ML19331C743: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. | {{#Wiki_filter:. | ||
r | r R | ||
Cpils DOCUMEtlT C0t1TAlNS 2. POOR QUAW #' | |||
i 6 | |||
p.....o. | |||
%ci.., p,. n t : nout. 2, so. is4. covert, wenia.n 49043 August 12, 1980 US Nuclear Regulatory Commission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET No 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of July 1980. | |||
Sh+dWWm David M Kennedy Ceneral Engineer CC JGKeppler, USNRC KWBerry, P24-207A DPHoffaan, P24-115 GHRPetitjean, Palisades CVWaits, P11-228B LTPhillips, P21-327 l | |||
Cpils DOCUMEtlT C0t1TAlNS | DEVanFarewe, Div of Radiological Health Lansing, MI SMier:va, Mich Dept of Labor RCallen, Mich Public Service Ccamission Document Control (2) 950-22*35*10 1 | ||
QOb r5 \\ | |||
Sh+dWWm | i t | ||
8008190% l}} | |||
David M Kennedy Ceneral Engineer CC JGKeppler, USNRC KWBerry, P24-207A DPHoffaan, P24-115 GHRPetitjean, Palisades | |||
CVWaits, P11-228B LTPhillips, P21-327 l | |||
QOb | |||
r5 \t 8008190% l}} | |||
Latest revision as of 03:55, 31 December 2024
| ML19331C743 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 08/12/1980 |
| From: | Kennedy D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC COMMISSION (OCM) |
| Shared Package | |
| ML18045A506 | List: |
| References | |
| NUDOCS 8008190481 | |
| Download: ML19331C743 (1) | |
Text
.
r R
Cpils DOCUMEtlT C0t1TAlNS 2. POOR QUAW #'
i 6
p.....o.
%ci.., p,. n t : nout. 2, so. is4. covert, wenia.n 49043 August 12, 1980 US Nuclear Regulatory Commission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET No 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of July 1980.
Sh+dWWm David M Kennedy Ceneral Engineer CC JGKeppler, USNRC KWBerry, P24-207A DPHoffaan, P24-115 GHRPetitjean, Palisades CVWaits, P11-228B LTPhillips, P21-327 l
DEVanFarewe, Div of Radiological Health Lansing, MI SMier:va, Mich Dept of Labor RCallen, Mich Public Service Ccamission Document Control (2) 950-22*35*10 1
QOb r5 \\
i t
8008190% l