ML19350E258: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:-    ?
{{#Wiki_filter:?
June 12, 1981 File: NG-3514(B)                                     Serial No.: NO-81-1026
June 12, 1981 File: NG-3514(B)
                                                                            /
Serial No.: NO-81-1026
                                                                            /6.
/
                                                                                                    \
\\
Office of Nuclear Reactor Regulation                           /C                     \/a{
\\/a{
Y ATTENTION: Mr. T. A. Ippolito, Chief                                   8 ( :UlilI Operating Reactors Branch No. 2                           yg; 1 G 1931        ?E >h United States Nuclear Regulatory Commission                  g~,
( :Ulil
(                   ,  , Q/
/6.
Washington, D. C. 20555                                       \   ..
Y Office of Nuclear Reactor Regulation
comu ca       ,; _
/C yg; 1 G 1931 >h I
                                                                            -\,x                   o BRUNSWICK STE?.M ELECTRIC PLANT UNIT NO. 2                          ;D DOCKET NO. 50-324                          .''i[,<-:i\';
8 ATTENTION:
                                                                                      .s LICENSE NO. DPR-62 REQUEST FOR LICENSE AMENDMENT ADDITIONAL INFORMATION - CONTAINMENT OXYGEN CONCENTRATION
Mr. T. A. Ippolito, Chief
?E Operating Reactors Branch No. 2 g~,
(
, Q/
United States Nuclear Regulatory Commission Washington, D. C.
20555
\\
comu ca
-\\,x o
;D
.''i[,<-:i\\';
BRUNSWICK STE?.M ELECTRIC PLANT UNIT NO. 2
.s DOCKET NO. 50-324 LICENSE NO. DPR-62 REQUEST FOR LICENSE AMENDMENT ADDITIONAL INFORMATION - CONTAINMENT OXYGEN CONCENTRATION


==Dear Mr. Ippolito:==
==Dear Mr. Ippolito:==
This letter is to confirm information provided to NRC in a June 12, 1981 conference call regarding the operational status of Brunswick Unit No. 2 and the existing situation relative to inerting contairsent.
This letter is to confirm information provided to NRC in a June 12, 1981 conference call regarding the operational status of Brunswick Unit No. 2 and the existing situation relative to inerting contairsent.
(1) Brunswick-2 reached 15% power level at 10:45 p.m. on June 11, 1981. Technical Specifications require containment to be inerted by 10:45 p.m. on June 12.
(1) Brunswick-2 reached 15% power level at 10:45 p.m. on June 11, 1981. Technical Specifications require containment to be inerted by 10:45 p.m. on June 12.
(2) Good progress has been made in installing the replace-ment oil-fired boiler which will be used to provide steam to vaporize nitrogen to inert containment. We expect to be able to light-off this boiler by about 1:00 p.m. on June 12, 1981.
(2) Good progress has been made in installing the replace-ment oil-fired boiler which will be used to provide steam to vaporize nitrogen to inert containment. We expect to be able to light-off this boiler by about 1:00 p.m. on June 12, 1981.
(3) If boiler operation is satisfactory, inerting contain-ment would take approximately 10 - 12 hours. This is beyond the Technical Specification 6eadline cf 10:45 p.m. on June 12, 1981.
(3) If boiler operation is satisfactory, inerting contain-ment would take approximately 10 - 12 hours. This is beyond the Technical Specification 6eadline cf 10:45 p.m. on June 12, 1981.
I j;ool s
Ij;ool s
ll0 1
ll0 1
810 6 y 7 03Ao P
810 6 y 7 03Ao P


