1.0 DEFINITIONS (Continued)
:
  ,
1.0 DEFINITIONS (Continued)
Surveillance Freguency - Each Surveillance Requirement shall be
    -
U.
U.
performed within the specified surveillance interval with a maximum allowable extension not to exceed 25 percent of the specified surveillance interval.
Surveillance Freguency - Each Surveillance Requirement shall be performed within the specified surveillance interval with a maximum allowable extension not to exceed 25 percent of the specified surveillance interval.
              -The Surveillance Frequency establishes the limit for which the specified time interval for Surveillance Requirements may be extended. It permits an allowable extension of the normal surveillance interval to facilitate surveillance schedule and consideration of plant operating conditions that may not be suitable for conducting the surveillance; e.g., transient conditions or other ongoing surveillance or maintenance activities. It is not intended that this provision be used repeatedly as a convenience to extend surveillance intervals beyond that specified for surveillances that are not performed during refueling outages. The limitation of Definition "U" is based on engineering judgment and the recognition that the most probable result of any particular surveillance being performed is the verification of conformance with the Surveillance Requirements. This provision is sufficient to ensure that the reliability ensured through surveillance activities is not significantly degraded beyond that obtained from the specified surveillance interval.
-The Surveillance Frequency establishes the limit for which the specified time interval for Surveillance Requirements may be extended.
V. Surveillance Interval - The surveillance interval is the calendar timo between surveillance tests, checks, calibrations, and examinations to be performed upon an instrument or component when it is required to be operable. These tests may be waived when the             i 1
It permits an allowable extension of the normal surveillance interval to facilitate surveillance schedule and consideration of plant operating conditions that may not be suitable for conducting the surveillance; e.g., transient conditions or other ongoing surveillance or maintenance activities.
It is not intended that this provision be used repeatedly as a convenience to extend surveillance intervals beyond that specified for surveillances that are not performed during refueling outages.
The limitation of Definition "U" is based on engineering judgment and the recognition that the most probable result of any particular surveillance being performed is the verification of conformance with the Surveillance Requirements.
This provision is sufficient to ensure that the reliability ensured through surveillance activities is not significantly degraded beyond that obtained from the specified surveillance interval.
V.
Surveillance Interval - The surveillance interval is the calendar timo between surveillance tests, checks, calibrations, and examinations to be performed upon an instrument or component when it i
is required to be operable.
These tests may be waived when the 1
instrument, component, or system is not required to be operable, but the instrument, component, or system shall be tested prior to being declared operable. The operating cycle interval is 18 months and the 25% tolerance given in Definition "U" is applicable.
instrument, component, or system is not required to be operable, but the instrument, component, or system shall be tested prior to being declared operable. The operating cycle interval is 18 months and the 25% tolerance given in Definition "U" is applicable.
H. Fire Sunoression Water System - A fire suppression water system shall consist of: a water source (s); gravity tank (s) or pump (s);
H.
and distribution piping with associated sectionalizing control or isolation valves. Such valves shall include hydrant post indicator valves and the first valve ahead of the water flow alarm device on each sprinkler, hose standpipe or spray system riser.
Fire Sunoression Water System - A fire suppression water system shall consist of: a water source (s); gravity tank (s) or pump (s);
X. Staggered Test Basis - A staggered test basis shall consist of: (a) a test schedule for D systems, subsystems, trains, or other designated components obtained by dividing the specified test             i
and distribution piping with associated sectionalizing control or isolation valves.
                                                                                          ;
Such valves shall include hydrant post indicator valves and the first valve ahead of the water flow alarm device on each sprinkler, hose standpipe or spray system riser.
interval into n equal subintervals; (b) the testing of one system,         '
X.
subsystem, train or other designated components at the beginning of each subinterval.
Staggered Test Basis - A staggered test basis shall consist of:
Y. Source Check - A source check shall be the qualitative assessment of channel response when the channel sensor is exposed to a radioactive source.
(a) a test schedule for D systems, subsystems, trains, or other i
Amendment No. 42, 89                                                         Sa
designated components obtained by dividing the specified test interval into n equal subintervals; (b) the testing of one system, subsystem, train or other designated components at the beginning of each subinterval.
                                      .'
Y.
8912190284 891207 PDR P    ADOCK 0500029.?
Source Check - A source check shall be the qualitative assessment of channel response when the channel sensor is exposed to a radioactive source.
* PDC                                                           ^
Amendment No. 42, 89 Sa 8912190284 891207 PDR ADOCK 0500029.?
P PDC
^
i
i


