, s.
                    <' norz r }% i on 6n Y/s- s f                         f.A L2 /[l2           -                      .h') ~hoS /ff'o)U M 0bN                            -
. e,a
y /*L$.)G E]ric'o acco==sNoavioa/aouTE To e .o,ECT ENG.NEEa.No                                                       ai. riEto oiscos. Tion aEsutTs>
: 4. 5E NI A L HUMBE R
ae. O ric'o o'5eas'':aa Accept as is based _on the following:
: 9. ST ART UP SYST EM No.
a)   Concrete did noe freeze b)   Cure was extended one full day such that coacrete was fully protected and cured for a minimum of 7 days _at a temparature not less than 50 F.
$PL ACEMEr4T PAR o.
_f_           EtnO2                 ob MrW &                     l2-8'" 7ISP                                                                                     = >. E NG N E E niNo o.s,o. Tion EsuuT s 2,. EyNE EN No of.Pos.v.oM The lower concrete curing temperature will tend to r.2 duce shrinkage, setting rate, and i. rater demand, while increasing durability and reluired curing time. Engineering concurs with the Field recommendation to "use as is" be ause                                   c        1) The minimum concrete surface temperature was 35'F and freezing did not oc:ur. 2) The ctpre for the subject concrete was extended one full day. 4 I4 h M .8 e M c.                                                     N d U ,nyl/7 l /r 7L
.~
: 14. OS oESIGN CH ANGE H EauiHEo         o o VES.5EE ATT ACHEos Je ATd         ISP S a r e'o N o ..
: n. euncN AsE onoE n No.
O = ".
s e. oc r.Eto.NsPEcTioN co AN No.
ar oc acc
'"... = E et A c c M E N T s E N. A t No.
                                                                                                                                                  . w.a a * * * * ** ue a T       E
/ ~2.2. - 7d N/A C-231-4-653 N/A
                                                                                                                                                                                                            / _t/u /rc f       ,/
.. co N T n A cTo nfooc A f ion si.AsME O vr5
oR AWGNG                     REV.                   oCN
'r5ovact
                                                                                                                                                                      .-1-...u....           u ,..                    ....
.....,w,,, m,..
SPEC.                         REV.                   Aoo.
@ No Can.strurJ.ipn 11 / 3
seese-a                                                                                                                             Whiie Copy       - Originator                                                   Q c-G 3-2 Canary Copy     - P solo Engineer Pink Copy       - PQAE Goldenrod Copy - OC
""M t o. Rout ONG ONSTRUCTioNSs 440UT E To F#E Lo ENGiNEEMtNG Q route To M ATENG AL SUPENvison Spec. 7220-C-2 31-Rev. 8 Sectior. 13.2.4 states in part that, during the curin_g period, the 9 9. NONCONFORMING CoNolTeoNs concrete members shall be adequately protected to maintain concrete temperature of no less than ~50 degrees.
Contrary to the above. concrete surface temperature fell below 50 decrees for approx. 3 hours for placemcht i
c - c.2 -,--
<mgo a rz
- o_dru.e e De ove's W
~4 5 ko'2-A(619)a.
"O" List No. is 1.205.
o
.h')
~hoS /ff'o)U M 0bN
_ norz r }% i on 6n Y/s-s f f.A L2 /[l2 A
y /*L$.)G ai. riEto oiscos. Tion aEsutTs>
ae.
O ric'o o'5eas'':aa E]ric'o acco==sNoavioa/aouTE To e.o,ECT ENG.NEEa.No Accept as is based _on the following:
a)
Concrete did noe freeze b)
Cure was extended one full day such that coacrete was fully protected and cured for a minimum of 7 days _at a temparature not less than 50 F.
_f_
EtnO2 ob MrW &
l2-8'" 7ISP
= >. E NG N E E niNo o.s,o. Tion EsuuT s 2,. EyNE EN No of.Pos.v.oM The lower concrete curing temperature will tend to r.2 duce shrinkage, setting rate, and i. rater demand, while increasing durability and reluired curing time.
Engineering concurs with the Field recommendation to "use as is" be ause 1) The minimum concrete c
surface temperature was 35'F and freezing did not oc:ur. 2) The ctpre for the subject j
concrete was extended one full day. 4 I4 h M.8 e M c.
N d U,nyl/7 l /r 7L
/ _t/u rc
: 14. OS oESIGN CH ANGE H EauiHEo Je ATd ISP S a r e'o N O = ". w.a a * * * * ** ue a
/
ar oc acc T
E o
o...
o VES.5EE ATT ACHEos f
,/
oR AWGNG REV.
oCN
.-1-...u....
u,..
SPEC.
REV.
Aoo.
seese-a Whiie Copy
- Originator Q c-G 3-2 Canary Copy
- P solo Engineer Pink Copy
- PQAE Goldenrod Copy - OC


V                                                       NONCONFORMANCE REPOR[
V NONCONFORMANCE REPOR[
                                                                                                                                                                                          ----t            ''#jy"
''#jy" 9G/PA AT P.O.
: 2. lsG A9G/PA AT P.O.                     s LG V.
L.._.
----t
[32
.DdM W///W ----",--g~
2b. DI$PO5f T IO N CO hCU*4 N E N w s LG V.
: 7. WOJE C1 N G, t''
: 7. WOJE C1 N G, t''
L.._. _ ..__ _.._- .- _
' OJs T E
s E8'   H                           '
: 2. lsG A s E8' H
                                                                                                                                                              ' OJs T E 2b. DI$PO5f T IO N CO hCU*4 N E N w
_s.p e c.,..R..T..N7220-C-208 i 5 7220
_s.p   e c., ..R..T..N7220-C-208         i5                7220
_i %
[32              _i.DdM%                     W///W ----",--g~
9_T.
Concrete Cylinders
C.. A T....,,,p
                                        . ~        .     .T . - . C . T .O Slab Pour S-4; Pour #A(614)1$                                                     ,g C.. A T . . . . , ,,p            l/,
.T. -. C. T.O
9_TY2) .
. ~
y[},[/
Slab Pour S-4; Pour #A(614)1$
f_ /,. 7             s.
,g l/, Y2) y[},[/
N U - . E .,                         .. .T A R T U     .T.T E. NO.                                                                       O.            R E ..
f_
7.E.                CE.ENT ,g                                                                                        ,
/,. 7 Concrete Cylinders 7.E.
.. PUNC H A SE OR DE R NO.                         le. QC FIELD ONSPECT BON PL AN NO.                               8 6. R E PL A C E M E N T SE R t A R. NO.                                                                       /
CE.ENT,g O.
* b d *7 C-231-3-659                         Rev. ')                   N/A                                                          J      *- ~ = -                                "
R E..
N/A
s.
.. CO TR ACTOR / OC AT.ON                                                                 ...  -E   C)'iEs        irsOuaCE                                                        .. ..'...,,,,, ,,.. " -                          ....
N U -. E.,
  ,ygited States _ Testing Co. ,__ Midland,_Mich.                                             .T E - G ,0                  Subcont ractor                                                                                _ _ _ _ _
...T A R T U
: 14. RO UTING GN S T FluCTIONS.                 Q ROUTE TO FaELD ENGSNEERING                               Q ROUTE TO M A T E NS A4. SUPE R V450R I.. MONCONFORMING CONOSTsON:
.T.T E. NO.
Specification 7220-C-208 Rev. 5 Paragraph 7.3.2 states in part that, " Concrete cylinders shall be maintained at a temperature of 60 degrees F to 80 degrees F prior to stripping". Contrary to the above,,
/
the concr_.ete cylinders made representing the concrete placed in Pour No. A(614)b on October 30, 1975 were init 'ly                                                                                                                       ~
* b d *7
cured between 46 degrees F and 64 degrees F. "Q" No. is 1.205. Nonconformance noted during QC review of report of concrete cylinders.                     do $p df(cicg                                                                                                                                               .<
.. PUNC H A SE OR DE R NO.
IS. O FIE LO OSSPO54 TION                   QFIELO RECOMMENDATION / ROUTE TO PR DJECT ENG6MELHING                                                                           3 8. FsELO DISPOSIT60N RESULT S Recommend _ acceptance on the basis that the strength c f the cylinders was not
le. QC FIELD ONSPECT BON PL AN NO.
_ impaired by the louer temperatures as indicated by te st results of 5 sets of 28 day cylinder _breaksi The_ overage of two individual sets ranged from 4045 psi to 5165 psi _with overall average of 4420 psi.                                     Required fc' is 4000 psi.
8 6. R E PL A C E M E N T SE R t A R. NO.
U l1rl'n           ~bM n/
J
2 2. sp<n N E E R.NG o..PO s.T O N
*- ~ = -
                                                          /2 -R-7[yf
N/A C-231-3-659 Rev.
                                                                                                                                                                                  ,3. E NG .,. E E R ,NG o ,,,0 s,T ,0,. R E U LT . ,
')
C'ylinder strengths given above show that the subject i:oncrete exceeds specification strength requirements. Engineering concurs with Field recommendation to "use as is.'
N/A C)'iEs irsOuaCE
                                                                    -        D                   .
.. CO TR ACTOR / OC AT.ON
Ws. W 2 1-m:e l} _ f
-E
: 24. BS DESIGN CH ANGE R EQUlHED        g Ra/A i-n.u
.T E - G,0 Subcont ractor
* E!/ %w~~ 40M
,ygited States _ Testing Co.,__ Midland,_Mich.
: 26. R EJECTED M AT E R S AL be5PostTsON                     O =naava w**ta==             a r. oc A CC E PT A N c,s O vEs. sEE ATT ACN.D.                          ---.
: 14. RO UTING GN S T FluCTIONS.
                                                                                                                                                                                  #. .. M...... & " -                   db .5.               6 DR AW9NG                       R E V.             DCN awvneaease sesesstem                               eats e
Q ROUTE TO FaELD ENGSNEERING Q ROUTE TO M A T E NS A4. SUPE R V450R I.. MONCONFORMING CONOSTsON:
SPE C.                         R E ..             ADO.
Specification 7220-C-208 Rev. 5 Paragraph 7.3.2 states in part that, " Concrete cylinders shall be maintained at a temperature of 60 degrees F to 80 degrees F prior to stripping".
'****'                                                                                                                                              White Copy           - Origenatos                                                     eGda a' CaneerCopy           - F sold E ngineer Pink Copy           - PQAE Goldenrod Copy - OC
Contrary to the above,,
the concr_.ete cylinders made representing the concrete placed in Pour No. A(614)b on October 30, 1975 were init
'ly
~
cured between 46 degrees F and 64 degrees F.
"Q" No. is 1.205.
Nonconformance noted during QC review of report of concrete cylinders.
do $p df(cicg IS.
O FIE LO OSSPO54 TION QFIELO RECOMMENDATION / ROUTE TO PR DJECT ENG6MELHING 3 8. FsELO DISPOSIT60N RESULT S Recommend _ acceptance on the basis that the strength c f the cylinders was not
_ impaired by the louer temperatures as indicated by te st results of 5 sets of 28 day cylinder _breaksi The_ overage of two individual sets ranged from 4045 psi to 5165 psi _with overall average of 4420 psi.
Required fc' is 4000 psi.
U l1rl'n
~bM n/
/2 -R-7[yf 2 2. sp<n N E E R.NG o..PO s.T O N
,3. E NG.,. E E R,NG o,,,0 s,T,0,. R E U LT.,
C'ylinder strengths given above show that the subject i:oncrete exceeds specification strength requirements.
Engineering concurs with Field recommendation to "use as is.'
D Ws. W 2 1-m:e l} _ f Ra/A i-n.u E!/ %w~~ 40M
: 24. BS DESIGN CH ANGE R EQUlHED g
: 26. R EJECTED M AT E R S AL be5PostTsON O =naava w**ta==
a r. oc A CC E PT A N c,s b
O vEs. sEE ATT ACN.D.
#... M...... & " -
d
.5.
6 DR AW9NG R E V.
DCN awvneaease sesesstem eats e
SPE C.
R E..
ADO.
eGda a' White Copy
- Origenatos CaneerCopy
- F sold E ngineer Pink Copy
- PQAE Goldenrod Copy - OC


. . , .-                          s.
s.
[g C4 jf,       . .r' J
[g C4 jf,
                                  ~\
~ \\
(^)   '
(^)
NONCONFORMANCE REPORT                                                                                       ' ""' '
..r' J
: 2. !L ,, A WI N G /P A R T NO.                             Y, PHOJECT hO,
NONCONFORMANCE REPORT 9
                                                                                                                                                                                          ,          9              365 s N E V.
365
      #                                                                                                                    12. N E PO R T E D W W ~
: 2. !L,, A WI N G /P A R T NO.
3.. tSPO54T40N CONCUR RENCE
s N E V.
_C-238                                          !6          7220~                                                          [                       b'DaTE 3.:T/u DEscRsPTiON Steel Columns                          a. eTEu LOcaTeoM                                          .v    so4TEo av                  i 26         " "*'~
Y, PHOJECT hO,
                                                                                                                                                                                                    " 'j "[             y"~
_C-238
F ,?ddN?b:                       {_.'b, caTE
!6 7220~
_D4.1,_DB.3._EK1.31 & EKI.11__ Auxiliary Buildine c.fER84LNUMBER
: 12. N E PO R T E D W W ~
                                                                                                                            *-        .X4                       !/A-@
b'DaTE 3.. tSPO54T40N CONCUR RENCE
: 9. $T AR TUP 5VSTEM NO.                                   . H EPLACLM ENT P ART
[ 26
                                                                                                                                                            .         'REV.         P.OJE C T g ang em e~ ? ' / h - 7L ests/
" "*'~
I
" 'j "[
                      ~
y"~
,?ddN?b: {_.'b, ' / h - 7L 3.:T/u DEscRsPTiON Steel Columns
: a. eTEu LOcaTeoM
.v so4TEo av i caTE
_D4.1,_DB.3._EK1.31 & EKI.11__ Auxiliary Buildine
.X4
!/A-@ F P.OJE C T g ang em e~ ?
c.fER84LNUMBER
: 9. $T AR TUP 5VSTEM NO.
'REV.
. H EPLACLM ENT P ART I
ests/
.s&c-6 s am I7- %s-T'.)p
~
n/A N/A I
: s. Pu =CN a sE O roe R NO.
: s. Pu =CN a sE O roe R NO.
n/A                                                    N/A                                  I
[ g. M..[g'd.-
                                                                                                                                                                                                        .s&c-6 s am          I7- %s-T'.)p a
f'/-7/o a
s o. Oc riELD iN sPEcT.ON PLAN NO.                                                                                                                        .,,.
s o. Oc riELD iN sPEcT.ON PLAN NO.
C-38                                                      d -Jciv-J- /
... R E PLac E M E NT s E R.L NO.
                                                                                                                            . .. R E PLac E M E NT s E R .L NO.
C-38 d -Jciv-J- /
[ g . M..[g'd.- f'/-7/o
N/A
          .. c3 NTR acTORiLOcaT ON                                                                                              N/A                                                                                           **'"
" " ' '"* * " "* ** ' 17
                                                                                                  ...asut      O vEs      ir souact                                                        " " ' '"* * " "* ** ' 17 N/A                                                                               i
.. c3 NTR acTORiLOcaT ON
                                                                                                        .'T E u'_M NO           Construction g a. ItOUTING 6N57N UCTIONSs Q ROUTE TO FIELD ENG4NEERING                         O ROUTE TO uaTERiaL supervisor
...asut O vEs ir souact N/A
.'T E u'_M NO Construction i
g a. ItOUTING 6N57N UCTIONSs Q ROUTE TO FIELD ENG4NEERING O ROUTE TO uaTERiaL supervisor
: 90. NONCONFORMING CONDtTION:
: 90. NONCONFORMING CONDtTION:
DCN 6 to drawing C-238, Rev. 6 shows a splice at the above columns atelevation 617'-0".
DCN 6 to drawing C-238, Rev. 6 shows a splice at the above columns atelevation 617'-0".
Columns D4.7 and D8.3 were cut at elevation 601'-0". Columns EK5.31 and EK7.79 were cut at elevation 616'-0".
Columns D4.7 and D8.3 were cut at elevation 601'-0".
O Number 1.201.                       h tags applied.
Columns EK5.31 and EK7.79 were cut at elevation 616'-0".
2L         C FIE LD DISPOSITION QFsELO RECOMMENDATION /POUTC TO PROJECT ENGlNEERING                                                             11. FIE LD DISPOSITION RESULTS:
O Number 1.201.
(1)           Field Recommendation for columns EK5.31 and EK7.79 is "use as is"                                                                                   .
h tags applied.
Splice will not interfere with any beam to column connections.
2L C FIE LD DISPOSITION QFsELO RECOMMENDATION /POUTC TO PROJECT ENGlNEERING
(2)           Field recommends that columns D4.7 and D8.3 be repaired as follows.                     Re-cut and splice column D4.7 at elevation
: 11. FIE LD DISPOSITION RESULTS:
        ..-......m.,           . - - .
(1)
616-0.                  Repair  .....'c   u.t s__a t _ e l e v a t i o n 601'-0 with full penetration welds                                                         23. E NG IN EERING DISPOSITBON R ESULT$i
Field Recommendation for columns EK5.31 and EK7.79 is "use as is" Splice will not interfere with any beam to column connections.
      - as noted below.
(2)
: 22. Engineering Disposition (1) Engineering concurs to ,,use as in" the column                                                                                          Monk (% gh'/f A 3 b &,w,sa,g '
Field recommends that columns D4.7 and D8.3 be repaired as follows.
D M as!f/04 e s b loc # #j c2cl splice at elevation 616'-0 for columns EK 5.3.1 and EK 7.79. (2) Field Recom-fg%2h Io //c McTOLv, /hld mendation to repair the columns D4.7 and D8.3, as outlined above, is acceptable,. ~                                                                                         Jg hj                       '
Re-cut and splice column D4.7 at elevation
D.C.N. to drawing C-238 will be issued incorporating above change.
..-......m.,
: 23. es oEs GN cH, HGE RcouinEo goafsy-X.vun.                        2.. RuEcTEp uaTE Ria' oisPOs TION
.....'c u.t s__a t _ e l e v a t i o n 601'-0 with full penetration welds 616-0.
[/M/ M _c [                                                'h / -/'I' 96 DW A WING                            REV.
Repair
V E S. 5EE ATTACNEDs DCH e s se n e m e g',';"" '* *""*"* "       2r gegEgT'^jEg oc s ke*=e"e e
: 23. E NG IN EERING DISPOSITBON R ESULT$i
                                                                                                                                                                                                    }                  j,qpg on,,
- as noted below.
EPEC.                                 R E V.                 ADD.                                                                                                         Auvmonease anses svon                      e4Ts t u a-a White Copy         - orig nator QGG32 Canary Copy         - Field Engineer Pink Copy           - PQAE
: 22. Engineering Disposition (1) Engineering concurs to,,use as Monk (% gh'/f A 3 b &,w,sa,g '
in" the column D M as!f/04 e s b loc # #j c2cl splice at elevation 616'-0 for columns EK 5.3.1 and EK 7.79.
(2) Field Recom-fg%2h Io //c McTOLv, /hld mendation to repair the columns D4.7 and D8.3, as outlined above, is acceptable,.
~
Jg hj D.C.N. to drawing C-238 will be issued incorporating above change.
[/M/ M
_c
[
'h / -/'I' 96 goafsy-X.vun.
: 23. es oEs GN cH, HGE RcouinEo 2.. RuEcTEp uaTE Ria' oisPOs TION g',';"" '* *""*"* "
gegEgT'^jEg j,qpg
}
2r V E S. 5EE ATTACNEDs e s se n e m e oc s ke*=e"e e DW A WING REV.
DCH on,,
Auvmonease anses svon EPEC.
R E V.
ADD.
e4Ts t u a-a White Copy
- orig nator QGG32 Canary Copy
- Field Engineer Pink Copy
- PQAE


j 4
j g_
g_
-4 3
3
G s~
_                                                                                                                            G-s~
C Q
_                                                                                                                            C                   :
g
g       Q
/6 _
        /6
/
                                                                  '                                                                                    .i
.i s
                                                                        /
v a
s v
L
a
,(
                                ,(                                                                                                                       L c
c a
a U
U y
                                    ) -
) -
y 4
E-D-4 L~s e
b E-D-h                                                                                                   -
b h
                                      -                                                                                                                                r e
r e
L~s e
2_ _
ne 2_r 0                       .
en r
r og t n o_                    0-                                                                                                                            aE n
0 og o_
id E
0 r
A Lm gl 2                     2#                                                                                                                             ieQC ri
t n Lm aE n
                -                                                                                                                                                   OFPO G
E id A gl 2
o                                                                                                                             - - -
2#
a c
ieQC riOFPO a
n a                      p-                      y p
E p-G o
I_
a I_
i
c y
                                      /lf o
n p
i t                                                                       s              E      '
o o
yp poyd oCpo
y C i
                                                                                                                                                              ~ Cy o nr y C o
yp
a i
/l s
l 6_              t r                                                                     n                                -
i poyd t
iter  e Ce h n kleino d
~ Cy o r oCpo f
E                                                                                                                              WCPG
a n
              )
T D                    f e
n e
n
n
* N O
- iter Ce i
C                                     %
r e
p
d l
                                                                                                      ;            n          M
n kl 6_
t eino hWCPG E
e n
)D f
n M
T e
N p
O n
C 0
d_
l 7
(
(
_                                0                                    d_
l s
e l
0 s
7 l            s 0           s                                                             .
e a
a           r 1           e                         v P ,_
r 1
E d
e v
Ut r
n r
t       :
e g
                                                -_l o_ l e  :-
i P,_
o     .
d t
g l
-_l l
a           b ia w           -
a o_ l o
ni                                -' -
a b
R, _          L                                                   e                                                                                                '
w i
co r/,
E U
i f           l                                                                                                             ~
R, L
E C                -      ur        f s
t r/,
f 3
co i
w 3
f l
e
e
~
E ur f
f w
e
(
C ct h_
r s
3 3
N r r t
n 7
n7 A.
s oo o
o o
q_
Y
=_~
R AA M
f f
o 1
1 t_
p\\
r_
r t
t O
d n
e e n
/
F ld d
l i
v i
v l
NO
; o o l
o e
o e e
v E
i~
l w
$y i_, R g
1,_
. 5. y a_ L' N_
P hr r
a i.
R s
C D t t
O T. c c
e e
1 e1 f
~
N S e e
g v
v o_
N
_~
l l
u o
l o l l
e e o
o D
o D g
a n
r r
n i.
t 0 8
n.
g.
h1 1
k S
S v.c c0G c
l 1
e6 7
a e W cW i
l y_
H E E B
v 4 "
eA cA e
b b
r i-f f
ec e o n
o s
r l
i s
u g4 hS e
d nU uU r_
i -
o-t i
e 1
c 1
S_
B nB S
a L
r a
t )
)
)
E_
ea h
c t.
g D(
(
(
N A.              ctrs r r oo t
(.
o n
t-n n
o 7
n i
n7 o    -
d n
h_
c_
q_        .       -      Y
l i
                                                                                                                                =_~
p_
M                              f  f      o                1          1      t_
a o
AA R
2 W
p\
J t
t                                      r_
f kc 3
r        t                           _                        ,
s o
O                        -     e e                n         . n     . d                          ,
e-1 8
F
9 0
                                  -    ld d          l          i        v    i    v    l                          /
/*
N                      E; o o        l            o      e    o e        e                        v                        i~
E_
O            l r    a        i.      R                  w    $y                  s C            P        hr                                      i_, R N_                      D t        t e          e            e1        f        g      1,_        ,
: 5. y a_ L' O                      T.
S e e c c      g          v 1
                                                                              . v    -              _
                                                                                                                                                ~
N                              l  l    u          o l          o l        o_        .        -    N            _~
l        e e    o          o D          o D        g a                n          r            r          n t 0        8                n .          g .      i.
h1          1    k                  S          S      v.
c0G            c        l          . 1      . c e6        7    a          eW            cW        i                                                                                 .
H E E            B          v        . y_    . l                      4 "
eA            cA          e b            b            r e                                f          f                                                                                            i-c                          e o          n    o    s r                        l            i            s u                          g4          hS          e d                           nU            uU        r_
* e                  1    i -            o-        t c                  1    S_ B          nB        S a                  L r                  a t )              )            )
                            .            E_                    ea                h            c                                            -
g                  D(                (            (.
          .;,              t.
n               n t-
    ,                      n              i d                      n c_
l                     i p_               a                   o
    .                      2               W                   J t
k s
c o                                                                                                                                           3 f
e-8 1                                                                                                                                            9 0
  /*                     ,
E_                                                                                                                               _
_ 0
_ 0
_ 1 P              ~".
_ 1
~".
P


