ML19350E258: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:-    ?
{{#Wiki_filter:?
June 12, 1981 File: NG-3514(B)                                     Serial No.: NO-81-1026
June 12, 1981 File: NG-3514(B)
                                                                            /
Serial No.: NO-81-1026
                                                                            /6.
/
                                                                                                    \
\\
Office of Nuclear Reactor Regulation                           /C                     \/a{
\\/a{
Y ATTENTION: Mr. T. A. Ippolito, Chief                                   8 ( :UlilI Operating Reactors Branch No. 2                           yg; 1 G 1931        ?E >h United States Nuclear Regulatory Commission                  g~,
( :Ulil
(                   ,  , Q/
/6.
Washington, D. C. 20555                                       \   ..
Y Office of Nuclear Reactor Regulation
comu ca       ,; _
/C yg; 1 G 1931 >h I
                                                                            -\,x                   o BRUNSWICK STE?.M ELECTRIC PLANT UNIT NO. 2                          ;D DOCKET NO. 50-324                          .''i[,<-:i\';
8 ATTENTION:
                                                                                      .s LICENSE NO. DPR-62 REQUEST FOR LICENSE AMENDMENT ADDITIONAL INFORMATION - CONTAINMENT OXYGEN CONCENTRATION
Mr. T. A. Ippolito, Chief
?E Operating Reactors Branch No. 2 g~,
(
, Q/
United States Nuclear Regulatory Commission Washington, D. C.
20555
\\
comu ca
-\\,x o
;D
.''i[,<-:i\\';
BRUNSWICK STE?.M ELECTRIC PLANT UNIT NO. 2
.s DOCKET NO. 50-324 LICENSE NO. DPR-62 REQUEST FOR LICENSE AMENDMENT ADDITIONAL INFORMATION - CONTAINMENT OXYGEN CONCENTRATION


==Dear Mr. Ippolito:==
==Dear Mr. Ippolito:==
This letter is to confirm information provided to NRC in a June 12, 1981 conference call regarding the operational status of Brunswick Unit No. 2 and the existing situation relative to inerting contairsent.
This letter is to confirm information provided to NRC in a June 12, 1981 conference call regarding the operational status of Brunswick Unit No. 2 and the existing situation relative to inerting contairsent.
(1) Brunswick-2 reached 15% power level at 10:45 p.m. on June 11, 1981. Technical Specifications require containment to be inerted by 10:45 p.m. on June 12.
(1) Brunswick-2 reached 15% power level at 10:45 p.m. on June 11, 1981. Technical Specifications require containment to be inerted by 10:45 p.m. on June 12.
(2) Good progress has been made in installing the replace-ment oil-fired boiler which will be used to provide steam to vaporize nitrogen to inert containment. We expect to be able to light-off this boiler by about 1:00 p.m. on June 12, 1981.
(2) Good progress has been made in installing the replace-ment oil-fired boiler which will be used to provide steam to vaporize nitrogen to inert containment. We expect to be able to light-off this boiler by about 1:00 p.m. on June 12, 1981.
(3) If boiler operation is satisfactory, inerting contain-ment would take approximately 10 - 12 hours. This is beyond the Technical Specification 6eadline cf 10:45 p.m. on June 12, 1981.
(3) If boiler operation is satisfactory, inerting contain-ment would take approximately 10 - 12 hours. This is beyond the Technical Specification 6eadline cf 10:45 p.m. on June 12, 1981.
I j;ool s
Ij;ool s
ll0 1
ll0 1
;
810 6 y 7 03Ao P
810 6 y 7 03Ao P


