ML19329F974: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
  ,y TOLEDO p- G EDISON July 2, 1980.                                             L80-589 FILE: RR 2 (NP-32-77-12)
,y TOLEDO p-G EDISON July 2, 1980.
Docket No. 50-346 License No.'NPF-3 Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois- 60137
L80-589 FILE: RR 2 (NP-32-77-12)
Docket No. 50-346 License No.'NPF-3 Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois-60137


==Dear Mr. Keppler:==
==Dear Mr. Keppler:==
Enclosed are three copies of Licensee Event Report NP-32-77-12 which has been revised.
Enclosed are three copies of Licensee Event Report NP-32-77-12 which has been revised.
The revisions to the report are indicated by a   "2" in the lef t margin of each page.
The revisions to the report are indicated by a "2" in the lef t margin of each page.
Please destroy your previous copies of this LER and replace with the attached revision.
Please destroy your previous copies of this LER and replace with the attached revision.
Yours truly,
Yours truly, f
                    /
/
f Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/ljk                                                                                   ,
Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/ljk Enclosure cc:
Enclosure cc:   Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Encl: 40 copies Mr. Norman Haller, Director Office of Management Program Analysis Enc 1: 3 copies                                                                     ,
Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Encl: 40 copies Mr. Norman Haller, Director Office of Management Program Analysis Enc 1: 3 copies l
l l
l i
i i
i THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MAOISON AVENUE TOLEDO. OHIO 43652 5,
THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MAOISON AVENUE   TOLEDO. OHIO 43652     5, 8007.110 Q S-.3                                                                       ._ A}}
8007.110 Q S-.3
. A}}

Latest revision as of 05:36, 31 December 2024

Forwards Revised LER 77-ZZZ/01T-2
ML19329F974
Person / Time
Site: Davis Besse 
Issue date: 07/02/1980
From: Murray T
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19329F975 List:
References
L80-589, NUDOCS 8007110427
Download: ML19329F974 (1)


Text

.

,y TOLEDO p-G EDISON July 2, 1980.

L80-589 FILE: RR 2 (NP-32-77-12)

Docket No. 50-346 License No.'NPF-3 Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois-60137

Dear Mr. Keppler:

Enclosed are three copies of Licensee Event Report NP-32-77-12 which has been revised.

The revisions to the report are indicated by a "2" in the lef t margin of each page.

Please destroy your previous copies of this LER and replace with the attached revision.

Yours truly, f

/

Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/ljk Enclosure cc:

Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Encl: 40 copies Mr. Norman Haller, Director Office of Management Program Analysis Enc 1: 3 copies l

l i

i THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MAOISON AVENUE TOLEDO. OHIO 43652 5,

8007.110 Q S-.3

. A