a                                              -
3) a
: 3)               -
,)
,)                                                               NONCONFORMANCE REPORT ^                                                                                         ''"* " '                  "'"'''~
NONCONFORMANCE REPORT ^
" ' " ' ' ' ~
e
e
_ _ _ _'oATE
: 25. otsvossiaoN CoHCunetE hr 2--
N l
F'
: 2. o ri A W Ally No.
: 2. o ri A W Ally No.
e DI V.
e DI V.
: 7. PROJECT No.
: 7. PROJECT No.
_                _ _ _ .                                          l    F'    2--                  N                    _
12 st c Poet rE o f'?
12 st c Poet rE o f'?           _ _ _ _'oATE Spec. 7220-C-2 31
Spec. 7220-C-2 31
!8 07220 h% b2b I&// '/S
;'* "j """' - g' "'
: s. si cu ocscnerraoM
: s. si cu ocscnerraoM
                                                !8                    07220                                              h% b2b I&//'onre'/S
* Aux.'oBidgv Pour No's.
: 25. otsvossiaoN CoHCunetE hr
                                                                                                                                                                                                  ;'* "j """' -      g' "'
* Aux.'oBidgv Pour No's.                                     i    -
19A rco =v
19A rco =v
                                                                                                                                      '                 /                                 .
/
'onre
. d~-m'
/'?-3-N i
Concrete Curing
Concrete Curing
. _ A(510)_a' & CC(635_)b '
/f, eretacEMcNr PARr N M/2-Il-7f
.N 8A8'
' '" g o ease 9/ /
1 4
: 4. sc esac Nuuss a
: 4. sc esac Nuuss a
                                                              .s._ stanTue A(510)_a'          & CC(635_)b '
: s. stanTue sysTru no b.I
sysTru no                                             4
' R E V.
                                                                                                                            /f, eretacEMcNr            PARr b.I N' RM/2-Il-7f E V.
N/A N/A N/A V
9/ /
I la'rt PE t-4[- 7(.,
1
86 I
                                                                                                                                                                                    .N 8A8' d~-m' 86  ' '" g o            /'?-3-N ease N/A                                                         N/A                                                           N/A                 V         I I                                    e      la'rt PE       t-4[- 7(.,
e s
s     JacNasa onorn No.                                                                                                                                                                     "
JacNasa onorn No.
so.oc resto iNsractioN roan No.                           j .s e, acroaceutNr sensat No.
so.oc resto iNsractioN roan No.
N/A                                                 C-231-4-693 & C-231-4-650                                             N/A
j.s e, acroaceutNr sensat No.
                                                                                                                                                                                    - a u          - = -J = =
/. [b *l[ ~
                                                                                                                                                                                                                            /.="=[b *l[ ~
N/A C-231-4-693 & C-231-4-650
[
[
: e. con rR ACTOR / loc AT8oM                                                             i3.A5Mc Q vg &             . 7. sou R CE irru (% hg_1_                    Construction J. ../ .ou1.No A .Nsv aucrioNs.
N/A
g ours vo r.rto cNo.Nec. No                                     o Nours to .rcan L surcav.w.
- a u
: 19. NoNCoNroRMING CoNo8 TION:
- = -J = =
Spec. 7220-C-231 Rev. 8 Paragraph 13.2.4 states in part, "That concrete members shall be adequately protected to maintain concrete surface temperature of no less than 50 degrees F". Contrary to the above Wall Pour #27 in the Aux. Bldg. had a surface..tenperature of 46 degrees for 5 hours. Pour No. CC(635)b'                                                                                                           ir,     j the Unit #2 tendon gallery access shaf t had a concret'e . surface temperature averaging 47 degrees for two days.
="=
Nonconformance noted during QC Surveillance. "Q" List No's. ~l.'205 and 1.105. Two tas;s applies.
: e. con rR ACTOR / loc AT8oM i3.A5Mc Q vg &
J0.     O ris'o oiscosarioN Greuo siccouurNoarsoNiaours 1o caosscr =No Neca No;                                           ,
. 7. sou R CE J.../ A irru
ai. risto oiseosir oN atsuoisi
(% hg_1_
                                                                                                                      ..y.v            -
Construction g ours vo r.rto cNo.Nec. No o Nours to.rcan L surcav.w.
_.AccepI_asd s _EaclLph nement._wae                                       niven an additional ,s .ytwo days. cure to assure a
.ou1.No.Nsv aucrioNs.
: 19. NoNCoNroRMING CoNo8 TION: Spec. 7220-C-231 Rev. 8 Paragraph 13.2.4 states in part, "That concrete members shall be adequately protected to maintain concrete surface temperature of no less than 50 degrees F".
Contrary to the above Wall Pour #27 in the Aux. Bldg. had a surface..tenperature of 46 degrees for 5 hours.
Pour No. CC(635)b' ir, j
the Unit #2 tendon gallery access shaf t had a concret'e. surface temperature averaging 47 degrees for two days.
Nonconformance noted during QC Surveillance.
"Q" List No's. ~l.'205 and 1.105.
Two tas;s applies.
J0.
O ris'o oiscosarioN Greuo siccouurNoarsoNiaours 1o caosscr =No Neca No; ai. risto oiseosir oN atsuoisi
_.AccepI_asd s _EaclLph nement._wae niven an additional
..y.v
,s.ytwo days. cure to assure a
_that_thc_ cnncretg_nuld not be adversely af fected by :he small temperature drop.
_that_thc_ cnncretg_nuld not be adversely af fected by :he small temperature drop.
              %dAhA /2 -/4-75w?
%dAhA /2 -/4-75w?
v
v
: 22. ENGeNE cRING oISPostrioN 2 3. ENGIN EE RING ogsPossTaoM MesuLTss
: 22. ENGeNE cRING oISPostrioN 2 3. ENGIN EE RING ogsPossTaoM MesuLTss
      .The lower concrete curin_g. temperature will tend to redt ce shrinkage, setting rate, and water demand, while increasing darability and required curing time. Engineering                                                                                                                                                 )
.The lower concrete curin_g. temperature will tend to redt ce shrinkage, setting rate, and water demand, while increasing darability and required curing time.
concurs with the Field recommendation to "use as is" because 1) The minimum concrete                                                                                                                               .
Engineering
surface temperature was 46*F and freezing did not occur. 2) The deviatic.n in curing temperature will have an insignificant affect upon regt. ired curing time, and 2 .as ossacN cNaNor acouincu         goo                                          Ze. ncaccyco m AT en sas. ossrusirioN                     D a 'wa a * * .="*.. a   2 7. oc c ser4Nc ,
)
oH AWSNG                      St E V.
concurs with the Field recommendation to "use as is" because 1) The minimum concrete surface temperature was 46*F and freezing did not occur. 2) The deviatic.n in curing temperature will have an insignificant affect upon regt. ired curing time, and goo 2.as ossacN cNaNor acouincu Ze. ncaccyco m AT en sas. ossrusirioN D a 'wa a * *.="*.. a 2 7. oc c ser4Nc,
O vas,sr=arracNco, oCN
db6,bd O vas,sr=arracNco, U"**"
                                                                                          ..-a    .
O
U"**"
-i.
                                                                                                                                                                              -i.
.t.
                                                                                                                                                                              .      .t. ...
..-a t
O                      db6,bd t  ....
oH AWSNG St E V.
auswomeneneme. scree                         m.,e f Pc C.                       M E V.               A p o.
oCN auswomeneneme. scree m.,e f Pc C.
wni . c.,,            ,WJ;F-
M E V.
* om1 c.n.,,co ,        - o,4.io en io ,
A p o.
Pink Copy         - PQAE Gold.ated Copy - OC
,WJ;F-om1 wni. c.,,
- o,4.io en io,
c.n.,,co,
Pink Copy
- PQAE Gold.ated Copy - OC


6
-6
        .6                                       }   i 3
.6
m
}
.        2                                                 .
i 3
2 c
m 2
c a
2 ccar s.
r s.
C
?
& A 0
7 a
3 1-x t
L
)
l D
T' w
%a, N
m/
O n
C
C
                              ?  & A
/
                              -  0  7 a    -  -
}BG
3 x
t 1-
          )
D l  L T'
N              m/          w
(
(
O C                /  %a,n T               .
w T
w J }BG R               s y
s R
O              a P             d E
y J O
l       L.e R_             l f
a P
u      Ah       '
d L.e E
o                                         .
l R_
w t
Ah lu f
M R             d O               e F             d n
o w
N              e                               .
t M
O              t x
R d
C              e N
O e
O              s a
d F
N             w r
n N
u o
e O
p t
t C
c e
x e
i_
NO s
b u
N aw ruop tce i_
s e                    ~
bus
h t
~
r a
e h
f r'
t r
u c
af r'uc h
h                     .
T
T
                      )                       .
)
J                     3
J 3
  -                  2
2
    ~
~
2
2
/ '                 k e
/ '
    /,*
ke
                  'B1
/,
1'B


                                                                                                                                  ~
$, ~
      $, ~                                                                                                         ^
^
LQC NONCONFOftMANCE REPORT
' ' ' "[ ' ' 1
* * * "6
~
LQC NONCONFOftMANCE REPORT 3
i
: 2. D M T.W IE T re d.
: 2. D M T.W IE T re d.
8 NE V.
8 NE V.
: 7. PR M C T NO.
: 7. PR M C T NO.
                                                                                                                                                                                ' ', ' "[ ' ' 1          * * *3"6        i
: 12. R E PON T3D F
: 12. R E PON T3D F                                     25. 08,Po set 80N CoreCu1Hf.NCd
!' ?! ATE
_ Spec 7120-0-231
_ Spec 7120-0-231
!8 07220 E'd.t dn u b.
: 25. 08,Po set 80N CoreCu1Hf.NCd I ~~14
~ ~ ' "
" " ' ~
~ ' ' '
: 3. B T EM D ELCHIPf EON
: 3. B T EM D ELCHIPf EON
                                                      !8                07220
: 4. 8T EM LOC ATION 0 3. V A L.ID TEDav I DATE
: 4. 8T EM LOC ATION E'd.t      dn 0 3. V A L.ID TEDav u b. !'I ?!~~14 I DATE ATE      ~ ~ ' "      " ' ' "    " " ' ~  " " " "      ~'''
_CongygtpJ. gip;r Pour No. A(626.25)a'
_CongygtpJ. gip;r
/ThI C #fM !/-7 I
: 6. SE R 6A L NUMDEN Pour No. A(626.25)a' D. ST AR TUP SYSTE M NO,                            /ThI C #fM !/-7       -
: 6. SE R 6A L NUMDEN D. ST AR TUP SYSTE M NO, t 5. R E PL ACEM ENT P A RT NO.
t 5. R E PL ACEM ENT P A RT NO.           R E W.       ***88 " F *st e s mesme s e I
R E W.
ee M
***88 " F *st e s mesme s e ee M
_H/_A _                                                           -H/A
_H/_A _
: 5. PuRCH ASE OMDE R fdC.                                                                                                                                   i                ......,.        ...                      e...
-H/A i
8 0. G C F8 ELD INSPECTSON PLAN NO.           - l 8 6. REPLACEMENT SER4 AL, NO.
: 5. PuRCH ASE OMDE R fdC.
N/A                                                               C-231-h-732                                   l N/A                                                     "*""''""*""***"*                        **"
e...
G. CONTR ACTDet/ LOC A TION                                                               39.ASME       C VE&       9 7. SOURCE J/A-O S. HuuT8NG INSTNuC TIONSs
8 0. G C F8 ELD INSPECTSON PLAN NO.
                                                                                                  'T E =
- l 8 6. REPLACEMENT SER4 AL, NO.
be.__LConstumtion HOuTE TO FtELD CNGsNECRfMG                   O aourt To =^TEasa'suPEav'soa 8 9. MONCONFOH MSNG CONOGTION:
N/A C-231-h-732 l N/A G. CONTR ACTDet/ LOC A TION 39.ASME C VE&
9 7. SOURCE J/A-
'T E = be.__LConstumtion O S. HuuT8NG INSTNuC TIONSs HOuTE TO FtELD CNGsNECRfMG O aourt To =^TEasa'suPEav'soa 8 9. MONCONFOH MSNG CONOGTION:
Spqpifica_ tion 721Q-C-231 Rev. 8 Fayagraph 13.2.h states in part, "The concrete members shall
Spqpifica_ tion 721Q-C-231 Rev. 8 Fayagraph 13.2.h states in part, "The concrete members shall
_ be adequately protected to maintain concrete surface temperature of no less than 50 degrees F''. Contrary to the
_ be adequately protected to maintain concrete surface temperature of no less than 50 degrees F''.
                                                                                                                                                                                                                                      )
Contrary to the above, for 12 hours on the hth day of cure and for 6 hours on i;he 5th day of cure, Vall Pour FP-h, A(626.25)a', )
above, for 12 hours on the hth day of cure and for 6 hours on i;he 5th day of cure, Vall Pour FP-h, A(626.25)a',
in the Aux. BlUn had a surface temperature of h8 do3rees F.
in the Aux. BlUn had a surface temperature of h8 do3rees F. Nonconformance noted during QC 'Surveillence.
Nonconformance noted during QC 'Surveillence.
    "Q" No. is 1.205.                                       1 Tag Applied 20     O P'C'u o'5Posa r'oH                             EPiELo NECO==ENo ATsONiaOuTE TO Pace rCT ENo NEER.NG                                                           Zi. P ELo aisPOsiTiON aEsuLTs.
"Q" No. is 1.205.
_Ecraommc1Ld " accept as is".                             A surface temperature of 480 F on the 4th day of cure
1 Tag Applied 20 O P'C'u o'5Posa r'oH EPiELo NECO==ENo ATsONiaOuTE TO Pace rCT ENo NEER.NG Zi. P ELo aisPOsiTiON aEsuLTs.
                                                                                                                                                                                                                                        ~
_Ecraommc1Ld " accept as is".
will. not adversely affect the design strength of the ccncreta.                                                                   The cure will be e>: tended for tim additional days so that the concrete vill have been water cured for i miniraum of seven , days at a min. of 50 F.
A surface temperature of 48 F on the 4th day of cure 0
22.Et eINEC H tf EG D85PQ 5eT60N          #
will. not adversely affect the design strength of the ccncreta.
Y?nes^dbm                             .m / .           /- ?- 76
The cure will be
~
e>: tended for tim additional days so that the concrete vill have been water cured for i miniraum of seven, days at a min. of 50 F.
Y?nes^dbm
.m /.
/- ?- 76 22.Et eINEC H tf EG D85PQ 5eT60N
: 21. ENGIN E EHING DISPO$sT sO N MELuLTE:
: 21. ENGIN E EHING DISPO$sT sO N MELuLTE:
: 23. is oEs GN CH AracE satouina u ONO                                     " * " "      " " " " " '""'"                          a-~~~~~~                 22. u u u n o u O vEs. sLE ATTACNEo.                                                                             O .e .
: 23. is oEs GN CH AracE satouina u ONO a-~~~~~~
D et a we h n                       R E V.                     DCN fJ E C                              REV.                                                                                                                                avveee. ease sat a. Tee                     meva ADD.
: 22. u u u n o u O vEs. sLE ATTACNEo.
  'd**''
O.e D et a we h n R E V.
White [opy Canary Copy Originator
DCN avveee. ease sat a. Tee fJ E C REV.
                                                                                                                                                                  - Field Enginaar E
ADD.
Pink Copy       - PGAE Goldenrod Copy - QC
meva
'd**''
White [opy Originator E
Canary Copy
- Field Enginaar Pink Copy
- PGAE Goldenrod Copy - QC


_.__--==--------
_. _ _ - - = = - - - - - - - -
                                                                                                                                                                                                                                              .P=Gn.
l __
l __                      .s.MCu
.P=Gn.
                .s NONCONFORMANCE REPORT                                                                                                         j     0, J                     36,
.s.MCu
: 2. em. ..N G      9 NO.                          . x E V.                                           r. P,.0,E C T N O.
.s NONCONFORMANCE REPORT j
44XWT oATE            et oss Os . ION Ca e. Cue.u NCE
0, J 36, 9 NO.
                                                                                                                                                                                                  / . 8 (Id~~-j]M/3,/A.
44XWT ~~-j]M/3,/A.
                                                                                                                                                                                                                                                  ~"               '~       " * '        '"*--
oATE et oss Os. ION Ca e. Cue.u NCE
SRAc, 7?1 20-C-230                               l5                                                             7220                                                                 ,
. x E V.
A TED BY k N I, BATE                               " ' '' I "~ I          l
: r. P,.0,E C T N O.
: 3. sT E M DESCN erf EON                     . . .                                                  S. BTEM LOC ATaON Batch Plant                                                                            g.pg            C    l/-/ 3-7b Fly Ash                                                                                                                                                                 ,.
: 2. em...N G
R E V.       '*****'***"*'"**"***              **'*
/. 8 (Id k N I
C, L E RI A L NUM S E R                                                                             9. ET Alt T UP S v5T E M NO.                                                         fEPLACEMENT PART NO N/A                                                                                             N/A                                                                   L         N/A                           I             ,..,,,,. ......                    ....
" ' '' I "~ I l
C. PURCH A 5C ONDE R NO.                                                                           3 0. QC F 4E LD ENSPECTION PL AN NO.                                         { 8 6. M E PL ACEMEN T SER s AL NO.
~"
N/A                                                                                             N/A                                                                 l         N/A
'~
: o. CONT a ACiOan OC AT.ON                                                                                                                        ...A.ME o vE.         j.T.sOuaCE                                               ,,,,,,,,,,,,,,......              ,,,.
SRAc, 7? 20-C-230 l5 7220
Champion Inc. , Midland, Michigan                                                                                                                     .T E         g  ,.O        l      Subcontractor                                                                          _ _._
, BATE 1
3 4. No u T ING GN57 N uC T sO N 5.                                                               ROUTE TO F4 ELD ENGSNEERING                                               () ROUT E T O M AT ERI AL SUPENVISOR lb. NG NCONFORM8NG CONOsTIOMs Section_LA.1 of Specifination 'L?lis-C-210, Rev. 5 states that__pozzolans shall conform to#
: 3. sT E M DESCN erf EON S. BTEM LOC ATaON A TED BY l/-/ 3-7b C
C 618-72.             ASTM C-618-72 in table 2 requires that the fineness value be not less than 6500 CM'/CM .
Fly Ash Batch Plant g.pg R E V.
MT-M                                                                                                                                                                                                                                                                         2           3 r*nntrary_tn the above, fi n enesa nr ny nah anmpind on_12/16/76 was reported n a 6662, 9%1, and 5783 CM /CM .
fEPLACEMENT PART NO C, L E RI A L NUM S E R
      ._Nonconformance_no et d during routine _.nacra_ testing _of "naterials. O list numbers 1.105 and 1. 205.
: 9. ET Alt T UP S v5T E M NO.
WoAw GuAmwr                                                                           ec--
N/A N/A L
2 9. FIELD Os5 POSIT 80N HESULT5J 2J       Q FaELQ ptSPoleTION                                                                   QFIELD HECOMMENO ATBON/ ROUTE TO PROJECT ENGINCEN8NG
N/A I
          /s           f \ jn 1 At          .-
C. PURCH A 5C ONDE R NO.
f W l~d- Z 2 3. E NGINEEH aNG DasPOSIT TON HESULT&s
3 0. QC F 4E LD ENSPECTION PL AN NO.
{ 8 6. M E PL ACEMEN T SER s AL NO.
N/A N/A l
N/A
...A.ME o vE.
j.T.sOuaCE
: o. CONT a ACiOan OC AT.ON g
,.O l
Subcontractor Champion Inc., Midland, Michigan
.T E 3 4. No u T ING GN57 N uC T sO N 5.
ROUTE TO F4 ELD ENGSNEERING
() ROUT E T O M AT ERI AL SUPENVISOR Section_LA.1 of Specifination 'L?lis-C-210, Rev. 5 states that__pozzolans shall conform to lb. NG NCONFORM8NG CONOsTIOMs ASTM C-618-72 in table 2 requires that the fineness value be not less than 6500 CM'/CM.
C 618-72.
MT-M 2
3 r*nntrary_tn the above, fi n enesa nr ny nah anmpind on_12/16/76 was reported n a 6662, 9%1, and 5783 CM /CM.
._Nonconformance_no et d during routine _.nacra_ testing _of "naterials. O list numbers 1.105 and 1. 205.
WoAw GuAmwr ec--
2 9. FIELD Os5 POSIT 80N HESULT5J 2J Q FaELQ ptSPoleTION QFIELD HECOMMENO ATBON/ ROUTE TO PROJECT ENGINCEN8NG
/s f \\ jn 1 f
W l~d-Z At 2 3. E NGINEEH aNG DasPOSIT TON HESULT&s
: 22. ENGSNEE R ONG DeSPOSIT40N
: 22. ENGSNEE R ONG DeSPOSIT40N
                                                                                                                                                                                                                                                                                                  ~)
~)
                                                                                                                                                      . R EJECTED M AT E76 A L D8SPOSIT SON                       O =*waa = w'*6**a         2 7. QC ACCEPT ANCd 2 3. es DESIGN CH ANGC NEQueH ED         O NO                                                                                                                                                             a.e...
. R EJECTED M AT E76 A L D8SPOSIT SON O =*waa = w'*6**a 2 7. QC ACCEPT ANCd 2 3. es DESIGN CH ANGC NEQueH ED O NO a.e...
O v Es. .EE avr ACNED.                                                                            .. ....                                                                                  .. ........                        ....
O v Es..EE avr ACNED.
R E V.                                                           DCN                                                                                                                                                                     e.g.
DH AWING R E V.
DH AWING                                                                                                                                                                                                                              .**tes..ea.o e..e..*..
DCN
R E V.                                                           A D D.                                                                                                                                                                             ~
.**tes..ea.o e..e..*..
OPE C. - .                                                                                                                                                                                                                                                                     G C-G3 2 White Copy       - Originator e .te-s                                                                                                                                                                                                     Cen##v Copy       - F e.id C eg'neer Pink Copy       - PCAE
e.g.
* Goldenrod Copy - OC w                                                                                                                                                               s J,
R E V.
A D D.
~
OPE C. -.
G C-G3 2 White Copy
- Originator e.te-s Cen##v Copy
- F e.id C eg'neer Pink Copy
- PCAE Goldenrod Copy - OC J,
w s


                    =%'             . 't ,         .:; . '.
f'"'
                                                                            -*  .      ;t .:                                                                   -
=%'
_ .c                           ----n           --
. 't,
f'"'                    "            '
;t.:
                                                              'NONCONFORMANCE REPORT                                               -
- _.c
: a. . cweh       r No,                     iHEV.       v. Pa mec r No.                                         a c Po M T E u                 juAvC              a oisP ssinN Co Sp c. C-230
----n
: s. arEm oEsCRsPrioN l5               7220
'NONCONFORMANCE REPORT juAvC
: s. artu loc AvaoM sh 6Argo av M it-A.%   8 OAT
: a..
                                                                                                                                                                        ~-"-            " " ' '          ' * ~    "
cweh r No, iHEV.
: v. Pa mec r No.
a c Po M T E u a oisP ssinN Co Sp c. C-230 l5 7220 sh M it-A.%
j
j
[ !/-l Aux. Bldn. Wall [h9W Concrete M[/g                                         **ese ct seese a ns, ass ee eave L. SE N 6 A L N UMeE R                                   9. ST AM rup S Y5 t EM NO.                                 EPLACEMENT P AR         .          R E V.
~-"-
_HLA N/A                                     _
' * ~
N/A           U               i             , , , , , , , , , , , , , , , ,                    . . ,
: s. arEm oEsCRsPrioN
W. PURCH A SE OR DC R NO.             ,                  IS. OC P RELD GNSPECTION PLAN NO.                     3 6. REPLACEMENT SER t AL NO.
: s. artu loc AvaoM 6Argo av 8 OAT Concrete Aux. Bldn. Wall [h9W M[/g
_u/A                                                           ('- M1-2=6B?                 Rev._0_ _ _. I             N/A                                                                                             "'",,
[ !/-l L. SE N 6 A L N UMeE R
: c. CoNr   N ACr oniLoC A reoM                                                     ss.AsuC   O vEs         lsr.sounCE                                                   , , , , , , , , ,        ,,,                  ,,
: 9. ST AM rup S Y5 t EM NO.
__ Champion Inc., Midland, Michigan                                                   iv e M D No      ,[_            Subcon tractor s e, ROUr0NG ON$rRUCr00NO                         { ROUI E TO F. ELD ENG4 NEE RgNG                   ] NOurE TO M AT ERS AL. 5UPC H Vg50R
EPLACEMENT P AR R E V.
**ese ct seese a ns, ass ee eave
_HLA N/A N/A U
i W. PURCH A SE OR DC R NO.
IS. OC P RELD GNSPECTION PLAN NO.
3 6. REPLACEMENT SER t AL NO.
_u/A
('- M1-2=6B?
Rev._0_ _ _. I N/A
: c. CoNr N ACr oniLoC A reoM ss.AsuC O vEs lsr.sounCE D No
,[_
Subcon tractor
__ Champion Inc., Midland, Michigan iv e M s e, ROUr0NG ON$rRUCr00NO
{ ROUI E TO F. ELD ENG4 NEE RgNG
] NOurE TO M AT ERS AL. 5UPC H Vg50R
: 5) NONCONPORMSNG CONDertOMs Spec. 7220-C-2 30 Rev. 5 Table 9.1 states in part that the rejection limit for slump of IF-1
: 5) NONCONPORMSNG CONDertOMs Spec. 7220-C-2 30 Rev. 5 Table 9.1 states in part that the rejection limit for slump of IF-1
_ cone s e mix is 5". Contrary to the above, a slump of 5'c" was measured at the end of the pumpline on D-1 con-crete mix represen~ted by Ticket flo. 07209 placed in the Aux. Bldg. - Wall No. 29 Pour No. A(599)L' on January 16, 1976. Nonconformance noted during routine testing of concrete. "Q" Lis t No.' 1.205. ONE Hold Tag applied.
_ cone s e mix is 5".
Contrary to the above, a slump of 5'c" was measured at the end of the pumpline on D-1 con-crete mix represen~ted by Ticket flo. 07209 placed in the Aux. Bldg. - Wall No. 29 Pour No. A(599)L' on January 16, 1976.
Nonconformance noted during routine testing of concrete.
"Q" Lis t No.' 1.205. ONE Hold Tag applied.
Ticket No. 07209 represents 8 cubic yards.
Ticket No. 07209 represents 8 cubic yards.
a ). O P'E'o ui5Posar'oN                                                                                                                                   a . r.ELo oisPos.r.oM REsuLrs QP E'o aECouuENo AiioNi>= oui s to PMoeE:r ENGiNCER.NG
a ).
_11so n n _.is : Cylinder set #732F cast on 1/16/76, from ti:ket #07209 Averaged 3180 psi 0 7 days, or 63.6% of fc'.                               Based on current stren ,th data cylinder set
O P'E'o ui5Posar'oN QP E'o aECouuENo AiioNi>= oui s to PMoeE:r ENGiNCER.NG a. r.ELo oisPos.r.oM REsuLrs
      #732F will exceed 5800 psi 0 90 days.                                       M . F mtL               7-%             M L __ ,       _ t. u . 4
_11so n n _.is : Cylinder set #732F cast on 1/16/76, from ti:ket #07209 Averaged 3180 psi 0 7 days, or 63.6% of fc'.
_Eield recommends "use as is."                                                                                           7 a t. ENGINE E MtNG DISPO5ev EON                                                                                                                                 13, E NG 4N EERING OtSPO51rsON N E $ ULT $s a . es oEssGN CN ANGC REouiNE           ONo O v E3. sE E A11 ACNEo.
Based on current stren,th data cylinder set
U"'."..'"~~~
#732F will exceed 5800 psi 0 90 days.
n .<
M. F mtL 7-%
                                                                                                                                                                    ' ' " ^ " ' * " "
M L __, t. u. 4
                                                                                  .. .. .                                                                          e,.       .....                                      ,,,,
_Eield recommends "use as is."
gRawsNG                       REV.                     DCN
7 a t. ENGINE E MtNG DISPO5ev EON 13, E NG 4N EERING OtSPO51rsON N E $ ULT $s a. es oEssGN CN ANGC REouiNE ONo U"'."..'"~~~
                                                                                                                                                                    **e vasenesse e..ee seen                             ,,,,
' ' " ^ " ' * " "
iPEC.                         R E V.                   ADO I'     '''                                                                                                                            Whete Copy         - Orig,natos                                                         GC-r.3 a Canary Copy       - F eld Ensin.or l' ink Copy       - PGAE Goldenrod copy - oC                                         -
n.<
W JJ                                               .
O v E3. sE E A11 ACNEo.
e,.
gRawsNG REV.
DCN
**e vasenesse e..ee seen iPEC.
R E V.
ADO I'
Whete Copy
- Orig,natos GC-r.3 a Canary Copy
- F eld Ensin.or l' ink Copy
- PGAE Goldenrod copy - oC W
JJ