    . . =
. =
Mr. T.-A. Ippolito                                         -  2-                                June 12, 1981                                              !
2-June 12, 1981 Mr.
(4) As stated in the conference call, Carolina Power &
T.-A.
Ippolito (4) As stated in the conference call, Carolina Power &
Light Company (CP&L) is contident that inerting can be completed in a shorter time than requested in our June 11, 1981 submittal. CP&L agreed to reduce the requested exemption to 72 hours.
Light Company (CP&L) is contident that inerting can be completed in a shorter time than requested in our June 11, 1981 submittal. CP&L agreed to reduce the requested exemption to 72 hours.
(5) With regard to fire protection considerations for operating in a deinerted condition, the plant fire brigade will be alerted to the degraded fire pro-tection cordition in containment.
(5) With regard to fire protection considerations for operating in a deinerted condition, the plant fire brigade will be alerted to the degraded fire pro-tection cordition in containment.
Thank you for your effsres in this matter.
Thank you for your effsres in this matter.
Yours very truly, CL) -                -
Yours very truly, CL) -
P. W. Howe Vice President Technical Services JAM /je (3948) 4 9
P. W. Howe Vice President Technical Services JAM /je (3948) 4 9
4 y       -
4 y
w-.- y.-w+- y   +, w _ --  v- m,, - mar w-- e w w*-r-r--   -,e--------+     '-=y--   -mme--     --s wwu   r, -w- -
w-.-
                                                                                                                                  -e* v---*v ' --v v-+,e*r~---"-- r- --}}
y.-w+-
y
+,
w v-m,,
- mar w--
e w w*-r-r--
-,e--------+
'-=y--
-mme--
--s wwu r,
-w-
-e*
v---*v
--v v-+,e*r~---"--
r-
--}}

Latest revision as of 19:14, 23 December 2024

Confirms 810612 Info Re Operational Status of Facility & Existing Situation Re Inerting Containment Oxygen Concentration.Tech Specs Require Containment to Be Inerted by 810612.Progress Achieved W/Replacement of Oil Boiler
ML19350E258
Person / Time
Site: Brunswick 
Issue date: 06/12/1981
From: Howe P
CAROLINA POWER & LIGHT CO.
To: Ippolito T
Office of Nuclear Reactor Regulation
References
NO-81-1026, NUDOCS 8106170210
Download: ML19350E258 (2)


Text

?

June 12, 1981 File: NG-3514(B)

Serial No.: NO-81-1026

/

\\

\\/a{

( :Ulil

/6.

Y Office of Nuclear Reactor Regulation

/C yg; 1 G 1931 >h I

8 ATTENTION:

Mr. T. A. Ippolito, Chief

?E Operating Reactors Branch No. 2 g~,

(

, Q/

United States Nuclear Regulatory Commission Washington, D. C.

20555

\\

comu ca

-\\,x o

D

.i[,<-:i\\';

BRUNSWICK STE?.M ELECTRIC PLANT UNIT NO. 2

.s DOCKET NO. 50-324 LICENSE NO. DPR-62 REQUEST FOR LICENSE AMENDMENT ADDITIONAL INFORMATION - CONTAINMENT OXYGEN CONCENTRATION

Dear Mr. Ippolito:

This letter is to confirm information provided to NRC in a June 12, 1981 conference call regarding the operational status of Brunswick Unit No. 2 and the existing situation relative to inerting contairsent.

(1) Brunswick-2 reached 15% power level at 10:45 p.m. on June 11, 1981. Technical Specifications require containment to be inerted by 10:45 p.m. on June 12.

(2) Good progress has been made in installing the replace-ment oil-fired boiler which will be used to provide steam to vaporize nitrogen to inert containment. We expect to be able to light-off this boiler by about 1:00 p.m. on June 12, 1981.

(3) If boiler operation is satisfactory, inerting contain-ment would take approximately 10 - 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. This is beyond the Technical Specification 6eadline cf 10:45 p.m. on June 12, 1981.

Ij;ool s

ll0 1

810 6 y 7 03Ao P

. =

2-June 12, 1981 Mr.

T.-A.

Ippolito (4) As stated in the conference call, Carolina Power &

Light Company (CP&L) is contident that inerting can be completed in a shorter time than requested in our June 11, 1981 submittal. CP&L agreed to reduce the requested exemption to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

(5) With regard to fire protection considerations for operating in a deinerted condition, the plant fire brigade will be alerted to the degraded fire pro-tection cordition in containment.

Thank you for your effsres in this matter.

Yours very truly, CL) -

P. W. Howe Vice President Technical Services JAM /je (3948) 4 9

4 y

w-.-

y.-w+-

y

+,

w v-m,,

- mar w--

e w w*-r-r--

-,e--------+

'-=y--

-mme--

--s wwu r,

-w-

-e*

v---*v

--v v-+,e*r~---"--

r-

--