ML19329F975

From kanterella
Jump to navigation Jump to search
Forwards Revised LER 77-ZZZ/01T-2
Date released: 12/09/2019 Download: ML19329F975


Revised LER 77-ZZZ/01T-2:on 770805,during Hot Functional Testing,Pressurizer Power Operated Relief Valve Was Opened & Severe Movement of Discharge Piping Was Observed.Caused by Loop Seals Allowing Water Slug to Cause Pipe Movement
ML19329F982
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/19/1977
From: Quennoz S
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19329F982 (4)
Forwards Revised LER 77-ZZZ/01T-2
ML19329F974
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/02/1980
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19329F974 (1)