yJy , ..                                               ,                                  e
yJy,.. '
                                ') '
e
                                        ~                                                                                       '
')
NCNCONFORMANCE REPOitT                                                                                       ' cr' -.''']               37         _
~
W. '4 R A WB;       TNg                     e sM V. 7. PH OJIC T NO.                                                 HEPURTED&V                                   2 5. D 45Po t e T ION CO NC U X M !NC' Spec, Tl20-C-208
NCNCONFORMANCE REPOitT
: 3. 87EM OE SCRIPT ION                     .
' ' ''']
                                                      !5                7220
cr -.
: 0. 0T EM LOC ATION 8 3. V
37 W. '4 R A WB; TNg e sM V.
                                                                                                                                    %D    T  S$ V
: 7. PH OJIC T NO.
                                                                                                                                                              -h' O A TE8/%
HEPURTED&V
E DATE
-h' O A TE8/%
        - ConCrct               1.indar<-                       A i nv . Rld . Slnh 4               Pntir A(6.3 l)h       i                4                 /~20 C. b s N t A L N U M                                     9.5TARTUP57 TE M NO.                                           5. H C A EMENT PART N               3 paces sy Peass emesme se                   e.te N/A                   2' ng                                                           /A                             l NEV.       ,,,,,,, ,,,,,,,,                          ,,,,
2 5. D 45Po t e T ION CO NC U X M !NC' Spec, Tl20-C-208
C. Fu rtCD9 A SE O RDE R MO                               9 o. OC PSE D.D 4N$PECT10 N PL A N NO.                     3 5. REPLAC EM ENT SE RI AL NO.
!5 7220
_nLA C-2 31-4-736               Rev. O _ __I                         N/A                                                                                       * * "
%D
: c. CON TR ACTORiLOC Af SON                                                         s i. AsuE       O vas                                                                   " , * " , , * " , , , ' ' , , '....          ,',.".*.
: 3. 87EM OE SCRIPT ION
lii.souaCE ~                                             , , , ,
: 0. 0T EM LOC ATION 8 3. V T
_.1!nited S ta tes_.Tes t.ing_fo e_Midlan d e_Hf.ch -                                   'na       M_N.O _ I                Subconnster 6 4. Rou f f reg INSTNUCT60N$;                         HOUTE TO FIELD kNG4NEERING                             Q NOU TE TO M A T E NI AL SUPCH V 850R t ). HONCON F O R M 8NG CO NDs T TON.
S$ V E DATE
Specification 7220-C-208 Rev. 5 pa ragraph 7.3.2 states in part that, " Concrete cylinders shall be maintained at a temperature of 60 degrees F to 80 d g,rees F prior to stripping". Contrary to the above, the field concrete cylinder sets (708F, 711F, 714F, 719F, 721F, 724F and 726F) made representing above location on January 9,1976 were initially cured between 60 degree s F and 82 degrees F.                                                                           "Q" List No. 1.205.                       Noncon formance noted during QC review of report of concrete cylinders.                                                         No Hold Tags applied.
- ConCrct 1.indar<-
2 ). O PIELO DISPosaTSON                           FIC LD RECOMMEND ATION/HOUTE TO PitOJE C T ENG4NEER 8NG                                                         2 9. PtE LD DeSPOSITeoas R E5uLTS4 Eic1d._reconmencla_usc as is.                         Durinn the initial curinn acriod of the first 24 hours, a deviation of 2 F for a maximum of 24 hours is an insiinificant period to effect the long range strength development of the field cylindar cast 1/9/76 from place-wn t_A(614)1L                   The_averane 7 day _atrengths of tite field cylinders is 3790 psi -
A i nv. Rld. Slnh 4 Pntir A(6. l)h 4
lowest set averaned 3525 psi and the hinhest averaged 4300 psi. ,
/~20 i
8 3. E N GIN E E H 8NG O B5PO5 ei SON                                                  a klS-+ll3-217L
3 C. b s N t A L N U M 9.5TARTUP57 TE M NO.
                                                                                                                                                  *N     4
3 5. H C A EMENT PART N paces sy Peass emesme se e.te N/A ng
* L .
/A l NEV.
* I LP     2 3. ENG tNEE R ONG D45POSeT SON RESU675:
2' C. Fu rtCD9 A SE O RDE R MO 9 o. OC PSE D.D 4N$PECT10 N PL A N NO.
2f4 IS DESIGN CH AP4GC HEOutN E O                                             * * " *'' C ' ' a " ^ ' ' " ' a ' o ' 5 PO 5' T .O N           a .. e e .-..     e. - ,,.OC-           .ANCE O NO                                                                                                U***
3 5. REPLAC EM ENT SE RI AL NO.
O Y E s. sE E ATT ACNED,             ,,,,,,,                                                                                  ,, ,,,,,,,,                                  ,,,,
_nLA C-2 31-4-736 Rev. O _ __I N/A
DM A WtNr.                         REV.                 DCN a.vme.asesens.ssvee                         , ,.
: c. CON TR ACTORiLOC Af SON s i. AsuE O vas lii.souaCE ~
(PE C.                             R E V.               ADO.
M_N.O _ I Subconnster
t u.s e s                                                                                                                                       whate Copy       - O#ig.nator                                           QCGaa Cenary Copy       - Field Engineer Penk Copy         - PO AE GoWenrod Copy - OC a--.u
_.1!nited S ta tes_.Tes t.ing_fo e_Midlan d e_Hf.ch -
'na 6 4. Rou f f reg INSTNUCT60N$;
HOUTE TO FIELD kNG4NEERING Q NOU TE TO M A T E NI AL SUPCH V 850R t ). HONCON F O R M 8NG CO NDs T TON.Specification 7220-C-208 Rev. 5 pa ragraph 7.3.2 states in part that, " Concrete cylinders shall be maintained at a temperature of 60 degrees F to 80 d g,rees F prior to stripping".
Contrary to the above, the field concrete cylinder sets (708F, 711F, 714F, 719F, 721F, 724F and 726F) made representing above location on January 9,1976 were initially cured between 60 degree s F and 82 degrees F.
"Q" List No. 1.205.
Noncon formance noted during QC review of report of concrete cylinders.
No Hold Tags applied.
2 ).
O PIELO DISPosaTSON FIC LD RECOMMEND ATION/HOUTE TO PitOJE C T ENG4NEER 8NG 2 9. PtE LD DeSPOSITeoas R E5uLTS4 Eic1d._reconmencla_usc as is.
Durinn the initial curinn acriod of the first 24 hours, a deviation of 2 F for a maximum of 24 hours is an insiinificant period to effect the long range strength development of the field cylindar cast 1/9/76 from place-wn t_A(614)1L The_averane 7 day _atrengths of tite field cylinders is 3790 psi -
lowest set averaned 3525 psi and the hinhest averaged 4300 psi.
klS-+ll3-217L
*N 4
* L.
* I LP 2 3. ENG tNEE R ONG D45POSeT SON RESU675:
8 3. E N GIN E E H 8NG O B5PO5 ei SON a
2f4 IS DESIGN CH AP4GC HEOutN E O O NO
* * " *'' C ' ' a " ^ ' ' " ' a ' o ' 5 PO 5' T.O N a.. e e.-..
: e. -
,,.OC-
.ANCE U***
O Y E s. sE E ATT ACNED, DM A WtNr.
REV.
DCN a.vme.asesens.ssvee (PE C.
R E V.
ADO.
t u.s e s whate Copy
- O#ig.nator QCGaa Cenary Copy
- Field Engineer Penk Copy
- PO AE GoWenrod Copy - OC
'a--.u


Q i
i Q
d F                   =
d F
1' NONCONFORMANCE REPORT                                                                                                                 "'
=
: c. DR A wsNG,P A R T NO.                 i R E V.                                                   ~
1' NONCONFORMANCE REPORT
                                                                                                                                                                      ' ' "''{
' ' "''{
Or                            ''f 1<2"'
''f " '
T. PROJE CWis.                                           ErORTEDmy                      I DATE
Or 1<2
                                                !0 i
: c. DR A wsNG,P A R T NO.
zS. DiSPoseT eoM CONCURRENCE FSP-C-2 3',                                                 722')
i R E V.
3 S TE M DESC RtPT90N                              4. ST EM LOC ATION v e Il?>/-u-- ! 951/4                       "*""          " ' ' " '    " ' " ' "
T. PROJE CWis.
j '"" " "
~
* 3. V A LID A T E D S v #             'DATE
I i
      '''' I,ia. r Plate Assanly Ji: B1th. Area (For Cont.
ErORTEDmy DATE zS. DiSPoseT eoM CONCURRENCE FSP-C-2 3',
l C. S E R I A L N UM BE R l) Nf                  M Lt        '
!0 722')
l 0 37 A
v e Il?>/-u-- ! 951/4
" ' " ' " j '"" " "
3 S TE M DESC RtPT90N
: 4. ST EM LOC ATION
* 3. V A LID A T E D S v #
'DATE
'''' I,ia. r Plate Assanly Ji: B1th. Area (For Cont.
l) Nf M Lt l
l 0 37 A C. S E R I A L N UM BE R
: 9. ST A N TUP SY ST E M NO.
: 9. ST A N TUP SY ST E M NO.
'                                                                                                              S. R E PL A CE M E N T PA R Y NO.           REV.       **.s. c v e s. 6e s ee.e.e s.                     ****
S. R E PL A CE M E N T PA R Y NO.
        - .c . .L-li- 1
REV.
_n/A                                                      "/A S. PURCH ASE ORDER NO.                                                         _
**.s. c v e s. 6e s ee.e.e s.
I               .... .        ...
-.c..L-li-1
g o. OC FIE LD GNSPEC TfON PL an N NO.                                                                                                                        ....
_n/A S. PURCH ASE ORDER NO.
"/A I
g o. OC FIE LD GNSPEC TfON PL an N NO.
: 4. RE PL A CE ME N T SE R3 AL NO.
: 4. RE PL A CE ME N T SE R3 AL NO.
7 721-C-5dA                                         C-111-63                                                 ':/A                                               - - "          - - - - - -                                    *=
7 721-C-5dA C-111-63
':/A
*=
4 CONT R ACTOR / LOC ATION
4 CONT R ACTOR / LOC ATION
                                                                      } ,8gg ,3{g .St.ASME     Q VES           T. SOURCE Southeirn hoiler & Tan!: 'lorha , In c. -To m .                                   ,,,,
},8gg,3{g.St.ASME Q VES T. SOURCE Southeirn hoiler & Tan!: 'lorha, In c. -To m.
                                                                                        .T E M O NO                Vendor NOUTING GNSTRUCT80NSt                                                                     ~
O NO Vendor
Q al'uTc 'o M a'<a'a' supe avisoa Q ROUTE TO F8 ELD ENGeNEhRING 9 9. NONCO N F O R MING CONDIT ION:
.T E M NOUTING GNSTRUCT80NSt Q ROUTE TO F8 ELD ENGeNEhRING Q al'uTc 'o M a'<a'a' supe avisoa
A t'istrenaacv exin ts bettmen _ntil sini _nunhsr_<Lo_cuncutntion   r                                              und the venc! ora trans ferred st.tn si ab nurber.
~
i.bcuncatation sicat Number is 51GAa703 uith S Lab :iu::ibc c A79070. The nlate is vendor transferred staaped .21GA0733 vith laat. di;;it in clab nua'ior in question A79377.                                                       Discrepancy detected durian OC field int,pection review. One !!ald Tag attached. Item "0" No. 1.109.
9 9. NONCO N F O R MING CONDIT ION:
19     Q F 0 ELD DISPOSOT 60H                 QF6 ELD RECOMMENDATION / ROUTE TO PROJECT EP G4NEERING                                                       15. FIELD DISPOSlTlON RESULTS:
A t'istrenaacv exin ts bettmen _ntil sini _nunhsr_<Lo_cuncutntion und the venc! ora trans ferred st.tn r
si ab nurber.
i.bcuncatation sicat Number is 51GAa703 uith S Lab :iu::ibc c A79070.
The nlate is vendor transferred staaped.21GA0733 vith laat. di;;it in clab nua'ior in question A79377.
Discrepancy detected durian OC field int,pection review.
One !!ald Tag attached.
Item "0" No. 1.109.
19 Q F 0 ELD DISPOSOT 60H QF6 ELD RECOMMENDATION / ROUTE TO PROJECT EP G4NEERING
: 15. FIELD DISPOSlTlON RESULTS:
: 22. EPeGtHE E RING DISPOSIT BON
: 22. EPeGtHE E RING DISPOSIT BON
: 23. ENG tNEERtNG DeSPOSITsON RESULT $r i
: 23. ENG tNEERtNG DeSPOSITsON RESULT $r i
e 3 3. :S DESiGM CN AraGE REOuenED ONO                                   ** "'''''' " ^ ' ' " ' ^ ' ''" '"' "                                             ''-'^'''"^"''
e 3 3. :S DESiGM CN AraGE REOuenED ONO
O vES. SEE ATvACNEDe                .. ....
** "'''''' " ^ ' ' " ' ^ ' ''" '"' "
U""..".'"~~''"
U""..".'"~~''"
O .e DR AWING                       R E V.               DCN                                                                                                                                                       ....
' ' - ' ^ ' ' ' " ^ " ' '
                                                                                                                                                                  .wveso.eae e e.ees ce..                         e.te
O.e O vES. SEE ATvACNEDe DR AWING R E V.
    $ PE C.                       REV.               ' ADD.
DCN
    '^''''
.wveso.eae e e.ees ce..
White Copy       - Originator                                                       QC-Ga-a Canary Copy       - Field Engineer Pink Copy         - PQAE Gosdenrod Copy - OC 1               /
e.te
$ PE C.
REV.
' ADD.
' ^ ' ' ' '
White Copy
- Originator QC-Ga-a Canary Copy
- Field Engineer Pink Copy
- PQAE Gosdenrod Copy - OC 1
/


1 s:
1 3
3
s:
                                                                                                                                                                                                -. - - v. ~                         -      -
NONCONFORMANCE REPORT
NONCONFORMANCE REPORT                                                                                                    '"^~~''                           " ' " ' " "
-. - - v. ~
WEPA R T N O.                         , R E V. v. PROaC T NO.                                         Ti . N E PO R T EH, o r _ __ 1                            373 Spec.-7220-C-208
' " ^ ~ ~ ' '
: 3. STEM DESCRtPT80N l5                     7220
WEPA R T N O.
: e. IT EM LOC AT ION
o r _ __ 1 373
                                                                                                                                    %      m-    t N.,        .-,\
, R E V.
                                                                                                                                                                        .oATE l\-Wh..                      2.. o sPOS,T.O N CON gc R,.E NCE
: v. PROaC T NO.
                                                                                                                                                                                                - - - -            m"                          - " ' -       " * -
Ti. N E PO R T EH, Spec.-7220-C-208 l5 7220
l'our A 614 1                     t!
.oATE 2.. o sPOS,T.O N CON gc R,.E NCE t N.,.- l\\-Wh..
5V A LIDATED BY                     I DATE                                                  l ~ ~ '-
,\\
___Cucretc_._ Cylinders                           Auxddg.__EIPJDE                         E it lab __ 'd*/te / W r M /- W. . r# -N 1
: 3. STEM DESCRtPT80N m-l ~ ~ '-
* C. L E R $ A L N UM BE R
m"
: e. IT EM LOC AT ION l'our A 614 1 5V A LIDATED BY I
t!
___Cucretc_._ Cylinders Auxddg.__EIPJDE E it lab __ 'd*/t / W r M - W.. r# -N 1 DATE e
/
C. L E R $ A L N UM BE R
: 9. S T A R T UP S YS TE M NO.
: 9. S T A R T UP S YS TE M NO.
                - tI/A                                                     MLA                                              '
- tI/A S I' R EPL ACE M E N T P A R T NO.
S/
3 R E V.
I' R EPL ACE M E N T P A R T NO.
* * *
* e c t * * * ** * *=- *n e e.
eat.
MLA
_ _.l![A
'/
I
/
r #
r #
3 I
I W PURCH ASE ORDER NO.
R E V.          * * *
* e c t * * * ** * *=- *n e e .                eat.
W PURCH ASE ORDER NO.
9 0. QC P sELD GN SPEC TION PL A N NO.
9 0. QC P sELD GN SPEC TION PL A N NO.
_ _.l![A                '/                I                  ...,,,,.              ...                            ....
: 44. REPLACEMENT SENsAL NO.
: 44. REPLACEMENT SENsAL NO.
_2UA                                                         C-2al-4-739
_2UA C-2al-4-739
: c. Cs N T,,4 C T O , LOC AT ON                                                                                     _.2;LA                                                          --*            - - - - - - -                        --
_.2;LA
                                                                                                    ...;SM;,, o TES n.=URCE
: c. Cs N T,,4 C T O, LOC AT ON
__Upf,tn.N
...;SM; o TES n.=URCE
                .s. ROUT            G .N S T R UC T .O             N S..d   a States Togtian_Qo,.._, iTE M  O NO         flidlandcon
__Upf,tn.N G.N S T R UC T.O N S..d States Togtian_Qo,.._, flidland _llich NEER.NG O NO
__,_Sph         _llich tXqcNEER.NG t.qr                                                                         ,
__,_Sph con tXqc t.qr a
g ROurE       TO riELD   ENG O RO .T E T O M AT ERe Ai. SUPE RviSOR
iTE M
                .t.NONCONPORM.NG CONo.Y.ON. Specification 7220-C-208 Rev. 5 paragr1ph 7.3.2 states in "part                                                                                          ,        Concrete   that cylindes shall bn maintained at a temperature of 60 degrees F to 80 degre 2s F prior to stripping." Contrary to the above, the
.s. ROUT g ROurE TO riELD ENG O RO.T E T O M AT ERe Ai. SUPE RviSOR
_ field concrete cylinder sets (728F and 73')F) made represen:ing above location on 01/1/i/76 were initielly cured between 56 degreca F to 65 degrees F.                                                                                                                               _
.t.NONCONPORM.NG CONo.Y.ON. Specification 7220-C-208 Rev. 5 paragr1ph 7.3.2 states in part that
" Concrete cylindes shall bn maintained at a temperature of 60 degrees F to 80 degre 2s F prior to stripping."
Contrary to the above, the
_ field concrete cylinder sets (728F and 73')F) made represen:ing above location on 01/1/i/76 were initielly cured between 56 degreca F to 65 degrees F.
In addition, lab concrete cylinder sets (727 and 729) representing sar.e
In addition, lab concrete cylinder sets (727 and 729) representing sar.e
_ location were initially cured between 63 denrecs F and 81__.!cgrees F. "O" List No. 1.205.
_ location were initially cured between 63 denrecs F and 81__.!cgrees F.
Monconformance noted LO during QC review of report of concrete cylinders. No hold tags applied.                                                                                 -
"O" List No. 1.205.
C PRELD DISPOSlTION QPIELD RECOMMENDATION / ROUTE TO PROJECT ENC eNEERING al. PIELD 08SPOSSTION R ESULT St s
Monconformance noted during QC review of report of concrete cylinders. No hold tags applied.
                                                                                                                                                                                                                                                                    ~
LO C PRELD DISPOSlTION QPIELD RECOMMENDATION / ROUTE TO PROJECT ENC eNEERING al. PIELD 08SPOSSTION R ESULT St s
~
s
s
: 27. KNGINEENING Da%POSeiSON
: 27. KNGINEENING Da%POSeiSON
: 23. ENGINEE RgNG OISPOSIT40N RESULTSs a
: 23. ENGINEE RgNG OISPOSIT40N RESULTSs a
f b
f b
2 3. 0) DESIG N CH ANGC HEQUeHED                                             *A"E'Ec'E O NO                                                        M A TERI A L 8SP 3 SIT 80N               O ==vvaaro*weeue=               27.ce         C,,,rANCE O TES. SEE 47Y ACMEo,                   . . . . , , ,
O NO
Crt AWING                     REV.               OCN                                                                                                                   J #c**semese                                                 . ,,
*A"E'Ec'E 2 3. 0) DESIG N CH ANGC HEQUeHED M A TERI A L 8SP 3 SIT 80N O==vvaaro*weeue=
SPEC.                         REV.                                                                                                                                          avveeeeese ,eneescre.
27.ce C,,,rANCE O TES. SEE 47Y ACMEo, Crt AWING REV.
ADD.                                                                                                                                                                               ,,,,
OCN J #c**semese avveeeeese,eneescre.
ame e White copy           - Origenator e C<.3 a Canary Copy         - Field Engineer Pink Copy           - POAE Condenrod Copp - OC e
SPEC.
                                                                                                                                                                                                                                          @                r 4                                                                                                                         %
REV.
                                                                                                                                                                                                                                                                          =
ADD.
w _ _ _ _ _ _ _ _ _ _. -                      -
ame e White copy
 