    . . =
. =
Mr. T.-A. Ippolito                                         -  2-                                June 12, 1981                                              !
2-June 12, 1981 Mr.
(4) As stated in the conference call, Carolina Power &
T.-A.
Ippolito (4) As stated in the conference call, Carolina Power &
Light Company (CP&L) is contident that inerting can be completed in a shorter time than requested in our June 11, 1981 submittal. CP&L agreed to reduce the requested exemption to 72 hours.
Light Company (CP&L) is contident that inerting can be completed in a shorter time than requested in our June 11, 1981 submittal. CP&L agreed to reduce the requested exemption to 72 hours.
(5) With regard to fire protection considerations for operating in a deinerted condition, the plant fire brigade will be alerted to the degraded fire pro-tection cordition in containment.
(5) With regard to fire protection considerations for operating in a deinerted condition, the plant fire brigade will be alerted to the degraded fire pro-tection cordition in containment.
Thank you for your effsres in this matter.
Thank you for your effsres in this matter.
Yours very truly, CL) -                -
Yours very truly, CL) -
P. W. Howe Vice President Technical Services JAM /je (3948) 4 9
P. W. Howe Vice President Technical Services JAM /je (3948) 4 9
4 y       -
4 y
w-.- y.-w+- y   +, w _ --  v- m,, - mar w-- e w w*-r-r--   -,e--------+     '-=y--   -mme--     --s wwu   r, -w- -
w-.-
                                                                                                                                  -e* v---*v ' --v v-+,e*r~---"-- r- --}}
y.-w+-
y
+,
w v-m,,
- mar w--
e w w*-r-r--
-,e--------+
'-=y--
-mme--
--s wwu r,
-w-
-e*
v---*v
--v v-+,e*r~---"--
r-
--}}

Latest revision as of 19:14, 23 December 2024

Confirms 810612 Info Re Operational Status of Facility & Existing Situation Re Inerting Containment Oxygen Concentration.Tech Specs Require Containment to Be Inerted by 810612.Progress Achieved W/Replacement of Oil Boiler
ML19350E258
Person / Time
Site: Brunswick 
Issue date: 06/12/1981
From: Howe P
CAROLINA POWER & LIGHT CO.
To: Ippolito T
Office of Nuclear Reactor Regulation
References
NO-81-1026, NUDOCS 8106170210
Download: ML19350E258 (2)


Text

?

June 12, 1981 File: NG-3514(B)

Serial No.: NO-81-1026

/

\\

\\/a{

( :Ulil

/6.

Y Office of Nuclear Reactor Regulation

/C yg; 1 G 1931 >h I

8 ATTENTION:

Mr. T. A. Ippolito, Chief

?E Operating Reactors Branch No. 2 g~,

(

, Q/

United States Nuclear Regulatory Commission Washington, D. C.

20555

\\

comu ca

-\\,x o

D

.i[,<-:i\\';

BRUNSWICK STE?.M ELECTRIC PLANT UNIT NO. 2

.s DOCKET NO. 50-324 LICENSE NO. DPR-62 REQUEST FOR LICENSE AMENDMENT ADDITIONAL INFORMATION - CONTAINMENT OXYGEN CONCENTRATION

Dear Mr. Ippolito:

This letter is to confirm information provided to NRC in a June 12, 1981 conference call regarding the operational status of Brunswick Unit No. 2 and the existing situation relative to inerting contairsent.

(1) Brunswick-2 reached 15% power level at 10:45 p.m. on June 11, 1981. Technical Specifications require containment to be inerted by 10:45 p.m. on June 12.

(2) Good progress has been made in installing the replace-ment oil-fired boiler which will be used to provide steam to vaporize nitrogen to inert containment. We expect to be able to light-off this boiler by about 1:00 p.m. on June 12, 1981.

(3) If boiler operation is satisfactory, inerting contain-ment would take approximately 10 - 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. This is beyond the Technical Specification 6eadline cf 10:45 p.m. on June 12, 1981.

Ij;ool s

ll0 1

810 6 y 7 03Ao P

. =

2-June 12, 1981 Mr.

T.-A.

Ippolito (4) As stated in the conference call, Carolina Power &

Light Company (CP&L) is contident that inerting can be completed in a shorter time than requested in our June 11, 1981 submittal. CP&L agreed to reduce the requested exemption to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

(5) With regard to fire protection considerations for operating in a deinerted condition, the plant fire brigade will be alerted to the degraded fire pro-tection cordition in containment.

Thank you for your effsres in this matter.

Yours very truly, CL) -

P. W. Howe Vice President Technical Services JAM /je (3948) 4 9

4 y

w-.-

y.-w+-

y

+,

w v-m,,

- mar w--

e w w*-r-r--

-,e--------+

'-=y--

-mme--

--s wwu r,

-w-

-e*

v---*v

--v v-+,e*r~---"--

r-

--