ML19343D419: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 20: Line 20:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
      .
    ,
o TOLEDO
o TOLEDO
                                                                      % EDISON RicHAno P. Cnoust Docket No. 50-346 License No. NPF-3                                               g" V
% EDISON RicHAno P. Cnoust Docket No. 50-346 License No. NPF-3 g"
          "e''al No. 713                                                   mei ass-saai Ap .t '7, 1981 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C. 20555
V "e''al No. 713 mei ass-saai Ap
.t
'7, 1981 Director of Nuclear Reactor Regulation Attention:
Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C.
20555


==Dear Mr. Stolz:==
==Dear Mr. Stolz:==
[
[
Under separate cover, we are transmitting three f3) original and forty (40) conformed copies of an application for Amendment to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station Unit No.         1.
Under separate cover, we are transmitting three f3) original and forty (40) conformed copies of an application for Amendment to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station Unit No.
1.
This application requests that the Davis-Besse Nuclear Power Station Unit 1 Technical Specifications, Appendix A, be revised to reflect the changes attached. The proposed change involves Section 6.9.1.4, Annual Operating Report, to revise submittal date from March I to March 31.
This application requests that the Davis-Besse Nuclear Power Station Unit 1 Technical Specifications, Appendix A, be revised to reflect the changes attached. The proposed change involves Section 6.9.1.4, Annual Operating Report, to revise submittal date from March I to March 31.
This amendment request involves a change of Class III type.     Enclosed is a check for $4,000 as requested by 10CFR170.22.
This amendment request involves a change of Class III type.
Very truly yours, f         f= G RPC: GAB Attachment
Enclosed is a check for $4,000 as requested by 10CFR170.22.
* mj d/3 cc:                                                                               l
Very truly yours, f
                                                                                              '
f= G RPC: GAB Attachment mj d/3 cc:
DB-1 NRC Resident Inspector 810so40W F                   /
DB-1 NRC Resident Inspector 810so40W F
THE TOLEDO EDISON COMPANY   EDISON PLAZA 300 MADISON AVENUE   TOLEE'O, OHIO 43652}}
/
THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEE'O, OHIO 43652}}

Latest revision as of 11:58, 24 December 2024

Forwards Application for Amend of License NPF-3 Requesting Changes to Tech Specs App a
ML19343D419
Person / Time
Site: Davis Besse 
Issue date: 04/27/1981
From: Crouse R
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML19343D420 List:
References
713, NUDOCS 8105040447
Download: ML19343D419 (1)


Text

.

o TOLEDO

% EDISON RicHAno P. Cnoust Docket No. 50-346 License No. NPF-3 g"

V "eal No. 713 mei ass-saai Ap

.t

'7, 1981 Director of Nuclear Reactor Regulation Attention:

Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Stolz:

[

Under separate cover, we are transmitting three f3) original and forty (40) conformed copies of an application for Amendment to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station Unit No.

1.

This application requests that the Davis-Besse Nuclear Power Station Unit 1 Technical Specifications, Appendix A, be revised to reflect the changes attached. The proposed change involves Section 6.9.1.4, Annual Operating Report, to revise submittal date from March I to March 31.

This amendment request involves a change of Class III type.

Enclosed is a check for $4,000 as requested by 10CFR170.22.

Very truly yours, f

f= G RPC: GAB Attachment mj d/3 cc:

DB-1 NRC Resident Inspector 810so40W F

/

THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEE'O, OHIO 43652