- Origenator e C<.3 a Canary Copy
          *1j                                                                                                                                                                                         s NONCONFORMANCE REPORT                                                                                                       1
- Field Engineer Pink Copy
                                                                                                    , , = - - - - -                                              -
- POAE Condenrod Copp - OC e
Oi                            174
r 4
: 2. DN A WING /P A R 7 NO.                 .R E Y. 7. PROJE C 7 NO.                                       I 2. M E PO RTED Dv                                     2 5. O s5PO51Y IO N CC6HC U R R E NC E lDATE
=
_ Spec. C-230                           l5               7220                                 _
w
                                                                                                                      .                 :" ,        Ii   ~r:       ~~~""         ~"*"       ""~       ' " * ' ' "    **'
* 1j s
: 3. IT E M DE SC R IPTION                            S. 8 TEM LOC ATaON                                    0 3. V ALGO AT ED S V                   I D      ,
NONCONFORMANCE REPORT 1
Concrete                                     Aux. liidg. Pour FPBS A(633.2 >)a L.1,iA ,. p p A $'h" /'h ATE'Y 7t
174
: 4. SE Re A L N UMRE R                               9. S T A R TUP S v5 TEM NO.                             9 5. REPL A C E M E N T P A RT NO. *       'REV.         ...se ct e as te e ..e.e s.                   DA's
: 2. DN A WING /P A R 7 NO.
  - N/A                                                        N/A                                  _
,, = - - - - -
N/A                        !        l            . . . , , , , . . . . . .                    ....
Oi
S. PURCH ASE O R DE R NO.                           99. QC F8ELO GNSPECTtON PLAN NO.                       9 4. R E PL A CEM E N T SE R 0 A L NO.
.R E Y.
N/A                                                     C-2 31-3-749                                           !:/A                                             - - - ~ ~ " - - - -                           --
: 7. PROJE C 7 NO.
  .. CON T R A CT ORiLOC AT ON                                                     ...AsME                     is. SOURCE CODE . (j vEs                                                                    ,,,,,,,,,,,,,,,,,,,                          ,,,,
I 2. M E PO RTED Dv lDATE 2 5. O s5PO51Y IO N CC6HC U R R E NC E
US Testin   g / !!dl_and. ''ichican                                           iT E M O NO , _                 Subcontractor                                                                                             _
_ Spec. C-230 l5 7220
t o. ROU FING INSI ST UC TIONS:
: 3. IT E M DE SC R IPTION S. 8 TEM LOC ATaON Ii
QROUTE TO FIELO ENGtNEERONG                       O aou's to M Avra' A' $uPravisoa 9 9. NONCONFORMING CONDIT goNr Spec. 7220-C-230 nev. 5 Table 9.1. 3 staten in part that sitmp measureuent shall be mada for overy 35 cu'ile yards or fraction thereof of concrete produced for clann I structures.                                                                             Contrary to the above on Aux. 111d g. Pour A(633.25)a' test vere taken at 175 cubic yards and 216 cubic yards.
~ r :
An interval of 4f1 cubic yart was placed. Nonconformance noted during QC review of QC-12 Form.                                                           "Q" List No. is 1.205.                           Hold Tag Applied (1).
~~~""
: 29. O P'<'o pasPosar'oa                     Or'c'o arco ="cao Avioataou'r to Paoe'.cr racia==aiao                                                             s ' ric'o o'5Posiveoa a ssu'vs.
~"*"
: 22. ENG5N EERONG DSSPO5sf EON                                                                                                                                   2 3. E NCONE E R$NG Os5 POSITION R ESULTS:
""~
                                                                                                                                                                                                                                    \
0 3. V ALGO AT ED S V I
: 24. s oEseGN CH ANGT REOUGHED                                                26. R EJECTED M ATENIAL DISPOS 8TaON O NO O v Es. EE ATT ACNEc.
Concrete Aux. liidg. Pour FPBS A(633.2 >)a L.1,iA,. p p A $'h" /'h ATE'Y 7t D
: 4. SE Re A L N UMRE R
: 9. S T A R TUP S v5 TEM NO.
9 5. REPL A C E M E N T P A RT NO. *
'REV.
...se ct e as te e..e.e s.
DA's S. PURCH ASE O R DE R NO.
: 99. QC F8ELO GNSPECTtON PLAN NO.
N/A l
- N/A N/A 9 4. R E PL A CEM E N T SE R 0 A L NO.
N/A C-2 31-3-749
!:/A
- - - ~ ~ " - - - -
CODE. (j vEs is. SOURCE
.. CON T R A CT ORiLOC AT ON
...AsME US Testin / !!dl_and. ''ichican O NO, _
Subcontractor g
iT E M t o. ROU FING INSI ST UC TIONS:
QROUTE TO FIELO ENGtNEERONG O aou's to M Avra' A' $uPravisoa 9 9. NONCONFORMING CONDIT goNr Spec. 7220-C-230 nev. 5 Table 9.1. 3 staten in part that sitmp measureuent shall be mada for overy 35 cu'ile yards or fraction thereof of concrete produced for clann I structures.
Contrary to the above on Aux. 111d g. Pour A(633.25)a' test vere taken at 175 cubic yards and 216 cubic yards.
An interval of 4f1 cubic yart was placed. Nonconformance noted during QC review of QC-12 Form.
"Q" List No. is 1.205.
Hold Tag Applied (1).
29.
O P'<'o pasPosar'oa Or'c'o arco ="cao Avioataou'r to Paoe'.cr racia==aiao s ' ric'o o'5Posiveoa a ssu'vs.
: 22. ENG5N EERONG DSSPO5sf EON 2 3. E NCONE E R$NG Os5 POSITION R ESULTS:
\\
O"'..".*"""''""
O"'..".*"""''""
O ee 2 7. OC ACCEPTANCE
: 24. s oEseGN CH ANGT REOUGHED O NO
                                                                              .. ....                                                                              ...    .e....                                  ....
: 26. R EJECTED M ATENIAL DISPOS 8TaON 2 7. OC ACCEPTANCE O ee O v Es. EE ATT ACNEc.
DR A WONG                     REV.               DCN
.e....
                                                                                                                                                                    .u s.o.ea s e eme s.e e,o.                     e.,,
DR A WONG REV.
SPEC.                         REV.                 ADD.
DCN
seese s                                                                                                                                   WNie Copy       - Originator                                                 Q C <. 3-a Canary Copy     - Field E n2in**r Pink Copy       - POAE Goldenrod Copy - QC J
.u s.o.ea s e eme s.e e,o.
e.,,
SPEC.
REV.
ADD.
seese s WNie Copy
- Originator Q C <. 3-a Canary Copy
- Field E n2in**r Pink Copy
- POAE Goldenrod Copy - QC J
4
4


                                                                                                                                                                                                                                                        ;..
g"g uo - - - - - - - -
g"g uo - - - - - - - -
(lUAUT! AUET F!ND!NG                                                                                                                                                 L .?2 515-1-u           ,,
(lUAUT! AUET F!ND!NG L.?2 515-1-u i.1/19/76
i.1/19/76
..~
                                                                                                                                                                                                                                                                  ..~
i 1
_                                                                                                                                                                                                                                      i 1
.....u..m.
.....                      .....u..m.                                                                                       ..            . . . . . , . . . . ,
g,,.,,
g,,.,,                               . . . . . .
Iland 1 & 2/ Job 7220 Construction B. Stojkov
Iland 1 & 2/ Job 7220                                                                                                           Construction                                                             .',*e=
.',*e=
B. Stojkov
: r......
: r. .....                                        . . . . . . . , . . . .
M/A 15-1-P-3', I tems NCR Log, Transmittal File J.' Miller, D. Palmet l
M/A                                                   15-1-P-3', I tems                                       NCR Log,                           Transmittal File                                                                                         J.' Miller, D. Palmet l
.....uw...........................
    .....uw...........................                                                                                                                                          ........
C. Newton, D. Long - i FIP G-3, Rev. 6, S/17/74, para. 4.6.2 Para. 4.6.2 Raads in part:- "The PFE's authority to make 51sposition 'of.nonconformances-chall be subject' to... the following:
                                                                                                                                                                                ,                                                                              C. Newton , D. Long - i FIP G-3, Rev. 6, S/17/74, para. 4.6.2 Para. 4.6.2                                     Raads in part:- "The PFE's authority to make 51sposition 'of .nonconformances-                                                                                                                                                                                                                     -
c.
chall be subject' to . . . the following:                                                                                                                             -                                                                                                                                                              , ,
Use approved repair procedure:
: c.                   Use approved repair procedure:                                                                       Requires notification of the'PE prior to or -
Requires notification of the'PE prior to or -
                                              . concurrent with implecentation.                                                                                                                                                                                                                                                     -
. concurrent with implecentation.
                                          ' Reject: Requires notification of the PE prior 'to or concurrent with
d.
: d.                                                                                                                                                                                                                                                      '
' Reject: Requires notification of the PE prior 'to or concurrent with implementation for items pugchased to an engineering specification".
I implementation for items pugchased to an engineering specification".
s-
s s-       -w                 -
-w i
                            .; c.        ,. . ,              c. ...                                -                                                                                                                                                                      .
s
                                                                                                                                                                                                                                                                                                                        .7                               i
.; c.
                                                                                                                                                                                                                                                                                                              ; ., . -
.7 c.
The PE's files were checked for the presence o'f copies of five (5) dispositioned NCR's (255, 297, 327, 342 and 354) and'fiiTe (5) closed NCR's (307, 317, 348,. 349 and 353) .which had d.thar "use approved repair procedure".or'"p$8 ject" dispositions.' - No evfdance that project in
The PE's files were checked for the presence o'f copies of five (5) dispositioned NCR's (255, 297, 327, 342 and 354) and'fiiTe (5) closed NCR's (307, 317, 348,. 349 and 353).which had d.thar "use approved repair procedure".or'"p$8 ject" dispositions.' - No evfdance that project in wring had been notified was available at the site or Project office. for'six (6) NCR','s.
      /2                  wring had been notified was available at the site or Project office. for'six (6) NCR','s.
/2 354, 307, 348, 349-and 353).
354, 307, 348, 349-and 353).                                                        .
~
                                                                                                                                                                                                          ~
.~
i
s i
                                                                                                                                                                                                                                                                                  .                    s       .
y.
                                                                                                                                                                                                                                                                                                                                                .~
- i.
: y.                                                                             -
s
s
_          - i.            .
~
                                                                              ~                          .                                                                                                                                                                      r
r s.
                                                                                                                                                                  .                                    ,                  s.                                                                 . ,                                      -
.y.
          .                          .                        .                                      .y.                                                                                                                       -                          >                                        -
' Datermine which NCR's having "use approved repair procedure" or " Reject" dispositions 1.*
1.*
have not been transmitted to the PE and transmit immediately.
                      ' Datermine which NCR's having "use approved repair procedure" or " Reject" dispositions
^
  . '.                  have not been transmitted to the PE and transmit immediately.
2.
                                                                                  ^
'The PFE, in coordination with the PFQCE, establish a cathod to assure ~ timely trans -
: 2.               'The PFE, in coordination with the PFQCE, establish a cathod to assure ~ timely trans -
taittal of subject NCR's to PE.;.
taittal of subject             ...
A
NCR's to PE.;.                                                                                                           . .'                                                                                      .                                  --
~.
                            . ,                          A       ,,                                                                ~.                                                                                                                    ,              .          - .                          .
c 4,
:;                                      c                                       .
....s.
4 ,                     ....s.          . ....                                              . . .        . . , . . . . . . . . . . , . . . . . . . . .
1:
1:             1/30/76, 2:                               2/23/76                           Proiect Suoerintendent                                                                                                                                                                                                                               "
1/30/76, 2:
  ... m u ,,... ,....
2/23/76 Proiect Suoerintendent
)                                                                                                                                                             <                                      =
... m u,,...,....
                                                                                                        's                 .                .                                                                                                                                                                                      ..
)
b-
=
: m.                                                          .                      . . . .
's b-
            -(v;
-(v; m.
                                                                                                                                                                                                                                                                                                            ?'. g ."h .
?'. g."h.
                                                                                                                                                                                                                                                                                -y
-y
  .m....                                                   .                                                      .-
.m....
,...~.s.................
,...~.s.................
ummu.euuuuuuum.                                       =m                                 -                                                          . .                          , ,
ummu.euuuuuuum.
miii     um   -          m         ,a           m m. mmsus su     mas,..
=m miii um m
* p' :
,a m m. mmsus su mas,..
73( 2-1-2)
 
                                                                                                                                                                                                                                              ;
p' QUAUTY AUDlT END1HG 73( 2-1-2) 1 l
QUAUTY AUDlT END1HG                                                                                                                _ . . . .
l,,..,.1/20-2 2 /
1 l
0 M/A
0 l,, M/A  . .,.1/20-2 2 /
: g...
: g. ..                      .
'diand 1 & 2 Construction O......
          'diand 1 & 2                                                                   Construction                                                                                         s. stojkov
: s. stojkov n.
: n.      . . . , . .          ............                    . . . . . . . .
:i/A 12-1-P-2 Item 1 FMR-1 PO Files R. Mathews, R. Grote
O .. . .. .
:i/A                       12-1-P-2 Item 1                       FMR-1 PO Files R. Mathews, R. Grote
_.,4.,u....
_.,4.,u....
                      ... ..................... .....                                                                    n......
n......
7220-C-233(Q) Rev. 5 9/22/75 Append. A                                                                                 7220-C-23 Rev. 3, 4/15/74 Append. 1
7220-C-233(Q) Rev. 5 9/22/75 Append. A 7220-C-23 Rev. 3, 4/15/74 Append. 1
                                                                                                                                                                                                                                        ~
~
O C-233(Q) Appendix A, states in part, "The seller / subcontractor shall establish and maintain and effective QA Program which will caet the applicable requirements of G-23 . . .".
O C-233(Q) Appendix A, states in part, "The seller / subcontractor shall establish and maintain and effective QA Program which will caet the applicable requirements of G-23...".
G-23, Appenix 1, states in part, "With the proposal, each bidder shall submit a su:=aary d scription of his QA Program . .. , or an uncontrolled copy of his QA Manual or procedure.
G-23, Appenix 1, states in part, "With the proposal, each bidder shall submit a su:=aary d scription of his QA Program.
If a bidder is currently performing' to or has cocpleted a Bechtel order which invokes the. re-quirecants of this specification, he nay, in lieu of submitting a copy of his manual, submit a latter listing the date of BechtMcSWEnual revision that is currently in effect or was in affect, and a statement that it will apply for this effort."                                                                                                               ..
, or an uncontrolled copy of his QA Manual or procedure.
                                                      ...r.                           .,.~:                     ..                .
If a bidder is currently performing' to or has cocpleted a Bechtel order which invokes the. re-quirecants of this specification, he nay, in lieu of submitting a copy of his manual, submit a latter listing the date of BechtMcSWEnual revision that is currently in effect or was in affect, and a statement that it will apply for this effort."
:- i. w ca :. ; ., . ..w.,n
...r.
                                                                                                                      .,              ,. , ,...m           . . . . , .
.,.~:
                                                                                                                                                                                      .. .g
:- i. w ca :. ;.,...w.,n
  ;. . ...
,.,,...m
Purchase Orders 7220-F-12726(Q) and 7220-F-12974(Q) resulting from FMR's CA-3038 and CC-2131, respectively, were a.earded to Inland-Ryerson. Specification 7220-C-233(Q) Rev. 5 is the controlling specification on both orders.                                                   Subsequently, 7220-G-23 is also applicable. Inland RE~on is currently performing work controlled by Specification 7220-C-233(Q), and has sub-
...g Purchase Orders 7220-F-12726(Q) and 7220-F-12974(Q) resulting from FMR's CA-3038 and CC-2131, respectively, were a.earded to Inland-Ryerson.
      *%            ) and had approved for use a Quality Assurance Manual. However, on neither of the sul i 4rder: h:: I:1:n?. P.Jcr ca sul.sitte' a le s. Lu siaLing thac the work to ce pertorned on                                                                                                                                       ,
Specification 7220-C-233(Q) Rev. 5 is the controlling specification on both orders.
the orders will be controlled by their currently approved program as specified in 7220-G-23, Apprndix.1. ,                   ,  ....-            -
Subsequently, 7220-G-23 is also applicable.
                                                                                  .              .            :: . -                    :            . ' .; :            -
Inland RE~on is currently performing work controlled by Specification 7220-C-233(Q), and has sub-
                                                                                                                                                                                    , . a. n
) and had approved for use a Quality Assurance Manual.
                                                                                                                                                                                                                            ~
However, on neither of the sul i 4rder: h:: I:1:n?. P.Jcr ca sul.sitte' le s. Lu siaLing thac the work to ce pertorned on a
                                                                                                              ~
the orders will be controlled by their currently approved program as specified in 7220-G-23, Apprndix.1.,
                                                                          ~
,. a. n
                                                                                                                                -      . ;. . . . . .
~
                                                                                    .                                .v                                      . ..: . ~ : a n .- 5                           .
~
                                                                                                                ,.1-                                     =       . . .          ,.g ,-        .                    *
~
  . . u... m a. . s o .
.v
                                          *.                      *                    ='                         *.
...:. ~ : a n.- 5
                                                                                                                                                      -- ==.. s; <* , a
,.1-
* s_,''y3.;                     *.  *
=
: 1.                                                                                                                                                                          .
,.g
Obtain from Inland-Ryerson stattent of the applicablity of their currently approved QA
.. u... m a.. s o.
  .                Program to the subject orders as specified in 7220-G-23, Appendix 1.
='
                                                                                                                  ,,                        . ;    . .. v,,               . . y .-
--==.. s; <*, a
: 2.             Reinstruct Field' Buyers to obtain satisfaction of QA requirements prior to award of Purchase Orders as specified.                                                   .                                        "            -
* s_,''y3.;
                                                                                                                                                                    .          r.                .
1.
'                                                      ........n...................
Obtain from Inland-Ryerson stattent of the applicablity of their currently approved QA Program to the subject orders as specified in 7220-G-23, Appendix 1.
v,,
.. y.-
2.
Reinstruct Field' Buyers to obtain satisfaction of QA requirements prior to award of Purchase Orders as specified.
r.
........n...................
1; 01/30/76:
1; 01/30/76:
  .. kg4*r.w3 d66 1.. ..ss . ''.
2: 02/27/7[
2: 02/27/7[                  Project Superintendent
Project Superintendent
                                                                                    , , *                      . . ~ , .             . . .                                                ..                . .
.. kg4*r.w3 d66 1....ss. ''.
                                                                                                                                                                                                                        '~
'~
.. ~,.
4
4
                                                                                                            . . -                        .' ?'                                           .
.' ?'
                                                                                                                                                                                      ''.*.\
''.*.\\
(
(
                    ).
).
r   a s     /                                                                                                                                                                                                   **
a r
                                                                                                                                                                                                                              .,.,.4**
s
u,_..                              ..
/
b                                l,....n...,...................                                                                                                                                             -
.,.,.4**
                                                                                                                                                                                                                                        ---=
u,_..
l Etzw m... . . ... .. . . . .. .
l,....n...,...................
b
---=
l Etzw m................
i
i
                                              .*N         * '
.*N
                                                                                          .Wm 6e
.Wm 6e
_ emm-a g               ,,
_ emm-a g 4
4    , ,,                        gg -                     _,,,3_
gg -
_,,,3_


              ,                                                                                                                                                        y,. . . . ._ ..
y,....._..
s$r, D       .
s$r, D
QUAUTI AUDIT RNDlMG                                                                                       _ m.!"-' -"
QUAUTI AUDIT RNDlMG
l 01/20
_ m.!"-' -"
                                                                                                                                                                        .......         -22/76
01/20
                                                                                                                                                                                    ^
....... -22/76
                                                                                                                                                                                                                        .. l g .. .
^
g...
aai.na 1
aai.na 1
: t. ?
: t. ?
                                .....u.,....                                ..........
rn, e.,,. s n-
rn, e .,,. s n-                             ] - '*=                     n e , q . ., , .
] - '*=
                                .                                         s                                                                                          .
n e, q..,,.
11/A                           12-1-P-L: Iten 4
.....u.,....
;. >... .. .... ...... ...................
s 11/A 12-1-P-L: Iten 4 RIR/PO Files T.
RIR/PO Files                                                                             T.       m .:-n, a       n_     pn1 .
m.:-n, a n_
i l
pn1.
FPC-9 Rev. 3, 9/5/75 Para. 3.10.1                                                                                                                                                                                     l "FP-9 " Reparation of Field Ifaterial Requisitions"                                                                                                                                                                   l Pera. 3.10.1 states in part, "Q-Listed caterials shall be identified in the initial des-cription by the statement "Q-Listed Material".
i FPC-9 Rev. 3, 9/5/75 Para. 3.10.1 l
1 l
"FP-9 " Reparation of Field Ifaterial Requisitions" Pera. 3.10.1 states in part, "Q-Listed caterials shall be identified in the initial des-cription by the statement "Q-Listed Material".
l
                                                                                                    ,
* I.s
* I.s
                                      .            ..:.              .        . . .    =. ~.               -
=. ~.
                                                                                                                              -.ca..-                       . . - ~i:
-.ca..-
l o
.. - ~i:
Two no (2)   of the dentify        the'seven nateri'ai    (7) as na's       for "Q-Listed" "Q-Lis          ted".          material checked (CA-3040 and AM-1006) did n
o Two (2) of the seven (7) na's for "Q-Listed" material checked (CA-3040 and AM-1006) did no dentify the' nateri'ai as "Q-Lis ted".
(NOTE:           The FMR's were processed as "Q-Lis ted"                                                               ;
(NOTE:
al even though not identified as such and the resulting Purchase Orders were correct.                                                                                                             ;
The FMR's were processed as "Q-Lis ted" al even though not identified as such and the resulting Purchase Orders were correct.
I         .ficd.)                                                                           .
n I
                                                                  ~
.ficd.)
                                        .                                                                                                                      ~ ....-                                 _
~
                                              .      . z. . -  -                                          -
~....-
                                                                                                                        .-          ~...                  ..
. z.. -
~...
:-t o__..m.......
:-t o__..m.......
it
it 1.
: 1.           Assure that. all RfR's for "Q-Listed" material have been identified as "Q",                                                                                               prccessed and purchased as "Q-Listed".                                                                 '
Assure that. all RfR's for "Q-Listed" material have been identified as "Q", prccessed and purchased as "Q-Listed".
                                                                                                                                                                          ' ^ '                                   -
' ^ '
: 2. . Reinstruct Field Engineers as to the requirements for writing and processing FMR's for "Q-Listed" material.                                                                       -
: 2.. Reinstruct Field Engineers as to the requirements for writing and processing FMR's for "Q-Listed" material.
: u. . m ... . .. ....                                               .........m.,..........,,......,
: u.. m..........
3                                                               ..
.........m.,..........,,......,
1 & 2:             02/27/76                                           Project Superintendent                                                                                                                         ,
3 1 & 2:
l
02/27/76 Project Superintendent
            ,m............
,m............
U
U m.-
                                            , , ,                                                                .                                    .                  m.-     .
.m
m                                                   :                              .
{y\\
{y\
o..
o..
                                                                                                                                                                                          .#f r.n             .u r..                . ... .. .. ......... . .........
.#f r.n
D                                   **
.u r..
m.w u . . . . .. . . . .. . . 7 , . .                                                                                                                                                             -
D m.w u............. 7,..
a                                                                                                                                                                                         ....
a k
k J                                                               ,.
J
l


                      .                                                                            Attach =ent A 4 Reissued     January 19, 1976 Route To       'Ihis Cony For               I$               File           16.3.6 v MSouthworth i
Attach =ent A 4 Reissued January 19, 1976 Route To
131Slager Sill!cwell GSKeeley 7h,              Issue Date May 9. 1975*
'Ihis Cony For I$
Project J
File 16.3.6 7h, v MSouthworth Sill!cwell Issue Date May 9. 1975*
                                                          \uj                             Midland i & 2 CQIlills           TCCooke JM11andin                  UW EICEEN           File Title NCR's on nachtel UFilolub               I*onconformance GLRichardson           Report Ho 0F-43
i J
* Stib l oc t File This I*onconfor=ance Report is Issued To:             Prepared ByNn,,,d8 MmDate 5-9-75 Mr. J. P. Connolly                                       Approved By         [/, /d.1       Date N [
131Slager GSKeeley
Bechtel Project Field Quality Control                                                                 6-6-75 Engineer                                            Written Reip y Request [By Date Corrective Action Requested By Date 6-6-75 who is resuonsible for corrective action.
\\uj Project Midland i & 2 CQIlills TCCooke UW EICEEN File Title NCR's on nachtel JM11andin UFilolub I*onconformance GLRichardson Report Ho 0F-43 Stib l oc t File This I*onconfor=ance Report is Issued To:
Nonconformance Description and Supporting Details: (1) Specification C-208, Rev. 4 section 7.3.2 states "A slump measurement shall be made for every 35 cubic yards or fraction thereof of concrete produced for Class I structures." For concrete placements CC(652.75)a' and CC(621.0)a', 56 cubic yards of concrete us placad between slump measurements.      (2) The C12-1 form (In-Process Concrete Test Report) for CC(652.75)a' indicates one air meter and one thermometer was.used in the field for testing.
Prepared ByNn,,,d8 MmDate 5-9-75 Mr. J. P. Connolly Approved By
However, at least three air meters and two thermometers' vere used in the . field.
[/, /d.1 Date N
One air meter and one themometer was needed at the pump discharge. One air meter and one themometer was needed at the truck discharge. Also, the QC inspector noted
[
  ,m on the C12-1 form an air meter change af ter obtaining 7.5% and 6.5% nir with the original air meter.         Limits on air content are 3.0%-6.0%.
Bechtel Project Field Quality Control Written Reip y Request [By Date 6-6-75 Engineer Corrective Action Requested By Date 6-6-75 who is resuonsible for corrective action.
I   )     AEC Reportable   .Yes ('~] Ho R See Procedure 9 (For nuclear Proiects Only)                             !
Nonconformance Description and Supporting Details: (1) Specification C-208, Rev. 4 section 7.3.2 states "A slump measurement shall be made for every 35 cubic yards or fraction thereof of concrete produced for Class I structures." For concrete placements CC(652.75)a' and CC(621.0)a', 56 cubic yards of concrete us placad between slump (2) The C12-1 form (In-Process Concrete Test Report) for CC(652.75)a' measurements.
Stop Work Necessary Yes             No @ See leocedure 16 - Stop Work Ko                           -
indicates one air meter and one thermometer was.used in the field for testing.
Recommended Corrective Action:         (a) For item (1) above, receive an Engineering evaluation of the acceptability of the concrete placed without the required slump                           1 measurement. No additional corrective action is necessary, because it has already been covered in letter C-208-56 from Bechtel to U.S Testing, concerning concrete testing frequencies and test locations. The written reply to this item is requested                         i with the Engineering evaluation.             (b) For item (2) above, take corrective action to preclude these occurrences. Written reply and corrective action requested for both                           {
However, at least three air meters and two thermometers' vere used in the. field.
Corrective Action Taken;                                                                                 l by June 6, 1975.
One air meter and one themometer was needed at the pump discharge.
(a) A Bechtel Engineering evaluation of the concrete cylinders was performed on the concrete placed without the required slump measurements and the concrete was determined acceptable.     (b) The missing information in (2) above, was found and placed in the placement package for CC(652.75)a'.             Also, -e- training acccics was given on May 16, 1975         '
One air meter and one themometer was needed at the truck discharge.
for U.S. Testing personnel to preclude repetition.                           Sf.H.Hff 76 Verification of Corrective Action Required Yes @ No O Method of Verification:
Also, the QC inspector noted on the C12-1 form an air meter change af ter obtaining 7.5% and 6.5% nir with the
,m original air meter.
Limits on air content are 3.0%-6.0%.
I
)
AEC Reportable
.Yes ('~] Ho R See Procedure 9 (For nuclear Proiects Only)
Stop Work Necessary Yes No @ See leocedure 16 - Stop Work Ko Recommended Corrective Action:
(a) For item (1) above, receive an Engineering evaluation of the acceptability of the concrete placed without the required slump No additional corrective action is necessary, because it has already measurement.
been covered in letter C-208-56 from Bechtel to U.S Testing, concerning concrete testing frequencies and test locations.
The written reply to this item is requested i
with the Engineering evaluation.
(b) For item (2) above, take corrective action to preclude these occurrences.
Written reply and corrective action requested for both Corrective Action Taken; by June 6, 1975.
(a) A Bechtel Engineering evaluation of the concrete cylinders was performed on the concrete placed without the required slump measurements and the concrete was determined acceptable.
(b) The missing information in (2) above, was found and placed in the placement package for CC(652.75)a'.
Also, -e-training acccics was given on May 16, 1975 for U.S. Testing personnel to preclude repetition.
Sf.H.Hff 76 Verification of Corrective Action Required Yes @ No O Method of Verification:
(a) Reviewed letter BEEC-807 dated June 6, 1975 from R. L. Castleberry to J. P.
(a) Reviewed letter BEEC-807 dated June 6, 1975 from R. L. Castleberry to J. P.
Connolly, that stated Engineering's evaluation. (b) Reviewed placement package for CC(652.75)a' to confirm the corrective action taken. Also reviewed the docu-
Connolly, that stated Engineering's evaluation.
  ,,    mentation of the training cc:M ers 9fi.9. I- N- 76 l   .
(b) Reviewed placement package for CC(652.75)a' to confirm the corrective action taken.
konconfor=cnceClosureConfirmedBy                   %.O     b. HO'Tsyv' Date 5 '-t ~75 1
Also reviewed the docu-mentation of the training cc:M ers 9fi.9.
To be cocplet'ed at ti:,c of closure by Consumers Pouer 'M Services,
I-N- 76 l
                                    ~
konconfor=cnceClosureConfirmedBy
n... , .c i
%.O
: b. HO'Tsyv' Date 5 '-t
~75 1To be cocplet'ed at ti:,c of closure by Consumers Pouer 'M Services,
~
n...
.c i


[*'                                   J                                                       Attach =ent A M-Reissued     January 19, 1976
[*'
,              Route To       'Ihis Copy For           7, '               File         16.3.6 FMSouthworth    Sillicwell              'Q,)g]               Iscue Date Aucust 7. Jo75**
J Attach =ent A M-Reissued January 19, 1976 Route To
EUSlager         GSKceley (2)             .. t   ./         Project     m d t ,na i 4 7 C
'Ihis Copy For 7, '
  '          CQllills         TCCooke                       ~'
File 16.3.6
        ?
'Q,)g FMSouthworth Sillicwell
Jnilandin            C N N FG W             File Title NCR's on Bechtel Oura 1' WFHolub                                                       "
]
Konconfor=ance GLRichardson     Ecport Eo OF-52 c h eet 2 21 n This Honconfoirr_nce Report is Issued To:           Prepared ByNc:JM$lb%Date R-7 '75 Mr. J. P. Connolly                                   ^EE#
Iscue Date Aucust 7. Jo75**
* Bechtel Proj ect Field Quality Contrcl                         7 WrittenneplyRequeste[ByDate               o-s-7 Engineer Corrective Action Requested By Date       9-5-7 who is resnensible for corrective action.                                    .
EUSlager GSKceley (2)
Nonconfermance Description and Supporting Details: (1)           Specification C-210 Rev. 4 Section 13.6 for plant area backfill and berm backfill states " Moisture control of the plant area and berm materials shall conform to section 12.6". Under section 12.6, 12.6.1 states in part that "the water content during compaction shall not be more than two percentage points below optimum coisture content and shall not be more than two percentage points above optimum coisture content".             Contrary to this requirement, test no. MD202 for plant area fill located 14' east of 8.7 linc and 36' north of A line at elevation 594.5 had a ' moisture content 2.9 below optimum moisture content.
.. t
./
Project m d t,na i 4 7 C
CQllills TCCooke
~'
?
C N N FG W File Title NCR's on Bechtel Oura 1' Jnilandin WFHolub Konconfor=ance GLRichardson Ecport Eo OF-52 c h eet 2 21 n This Honconfoirr_nce Report is Issued To:
Prepared ByNc:JM$lb%Date R-7 '75 Mr. J. P. Connolly
^EE#
7 Bechtel Proj ect Field Quality Contrcl WrittenneplyRequeste[ByDate o-s-7 Engineer Corrective Action Requested By Date 9-5-7 who is resnensible for corrective action.
Nonconfermance Description and Supporting Details: (1)
Specification C-210 Rev. 4 Section 13.6 for plant area backfill and berm backfill states " Moisture control of the plant area and berm materials shall conform to section 12.6".
