{{#Wiki_filter:9 OPERATING DATA REPORT DOCKET NO. 50-334 DATE 1/6/81 COMPLETED BY D.
OPERATING DATA REPORT DOCKET NO. 50-334 DATE 1/6/81 COMPLETED BY         D. R. Tiiko l
R.
TELEPHONE. 41' 441-9308 OPERATING STATUS
Tiiko TELEPHONE. 41' 441-9308 OPERATING STATUS
: 1. Unit Name: Beaver Valley Power Station, Unit #1                     Notes
: 1. Unit Name: Beaver Valley Power Station, Unit #1 Notes October 1980
: 2. Reporting Period:           October 1980                                                                          j
: 2. Reporting Period:
: 3. t le===d Thennal Power (MWt):                   NO
j
: 4. Namepiste Rating (Gross MWe):                     923
: 3. t le===d Thennal Power (MWt):
: 5. Design Electncal Racing (Net MWe):               852
NO
: 6. Maximum Dependable Capacity (Gross MWe):         845
: 4. Namepiste Rating (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe):           810
923 852
: 5. Design Electncal Racing (Net MWe):
845
: 6. Maximum Dependable Capacity (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe):
810
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 9. Power Level To Which Restricted. If Any (Net MWe):         None
: 9. Power Level To Which Restricted. If Any (Net MWe):
: 10. Reasons For Restnctions,1f Any:                           N/A This Month           Yr.-to-Dete             Cumulative 745                 7320                   39,487
None
        !!. Hours In Reporting Period
: 10. Reasons For Restnctions,1f Any:
: 12. Number Of Hours Reactor Was Critical 0                    0                  13,744.71
N/A This Month Yr.-to-Dete Cumulative 745 7320 39,487
: 13. Reactor Reserve Shutdown Hours                           0                   0                   4,482.8
!!. Hours In Reporting Period 0
: 14. Hours Generator On-l.ine                                 0                   0                 13,105.07 IS. Unit Reserve Shutdown Hours                               0                   0                         0
0 13,744.71
: 16. Gross Thermal Energy Generated (MWH)                     0                    0          26,974.253.33
: 12. Number Of Hours Reactor Was Critical
: 17. Gross Electrical Energy Generated (MWH)                   0     ,_,
: 13. Reactor Reserve Shutdown Hours 0
0            8,277,940
0 4,482.8
: 18. Net Electrical Energy Generated (MWH)                 -10,014               -10,014         7,560,729
: 14. Hours Generator On-l.ine 0
: 19. Unit Service Factor                                       0                   0                       33.9
0 13,105.07 IS. Unit Reserve Shutdown Hours 0
: 20. Unit Availability Factor                                   0                   0                       33.9
0 0
: 21. Unit Capacity Factor (Using MDC Net)                       0                    0                        h.a
0 0
: 22. Unit Capacity FactoriUsing DER Net)                       0                   0                       25.2
26,974.253.33
: 23. Unit Forced Outage Rate                                   0                   0                       46.4
: 16. Gross Thermal Energy Generated (MWH)
: 17. Gross Electrical Energy Generated (MWH) 0 0
8,277,940
: 18. Net Electrical Energy Generated (MWH)
-10,014
-10,014 7,560,729
: 19. Unit Service Factor 0
0 33.9
: 20. Unit Availability Factor 0
0 33.9 0
0 h.a
: 21. Unit Capacity Factor (Using MDC Net)
: 22. Unit Capacity FactoriUsing DER Net) 0 0
25.2
: 23. Unit Forced Outage Rate 0
0 46.4
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Dete, and Duration o' Eacht:
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Dete, and Duration o' Eacht:
2S. If Shus Down At End Of Report Period. Estimated Date of Startup:
2S. If Shus Down At End Of Report Period. Estimated Date of Startup:
: 26. Units la Test Status iPrior to Commercial Operationi:                     Forecast                 Achieved INITIAL CRITICALITY                                       N/A                     N/A INITIAL ELECTRICITY                                       N/A                     N/A CCMMERCIAL OPERATION                                       N/A                     N/A Bi101160 M                                                                                                           (at77)
: 26. Units la Test Status iPrior to Commercial Operationi:
                                                                                                  .__.._ _ ._ .}}
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A CCMMERCIAL OPERATION N/A N/A Bi101160 M (at77)
.}}

Latest revision as of 17:43, 24 December 2024

Revised Operating Data Rept Sheet for Oct 1980
ML19340E997
Person / Time
Site: Beaver Valley
Issue date: 01/06/1981
From: Timko D
DUQUESNE LIGHT CO.
To:
Shared Package
ML19340E994 List:
References
NUDOCS 8101160467
Download: ML19340E997 (1)


Text

9 OPERATING DATA REPORT DOCKET NO. 50-334 DATE 1/6/81 COMPLETED BY D.

R.

Tiiko TELEPHONE. 41' 441-9308 OPERATING STATUS

1. Unit Name: Beaver Valley Power Station, Unit #1 Notes October 1980
2. Reporting Period:

j

3. t le===d Thennal Power (MWt):

NO

4. Namepiste Rating (Gross MWe):

923 852

5. Design Electncal Racing (Net MWe):

845

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

810

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe):

None

10. Reasons For Restnctions,1f Any:

N/A This Month Yr.-to-Dete Cumulative 745 7320 39,487

!!. Hours In Reporting Period 0

0 13,744.71

12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0

0 4,482.8

14. Hours Generator On-l.ine 0

0 13,105.07 IS. Unit Reserve Shutdown Hours 0

0 0

0 0

26,974.253.33

16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 0 0

8,277,940

18. Net Electrical Energy Generated (MWH)

-10,014

-10,014 7,560,729

19. Unit Service Factor 0

0 33.9

20. Unit Availability Factor 0

0 33.9 0

0 h.a

21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity FactoriUsing DER Net) 0 0

25.2

23. Unit Forced Outage Rate 0

0 46.4

24. Shutdowns Scheduled Over Next 6 Months (Type. Dete, and Duration o' Eacht:

2S. If Shus Down At End Of Report Period. Estimated Date of Startup:

26. Units la Test Status iPrior to Commercial Operationi:

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A CCMMERCIAL OPERATION N/A N/A Bi101160 M (at77)

.