Under section 12.6, 12.6.1 states in part that "the water content during compaction shall not be more than two percentage points below optimum coisture content and shall not be more than two percentage points above optimum coisture content".
Contrary to this requirement, test no. MD202 for plant area fill located 14' east of 8.7 linc and 36' north of A line at elevation 594.5 had a ' moisture content 2.9 below optimum moisture content.
Approximately 7 f eet of material has been placed over this failing material.
Approximately 7 f eet of material has been placed over this failing material.
(Contd)
(Contd)
AEC Reportable     Yes     no [ See Procedure 9 (For Nuclear Projects Only)
AEC Reportable Yes no [ See Procedure 9 (For Nuclear Projects Only)
(j         stnp un* Wecess wf von ] Un @ h a penna @re 14 - Ste; Merk He                                       /
(j stnp un* Wecess wf von ] Un @ h a penna @re 14 - Ste; Merk He
Recommended Corrective Action: (1) Receive a Proj ect Engineering evaluation on the acceptability of the material in question or remove the material. (2) U.S. Testing should have. training sessions to take corrective action to preclude repetition.
/
(3) Quality Control should have training sessions to take corrective action to preclude repetition. The written replies to these items is requested' with the Project Engineering evaluation.
Recommended Corrective Action:
1 Corrective Action Taken:     (1) Project Engineering has evaluated and accepted the in place material with low moisture content based on a satisfactory compaction test result (2) United States Testing and Bechtel Quality Control have each had training sessions re-emphasiaing the acceptance criteria for soil tests.
(1) Receive a Proj ect Engineering evaluation on the acceptability of the material in question or remove the material.
Verification of Corrective Action Required Yes X           Ho 1
(2)
Method of' Verification: Rcviewed Iechtel ECR #324 covering item (1) of this KCR (QF-52 and the Project Engineering disposition. Also reviewed letter FQCL-049 dated 8-13-75*
U.S. Testing should have. training sessions to take corrective action to preclude repetition.
(3)
Quality Control should have training sessions to take corrective action to preclude repetition. The written replies to these items is requested' with the Project Engineering evaluation.
1Corrective Action Taken:
(1) Project Engineering has evaluated and accepted the in place material with low moisture content based on a satisfactory compaction test result (2)
United States Testing and Bechtel Quality Control have each had training sessions re-emphasiaing the acceptance criteria for soil tests.
Verification of Corrective Action Required Yes X Ho 1Method of' Verification:
Rcviewed Iechtel ECR #324 covering item (1) of this KCR (QF-52 and the Project Engineering disposition. Also reviewed letter FQCL-049 dated 8-13-75*
that states U.S. Testing and Bechtel Quality Control have each had training sessions to re-emphasiac the acceptance criteria for soil tests.
that states U.S. Testing and Bechtel Quality Control have each had training sessions to re-emphasiac the acceptance criteria for soil tests.
I     >1Ronconfor.ance Closure Confirmed By         k--J,id.9Lyw.                                             '
I
Date   H- ps       15 1
>1Ronconfor.ance Closure Confirmed By k--J,id.9Lyw.
Date H-ps 15 1
To be completed at time of closure by Consumers Power QA Services.
To be completed at time of closure by Consumers Power QA Services.
Pace 1 of 2
Pace 1 of 2 k
            *Corrmend, prov!cudTi.-,enet P_7_7s           k      00 e  r"~-        e e -'
00 e r"~-
*Corrmend, prov!cudTi.-,enet P_7_7s e e -'


                          '(/                         ~
'(/
                                                        ).
~
Filo     ,.) ** 16.3.6 Reissued January 19, 197f
).
/                                                                             Issuo Date August 7,1975**
** Reissued January 19, 197f Filo
Proj ect       Midland 1 & 2 Filo Title     NCR's on Ecchtel Quality Control Nonconformance Report No QF-52 (Contd)
,.)
16.3.6
/
Issuo Date August 7,1975**
Proj ect Midland 1 & 2 Filo Title NCR's on Ecchtel Quality Control Nonconformance Report No QF-52 (Contd)
Nonconformance Description and Supporting Details:
Nonconformance Description and Supporting Details:
~                                                                                    (Contd)
(Contd)
~
(2)
(2)
QC-Cl as passlug by U.S. Testing in the remarks column.This faili
QC-Cl as passlug by U.S. Testing in the remarks column.This fail (3)
    '                          (3)
On the back of the QC-Cl form. in the FIM, it states the entry inforcation For Block no. 3 the entry information ' states "to be signed and dated by the Q Engineer signifying the form has been reviewed for completeness and correctne Contrary to this requirement, fill density test r. aport the acceptance of MD202 which had actua 4
On the back of the QC-Cl form. in the FIM, it states the entry inforcation For Block no. 3 the entry information ' states "to be signed and dated by the Q Contrary tosignifying Engineer             the form has been reviewed for completeness and correctne this requirement,                                                       .
W e
                -            fill density test r. aport the acceptance of MD202 which had actual          .
rr i
4 W
4 e
e rr i             <
.s--
l 4
l l
l e
                .s--
4 x
4 x


5
5
                                      )                                                             Attechm:nt A Route 'ib      This Cony For
)
                                                      ..[%.,                 File           16.3.4 & 36.3.6       .
Attechm:nt A
P:ISou thworth   SliHowell                                         Issue Date October 13.19h litislager       GSKeeley                 (q ,Iy' fj              Fr j t       Midland 1 & 2 j
..[%.,
CQllills           TCCooke                 g,jg        ,.
Route 'ib This Cony For File 16.3.4 & 36.3.6 (q,Iy' fj Issue Date October 13.19h P:ISou thworth SliHowell litislager GSKeeley Fr j t Midland 1 & 2 j
                            .EHolub             Eonconfor=cnce Construction and Cualitv Control GLRfchardson sum ee t File      Eerort No OF-67 1his Ncnconfor=ance Ecport is Issued '1b:               Prepared Byhf/ 6>.dk/.,~ Dcte M-!3-75 J. P. Connolly                                           Approved By kM8N+ Date Nd?Am-Bechtel Project Field Quality Control                   WrittenRepYyRequeste8ByDate Engineer                                                                       V 11            J. F. Newgen                                             Corrective Action Requested By Date 13           $,992h1MPMbbEMIT6$fcYve cetion.
CQllills TCCooke g,j g
Ecnconfermance De::cription and Supporting Details: PSAR section 5.1.3.3.la states in part that "In a 'dition to the tests required of the cement manufacturers, the followir user tests are p . formed: . . . ASTN C-115 Fincncss of Portland Cement". Spcc. C-208 Rev.
.EHolub Construction and Cualitv Control Eonconfor=cnce GLRfchardson Eerort No OF-67 sum ee t File 1his Ncnconfor=ance Ecport is Issued '1b:
section 6.1.1 states in part that (1) " Prior to cc:=lencing of any concrete work cemer.
Prepared Byhf/ 6>.dk/.,~ Dcte M-!3-75 J. P. Connolly Approved By kM8N+ Date Nd?Am-Bechtel Project Field Quality Control WrittenRepYyRequeste8ByDate 11 Engineer V
from the source selected by the concrete supplier shall be given an initial Acceptance Test consisting of a complete chemical and physical analysis by the Subcontractor in accordance with Paragraph 7 of ASTM C150 with the fineness to be determined by AST11 C115." (2) "In addition, for each subsequent grind the subcontractor shall perform an Acceptance Test consisting of a complete chemical and physical analysis.. ."
J. F. Newgen Corrective Action Requested By Date 13 $,992h1MPMbbEMIT6$fcYve cetion.
Ecnconfermance De::cription and Supporting Details: PSAR section 5.1.3.3.la states in part that "In a 'dition to the tests required of the cement manufacturers, the followir user tests are p. formed:... ASTN C-115 Fincncss of Portland Cement".
Spcc. C-208 Rev.
section 6.1.1 states in part that (1)
" Prior to cc:=lencing of any concrete work cemer.
from the source selected by the concrete supplier shall be given an initial Acceptance Test consisting of a complete chemical and physical analysis by the Subcontractor in accordance with Paragraph 7 of ASTM C150 with the fineness to be determined by AST11 C115."
(2)
"In addition, for each subsequent grind the subcontractor shall perform an Acceptance Test consisting of a complete chemical and physical analysis..."
(Cc 'd
(Cc 'd
    )     AEC ReyviI,abic   1*ca U Uu h See Proceduru 9 (For Nuclear Erojects ung)
)
Stop Ucrk Necessary Yes         No @ See Procedure 16 - Stop Work No Recc:= tended Corrective Action:   (1) Review the initial Acceptance Test, Acceptance Tests and User Tests for similar deficiencies (2) Receive a Project Engineering evaluation on the acceptability of the cement tested by the alternative method (3) Notify U.S. Testing of this nonconformance and take corrective ac. tion to preclude these occurrences (4) Instruct QC personnel on the propcr test method for determining the fineness of Portland Cement. The written reply to these items is yrequested with the Project Engineering evaluation.
AEC ReyviI,abic 1*ca U Uu h See Proceduru 9 (For Nuclear Erojects ung)
Stop Ucrk Necessary Yes No @ See Procedure 16 - Stop Work No Recc:= tended Corrective Action:
(1) Review the initial Acceptance Test, Acceptance Tests and User Tests for similar deficiencies (2) Receive a Project Engineering evaluation on the acceptability of the cement tested by the alternative method (3) Notify U.S. Testing of this nonconformance and take corrective ac. tion to preclude these occurrences (4)
Instruct QC personnel on the propcr test method for determining the fineness of Portland Cement.
The written reply to these items is yrequested with the Project Engineering evaluation.
Corrective Action Taken:
Corrective Action Taken:
(1) The results of all fineness tests performed in accordanc
(1) The results of all fineness tests performed in accordanc with ASTM C204 were reported to Project Engineering.
      '    with ASTM C204 were reported to Project Engineering. (2) Project Engineering evaluate the test results and determined that the cement is acceptabic. (3) Both U.S. Tcsting and Bechtel Quality Control personnel have been notified of the correct test require-trents .
(2) Project Engineering evaluate the test results and determined that the cement is acceptabic.
inn.
(3) Both U.S. Tcsting and Bechtel Quality Control personnel have been notified of the correct test require-trents.
(4) PSAR Change Notice No. 0101 has been reviewed and cpproved by CPCo Enginec The change will require cement to be tested for fineness in accordance with 3 AST!! C150. This in turn will permit the use of               the     f the test methods, ASTM C115 Verification of Corrective Action Eequired Yes                 No or ASTM C204.
(4) PSAR Change Notice No. 0101 has been reviewed and cpproved by CPCo Enginec inn.
1 Nethod of Verification: Reviewed letter FQCL-058 dated January 19, 1976.
The change will require cement to be tested for fineness in accordance with AST!! C150. This in turn will permit the use of the f the test methods, ASTM C115 3 Verification of Corrective Action Eequired Yes No or ASTM C204.
Reviewed letter BEBC-921 dated January 16, 1976 in the Ecchtel QC file for NCR QF-67. Tclecon with R. C. Bauman on January 20, 1976 confirmed CPCo revleu and approtal of PSAR Cinng Notice No. 0101.
1Nethod of Verification:
mdk b.b%d I
Reviewed letter FQCL-058 dated January 19, 1976.
Nonconfo'rmance Clocure Confirmed By Datev % w w -u 3 0 p 1G I
Reviewed letter BEBC-921 dated January 16, 1976 in the Ecchtel QC file for NCR QF-67.
To be completed at ^ c of closure by Consuncrc Fowc               'A Services.
Tclecon with R. C. Bauman on January 20, 1976 confirmed CPCo revleu and approtal of PSAR Cinng Notice No. 0101.
INonconfo'rmance Clocure Confirmed By mdk b.b%d Date % w w - 3 0 p 1G v
u ITo be completed at ^ c of closure by Consuncrc Fowc
'A Services.


c/
c/
                                              )                       File:       )   16.3.4 & 16.3.6 Issua Date: October 13, 1975 Project:       Midland 1 & 2-
)
          ~s                                                          File
File:
)
16.3.4 & 16.3.6 Issua Date: October 13, 1975 Project:
Midland 1 & 2-File


==Title:==
==Title:==
NCR's on Bechtel
NCR's on Bechtel
    *7 i                                                     Construction and Quality Control
~ s
      ~s
*7 i
                  ,                      Nonconformance Report No QF-67 (Contd)
Construction and Quality Control
Nonconforcance Description and Supporting Details:     (Contd)
~s Nonconformance Report No QF-67 (Contd)
(3) "Also, Tor every 5000 cubic yards of concrete produced. . .a User's Test con-sisting of a complete chemical and physical analysis" is =ade.
Nonconforcance Description and Supporting Details:
(Contd)
(3)
"Also, Tor every 5000 cubic yards of concrete produced...a User's Test con-sisting of a complete chemical and physical analysis" is =ade.
Contrary to the requirements above, the fineness for User Tests 20 (Report 66),
Contrary to the requirements above, the fineness for User Tests 20 (Report 66),
21 (Report 67) and 23 (Report 74) .and Acceptance Tests for Silo 20 (Report 41),
21 (Report 67) and 23 (Report 74).and Acceptance Tests for Silo 20 (Report 41),
Silo 18 (Report 58), Silo 12 (Report 62), Silo 20 (Report 69) and Silo 17 (Report 76) was determined by ASTM C204, Test for Fineness of Portland Ce=ent by Air Per eability Apparatus Turbidimeter.instead of by ASIM C115, Test for Fineness of Portland Cement by the l
Silo 18 (Report 58), Silo 12 (Report 62), Silo 20 (Report 69) and Silo 17 (Report 76) was determined by ASTM C204, Test for Fineness of Portland Ce=ent by Air Per eability Apparatus instead of by ASIM C115, Test for Fineness of Portland Cement by the Turbidimeter.
      \%    /                                                                                           ,
l
9 4                                                                                                       l 1
\\
I1          i s_._-
/
l l
9 4
l l
l I
l Page 2 of 2
i 1
s_._-
Page 2 of 2


f'                                                         '
f' f
f                Attach ~nt A Route To         Tais Copy For                 -
Attach ~nt A Route To Tais Copy For Filo y 16.3.6 & 16.3.4 FMSouthworth ' Sitifowell r/6 Issue Date December LG. 1975 INSlager CSKeeley "y /
Filo       y 16.3.6 & 16.3.4 FMSouthworth ' Sitifowell                     r/6 INSlager          CSKeeley                                    Issue Date December LG. 1975 "y /             Project Midland 1 & 2             .
Project Midland 1 & 2 E
  ' -                                                E        E f 11   din WFHolub File Title NCR's on Eechtel Konconfomance         Ouality Control & Bechtel Construc GLRichardson                                   "
E f
Subject File       Report No _OF-69 This Nonconfomance Report i: Issued To:
11 din File Title NCR's on Eechtel WFHolub Konconfomance Ouality Control & Bechtel Construc GLRichardson Subject File Report No _OF-69 This Nonconfomance Report i: Issued To:
Prepared By/6/,L/uM/pa.       Date a//4 -
Prepared By/6/,L/uM/pa.
Bechtel       j   t Field Quality Control           Appr ved E d d d I .
Date a//4 -
Engineer                                                                        Dateded-No' J. F. Newgen                                         Written'RIply Reque;Ied'By Date           1-9-76 Bechtel Project Superintendent                                         n h@esM W Dah M4 uho ic responsible for corrective action.
Bechtel j
t Field Quality Control Appr ved E d d d I.
Dateded-No' Engineer J. F. Newgen Written'RIply Reque;Ied'By Date 1-9-76 Bechtel Project Superintendent n h@esM W Dah M4 uho ic responsible for corrective action.
Uonconforacnce Description and Supporting Details:
Uonconforacnce Description and Supporting Details:
Bechtel's storage requirement for decay in  part,heat     removal pump motors file nos. F-1-37, 38, 39 Rev. 2, Section 5 2 all sta
Bechtel's storage requirement for decay heat removal pump motors file nos. F-1-37, 38, 39 Rev. 2, Section 5 2 all sta in part, " rotate shaf t 10-25 complete revolutions plus one quarter turn at intervals not to exceed 90 days, record final keyway position".
                        " rotate shaf t 10-25 complete revolutions plus one quarter turn at intervals not to exceed 90 days, record final keyway position".
the shaf t rotation of the three decay heat removal pump c:otors exceeded thContrary requirement.
the shaf t rotation of the three decay heat removal pump c:otors exceeded requirement.                                                                               thContrary e 90 day Elapsed performed on August 27, 1975  time of 99 days between   rotation existed.
Elapsed time of 99 days between rotation existed.
Last rotation was and next rotation performed was on December 4, 1975       .
e 90 day performed on August Last rotation was 27, 1975 and next rotation performed was on December 4, 1975.
AEC Reportable         Yes No @ See Procedure 9 (For nuclear Projects Only)                     '
AEC Reportable Yes No @ See Procedure 9 (For nuclear Projects Only)
Stcp W0rh Ucccs34.y
Stcp W0rh Ucccs34.y
                                      ~ica U hoe tiee Procedure 16 - Stop Work No Reco::=lended           Corrective Action:1) Evaluate and determine motor acceptability '
~ica U hoe tiee Procedure 16 - Stop Work No Reco::=lended Corrective Action:1) Evaluate and determine motor acceptability '
: 2) Take corrective action to preclude recurrences.                                   .
: 2) Take corrective action to preclude recurrences.
1 l
Corrective Action Taken:
Corrective Action Taken:
See Attachment A.
See Attachment A.
l 1
1 Verification of Corrective Action Required Yes x no O Met' hod of Verification:
Verification of Corrective Action Required Yes x no O Met' hod of Verification:
Visually verified that motor acceptability was docum a.
a.
b.
b.
Visually verified that motor acceptability wasrequire-                                  docum e     CE.
e CE.
ment BechtelF-2 QCE  forms   stating that"cmooth rotation indicates bearing coated with oil'jby and MSE.
ment F-2 forms stating that"cmooth rotation indicates bearing coated withrequire-Bechtel QCE and MSE.
c.
oil'jby Verified by reviewing requirement for c c.
Verified by reviewing requirement for c
h!onconformance Closure Confirmed By38p /%jt,o age off motors in Instruction Man
{    h!onconformance Closure Confirmed By38p                     /%jt,o age off motors in Instruction Man
{
                                                              .w/$g/
.w/$g/
GEH-3160J.
GEH-3160J.
Date )~s9-pr To be completed at' time of closure by Consumers Power QA Services.
Date
_                                                    Page 1 of 1
)~s9-pr To be completed at' time of closure by Consumers Power QA Services.
Page 1 of 1


[)
[)
          /
[)
File    [)   16.3.6 & 16.3.4 Issue Date December 10, 1975 Project       Midland 1 & 2 File Title NCR's on Bechte. Quality
16.3.6 & 16.3.4 File
    . (''g .                                                                   '        Control & Bechtel Con-                    ,
/
    \ ,)                                                                                 struction
Issue Date December 10, 1975 Project Midland 1 & 2 File Title NCR's on Bechte. Quality Control & Bechtel Con-
                  .                                      . Attachment A Nonconfotaiance Report No QF-69 Corrective Action Taken:                                                             .
. (''g.
: 1. a.
\\,)
struction
. Attachment A Nonconfotaiance Report No QF-69 Corrective Action Taken:
1.
a.
Received a ' response from Bechtel Project Superintendent stating that motors had been inspected and determined to be acceptable.
Received a ' response from Bechtel Project Superintendent stating that motors had been inspected and determined to be acceptable.
b.
b.
Received response from PFQCE stating that the motors were hound acceptable
Received response from PFQCE stating that the motors were hound acceptable and the statement was documented on storage requirement forms F-2.
                                          ~
~
and the statement was documented on storage requirement forms F-2.
-2.
                -2.     a.
a.
Bechtel Project reinstructed the concerned personnel in regards to prepara-tion and performance of maintenance instructions. In addition, the periodic inspection times have been' adjusted to weeks rather than to days to preclude
Bechtel Project reinstructed the concerned personnel in regards to prepara-tion and performance of maintenance instructions.
                            . inspection times falling during weekends causing inadvertent tine extensions.
In addition, the periodic inspection times have been' adjusted to weeks rather than to days to preclude
Meggering equipment is under consideration for purpose to prevent equipment shortages at critical inspection periods.             '
. inspection times falling during weekends causing inadvertent tine extensions.
Meggering equipment is under consideration for purpose to prevent equipment shortages at critical inspection periods.
b.
b.
Bechtel QC has instructed the assigned QCE to document any delayed maintenance activities on the F-2 form for equipment concerned.
Bechtel QC has instructed the assigned QCE to document any delayed maintenance activities on the F-2 form for equipment concerned.
O O                                                                                                                            .)
OO
.)
l s
l s
l l
-s Page 2 of*2 L-_.--.,.
      -s                                                                                                                       .*
Page 2 of*2 L-_.--.,.     . - . -        --                -


)
,[
,[
                                        >                                  )              Attacimnt A Route To       This Cory For           Q               File         16.3.6 & 16.3.4 F.MSouthworth   SHilowell             -
Attacimnt A Route To This Cory For Q
h          Issue Date   December 12. 1975
File 16.3.6 & 16.3.4 F.MSouthworth SHilowell h
          'Hk'Sleger l
Issue Date December 12. 1975
l  CQIlills CSKecicy TCCooke
'Hk'Sleger CSKecicy
                                                      ' 'hr Pr ject     Midinnd 1 &7 JMilandin          COM!mb FCY:Ci         File htlc   iiCR's on idechtel Qual tFHolub          Nonconformance          C ntr 1 & Bechtel conetroreirn hu     '[ ij"   Report no QF-60a This %onconformance Report is Issued 'ib:         Prcpsred DypM /bdMDate             /.7- /.7-J. P. Connolly                                     Approved 37 9g8{My Eechtel Project Field Quality Engineer                                            Date /Ch/X+
' 'hr Pr ject Midinnd 1 &7 l
                                                                                      /
l CQIlills TCCooke COM!mb FCY:Ci File htlc iiCR's on idechtel Qual JMilandin C ntr 1 & Bechtel conetroreirn tFHolub Nonconformance hu
Written Rep &lyRequestc[iByDate         1-9-7 J. F. Newgen                                                           W Bechtel Project Superintendent                    Correct.d.ve Action Requested By Date 1-9               who is resuonsible for corrective action.
'[ ij" Report no QF-60a This %onconformance Report is Issued 'ib:
Nonconfomance Description and Suppcrting Details: ,echtel storage requirement for-decay heat removal pump motors file nos. F-1-37, 33, 39, Rev. 2 Section 5.3 all stated in part, " test insulation resistance uith a meggerand record readings at intervals not to exceed 30 days". Contrary to this requirement, the motor meggering of the three decay heat removal pump motors exceeded the 30 day requirement. Elapsed time of 38 days between meggering existed. The last meggering was performed on August 27, 1975 and the next meggering performed was on December 4,1975.
Prcpsred DypM /bdMDate
AEC Reportable     Yes O no Q see Procedure 9 (For Nuclear Pro 3ects on17) i V-Stop Work Recessar/- Yes C Ho @ See Procedure 16 - Step Work Ko Reco= mended Corrective Action:
/.7- /.7-J. P. Connolly Approved 37 9g8{My Date /Ch/X+
: 1. Evaluate and detemin't motor acceptability.
Eechtel Project Field Quality Engineer Written Rep &lyRequestc[iByDate 1-9-7
: 2. Take corrective actica to preclude recurrences.
/
1 Corrective Action Taken-                                                                         I l
J. F. Newgen W
See Attachment A.                                                                                 l 1
Correct.d.ve Action Requested By Date 1-9 Bechtel Project Superintendent who is resuonsible for corrective action.
1 Verification of Corrective Action Required Yes X         No b4ethodofVerification:
Nonconfomance Description and Suppcrting Details:
,echtel storage requirement for-decay heat removal pump motors file nos. F-1-37, 33, 39, Rev. 2 Section 5.3 all stated in part, " test insulation resistance uith a meggerand record readings at intervals not to exceed 30 days".
Contrary to this requirement, the motor meggering of the three decay heat removal pump motors exceeded the 30 day requirement.
Elapsed time of 38 days between meggering existed. The last meggering was performed on August 27, 1975 and the next meggering performed was on December 4,1975.
AEC Reportable Yes O no Q see Procedure 9 (For Nuclear Pro 3ects on17) i Stop Work Recessar/- Yes C Ho @ See Procedure 16 - Step Work Ko V-Reco= mended Corrective Action:
1.
Evaluate and detemin't motor acceptability.
2.
Take corrective actica to preclude recurrences.
1Corrective Action Taken-See Attachment A.
1Verification of Corrective Action Required Yes X No b4ethodofVerification:
Reviewed correspondence from Bechtel Project Superintendent and Bechtel PFQCE.
a.
a.
: b. Reviewed correspondence from Bechtel Project Superintendent and Bechtel PFQCE.
b.
Visually verified that motor acceptability was noted on the F-2 form.
Meggering of motors on 12-4-75 determined motors insulation acceptable.
c.
c.
Visually verified that motor acceptability was noted on the F-2 form.                        ,
d.
: d. Meggering of motors on 12-4-75 determined motors insulation acceptable.
Reviewed GE Instruction Manual - GEH-3160J, page 2 " storage requirement".
Reviewed GE Instruction Manual - GEH-3160J, page 2 " storage requirement".
b;onconfor.s ce Closure Confirmed By M             fM '7!
b;onconfor.s ce Closure Confirmed By M fM '7!
Date / - : 7c ~; g, 1
Date / - : 7c ~; g, 1To be completed at ti:ae of closure by Const=crs Fo eer QA Services.
To be completed at ti:ae of closure by Const=crs Fo eer QA Services.
Page 1 of 1
Page 1 of 1


            .                          ~;~
~;~
                                          ~
Fils 16.3.6 & 16.3.4
Fils         16.3.6 & 16.3.4 I :ue Date December 12, 1975
~
                                                                      ' Project     Midlcnd 1 & 2 File Title NCR's on Bechtel Quality Control & Bechtel Con-
I :ue Date December 12, 1975
    ',        ,b struction v
' Project Midlcnd 1 & 2 File Title NCR's on Bechtel Quality Control & Bechtel Con-
Attachment A                                       *
,b struction v
                                .            Nonconforcance Report No QF-69a Corrective Action Taken:                                                         *
Attachment A Nonconforcance Report No QF-69a Corrective Action Taken:
: 1. a. Bechtcl-Project inspected and dercrmined the motors to be acceptable.
1.
: b. Bechtel QCE and the Bechtel MSE evaluated and agreed that there was no 1 mage to the motors as a result of the delay in the maintencnce activity nnd the motor acceptability was documented on the storage requirement form F-2.
a.
: 2. a. Bechtel Project reinstructed the concerned personnel regarding the prepara-tion and performance of maintenance instructions.
Bechtcl-Project inspected and dercrmined the motors to be acceptable.
b.
Bechtel QCE and the Bechtel MSE evaluated and agreed that there was no 1 mage to the motors as a result of the delay in the maintencnce activity nnd the motor acceptability was documented on the storage requirement form F-2.
2.
a.
Bechtel Project reinstructed the concerned personnel regarding the prepara-tion and performance of maintenance instructions.
b.
b.
Bechtel QC has instructed the assigned QCE to document any delayed maintenance activities on the F-2 form for equipment concerned.
Bechtel QC has instructed the assigned QCE to document any delayed maintenance activities on the F-2 form for equipment concerned.
I         ;                                                                                              T N/m l
I T'
l f          )                                                                                           Jl
N/
: i. /                                                                                                         l l
m Jl f
l l
)
: i. /
Page 2 of 2
Page 2 of 2


f                       c Attac'=nt     A i              Rout 7 To       9.is Cot 7 For       (                 Filo         /16.3.4 & 16.3.6 HUSlager        SHHowell Issue Date Dece=cer Lu, 19/5 CQilills         CSKeeley               (.
f Attac'=nt A c
                                                      ,  a            Project         Midland tiuclear Plan:
Rout 7 To 9.is Cot 7 For
I?!Southworth   TCCooke                   N                                                        ~
(
( h                     WFHolub             CESUdfl3 ESW3f     File Title I!CR's on Bechtel
Filo
                                                                                                                ~
/16.3.4 & 16.3.6 i
CLRichardson       Conconformance JMilandin         Report Uo op-70 This Conconformance Report is Issued To:           Prepared By W[ 6] h Y b v Date I W Ml W J. F. Neugen, Bechtel Corp.
(.
Project Superintendent                           Auproved By
Issue Date Dece=cer Lu, 19/5 HUSlager SHHowell CQilills CSKeeley Project Midland tiuclear Plan:
                                                                  -              Nb/pDate / 2-4.-ds J. P. Connolly, Bechtel Corp. , Project           Written R lyReque:gedByDate               12/24/
a N
Field Quality Control Engineer                   Corrective Action Requested By Date 1/12/
~
I?!Southworth TCCooke
(
h WFHolub CESUdfl3 ESW3f File Title I!CR's on Bechtel
~
CLRichardson Conconformance JMilandin Report Uo op-70 This Conconformance Report is Issued To:
Prepared By W[ 6] h Y b v Date I W Ml W J. F. Neugen, Bechtel Corp.
Project Superintendent Auproved By Nb/ Date / 2-4.-ds p
J. P. Connolly, Bechtel Corp., Project Written R lyReque:gedByDate 12/24/
Field Quality Control Engineer Corrective Action Requested By Date 1/12/
v'io is resnonsible for corrective action.
v'io is resnonsible for corrective action.
Uonconformance Description and Supporting Details:                                     -
Uonconformance Description and Supporting Details:
Storage requirement forms F-1-207 and F-1-208 for the Upper and Lower Reactor Vessel Internals require that any nitrogen addition be logged weekly. For the period from 11/21/75 to 12/5/75 the storage records do not show any addition of nitrogen.
Storage requirement forms F-1-207 and F-1-208 for the Upper and Lower Reactor Vessel Internals require that any nitrogen addition be logged weekly.
F-2 form that was issued 11/14/75 indicate the flow meter was removed because The          it did not allow enough nitrogen to be added.
For the period from 11/21/75 to 12/5/75 the storage records do not show any addition of nitrogen.
AEC Reportable       Yes O no O see Proceeure 9 (For nuclear rrosects only)
The F-2 form that was issued 11/14/75 indicate the flow meter was removed because it did not allow enough nitrogen to be added.
Stop Unrk Necessatm       va= O No { See Precetc.rc 16     Ctcp ',Tork Mc, Recc = ended Corrective Action:
AEC Reportable Yes O no O see Proceeure 9 (For nuclear rrosects only)
Stop Unrk Necessatm va= O No { See Precetc.rc 16 Ctcp ',Tork Mc, Recc = ended Corrective Action:
1.
1.
Rework internals storage cannisters to reduce nitrogen leakage to a level that the flow meter will indicate, or install a flow meter with a higher range.
Rework internals storage cannisters to reduce nitrogen leakage to a level that the flow meter will indicate, or install a flow meter with a higher range.
2.
2.
Reinstruct personnel in the preparation and performance of. maintenance instruc-tions, so that the final records reflect the written instructions.
Reinstruct personnel in the preparation and performance of. maintenance instruc-tions, so that the final records reflect the written instructions.
l Corrective Action Taken:
lCorrective Action Taken:
1.
1.
A QC training session was held concerning the storage and maintenance program and the proper documentation of delayed or missed tasks.
A QC training session was held concerning the storage and maintenance program and the proper documentation of delayed or missed tasks.
2.
2.
Field engineering personnel were reinstructed regarding the preparation and performance of maintenance instructions so that final records will reflect the written instructions.
Field engineering personnel were reinstructed regarding the preparation and performance of maintenance instructions so that final records will reflect the written instructions.
3     Storage requirement forms F-1-207 and F-1-20 wer 1
3 1
Verification of Corrective Action Required Yes                 evised deleting the requirener Ho         to log the addition of 1
Storage requirement forms F-1-207 and F-1-20 evised deleting the requirener wer Verification of Corrective Action Required Yes Ho to log the addition of 1
        ^Eethod of Verification:                                               nitrogen.
^Eethod of Verification:
: 1. The records of the QC training session were reviewed.
nitrogen.
1.
The records of the QC training session were reviewed.
2.
2.
The revised F-1-207 and F-1-203 forms were reviewed.
The revised F-1-207 and F-1-203 forms were reviewed.
9       Honconformance Closure Confi:ned By iN[MMM-Date //I'!/7C I
9 Honconformance Closure Confi:ned By iN[MMM-Date //I'!/7C I
To be completed at time of closure by Censumers Po rer QA Services.
To be completed at time of closure by Censumers Po rer QA Services.
Page 1 of 1}}
Page 1 of 1}}

Latest revision as of 05:54, 31 December 2024

Nonconformance Rept for Jan 1976.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month
ML19329E921
Person / Time
Site: Midland
Issue date: 01/31/1976
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML19329E918 List:
References
NUDOCS 8006180777
Download: ML19329E921 (30)


Text

m -

NONCON FORMANCE. REPC 4 LOG & STATUS BOOK u

/

Fil # Y-j

)

(

nEPoHT D ATE

~

PAGE CoMPL.

.. ENo. sten

1. PROJECT NO 7220 STATUS

~

NCR ORIG.

NONCON FORf.1AN CE PREPARED BY C

l NO.

DATE DESCRIPTION / REM /.RKS hc:; e 7 NTE N

c00 SED x

CLOSED BY 352 10-29 R. A. Moray R-2n$. cirnuit Brnnienrn, unmnpinton; anmngna, Ficid

^

_7

-75 Identificatinn 3 101 10-39-75 l

353 11-4 H. D. Foster

_C-111. Denp impnvenntinnn nntna nn n 111 11:

Field No 11-5 11-18 H.D. Foster

-75 during coating work 1.109 1 1-h-75

-75

-75 354 11-5 C. F. Clark 0-111. Dome liner plate broken. c-111-15 Field No 11-6 i

-75 1.109 1 1-5-75

-75 e

m 355 11-10 D. L. osborn C-230. Flyash below weight on one ticket, pour Fiold 12--8 1-23 1-26 L. R. Albert 9

-75 a(614)b 1.205 "- 0-75

-75

-76

-76 m

  • ^

356 11-14 L.R. Albert C-230. Air content. Pours AIG9911' & A(487)b' T'l ald-12-8

-76

~

-75~

Q

'1.205 44--+h-7!G -75

~

357 11-17 R.A. Moray N P-1-193. M-92 Mntnrn hnntarn dinnnnnontna Pield No 12-8

-75 vy 4.001 ; 4175

-75 358 11-17 H. Boleen 4-117. vn1vn 'Paccing requiro n. nt" viole ted Field No 11-25

-75 ASME

/if/ /$

-75 1-23 1-26 L. R. Albert 359 11-2h E. Dutton

%230. Air content hi% Pour 81(fi14)n hld 12 -76

-7f

-75 1.205

-u-26-75

-75

-3 360 11-25 R. Bennett 1-231. Curin.- temnerature below 600 3 hrs.

Pi ol a 12-8 1-26 L. R. Albert

-76

-75 Pour #A(619)a 1.205 1

4 25 75

-75

-76

.m 1-27 361 11-26 D.C. Thompson 2-} 32. cnnanit npnning. Any B1dg Slnh Puni Pnni F* eld 12-12 1-30'f

-75

_ lab 3 006 22 2 -75 76 362 12-1 D.C. Thompson 3-h2. Conduit size reduced. Aux Blde slab.

-Eicid-12-5

-75 3 006 t2-2-75

-75 363 12-1 L.R. Albert c-230 Pailinc vntne unnv test.

Wlt 12-1-75 12-16 12_18-75.g. 2 7 puow; ei ns L

t<'

R. Albert

-75_

1.105,1.205 m

  • 75

-75

.o.103 09/74 OC

11. #A QC C31 p

'. A b

F. -

N NONCON FORMANCE - REP OG & STATUS BOOK 12 N'

I*

  • I<

dl REPORT DATE PAGE COMPL.

l

(

1. PROJECT NO.

7')20

~

STAWS NCR ORIG.

NONCONFORMANCE PREPARED BY l NO.

DATE DESCRIPTION / REMARKS 6' ROUTE X T CLOSED CLOSED BY 1 #

3 614 12 D.L. Osborn C-208. Concrete cylinder curiIg. Pour A(61 hlb FieM 12 76

~

4 75 1.205

+3-k45 75

-76 365 12 u. Shawl C-38.

Aux. Bldg. columns cut short.

FieM 12 1 1-19 A. L. Boulden 75 1.201 43-845 75 76

-76 l

1-23 1-26 L* R* Albert [

166 12 R. Bennett 0.2'41. Curing Temperature. A(j90)n' & 1.105. &

FieM 12,74

-76 3

l 75 cc'635)b' 1.205 12 " 70 75

.<:: 1 367 12 H. Boleen b10hA. Da2naged pipe spool u 3on receipt.

-FieM- -lw i s - ( G1 16

-76 75 A5iE 4 10h

- G.16-79 //s 368 1 E. Dutton C-2'11. Curine temperature. Poor A(626.25)n' m ld-- 1-9-76 76 1.205 T-t-46 =

369 l-13 L. R. Albert C-230. Fly A sh finene n n nnt-pa'- ^ RT M

- Rield 1-15

-76 C-618-72.

1.105,1.205 7 6

-76 370 1-19 E. Dutton C 230. Slumn hirrh. Pnur A(5 99)1' M54d=

-76 1.205 4:20:76

-76

^

~~

L-Li 371 1-20 T. Lieb C-231. Field evlinder curint temp e ratu re, jfffff6-

-76

-76 pour A(614)h 1.205 L72 1-27 G. E. Depew C-50A. Liner Plate slab numbers not match-Field

-76 ing.

1.109 l-28-76

,73 IQ9 T. R. Lieb C-208. Concrete cylinder curing. pour Field A(614)1 1.205 1-2-76 1-29 E. Dutton C-230.

L74 Concrete slump test frequencv. pour Field

-76 A (6 3 3. 2 5)a' 1.205 2-2-76 D-103 09/74 OC

,g

11. PAf* 3 GC-G31

\\>

'1 s a

~

  1. ^"'

NONCONFORMANCtf REPORPs L _._ _.. ___ /'

._ _ __. I or 1

3b.

3 d

II.

/

3

35. 06brosaraoM C%NCUN8 tele -

i

,!p 7f ' ~- -

p 4 M" " l

3. 0 " ^ --

""'"D.

s EG V.

F. P4 oJ JC r N *.J.

Spec. C-230 I 5 7220 Mc D = v

~ ~ ' da 6

~-

pour # A[ G )_

a

. irem DesC.r 1.oM

.. ircu oCar. "

b 7d - Sb[Indd

/O[3 Concrete A..un_J31dgmSlab_.Egur S-4 gtaCrucNr eaar H j acV.

g-i

...a ac Muu.cn sr anrue srsrc= No.

N/A N/A N/A I

-m

.. eunCNass onDen No.

... oC r a tp.Nse CrioN reaN No.

i. =c es.a Cr u s Nr se n saiNo.

]

/. 26 7[.,

__N /JL C-708--1=l? ?

N/A

.. CoNr n aCr o nia.oCarioH

.. ue O vr5

*ouacs 0 Lao rwhrolu;

__Chamnion ln.c.._ Midland._Mtchinon O nourc to marca. ractor_

. ' = =

g=our c ro,.ctD No.N er n.N.

usuran m on

... nou r.No NsrauCr oNs, 9 9. NONCoNFoRM8NG CoND$ r foNs Section 9.2.1 of Spec. C-230 Rev,. 5 requires that all concrete materials be menured in ac. card-shall be witlL p + 3 percent of i

ance with ASTM C-94-72 states in part that powdered.idmixtures weinhina accuracy I

the design weight.

Contrary to the above Batch Tickist No. 06594 representing concrete placed in Pour No. A(614 on 10/30/75 shows the f1vash content to be 3 lbs. be:.ow the minimum allowable weight of 310 lbs.

Nonconformance noted during QC review of Batch Tickets.

"Q" No. is 7 DOLUM 1.206.

One tag applied.

' ' - ;e.,

30.

O FIELD De PostreoM F4 ELD RECoMMENDArgoN/RourE ro PReBJECr ENGINEERING 2 9. F8ELo Dt.PostreoM #c EsuLrst

-Recommend acceptance on the basis that a reduction of 3 lbs. of flyash below the minimum should not significantly affect the required strength of the concrete.

For project engineerinn's evaluation the average of 5 sets of 28 day cylinder breaks was 4420 psi. the lowest avercne _of one set of two cylind er breaks was 4045 psi.

Re-quired fc' is 4000 psi, h jdan.osd

/2 cP-7[f)/

2 3. cNo.NacN.NG o.srosir.oM na suurs,

..N o.N e s N No D.5,o s.r.oM For pour A(614)b a C-1 mir.'containing 3 lb less than the required amount of flyash for a 4 c.y. batch will have an insignificant impact upon affected properties.

1 Based on the 28 day cylinder breaks as shown -above, Engineering concurs with NJhM/[M HU&a/Jn Unh

,i f :..Aj M ) [

l Field recommendation to "use'as is."

U 2.. R EJECTED mat EHI AL'd.sPo.IreoM Q.. w.=,eOwreba.

gy y' }g]g7 j

(,

gg g a4. es OEstGN CH ANGc HEQueNED o

o.a...

O ves. sac avv4CNro,

,,- ag.,

s, DR AW6MG REV.

DCN

.w3.......

SPEC.

REV-ADD.

GC-G3 a 8 e...-8 White Copy

- Originator Cenery Copy

- Field Engineer j

Pink Copy

- POAE Goldenrod Copy - OC

'~'

356

'#^"

NONCONFORMANCE REPOR n

__1 Spgc. 7220-C-230

!5 07220 m (bM

!'////y'n IJ ** # '-G -

-,-1

~JJ.

I Ol V.

T.PhOJECTNO.

3 2. N E POR T E D EV DATE 2s. D airusIT a ".N CO NCu,.H L re

"'"f; ""'~ lK

,""*" W L..r..

- /. 2 34):,

I DdTE y

{

A a.rD AT E D

2. gT EM DEsCRarf SON

.S. 0T E M LOC A TeO Concrete Pour No. A(

J A(587)b' Q )tj Mev cf, l///cy/g u./

N.

i ' E V.

~7h ^'

g,. n E rt.C Eu EN T,..

,. u.. u.

.. sE =.a c Nuu.E n

...raaTue sysTE u N O.

.til,unC,.asEO.oEnNO.

NLA N/A

[.

7d A

f. 2 2 -74

... O C r.E oD.N s,E C T.ON et. N NO.

....E rt.CE M E N T sE n,. u MG.

N/A C-231-3-665 Rev. O N/A

~

I""*"'"'

[j 4 Es

.,.sOunCE

.. CON r a a C7OnicOCa T.ON ME G__, O subsontractor

.C.hamnimIncE _His11and 111chinan

E-t. ROUTING SNsTRUCTIONs; HOUT E TO FIELD ENGIN EE RING O aouTE To aATEa A' s u rE a v iso a 8 9. HONCONFO R M4NG CONOeTIO N :Spec. 7220-C-230 Rev. 5 Section 9.1.5 requires that amount of entrained air in the concrete shall be not less than three percent and not more thaa six percent of the total volume at the point of placement.

Contrary tc, the above Batch Ticket No's. 06651, 06655 and 06656 had a measured air content of 2.0%, 2.7% and 2.; [

.refinectlyely at_ the nd of the numpline in Aux. Bldg.__ Wall Placements A(599)J' and A(587)b' placed on 11/12/75.

"n" u n,- Mo. 1 ?ns.

Monconformance noted_during routLne_QC_ Testing _of_. concrete-Z hI' Y :

-8 r M u r n e

2 8. FlELE' 90sPO.BTeON RESULT 54 20.

O FIE LD DisPosBTION QFaELD RECOMMENDATsON/ ROUTE TO PR 3 AECT ENGSNEENtNG Field recommends acceptance on the basis that these r.re interior walls, below grade,

_and will_not be sublect to a freezing - thawing cycle.

Results of 7 day cylinder breaks were 4245, 4365, and 3390 psi.

Required 90 day strength is 5000 psi.

w&rg)

/z -J ~7)f

72. E NG.N E E..NG Dis,Os.v ON 2 3. E NG.,c_ ;.

.NG o.s,0s.T.ON n E so uT.,

Project Engineering concurs with the Field recommendation that low air content is i

acceptable for the subject pour because:

1) These are interior walls not subject to freeze-thaw cycles, and 1

2)

. Low air content will not' reduce strength._ Engineering concurs /}) 9,[

with Field recommendation to "use as is "Qf6,Q)-f), f u, ((// d,fg4M^.' f///e 24.15 DESIGN CH ANGE HFOutHED NO

~

O vEs. sEE aTTaC ED.

m-~

j,,

D

-O

-E-oc~

SPEC.

REV.

. ADO.

~

s oe s s-a White copy

- Orig nator Es C G 8 2 Canary Copy

- Field Engineer Pink Copy

- POAE Goldenrod Copy - OC e

-a.

NONCONFORMANCE REPORT 1_ "' "'y ^

71 D r.'& WING /P ALT NO.

3 GM V.

T. PR OJECT N i),

t2 64 E PO LT IV CA

25. DISPOSITION ChNCURRCHC1

~

I

!5 01220

__ O/wr$

f/74

[ *~" ',,'

N ""

" ~ * "

~~ ~

Spec.__1220-c-210 3 DATE Concrete Pour #A(619)a Aux. Bldg.

~ L gQ*-[ [(/ !//-2f6 _ M brbu

/.1.3 //d S. S TEM LOC AT8ON a.n4TEDSV

.. 3. eTEM DEsCR 8PTION

~.

D.Te

[

ed. SE RI AL NUMBER

9. ST ARTuP SYSTE M NO.

A #dPL ACE MEN T PAR T

' R E V.

  • ..asesdeE o.mo ee

(-

m g g...i g pg l

1. f t,- 7(,

UlA I

.N/A d/A f.- 6 -7/.

2

_,'.. R E Pi. A C E M E N T sE R. A L N O.

e. PuRCN AsE ORoER NO.

... O C r.E Lo.N s,E C T.O N,L A N O.

~ "" '

  • a '- a -* *- # -

N/A

~'=

N/A C-231-3-652.

Rev. O n.

oRCE

...AsM; a os mCONTRAmOR,OCAT.oM ITEM UI NO Subcontra.ctor

.Chaminion_Inc.. MidlanL_llithiann 0 8. ROUT SNG SNsT RUCT BONO f.OUTE TO F8 ELD ENGINEERING

] RO* ATE TO M AT ental suPERwasOR Snec. C-230 B_ev. 5 Ssction 9.1.5 states in_part. "That the amount of entrained air in the 8 9. NONCONFORMING CONOGTIOMs concrete shall not be less than three percent and not mare than six percent of the total volume at point of place-5 ment".

Contrary to the above Batch Ticket No. 06686 ha-1 a measured air content of 6.2% at the end of the pump-line in Aux. Bldg. Slab Pour A(619)a on 11/20/75.

Six compressive strength cylinder's made (Set #673), ("Q" No.

is 1.205.

Nonconformance noted during routing QC Testiag of concrete.

' Pun t n cm n nnl i ed.

an. r ELo oisPOs TION aEsuLTsi O Pii'a onskosiviON GriE'o aECOMMENoaTiON/Rouv E TO rescas CT ENoiHEER No so-Field recommends acceptance on the basis that an increase of 0.2% over the upper limit will not significantly affect the strength and di.rability of the concrete.

_The_Iesults_of_two 7 day cylinder breaks were 3850 and 3880 psi.

This is an average of 77% of the required 90 day strength of 5000 psi.

We

/L-8 70F

=>.ENo.

EER.No

..,0s T,0N REsuLTs, a n. E gN E E a.M. o.sros.T.O N Iliph air content tends to reduce strength while increasing durability of the concret(

28 day cylinder breaks rec.eived on 1-7-76 give an average strength of 5605 psi.

i

. Engineering concurs with Field recommendation to "use as is" because the subject con; crete with an air conter c of 6.2% meets: speci$1catidn strength requirements.

c.' /. WDI-s. 1G l1[. Ab g.gs-w $ N & J)-ls, W $ /O- ]l a, N, : J E7)"5 k-a/

/,/zc,,/74

36. R EJECTro M ATE RI AL DisPostT40N O as waa's*=**6*a=

as as oEssoN CHff6GE REQuaHED

  • A"*

a.....

o u s.5 -.TTAC.Eo, OR AwsNG REV DCN SPEC E V.

ADO.

GC4 3-2 White Copy

- Originator seess a Canary Copy

- Field Engineer Pink Copy

- PoAE Goldenrod Copy - OC

F

'#^""'

G NONCONFORMANCE REPOT

\\

t

2. ha.~. W4NG/P ART H A e ' M V.
7. PAoJE r.T No.

I2

'PCMTCo av

'CATE

25. os5PosaisoM CoNCU fA E

!A I

W6

," * '"]

3. Ne-

, fATEo n,_Mt@f

,""f(8 /k/

/. 2-3.q

~~~

n7770 i

S 7770-C-7 31 M oEscaerTioN

e. sT EM ooc ATtoM s.

j oATE y

(,(4 Y/267f Concrete Slab Pour # A(619)a l'

N/A N/A N/A l R E V.* * ** 8 C ' F 'M* * *

  • =6*=

- A"d I /~/I[~ M, s.

. e,a

4. 5E NI A L HUMBE R
9. ST ART UP SYST EM No.

$PL ACEMEr4T PAR o.

.~

n. euncN AsE onoE n No.

s e. oc r.Eto.NsPEcTioN co AN No.

'"... = E et A c c M E N T s E N. A t No.

/ ~2.2. - 7d N/A C-231-4-653 N/A

.. co N T n A cTo nfooc A f ion si.AsME O vr5

'r5ovact

.....,w,,, m,..

@ No Can.strurJ.ipn 11 / 3

""M t o. Rout ONG ONSTRUCTioNSs 440UT E To F#E Lo ENGiNEEMtNG Q route To M ATENG AL SUPENvison Spec. 7220-C-2 31-Rev. 8 Sectior. 13.2.4 states in part that, during the curin_g period, the 9 9. NONCONFORMING CoNolTeoNs concrete members shall be adequately protected to maintain concrete temperature of no less than ~50 degrees.

Contrary to the above. concrete surface temperature fell below 50 decrees for approx. 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> for placemcht i

c - c.2 -,--

<mgo a rz

- o_dru.e e De ove's W

~4 5 ko'2-A(619)a.

"O" List No. is 1.205.

o

.h')

~hoS /ff'o)U M 0bN

_ norz r }% i on 6n Y/s-s f f.A L2 /[l2 A

y /*L$.)G ai. riEto oiscos. Tion aEsutTs>

ae.

O ric'o o'5eas:aa E]ric'o acco==sNoavioa/aouTE To e.o,ECT ENG.NEEa.No Accept as is based _on the following:

a)

Concrete did noe freeze b)

Cure was extended one full day such that coacrete was fully protected and cured for a minimum of 7 days _at a temparature not less than 50 F.

_f_

EtnO2 ob MrW &

l2-8'" 7ISP

= >. E NG N E E niNo o.s,o. Tion EsuuT s 2,. EyNE EN No of.Pos.v.oM The lower concrete curing temperature will tend to r.2 duce shrinkage, setting rate, and i. rater demand, while increasing durability and reluired curing time.

Engineering concurs with the Field recommendation to "use as is" be ause 1) The minimum concrete c

surface temperature was 35'F and freezing did not oc:ur. 2) The ctpre for the subject j

concrete was extended one full day. 4 I4 h M.8 e M c.

N d U,nyl/7 l /r 7L

/ _t/u rc

14. OS oESIGN CH ANGE H EauiHEo Je ATd ISP S a r e'o N O = ". w.a a * * * * ** ue a

/

ar oc acc T

E o

o...

o VES.5EE ATT ACHEos f

,/

oR AWGNG REV.

oCN

.-1-...u....

u,..

SPEC.

REV.

Aoo.

seese-a Whiie Copy

- Originator Q c-G 3-2 Canary Copy

- P solo Engineer Pink Copy

- PQAE Goldenrod Copy - OC

V NONCONFORMANCE REPOR[

#jy" 9G/PA AT P.O.

L.._.


t

[32

.DdM W///W ----",--g~

2b. DI$PO5f T IO N CO hCU*4 N E N w s LG V.

7. WOJE C1 N G, t

' OJs T E

2. lsG A s E8' H

_s.p e c.,..R..T..N7220-C-208 i 5 7220

_i %

9_T.

C.. A T....,,,p

.T. -. C. T.O

. ~

Slab Pour S-4; Pour #A(614)1$

,g l/, Y2) y[},[/

f_

/,. 7 Concrete Cylinders 7.E.

CE.ENT,g O.

R E..

s.

N U -. E.,

...T A R T U

.T.T E. NO.

/

  • b d *7

.. PUNC H A SE OR DE R NO.

le. QC FIELD ONSPECT BON PL AN NO.

8 6. R E PL A C E M E N T SE R t A R. NO.

J

  • - ~ = -

N/A C-231-3-659 Rev.

')

N/A C)'iEs irsOuaCE

.. CO TR ACTOR / OC AT.ON

-E

.T E - G,0 Subcont ractor

,ygited States _ Testing Co.,__ Midland,_Mich.

14. RO UTING GN S T FluCTIONS.

Q ROUTE TO FaELD ENGSNEERING Q ROUTE TO M A T E NS A4. SUPE R V450R I.. MONCONFORMING CONOSTsON:

Specification 7220-C-208 Rev. 5 Paragraph 7.3.2 states in part that, " Concrete cylinders shall be maintained at a temperature of 60 degrees F to 80 degrees F prior to stripping".

Contrary to the above,,

the concr_.ete cylinders made representing the concrete placed in Pour No. A(614)b on October 30, 1975 were init

'ly

~

cured between 46 degrees F and 64 degrees F.

"Q" No. is 1.205.

Nonconformance noted during QC review of report of concrete cylinders.

do $p df(cicg IS.

O FIE LO OSSPO54 TION QFIELO RECOMMENDATION / ROUTE TO PR DJECT ENG6MELHING 3 8. FsELO DISPOSIT60N RESULT S Recommend _ acceptance on the basis that the strength c f the cylinders was not

_ impaired by the louer temperatures as indicated by te st results of 5 sets of 28 day cylinder _breaksi The_ overage of two individual sets ranged from 4045 psi to 5165 psi _with overall average of 4420 psi.

Required fc' is 4000 psi.

U l1rl'n

~bM n/

/2 -R-7[yf 2 2. sp<n N E E R.NG o..PO s.T O N

,3. E NG.,. E E R,NG o,,,0 s,T,0,. R E U LT.,

C'ylinder strengths given above show that the subject i:oncrete exceeds specification strength requirements.

Engineering concurs with Field recommendation to "use as is.'

D Ws. W 2 1-m:e l} _ f Ra/A i-n.u E!/ %w~~ 40M

24. BS DESIGN CH ANGE R EQUlHED g
26. R EJECTED M AT E R S AL be5PostTsON O =naava w**ta==

a r. oc A CC E PT A N c,s b

O vEs. sEE ATT ACN.D.

  1. ... M...... & " -

d

.5.

6 DR AW9NG R E V.

DCN awvneaease sesesstem eats e

SPE C.

R E..

ADO.

eGda a' White Copy

- Origenatos CaneerCopy

- F sold E ngineer Pink Copy

- PQAE Goldenrod Copy - OC

s.

[g C4 jf,

~ \\

(^)

..r' J

NONCONFORMANCE REPORT 9

365

2. !L,, A WI N G /P A R T NO.

s N E V.

Y, PHOJECT hO,

_C-238

!6 7220~

12. N E PO R T E D W W ~

b'DaTE 3.. tSPO54T40N CONCUR RENCE

[ 26

" "*'~

" 'j "[

y"~

,?ddN?b: {_.'b, ' / h - 7L 3.:T/u DEscRsPTiON Steel Columns

a. eTEu LOcaTeoM

.v so4TEo av i caTE

_D4.1,_DB.3._EK1.31 & EKI.11__ Auxiliary Buildine

.X4

!/A-@ F P.OJE C T g ang em e~ ?

c.fER84LNUMBER

9. $T AR TUP 5VSTEM NO.

'REV.

. H EPLACLM ENT P ART I

ests/

.s&c-6 s am I7- %s-T'.)p

~

n/A N/A I

s. Pu =CN a sE O roe R NO.

[ g. M..[g'd.-

f'/-7/o a

s o. Oc riELD iN sPEcT.ON PLAN NO.

... R E PLac E M E NT s E R.L NO.

C-38 d -Jciv-J- /

N/A

" " ' '"* * " "* ** ' 17

.. c3 NTR acTORiLOcaT ON

...asut O vEs ir souact N/A

.'T E u'_M NO Construction i

g a. ItOUTING 6N57N UCTIONSs Q ROUTE TO FIELD ENG4NEERING O ROUTE TO uaTERiaL supervisor

90. NONCONFORMING CONDtTION:

DCN 6 to drawing C-238, Rev. 6 shows a splice at the above columns atelevation 617'-0".

Columns D4.7 and D8.3 were cut at elevation 601'-0".

Columns EK5.31 and EK7.79 were cut at elevation 616'-0".

O Number 1.201.

h tags applied.

2L C FIE LD DISPOSITION QFsELO RECOMMENDATION /POUTC TO PROJECT ENGlNEERING

11. FIE LD DISPOSITION RESULTS:

(1)

Field Recommendation for columns EK5.31 and EK7.79 is "use as is" Splice will not interfere with any beam to column connections.

(2)

Field recommends that columns D4.7 and D8.3 be repaired as follows.

Re-cut and splice column D4.7 at elevation

..-......m.,

.....'c u.t s__a t _ e l e v a t i o n 601'-0 with full penetration welds 616-0.

Repair

23. E NG IN EERING DISPOSITBON R ESULT$i

- as noted below.

22. Engineering Disposition (1) Engineering concurs to,,use as Monk (% gh'/f A 3 b &,w,sa,g '

in" the column D M as!f/04 e s b loc # #j c2cl splice at elevation 616'-0 for columns EK 5.3.1 and EK 7.79.

(2) Field Recom-fg%2h Io //c McTOLv, /hld mendation to repair the columns D4.7 and D8.3, as outlined above, is acceptable,.

~

Jg hj D.C.N. to drawing C-238 will be issued incorporating above change.

[/M/ M

_c

[

'h / -/'I' 96 goafsy-X.vun.

23. es oEs GN cH, HGE RcouinEo 2.. RuEcTEp uaTE Ria' oisPOs TION g',';"" '* *""*"* "

gegEgT'^jEg j,qpg

}

2r V E S. 5EE ATTACNEDs e s se n e m e oc s ke*=e"e e DW A WING REV.

DCH on,,

Auvmonease anses svon EPEC.

R E V.

ADD.

e4Ts t u a-a White Copy

- orig nator QGG32 Canary Copy

- Field Engineer Pink Copy

- PQAE

j g_

-4 3

G s~

C Q

g

/6 _

/

.i s

v a

L

,(

c a

U y

) -

E-D-4 L~s e

b h

r e

2_ _

en r

0 og o_

0 r

t n Lm aE n

E id A gl 2

2#

ieQC riOFPO a

E p-G o

a I_

c y

n p

o o

y C i

yp

/l s

i poyd t

~ Cy o r oCpo f

a n

n

- iter Ce i

r e

d l

n kl 6_

t eino hWCPG E

e n

)D f

n M

T e

N p

O n

C 0

d_

l 7

(

l s

0 s

e a

r 1

e v

n r

e g

i P,_

d t

-_l l

a o_ l o

a b

w i

E U

R, L

t r/,

co i

f l

e

~

E ur f

f w

e

(

C ct h_

r s

3 3

N r r t

n 7

n7 A.

s oo o

o o

q_

Y

=_~

R AA M

f f

o 1

1 t_

p\\

r_

r t

t O

d n

e e n

/

F ld d

l i

v i

v l

NO

o o l

o e

o e e

v E

i~

l w

$y i_, R g

1,_

. 5. y a_ L' N_

P hr r

a i.

R s

C D t t

O T. c c

e e

1 e1 f

~

N S e e

g v

v o_

N

_~

l l

u o

l o l l

e e o

o D

o D g

a n

r r

n i.

t 0 8

n.

g.

h1 1

k S

S v.c c0G c

l 1

e6 7

a e W cW i

l y_

H E E B

v 4 "

eA cA e

b b

r i-f f

ec e o n

o s

r l

i s

u g4 hS e

d nU uU r_

i -

o-t i

e 1

c 1

S_

B nB S

a L

r a

t )

)

)

E_

ea h

c t.

g D(

(

(.

t-n n

n i

d n

c_

l i

p_

a o

2 W

J t

f kc 3

s o

e-1 8

9 0

/*

E_

_ 0

_ 1

~".

P

3) a

,)

NONCONFORMANCE REPORT ^

" ' " ' ' ' ~

e

_ _ _ _'oATE

25. otsvossiaoN CoHCunetE hr 2--

N l

F'

2. o ri A W Ally No.

e DI V.

7. PROJECT No.

12 st c Poet rE o f'?

Spec. 7220-C-2 31

!8 07220 h% b2b I&// '/S

'* "j """' - g' "'
s. si cu ocscnerraoM
  • Aux.'oBidgv Pour No's.

19A rco =v

/

'onre

. d~-m'

/'?-3-N i

Concrete Curing

. _ A(510)_a' & CC(635_)b '

/f, eretacEMcNr PARr N M/2-Il-7f

.N 8A8'

' '" g o ease 9/ /

1 4

4. sc esac Nuuss a
s. stanTue sysTru no b.I

' R E V.

N/A N/A N/A V

I la'rt PE t-4[- 7(.,

86 I

e s

JacNasa onorn No.

so.oc resto iNsractioN roan No.

j.s e, acroaceutNr sensat No.

/. [b *l[ ~

N/A C-231-4-693 & C-231-4-650

[

N/A

- a u

- = -J = =

"

e. con rR ACTOR / loc AT8oM i3.A5Mc Q vg &

. 7. sou R CE J.../ A irru

(% hg_1_

Construction g ours vo r.rto cNo.Nec. No o Nours to.rcan L surcav.w.

.ou1.No.Nsv aucrioNs.

19. NoNCoNroRMING CoNo8 TION: Spec. 7220-C-231 Rev. 8 Paragraph 13.2.4 states in part, "That concrete members shall be adequately protected to maintain concrete surface temperature of no less than 50 degrees F".

Contrary to the above Wall Pour #27 in the Aux. Bldg. had a surface..tenperature of 46 degrees for 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

Pour No. CC(635)b' ir, j

the Unit #2 tendon gallery access shaf t had a concret'e. surface temperature averaging 47 degrees for two days.

Nonconformance noted during QC Surveillance.

"Q" List No's. ~l.'205 and 1.105.

Two tas;s applies.

J0.

O ris'o oiscosarioN Greuo siccouurNoarsoNiaours 1o caosscr =No Neca No; ai. risto oiseosir oN atsuoisi

_.AccepI_asd s _EaclLph nement._wae niven an additional

..y.v

,s.ytwo days. cure to assure a

_that_thc_ cnncretg_nuld not be adversely af fected by :he small temperature drop.

%dAhA /2 -/4-75w?

v

22. ENGeNE cRING oISPostrioN 2 3. ENGIN EE RING ogsPossTaoM MesuLTss

.The lower concrete curin_g. temperature will tend to redt ce shrinkage, setting rate, and water demand, while increasing darability and required curing time.

Engineering

)

concurs with the Field recommendation to "use as is" because 1) The minimum concrete surface temperature was 46*F and freezing did not occur. 2) The deviatic.n in curing temperature will have an insignificant affect upon regt. ired curing time, and goo 2.as ossacN cNaNor acouincu Ze. ncaccyco m AT en sas. ossrusirioN D a 'wa a * *.="*.. a 2 7. oc c ser4Nc,

db6,bd O vas,sr=arracNco, U"**"

O

-i.

.t.

..-a t

oH AWSNG St E V.

oCN auswomeneneme. scree m.,e f Pc C.

M E V.

A p o.

,WJ;F-om1 wni. c.,,

- o,4.io en io,

c.n.,,co,

Pink Copy

- PQAE Gold.ated Copy - OC

-6

.6

}

i 3

m 2

2 ccar s.

C

?

& A 0

7 a

3 1-x t

L

)

l D

T' w

%a, N

m/

O n

C

/

}BG

(

w T

s R

y J O

a P

d L.e E

l R_

Ah lu f

o w

t M

R d

O e

d F

n N

e O

t C

x e

NO s

N aw ruop tce i_

bus

~

e h

t r

af r'uc h

T

)

J 3

2

~

2

/ '

ke

/,

1'B

$, ~

^

' ' ' "[ ' ' 1

  • * * "6

~

LQC NONCONFOftMANCE REPORT 3

i

2. D M T.W IE T re d.

8 NE V.

7. PR M C T NO.
12. R E PON T3D F

!' ?! ATE

_ Spec 7120-0-231

!8 07220 E'd.t dn u b.

25. 08,Po set 80N CoreCu1Hf.NCd I ~~14

~ ~ ' "

" " ' ~

~ ' ' '

3. B T EM D ELCHIPf EON
4. 8T EM LOC ATION 0 3. V A L.ID TEDav I DATE

_CongygtpJ. gip;r Pour No. A(626.25)a'

/ThI C #fM !/-7 I

6. SE R 6A L NUMDEN D. ST AR TUP SYSTE M NO, t 5. R E PL ACEM ENT P A RT NO.

R E W.

      • 88 " F *st e s mesme s e ee M

_H/_A _

-H/A i

5. PuRCH ASE OMDE R fdC.

e...

8 0. G C F8 ELD INSPECTSON PLAN NO.

- l 8 6. REPLACEMENT SER4 AL, NO.

N/A C-231-h-732 l N/A G. CONTR ACTDet/ LOC A TION 39.ASME C VE&

9 7. SOURCE J/A-

'T E = be.__LConstumtion O S. HuuT8NG INSTNuC TIONSs HOuTE TO FtELD CNGsNECRfMG O aourt To =^TEasa'suPEav'soa 8 9. MONCONFOH MSNG CONOGTION:

Spqpifica_ tion 721Q-C-231 Rev. 8 Fayagraph 13.2.h states in part, "The concrete members shall

_ be adequately protected to maintain concrete surface temperature of no less than 50 degrees F.

Contrary to the above, for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> on the hth day of cure and for 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> on i;he 5th day of cure, Vall Pour FP-h, A(626.25)a', )

in the Aux. BlUn had a surface temperature of h8 do3rees F.

Nonconformance noted during QC 'Surveillence.

"Q" No. is 1.205.

1 Tag Applied 20 O P'C'u o'5Posa r'oH EPiELo NECO==ENo ATsONiaOuTE TO Pace rCT ENo NEER.NG Zi. P ELo aisPOsiTiON aEsuLTs.

_Ecraommc1Ld " accept as is".

A surface temperature of 48 F on the 4th day of cure 0

will. not adversely affect the design strength of the ccncreta.

The cure will be

~

e>: tended for tim additional days so that the concrete vill have been water cured for i miniraum of seven, days at a min. of 50 F.

Y?nes^dbm

.m /.

/- ?- 76 22.Et eINEC H tf EG D85PQ 5eT60N

21. ENGIN E EHING DISPO$sT sO N MELuLTE:
23. is oEs GN CH AracE satouina u ONO a-~~~~~~
22. u u u n o u O vEs. sLE ATTACNEo.

O.e D et a we h n R E V.

DCN avveee. ease sat a. Tee fJ E C REV.

ADD.

meva

'd**

White [opy Originator E

Canary Copy

- Field Enginaar Pink Copy

- PGAE Goldenrod Copy - QC

_. _ _ - - = = - - - - - - - -

l __

.P=Gn.

.s.MCu

.s NONCONFORMANCE REPORT j

0, J 36, 9 NO.

44XWT ~~-j]M/3,/A.

oATE et oss Os. ION Ca e. Cue.u NCE

. x E V.

r. P,.0,E C T N O.
2. em...N G

/. 8 (Id k N I

" ' I "~ I l

~"

'~

SRAc, 7? 20-C-230 l5 7220

, BATE 1

3. sT E M DESCN erf EON S. BTEM LOC ATaON A TED BY l/-/ 3-7b C

Fly Ash Batch Plant g.pg R E V.

fEPLACEMENT PART NO C, L E RI A L NUM S E R

9. ET Alt T UP S v5T E M NO.

N/A N/A L

N/A I

C. PURCH A 5C ONDE R NO.

3 0. QC F 4E LD ENSPECTION PL AN NO.

{ 8 6. M E PL ACEMEN T SER s AL NO.

N/A N/A l

N/A

...A.ME o vE.

j.T.sOuaCE

o. CONT a ACiOan OC AT.ON g

,.O l

Subcontractor Champion Inc., Midland, Michigan

.T E 3 4. No u T ING GN57 N uC T sO N 5.

ROUTE TO F4 ELD ENGSNEERING

() ROUT E T O M AT ERI AL SUPENVISOR Section_LA.1 of Specifination 'L?lis-C-210, Rev. 5 states that__pozzolans shall conform to lb. NG NCONFORM8NG CONOsTIOMs ASTM C-618-72 in table 2 requires that the fineness value be not less than 6500 CM'/CM.

C 618-72.

MT-M 2

3 r*nntrary_tn the above, fi n enesa nr ny nah anmpind on_12/16/76 was reported n a 6662, 9%1, and 5783 CM /CM.

._Nonconformance_no et d during routine _.nacra_ testing _of "naterials. O list numbers 1.105 and 1. 205.

WoAw GuAmwr ec--

2 9. FIELD Os5 POSIT 80N HESULT5J 2J Q FaELQ ptSPoleTION QFIELD HECOMMENO ATBON/ ROUTE TO PROJECT ENGINCEN8NG

/s f \\ jn 1 f

W l~d-Z At 2 3. E NGINEEH aNG DasPOSIT TON HESULT&s

22. ENGSNEE R ONG DeSPOSIT40N

~)

. R EJECTED M AT E76 A L D8SPOSIT SON O =*waa = w'*6**a 2 7. QC ACCEPT ANCd 2 3. es DESIGN CH ANGC NEQueH ED O NO a.e...

O v Es..EE avr ACNED.

DH AWING R E V.

DCN

.**tes..ea.o e..e..*..

e.g.

R E V.

A D D.

~

OPE C. -.

G C-G3 2 White Copy

- Originator e.te-s Cen##v Copy

- F e.id C eg'neer Pink Copy

- PCAE Goldenrod Copy - OC J,

w s

f'"'

=%'

. 't,

t.

- _.c


n

'NONCONFORMANCE REPORT juAvC

a..

cweh r No, iHEV.

v. Pa mec r No.

a c Po M T E u a oisP ssinN Co Sp c. C-230 l5 7220 sh M it-A.%

j

~-"-

' * ~

s. arEm oEsCRsPrioN
s. artu loc AvaoM 6Argo av 8 OAT Concrete Aux. Bldn. Wall [h9W M[/g

[ !/-l L. SE N 6 A L N UMeE R

9. ST AM rup S Y5 t EM NO.

EPLACEMENT P AR R E V.

    • ese ct seese a ns, ass ee eave

_HLA N/A N/A U

i W. PURCH A SE OR DC R NO.

IS. OC P RELD GNSPECTION PLAN NO.

3 6. REPLACEMENT SER t AL NO.

_u/A

('- M1-2=6B?

Rev._0_ _ _. I N/A

c. CoNr N ACr oniLoC A reoM ss.AsuC O vEs lsr.sounCE D No

,[_

Subcon tractor

__ Champion Inc., Midland, Michigan iv e M s e, ROUr0NG ON$rRUCr00NO

{ ROUI E TO F. ELD ENG4 NEE RgNG

] NOurE TO M AT ERS AL. 5UPC H Vg50R

5) NONCONPORMSNG CONDertOMs Spec. 7220-C-2 30 Rev. 5 Table 9.1 states in part that the rejection limit for slump of IF-1

_ cone s e mix is 5".

Contrary to the above, a slump of 5'c" was measured at the end of the pumpline on D-1 con-crete mix represen~ted by Ticket flo. 07209 placed in the Aux. Bldg. - Wall No. 29 Pour No. A(599)L' on January 16, 1976.

Nonconformance noted during routine testing of concrete.

"Q" Lis t No.' 1.205. ONE Hold Tag applied.

Ticket No. 07209 represents 8 cubic yards.

a ).

O P'E'o ui5Posar'oN QP E'o aECouuENo AiioNi>= oui s to PMoeE:r ENGiNCER.NG a. r.ELo oisPos.r.oM REsuLrs

_11so n n _.is : Cylinder set #732F cast on 1/16/76, from ti:ket #07209 Averaged 3180 psi 0 7 days, or 63.6% of fc'.

Based on current stren,th data cylinder set

  1. 732F will exceed 5800 psi 0 90 days.

M. F mtL 7-%

M L __, t. u. 4

_Eield recommends "use as is."

7 a t. ENGINE E MtNG DISPO5ev EON 13, E NG 4N EERING OtSPO51rsON N E $ ULT $s a. es oEssGN CN ANGC REouiNE ONo U"'."..'"~~~

' ' " ^ " ' * " "

n.<

O v E3. sE E A11 ACNEo.

e,.

gRawsNG REV.

DCN

    • e vasenesse e..ee seen iPEC.

R E V.

ADO I'

Whete Copy

- Orig,natos GC-r.3 a Canary Copy

- F eld Ensin.or l' ink Copy

- PGAE Goldenrod copy - oC W

JJ

yJy,.. '

e

')

~

NCNCONFORMANCE REPOitT

' ' ]

cr -.

37 W. '4 R A WB; TNg e sM V.

7. PH OJIC T NO.

HEPURTED&V

-h' O A TE8/%

2 5. D 45Po t e T ION CO NC U X M !NC' Spec, Tl20-C-208

!5 7220

%D

3. 87EM OE SCRIPT ION
0. 0T EM LOC ATION 8 3. V T

S$ V E DATE

- ConCrct 1.indar<-

A i nv. Rld. Slnh 4 Pntir A(6. l)h 4

/~20 i

3 C. b s N t A L N U M 9.5TARTUP57 TE M NO.

3 5. H C A EMENT PART N paces sy Peass emesme se e.te N/A ng

/A l NEV.

2' C. Fu rtCD9 A SE O RDE R MO 9 o. OC PSE D.D 4N$PECT10 N PL A N NO.

3 5. REPLAC EM ENT SE RI AL NO.

_nLA C-2 31-4-736 Rev. O _ __I N/A

c. CON TR ACTORiLOC Af SON s i. AsuE O vas lii.souaCE ~

M_N.O _ I Subconnster

_.1!nited S ta tes_.Tes t.ing_fo e_Midlan d e_Hf.ch -

'na 6 4. Rou f f reg INSTNUCT60N$;

HOUTE TO FIELD kNG4NEERING Q NOU TE TO M A T E NI AL SUPCH V 850R t ). HONCON F O R M 8NG CO NDs T TON.Specification 7220-C-208 Rev. 5 pa ragraph 7.3.2 states in part that, " Concrete cylinders shall be maintained at a temperature of 60 degrees F to 80 d g,rees F prior to stripping".

Contrary to the above, the field concrete cylinder sets (708F, 711F, 714F, 719F, 721F, 724F and 726F) made representing above location on January 9,1976 were initially cured between 60 degree s F and 82 degrees F.

"Q" List No. 1.205.

Noncon formance noted during QC review of report of concrete cylinders.

No Hold Tags applied.

2 ).

O PIELO DISPosaTSON FIC LD RECOMMEND ATION/HOUTE TO PitOJE C T ENG4NEER 8NG 2 9. PtE LD DeSPOSITeoas R E5uLTS4 Eic1d._reconmencla_usc as is.

Durinn the initial curinn acriod of the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, a deviation of 2 F for a maximum of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is an insiinificant period to effect the long range strength development of the field cylindar cast 1/9/76 from place-wn t_A(614)1L The_averane 7 day _atrengths of tite field cylinders is 3790 psi -

lowest set averaned 3525 psi and the hinhest averaged 4300 psi.

klS-+ll3-217L

  • N 4
  • L.
  • I LP 2 3. ENG tNEE R ONG D45POSeT SON RESU675:

8 3. E N GIN E E H 8NG O B5PO5 ei SON a

2f4 IS DESIGN CH AP4GC HEOutN E O O NO

  • * " * C ' ' a " ^ ' ' " ' a ' o ' 5 PO 5' T.O N a.. e e.-..
e. -

,,.OC-

.ANCE U***

O Y E s. sE E ATT ACNED, DM A WtNr.

REV.

DCN a.vme.asesens.ssvee (PE C.

R E V.

ADO.

t u.s e s whate Copy

- O#ig.nator QCGaa Cenary Copy

- Field Engineer Penk Copy

- PO AE GoWenrod Copy - OC

'a--.u

i Q

d F

=

1' NONCONFORMANCE REPORT

' ' "{

f " '

Or 1<2

c. DR A wsNG,P A R T NO.

i R E V.

T. PROJE CWis.

~

I i

ErORTEDmy DATE zS. DiSPoseT eoM CONCURRENCE FSP-C-2 3',

!0 722')

v e Il?>/-u-- ! 951/4

" ' " ' " j '"" " "

3 S TE M DESC RtPT90N

4. ST EM LOC ATION
  • 3. V A LID A T E D S v #

'DATE

' I,ia. r Plate Assanly Ji: B1th. Area (For Cont.

l) Nf M Lt l

l 0 37 A C. S E R I A L N UM BE R

9. ST A N TUP SY ST E M NO.

S. R E PL A CE M E N T PA R Y NO.

REV.

    • .s. c v e s. 6e s ee.e.e s.

-.c..L-li-1

_n/A S. PURCH ASE ORDER NO.

"/A I

g o. OC FIE LD GNSPEC TfON PL an N NO.

4. RE PL A CE ME N T SE R3 AL NO.

7 721-C-5dA C-111-63

':/A

  • =

4 CONT R ACTOR / LOC ATION

},8gg,3{g.St.ASME Q VES T. SOURCE Southeirn hoiler & Tan!: 'lorha, In c. -To m.

O NO Vendor

.T E M NOUTING GNSTRUCT80NSt Q ROUTE TO F8 ELD ENGeNEhRING Q al'uTc 'o M a'<a'a' supe avisoa

~

9 9. NONCO N F O R MING CONDIT ION:

A t'istrenaacv exin ts bettmen _ntil sini _nunhsr_<Lo_cuncutntion und the venc! ora trans ferred st.tn r

si ab nurber.

i.bcuncatation sicat Number is 51GAa703 uith S Lab :iu::ibc c A79070.

The nlate is vendor transferred staaped.21GA0733 vith laat. di;;it in clab nua'ior in question A79377.

Discrepancy detected durian OC field int,pection review.

One !!ald Tag attached.

Item "0" No. 1.109.

19 Q F 0 ELD DISPOSOT 60H QF6 ELD RECOMMENDATION / ROUTE TO PROJECT EP G4NEERING

15. FIELD DISPOSlTlON RESULTS:
22. EPeGtHE E RING DISPOSIT BON
23. ENG tNEERtNG DeSPOSITsON RESULT $r i

e 3 3. :S DESiGM CN AraGE REOuenED ONO

    • "' " ^ ' ' " ' ^ ' " '"' "

U""..".'"~~"

' ' - ' ^ ' ' ' " ^ " ' '

O.e O vES. SEE ATvACNEDe DR AWING R E V.

DCN

.wveso.eae e e.ees ce..

e.te

$ PE C.

REV.

' ADD.

' ^ ' ' ' '

White Copy

- Originator QC-Ga-a Canary Copy

- Field Engineer Pink Copy

- PQAE Gosdenrod Copy - OC 1

/

1 3

s:

NONCONFORMANCE REPORT

-. - - v. ~

' " ^ ~ ~ ' '

WEPA R T N O.

o r _ __ 1 373

, R E V.

v. PROaC T NO.

Ti. N E PO R T EH, Spec.-7220-C-208 l5 7220

.oATE 2.. o sPOS,T.O N CON gc R,.E NCE t N.,.- l\\-Wh..

,\\

3. STEM DESCRtPT80N m-l ~ ~ '-

m"

e. IT EM LOC AT ION l'our A 614 1 5V A LIDATED BY I

t!

___Cucretc_._ Cylinders Auxddg.__EIPJDE E it lab __ 'd*/t / W r M - W.. r# -N 1 DATE e

/

C. L E R $ A L N UM BE R

9. S T A R T UP S YS TE M NO.

- tI/A S I' R EPL ACE M E N T P A R T NO.

3 R E V.

  • * *
  • e c t * * * ** * *=- *n e e.

eat.

MLA

_ _.l![A

'/

I

/

r #

I W PURCH ASE ORDER NO.

9 0. QC P sELD GN SPEC TION PL A N NO.

44. REPLACEMENT SENsAL NO.

_2UA C-2al-4-739

_.2;LA

c. Cs N T,,4 C T O, LOC AT ON

...;SM; o TES n.=URCE

__Upf,tn.N G.N S T R UC T.O N S..d States Togtian_Qo,.._, flidland _llich NEER.NG O NO

__,_Sph con tXqc t.qr a

iTE M

.s. ROUT g ROurE TO riELD ENG O RO.T E T O M AT ERe Ai. SUPE RviSOR

.t.NONCONPORM.NG CONo.Y.ON. Specification 7220-C-208 Rev. 5 paragr1ph 7.3.2 states in part that

" Concrete cylindes shall bn maintained at a temperature of 60 degrees F to 80 degre 2s F prior to stripping."

Contrary to the above, the

_ field concrete cylinder sets (728F and 73')F) made represen:ing above location on 01/1/i/76 were initielly cured between 56 degreca F to 65 degrees F.

In addition, lab concrete cylinder sets (727 and 729) representing sar.e

_ location were initially cured between 63 denrecs F and 81__.!cgrees F.

"O" List No. 1.205.

Monconformance noted during QC review of report of concrete cylinders. No hold tags applied.

LO C PRELD DISPOSlTION QPIELD RECOMMENDATION / ROUTE TO PROJECT ENC eNEERING al. PIELD 08SPOSSTION R ESULT St s

~

s

27. KNGINEENING Da%POSeiSON
23. ENGINEE RgNG OISPOSIT40N RESULTSs a

f b

O NO

  • A"E'Ec'E 2 3. 0) DESIG N CH ANGC HEQUeHED M A TERI A L 8SP 3 SIT 80N O==vvaaro*weeue=

27.ce C,,,rANCE O TES. SEE 47Y ACMEo, Crt AWING REV.

OCN J #c**semese avveeeeese,eneescre.

SPEC.

REV.

ADD.

ame e White copy

- Origenator e C<.3 a Canary Copy

- Field Engineer Pink Copy

- POAE Condenrod Copp - OC e

r 4

=

w

  • 1j s

NONCONFORMANCE REPORT 1

174

2. DN A WING /P A R 7 NO.

,, = - - - - -

Oi

.R E Y.

7. PROJE C 7 NO.

I 2. M E PO RTED Dv lDATE 2 5. O s5PO51Y IO N CC6HC U R R E NC E

_ Spec. C-230 l5 7220

3. IT E M DE SC R IPTION S. 8 TEM LOC ATaON Ii

~ r :

~~~""

~"*"

""~

0 3. V ALGO AT ED S V I

Concrete Aux. liidg. Pour FPBS A(633.2 >)a L.1,iA,. p p A $'h" /'h ATE'Y 7t D

4. SE Re A L N UMRE R
9. S T A R TUP S v5 TEM NO.

9 5. REPL A C E M E N T P A RT NO. *

'REV.

...se ct e as te e..e.e s.

DA's S. PURCH ASE O R DE R NO.

99. QC F8ELO GNSPECTtON PLAN NO.

N/A l

- N/A N/A 9 4. R E PL A CEM E N T SE R 0 A L NO.

N/A C-2 31-3-749

!:/A

- - - ~ ~ " - - - -

CODE. (j vEs is. SOURCE

.. CON T R A CT ORiLOC AT ON

...AsME US Testin / !!dl_and. ichican O NO, _

Subcontractor g

iT E M t o. ROU FING INSI ST UC TIONS:

QROUTE TO FIELO ENGtNEERONG O aou's to M Avra' A' $uPravisoa 9 9. NONCONFORMING CONDIT goNr Spec. 7220-C-230 nev. 5 Table 9.1. 3 staten in part that sitmp measureuent shall be mada for overy 35 cu'ile yards or fraction thereof of concrete produced for clann I structures.

Contrary to the above on Aux. 111d g. Pour A(633.25)a' test vere taken at 175 cubic yards and 216 cubic yards.

An interval of 4f1 cubic yart was placed. Nonconformance noted during QC review of QC-12 Form.

"Q" List No. is 1.205.

Hold Tag Applied (1).

29.

O P'<'o pasPosar'oa Or'c'o arco ="cao Avioataou'r to Paoe'.cr racia==aiao s ' ric'o o'5Posiveoa a ssu'vs.

22. ENG5N EERONG DSSPO5sf EON 2 3. E NCONE E R$NG Os5 POSITION R ESULTS:

\\

O"'..".*"""""

24. s oEseGN CH ANGT REOUGHED O NO
26. R EJECTED M ATENIAL DISPOS 8TaON 2 7. OC ACCEPTANCE O ee O v Es. EE ATT ACNEc.

.e....

DR A WONG REV.

DCN

.u s.o.ea s e eme s.e e,o.

e.,,

SPEC.

REV.

ADD.

seese s WNie Copy

- Originator Q C <. 3-a Canary Copy

- Field E n2in**r Pink Copy

- POAE Goldenrod Copy - QC J

4

g"g uo - - - - - - - -

(lUAUT! AUET F!ND!NG L.?2 515-1-u i.1/19/76

..~

i 1

.....u..m.

g,,.,,

Iland 1 & 2/ Job 7220 Construction B. Stojkov

.',*e=

r......

M/A 15-1-P-3', I tems NCR Log, Transmittal File J.' Miller, D. Palmet l

.....uw...........................

C. Newton, D. Long - i FIP G-3, Rev. 6, S/17/74, para. 4.6.2 Para. 4.6.2 Raads in part:- "The PFE's authority to make 51sposition 'of.nonconformances-chall be subject' to... the following:

c.

Use approved repair procedure:

Requires notification of the'PE prior to or -

. concurrent with implecentation.

d.

' Reject: Requires notification of the PE prior 'to or concurrent with implementation for items pugchased to an engineering specification".

s-

-w i

s

.; c.

.7 c.

The PE's files were checked for the presence o'f copies of five (5) dispositioned NCR's (255, 297, 327, 342 and 354) and'fiiTe (5) closed NCR's (307, 317, 348,. 349 and 353).which had d.thar "use approved repair procedure".or'"p$8 ject" dispositions.' - No evfdance that project in wring had been notified was available at the site or Project office. for'six (6) NCR','s.

/2 354, 307, 348, 349-and 353).

~

.~

s i

y.

- i.

s

~

r s.

.y.

' Datermine which NCR's having "use approved repair procedure" or " Reject" dispositions 1.*

have not been transmitted to the PE and transmit immediately.

^

2.

'The PFE, in coordination with the PFQCE, establish a cathod to assure ~ timely trans -

taittal of subject NCR's to PE.;.

A

~.

c 4,

....s.

1:

1/30/76, 2:

2/23/76 Proiect Suoerintendent

... m u,,...,....

)

=

's b-

-(v; m.

?'. g."h.

-y

.m....

,...~.s.................

ummu.euuuuuuum.

=m miii um m

,a m m. mmsus su mas,..

p' QUAUTY AUDlT END1HG 73( 2-1-2) 1 l

l,,..,.1/20-2 2 /

0 M/A

g...

'diand 1 & 2 Construction O......

s. stojkov n.
i/A 12-1-P-2 Item 1 FMR-1 PO Files R. Mathews, R. Grote

_.,4.,u....

n......

7220-C-233(Q) Rev. 5 9/22/75 Append. A 7220-C-23 Rev. 3, 4/15/74 Append. 1

~

O C-233(Q) Appendix A, states in part, "The seller / subcontractor shall establish and maintain and effective QA Program which will caet the applicable requirements of G-23...".

G-23, Appenix 1, states in part, "With the proposal, each bidder shall submit a su:=aary d scription of his QA Program.

, or an uncontrolled copy of his QA Manual or procedure.

If a bidder is currently performing' to or has cocpleted a Bechtel order which invokes the. re-quirecants of this specification, he nay, in lieu of submitting a copy of his manual, submit a latter listing the date of BechtMcSWEnual revision that is currently in effect or was in affect, and a statement that it will apply for this effort."

...r.

.,.~:

- i. w ca :. ;.,...w.,n

,.,,...m

...g Purchase Orders 7220-F-12726(Q) and 7220-F-12974(Q) resulting from FMR's CA-3038 and CC-2131, respectively, were a.earded to Inland-Ryerson.

Specification 7220-C-233(Q) Rev. 5 is the controlling specification on both orders.

Subsequently, 7220-G-23 is also applicable.

Inland RE~on is currently performing work controlled by Specification 7220-C-233(Q), and has sub-

) and had approved for use a Quality Assurance Manual.

However, on neither of the sul i 4rder: h:: I:1:n?. P.Jcr ca sul.sitte' le s. Lu siaLing thac the work to ce pertorned on a

the orders will be controlled by their currently approved program as specified in 7220-G-23, Apprndix.1.,

,. a. n

~

~

~

.v

...:. ~ : a n.- 5

,.1-

=

,.g

.. u... m a.. s o.

='

--==.. s; <*, a

  • s_,y3.;

1.

Obtain from Inland-Ryerson stattent of the applicablity of their currently approved QA Program to the subject orders as specified in 7220-G-23, Appendix 1.

v,,

.. y.-

2.

Reinstruct Field' Buyers to obtain satisfaction of QA requirements prior to award of Purchase Orders as specified.

r.

........n...................

1; 01/30/76:

2: 02/27/7[

Project Superintendent

.. kg4*r.w3 d66 1....ss. .

'~

.. ~,.

4

.' ?'

.*.\\

(

).

a r

s

/

.,.,.4**

u,_..

l,....n...,...................

b

---=

l Etzw m................

i

.*N

.Wm 6e

_ emm-a g 4

gg -

_,,,3_

y,....._..

s$r, D

QUAUTI AUDIT RNDlMG

_ m.!"-' -"

01/20

....... -22/76

^

g...

aai.na 1

t. ?

rn, e.,,. s n-

] - '*=

n e, q..,,.

.....u.,....

s 11/A 12-1-P-L: Iten 4 RIR/PO Files T.

m.:-n, a n_

pn1.

i FPC-9 Rev. 3, 9/5/75 Para. 3.10.1 l

"FP-9 " Reparation of Field Ifaterial Requisitions" Pera. 3.10.1 states in part, "Q-Listed caterials shall be identified in the initial des-cription by the statement "Q-Listed Material".

  • I.s

=. ~.

-.ca..-

.. - ~i:

o Two (2) of the seven (7) na's for "Q-Listed" material checked (CA-3040 and AM-1006) did no dentify the' nateri'ai as "Q-Lis ted".

(NOTE:

The FMR's were processed as "Q-Lis ted" al even though not identified as such and the resulting Purchase Orders were correct.

n I

.ficd.)

~

~....-

. z.. -

~...

-t o__..m.......

it 1.

Assure that. all RfR's for "Q-Listed" material have been identified as "Q", prccessed and purchased as "Q-Listed".

' ^ '

2.. Reinstruct Field Engineers as to the requirements for writing and processing FMR's for "Q-Listed" material.
u.. m..........

.........m.,..........,,......,

3 1 & 2:

02/27/76 Project Superintendent

,m............

U m.-

.m

{y\\

o..

.#f r.n

.u r..

D m.w u............. 7,..

a k

J

Attach =ent A 4 Reissued January 19, 1976 Route To

'Ihis Cony For I$

File 16.3.6 7h, v MSouthworth Sill!cwell Issue Date May 9. 1975*

i J

131Slager GSKeeley

\\uj Project Midland i & 2 CQIlills TCCooke UW EICEEN File Title NCR's on nachtel JM11andin UFilolub I*onconformance GLRichardson Report Ho 0F-43 Stib l oc t File This I*onconfor=ance Report is Issued To:

Prepared ByNn,,,d8 MmDate 5-9-75 Mr. J. P. Connolly Approved By

[/, /d.1 Date N

[

Bechtel Project Field Quality Control Written Reip y Request [By Date 6-6-75 Engineer Corrective Action Requested By Date 6-6-75 who is resuonsible for corrective action.

Nonconformance Description and Supporting Details: (1) Specification C-208, Rev. 4 section 7.3.2 states "A slump measurement shall be made for every 35 cubic yards or fraction thereof of concrete produced for Class I structures." For concrete placements CC(652.75)a' and CC(621.0)a', 56 cubic yards of concrete us placad between slump (2) The C12-1 form (In-Process Concrete Test Report) for CC(652.75)a' measurements.

indicates one air meter and one thermometer was.used in the field for testing.

However, at least three air meters and two thermometers' vere used in the. field.

One air meter and one themometer was needed at the pump discharge.

One air meter and one themometer was needed at the truck discharge.

Also, the QC inspector noted on the C12-1 form an air meter change af ter obtaining 7.5% and 6.5% nir with the

,m original air meter.

Limits on air content are 3.0%-6.0%.

I

)

AEC Reportable

.Yes ('~] Ho R See Procedure 9 (For nuclear Proiects Only)

Stop Work Necessary Yes No @ See leocedure 16 - Stop Work Ko Recommended Corrective Action:

(a) For item (1) above, receive an Engineering evaluation of the acceptability of the concrete placed without the required slump No additional corrective action is necessary, because it has already measurement.

been covered in letter C-208-56 from Bechtel to U.S Testing, concerning concrete testing frequencies and test locations.

The written reply to this item is requested i

with the Engineering evaluation.

(b) For item (2) above, take corrective action to preclude these occurrences.

Written reply and corrective action requested for both Corrective Action Taken; by June 6, 1975.

(a) A Bechtel Engineering evaluation of the concrete cylinders was performed on the concrete placed without the required slump measurements and the concrete was determined acceptable.

(b) The missing information in (2) above, was found and placed in the placement package for CC(652.75)a'.

Also, -e-training acccics was given on May 16, 1975 for U.S. Testing personnel to preclude repetition.

Sf.H.Hff 76 Verification of Corrective Action Required Yes @ No O Method of Verification:

(a) Reviewed letter BEEC-807 dated June 6, 1975 from R. L. Castleberry to J. P.

Connolly, that stated Engineering's evaluation.

(b) Reviewed placement package for CC(652.75)a' to confirm the corrective action taken.

Also reviewed the docu-mentation of the training cc:M ers 9fi.9.

I-N- 76 l

konconfor=cnceClosureConfirmedBy

%.O

b. HO'Tsyv' Date 5 '-t

~75 1To be cocplet'ed at ti:,c of closure by Consumers Pouer 'M Services,

~

n...

.c i

[*'

J Attach =ent A M-Reissued January 19, 1976 Route To

'Ihis Copy For 7, '

File 16.3.6

'Q,)g FMSouthworth Sillicwell

]

Iscue Date Aucust 7. Jo75**

EUSlager GSKceley (2)

.. t

./

Project m d t,na i 4 7 C

CQllills TCCooke

~'

?

C N N FG W File Title NCR's on Bechtel Oura 1' Jnilandin WFHolub Konconfor=ance GLRichardson Ecport Eo OF-52 c h eet 2 21 n This Honconfoirr_nce Report is Issued To:

Prepared ByNc:JM$lb%Date R-7 '75 Mr. J. P. Connolly

^EE#

7 Bechtel Proj ect Field Quality Contrcl WrittenneplyRequeste[ByDate o-s-7 Engineer Corrective Action Requested By Date 9-5-7 who is resnensible for corrective action.

Nonconfermance Description and Supporting Details: (1)

Specification C-210 Rev. 4 Section 13.6 for plant area backfill and berm backfill states " Moisture control of the plant area and berm materials shall conform to section 12.6".

Under section 12.6, 12.6.1 states in part that "the water content during compaction shall not be more than two percentage points below optimum coisture content and shall not be more than two percentage points above optimum coisture content".

Contrary to this requirement, test no. MD202 for plant area fill located 14' east of 8.7 linc and 36' north of A line at elevation 594.5 had a ' moisture content 2.9 below optimum moisture content.

Approximately 7 f eet of material has been placed over this failing material.

(Contd)

AEC Reportable Yes no [ See Procedure 9 (For Nuclear Projects Only)

(j stnp un* Wecess wf von ] Un @ h a penna @re 14 - Ste; Merk He

/

Recommended Corrective Action:

(1) Receive a Proj ect Engineering evaluation on the acceptability of the material in question or remove the material.

(2)

U.S. Testing should have. training sessions to take corrective action to preclude repetition.

(3)

Quality Control should have training sessions to take corrective action to preclude repetition. The written replies to these items is requested' with the Project Engineering evaluation.

1Corrective Action Taken:

(1) Project Engineering has evaluated and accepted the in place material with low moisture content based on a satisfactory compaction test result (2)

United States Testing and Bechtel Quality Control have each had training sessions re-emphasiaing the acceptance criteria for soil tests.

Verification of Corrective Action Required Yes X Ho 1Method of' Verification:

Rcviewed Iechtel ECR #324 covering item (1) of this KCR (QF-52 and the Project Engineering disposition. Also reviewed letter FQCL-049 dated 8-13-75*

that states U.S. Testing and Bechtel Quality Control have each had training sessions to re-emphasiac the acceptance criteria for soil tests.

I

>1Ronconfor.ance Closure Confirmed By k--J,id.9Lyw.

Date H-ps 15 1

To be completed at time of closure by Consumers Power QA Services.

Pace 1 of 2 k

00 e r"~-

  • Corrmend, prov!cudTi.-,enet P_7_7s e e -'

'(/

~

).

    • Reissued January 19, 197f Filo

,.)

16.3.6

/

Issuo Date August 7,1975**

Proj ect Midland 1 & 2 Filo Title NCR's on Ecchtel Quality Control Nonconformance Report No QF-52 (Contd)

Nonconformance Description and Supporting Details:

(Contd)

~

(2)

QC-Cl as passlug by U.S. Testing in the remarks column.This fail (3)

On the back of the QC-Cl form. in the FIM, it states the entry inforcation For Block no. 3 the entry information ' states "to be signed and dated by the Q Engineer signifying the form has been reviewed for completeness and correctne Contrary to this requirement, fill density test r. aport the acceptance of MD202 which had actua 4

W e

rr i

4 e

.s--

4 x

5

)

Attechm:nt A

..[%.,

Route 'ib This Cony For File 16.3.4 & 36.3.6 (q,Iy' fj Issue Date October 13.19h P:ISou thworth SliHowell litislager GSKeeley Fr j t Midland 1 & 2 j

CQllills TCCooke g,j g

.EHolub Construction and Cualitv Control Eonconfor=cnce GLRfchardson Eerort No OF-67 sum ee t File 1his Ncnconfor=ance Ecport is Issued '1b:

Prepared Byhf/ 6>.dk/.,~ Dcte M-!3-75 J. P. Connolly Approved By kM8N+ Date Nd?Am-Bechtel Project Field Quality Control WrittenRepYyRequeste8ByDate 11 Engineer V

J. F. Newgen Corrective Action Requested By Date 13 $,992h1MPMbbEMIT6$fcYve cetion.

Ecnconfermance De::cription and Supporting Details: PSAR section 5.1.3.3.la states in part that "In a 'dition to the tests required of the cement manufacturers, the followir user tests are p. formed:... ASTN C-115 Fincncss of Portland Cement".

Spcc. C-208 Rev.

section 6.1.1 states in part that (1)

" Prior to cc:=lencing of any concrete work cemer.

from the source selected by the concrete supplier shall be given an initial Acceptance Test consisting of a complete chemical and physical analysis by the Subcontractor in accordance with Paragraph 7 of ASTM C150 with the fineness to be determined by AST11 C115."

(2)

"In addition, for each subsequent grind the subcontractor shall perform an Acceptance Test consisting of a complete chemical and physical analysis..."

(Cc 'd

)

AEC ReyviI,abic 1*ca U Uu h See Proceduru 9 (For Nuclear Erojects ung)

Stop Ucrk Necessary Yes No @ See Procedure 16 - Stop Work No Recc:= tended Corrective Action:

(1) Review the initial Acceptance Test, Acceptance Tests and User Tests for similar deficiencies (2) Receive a Project Engineering evaluation on the acceptability of the cement tested by the alternative method (3) Notify U.S. Testing of this nonconformance and take corrective ac. tion to preclude these occurrences (4)

Instruct QC personnel on the propcr test method for determining the fineness of Portland Cement.

The written reply to these items is yrequested with the Project Engineering evaluation.

Corrective Action Taken:

(1) The results of all fineness tests performed in accordanc with ASTM C204 were reported to Project Engineering.

(2) Project Engineering evaluate the test results and determined that the cement is acceptabic.

(3) Both U.S. Tcsting and Bechtel Quality Control personnel have been notified of the correct test require-trents.

(4) PSAR Change Notice No. 0101 has been reviewed and cpproved by CPCo Enginec inn.

The change will require cement to be tested for fineness in accordance with AST!! C150. This in turn will permit the use of the f the test methods, ASTM C115 3 Verification of Corrective Action Eequired Yes No or ASTM C204.

1Nethod of Verification:

Reviewed letter FQCL-058 dated January 19, 1976.

Reviewed letter BEBC-921 dated January 16, 1976 in the Ecchtel QC file for NCR QF-67.

Tclecon with R. C. Bauman on January 20, 1976 confirmed CPCo revleu and approtal of PSAR Cinng Notice No. 0101.

INonconfo'rmance Clocure Confirmed By mdk b.b%d Date % w w - 3 0 p 1G v

u ITo be completed at ^ c of closure by Consuncrc Fowc

'A Services.

c/

)

File:

)

16.3.4 & 16.3.6 Issua Date: October 13, 1975 Project:

Midland 1 & 2-File

Title:

NCR's on Bechtel

~ s

  • 7 i

Construction and Quality Control

~s Nonconformance Report No QF-67 (Contd)

Nonconforcance Description and Supporting Details:

(Contd)

(3)

"Also, Tor every 5000 cubic yards of concrete produced...a User's Test con-sisting of a complete chemical and physical analysis" is =ade.

Contrary to the requirements above, the fineness for User Tests 20 (Report 66),

21 (Report 67) and 23 (Report 74).and Acceptance Tests for Silo 20 (Report 41),

Silo 18 (Report 58), Silo 12 (Report 62), Silo 20 (Report 69) and Silo 17 (Report 76) was determined by ASTM C204, Test for Fineness of Portland Ce=ent by Air Per eability Apparatus instead of by ASIM C115, Test for Fineness of Portland Cement by the Turbidimeter.

l

\\

/

9 4

l I

i 1

s_._-

Page 2 of 2

f' f

Attach ~nt A Route To Tais Copy For Filo y 16.3.6 & 16.3.4 FMSouthworth ' Sitifowell r/6 Issue Date December LG. 1975 INSlager CSKeeley "y /

Project Midland 1 & 2 E

E f

11 din File Title NCR's on Eechtel WFHolub Konconfomance Ouality Control & Bechtel Construc GLRichardson Subject File Report No _OF-69 This Nonconfomance Report i: Issued To:

Prepared By/6/,L/uM/pa.

Date a//4 -

Bechtel j

t Field Quality Control Appr ved E d d d I.

Dateded-No' Engineer J. F. Newgen Written'RIply Reque;Ied'By Date 1-9-76 Bechtel Project Superintendent n h@esM W Dah M4 uho ic responsible for corrective action.

Uonconforacnce Description and Supporting Details:

Bechtel's storage requirement for decay heat removal pump motors file nos. F-1-37, 38, 39 Rev. 2, Section 5 2 all sta in part, " rotate shaf t 10-25 complete revolutions plus one quarter turn at intervals not to exceed 90 days, record final keyway position".

the shaf t rotation of the three decay heat removal pump c:otors exceeded thContrary requirement.

Elapsed time of 99 days between rotation existed.

e 90 day performed on August Last rotation was 27, 1975 and next rotation performed was on December 4, 1975.

AEC Reportable Yes No @ See Procedure 9 (For nuclear Projects Only)

Stcp W0rh Ucccs34.y

~ica U hoe tiee Procedure 16 - Stop Work No Reco::=lended Corrective Action:1) Evaluate and determine motor acceptability '

2) Take corrective action to preclude recurrences.

Corrective Action Taken:

See Attachment A.

1 Verification of Corrective Action Required Yes x no O Met' hod of Verification:

Visually verified that motor acceptability was docum a.

b.

e CE.

ment F-2 forms stating that"cmooth rotation indicates bearing coated withrequire-Bechtel QCE and MSE.

oil'jby Verified by reviewing requirement for c c.

h!onconformance Closure Confirmed By38p /%jt,o age off motors in Instruction Man

{

.w/$g/

GEH-3160J.

Date

)~s9-pr To be completed at' time of closure by Consumers Power QA Services.

Page 1 of 1

[)

[)

16.3.6 & 16.3.4 File

/

Issue Date December 10, 1975 Project Midland 1 & 2 File Title NCR's on Bechte. Quality Control & Bechtel Con-

. (g.

\\,)

struction

. Attachment A Nonconfotaiance Report No QF-69 Corrective Action Taken:

1.

a.

Received a ' response from Bechtel Project Superintendent stating that motors had been inspected and determined to be acceptable.

b.

Received response from PFQCE stating that the motors were hound acceptable and the statement was documented on storage requirement forms F-2.

~

-2.

a.

Bechtel Project reinstructed the concerned personnel in regards to prepara-tion and performance of maintenance instructions.

In addition, the periodic inspection times have been' adjusted to weeks rather than to days to preclude

. inspection times falling during weekends causing inadvertent tine extensions.

Meggering equipment is under consideration for purpose to prevent equipment shortages at critical inspection periods.

b.

Bechtel QC has instructed the assigned QCE to document any delayed maintenance activities on the F-2 form for equipment concerned.

OO

.)

l s

-s Page 2 of*2 L-_.--.,.

)

,[

Attacimnt A Route To This Cory For Q

File 16.3.6 & 16.3.4 F.MSouthworth SHilowell h

Issue Date December 12. 1975

'Hk'Sleger CSKecicy

' 'hr Pr ject Midinnd 1 &7 l

l CQIlills TCCooke COM!mb FCY:Ci File htlc iiCR's on idechtel Qual JMilandin C ntr 1 & Bechtel conetroreirn tFHolub Nonconformance hu

'[ ij" Report no QF-60a This %onconformance Report is Issued 'ib:

Prcpsred DypM /bdMDate

/.7- /.7-J. P. Connolly Approved 37 9g8{My Date /Ch/X+

Eechtel Project Field Quality Engineer Written Rep &lyRequestc[iByDate 1-9-7

/

J. F. Newgen W

Correct.d.ve Action Requested By Date 1-9 Bechtel Project Superintendent who is resuonsible for corrective action.

Nonconfomance Description and Suppcrting Details:

,echtel storage requirement for-decay heat removal pump motors file nos. F-1-37, 33, 39, Rev. 2 Section 5.3 all stated in part, " test insulation resistance uith a meggerand record readings at intervals not to exceed 30 days".

Contrary to this requirement, the motor meggering of the three decay heat removal pump motors exceeded the 30 day requirement.

Elapsed time of 38 days between meggering existed. The last meggering was performed on August 27, 1975 and the next meggering performed was on December 4,1975.

AEC Reportable Yes O no Q see Procedure 9 (For Nuclear Pro 3ects on17) i Stop Work Recessar/- Yes C Ho @ See Procedure 16 - Step Work Ko V-Reco= mended Corrective Action:

1.

Evaluate and detemin't motor acceptability.

2.

Take corrective actica to preclude recurrences.

1Corrective Action Taken-See Attachment A.

1Verification of Corrective Action Required Yes X No b4ethodofVerification:

Reviewed correspondence from Bechtel Project Superintendent and Bechtel PFQCE.

a.

b.

Visually verified that motor acceptability was noted on the F-2 form.

Meggering of motors on 12-4-75 determined motors insulation acceptable.

c.

d.

Reviewed GE Instruction Manual - GEH-3160J, page 2 " storage requirement".

b;onconfor.s ce Closure Confirmed By M fM '7!

Date / - : 7c ~; g, 1To be completed at ti:ae of closure by Const=crs Fo eer QA Services.

Page 1 of 1

~;~

Fils 16.3.6 & 16.3.4

~

I :ue Date December 12, 1975

' Project Midlcnd 1 & 2 File Title NCR's on Bechtel Quality Control & Bechtel Con-

,b struction v

Attachment A Nonconforcance Report No QF-69a Corrective Action Taken:

1.

a.

Bechtcl-Project inspected and dercrmined the motors to be acceptable.

b.

Bechtel QCE and the Bechtel MSE evaluated and agreed that there was no 1 mage to the motors as a result of the delay in the maintencnce activity nnd the motor acceptability was documented on the storage requirement form F-2.

2.

a.

Bechtel Project reinstructed the concerned personnel regarding the prepara-tion and performance of maintenance instructions.

b.

Bechtel QC has instructed the assigned QCE to document any delayed maintenance activities on the F-2 form for equipment concerned.

I T'

N/

m Jl f

)

i. /

Page 2 of 2

f Attac'=nt A c

Rout 7 To 9.is Cot 7 For

(

Filo

/16.3.4 & 16.3.6 i

(.

Issue Date Dece=cer Lu, 19/5 HUSlager SHHowell CQilills CSKeeley Project Midland tiuclear Plan:

a N

~

I?!Southworth TCCooke

(

h WFHolub CESUdfl3 ESW3f File Title I!CR's on Bechtel

~

CLRichardson Conconformance JMilandin Report Uo op-70 This Conconformance Report is Issued To:

Prepared By W[ 6] h Y b v Date I W Ml W J. F. Neugen, Bechtel Corp.

Project Superintendent Auproved By Nb/ Date / 2-4.-ds p

J. P. Connolly, Bechtel Corp., Project Written R lyReque:gedByDate 12/24/

Field Quality Control Engineer Corrective Action Requested By Date 1/12/

v'io is resnonsible for corrective action.

Uonconformance Description and Supporting Details:

Storage requirement forms F-1-207 and F-1-208 for the Upper and Lower Reactor Vessel Internals require that any nitrogen addition be logged weekly.

For the period from 11/21/75 to 12/5/75 the storage records do not show any addition of nitrogen.

The F-2 form that was issued 11/14/75 indicate the flow meter was removed because it did not allow enough nitrogen to be added.

AEC Reportable Yes O no O see Proceeure 9 (For nuclear rrosects only)

Stop Unrk Necessatm va= O No { See Precetc.rc 16 Ctcp ',Tork Mc, Recc = ended Corrective Action:

1.

Rework internals storage cannisters to reduce nitrogen leakage to a level that the flow meter will indicate, or install a flow meter with a higher range.

2.

Reinstruct personnel in the preparation and performance of. maintenance instruc-tions, so that the final records reflect the written instructions.

lCorrective Action Taken:

1.

A QC training session was held concerning the storage and maintenance program and the proper documentation of delayed or missed tasks.

2.

Field engineering personnel were reinstructed regarding the preparation and performance of maintenance instructions so that final records will reflect the written instructions.

3 1

Storage requirement forms F-1-207 and F-1-20 evised deleting the requirener wer Verification of Corrective Action Required Yes Ho to log the addition of 1

^Eethod of Verification:

nitrogen.

1.

The records of the QC training session were reviewed.

2.

The revised F-1-207 and F-1-203 forms were reviewed.

9 Honconformance Closure Confi:ned By iN[MMM-Date //I'!/7C I

To be completed at time of closure by Censumers Po rer QA Services.

Page 1 of 1