r
]
                                                                                            ]
r 1:0 DEFINITIONS (Continued) 2.
: ..                                                                                      ,
Offsite Dose Calculation Manual (ODCM) - An offsite dose calculation manual (ODCM) shall be a manual containing the current methodology and parameters to be used for the calculation of offsite doses due to i
1:0   DEFINITIONS (Continued)
l radioactive gaseous ard liquid effluents, the calculation of gaseous and liquid effluent monitoring instrumentation alarm / trip setpoints, and the conduct of the Radiological Environmental Monitoring Program.
: 2. Offsite Dose Calculation Manual (ODCM) - An offsite dose calculation manual (ODCM) shall be a manual containing the current methodology and         ;
AA.
parameters to be used for the calculation of offsite doses due to             i l             radioactive gaseous ard liquid effluents, the calculation of gaseous and liquid effluent monitoring instrumentation alarm / trip setpoints, and the     ;
Action - Action shall be that part of a specification which prescribes remedial measures required under designated conditions.
conduct of the Radiological Environmental Monitoring Program.                 !
BB.
AA. Action - Action shall be that part of a specification which prescribes remedial measures required under designated conditions.
Member (s) of the PublicI - Member (s) of the public shall include all i
BB. Member (s) of the PublicI - Member (s) of the public shall include all         i persons who are not occupationally associated with the plant. This             i category does not include employees of the utility, its contractors, or       1 vendors. Also excluded from this category are persons who enter the site to service equipment or to make deliveries. This category does           :
persons who are not occupationally associated with the plant.
include persons who use portions of the site for recreational,                 i occupational or other purposes not associated with the site.
This i
CC. Site Boundarvi - The site boundary is shown in Figure 1.6-1 in the FSAR.
category does not include employees of the utility, its contractors, or 1
DD. Radwaste Treatment System
vendors. Also excluded from this category are persons who enter the site to service equipment or to make deliveries.
: 1. Gaseous Radwaste Treatment System - The gaseous radwaste treatment system is that system identified in Figure 4.8-2.
This category does include persons who use portions of the site for recreational, i
: 2. Liouid Radwaste Treatment System - The liquid radwaste treatment system is that system identified in Figure 4.8-1.
occupational or other purposes not associated with the site.
EE. Automatic Primary Containment Isolation Valves - Are primary containment isolation valves which receive an automatic primary containment group isolation signal, n
CC.
                                                                                            !
Site Boundarvi - The site boundary is shown in Figure 1.6-1 in the FSAR.
3 See FSAR Figure 1.6-1 i                                                                                           i I-
DD.
;        Revision l       Amendment No. 89, 173                                                           Sb i
Radwaste Treatment System 1.
                                                                .
Gaseous Radwaste Treatment System - The gaseous radwaste treatment system is that system identified in Figure 4.8-2.
                                                                      -w
2.
Liouid Radwaste Treatment System - The liquid radwaste treatment system is that system identified in Figure 4.8-1.
EE.
Automatic Primary Containment Isolation Valves - Are primary containment isolation valves which receive an automatic primary containment group isolation signal, n
3 See FSAR Figure 1.6-1 i
i I-Revision l
Amendment No. 89, 173 Sb i
-w


.
. e- -.
e- - .
...d ATTACHMENT C a
            .. .d
t 4.
          .
ATTACHMENT C t
4 .
p.-_
p.-_
k t
k t
                                        !
.)
                                        .!
                                      .)


!
i l.0 DEFINITIONS (Continued)
        ,.  . .
Surveil 1 Y recuency - Unless otherwi [sts, c U.
i
stated thes specificat
    .,          ..
's, peri ic surv 111ance/e ks, c bration,
              '
and exam tions s 11 be p formed,Atthint specif) d survei nce inte vals.
l.0 DEFINITIONS (Continued)
ese int vals ma e adjupted plus $7..
U.                                                     stated     thes
The 1 maxim combined interv 1 time f any t ree cons utive mb6PEC tes) shall n exceed
        '
.25 tim the sp ified i
Surveil specificat1 Y  's,recuency peri         - Unless ic surv   111ance/e otherwi    [sts, ks, cc      bration ,
: erval, he WT4 dtv Qgrating le inte al is c sidere o be 18 nths a the tated o
and exam     tions s 11 be p formed,Atthint               specif) d
icabl.
                          >
'EF/4m V.
survei     nce inte vals.       ese int vals ma e adjupted plus $7. .
Surveillance Interval - The surveillance interval is the calendar time between surveillance tests, checks, Calibrations, and examinations to be performed upon an instrument or component when it is required to be operable.
The       1 maxim     combined interv 1 time f any t ree cons utive mb6PEC         tes) shall n       exceed   .25 tim the sp ified i erval,               he WT4 dtv                         le inte al is c     sidere     o be 18   nths a       the
These tests may be waived when the instrument, component, or system is not required to be operable, but qO the instrument, component, or system shall be tested prior to being declared operable.f '
            'EF/4m Qgrating
se--
  ,
SECTtrXL Q
tated    o            icabl .                       _
p AbDtJ)
                                          ,                                    _
H.
_
Fire SupDre3Tio? rwa'tFFTyMA fire suppression water system shall consist of; a water source (s); gravity tank (s) or pump (s);
V. Surveillance Interval - The surveillance interval is the calendar time between surveillance tests, checks, Calibrations, and examinations to be performed upon an instrument or component when it is required to be operable. These tests may be waived when the instrument, component, or system is not required to be operable, but qO             the instrument, component, or system shall be tested prior to being declared operable.f '                                     se--
and distribution piping with associated sectionalizing control or isolation valves.
SECTtrXL         Q                                         ___  p Fire SupDre3Tio? rwa'tFFTyMA fire suppression water system AbDtJ)      H.
Such valves shall include hydrant post indicator valves and the first valve ahead of the water flow alarm device on each sprinkler, hose standpipe or spray system riser.
shall consist of;     a water source (s); gravity tank (s) or pump (s);
X.
and distribution piping with associated sectionalizing control or isolation valves. Such valves shall include hydrant post indicator valves and the first valve ahead of the water flow alarm device on each sprinkler, hose standpipe or spray system riser.
Staggered Test Basis - A staggered test basis shall consist of:
X. Staggered Test Basis - A staggered test basis shall consist of:                 (a) a test schedule for n systems, subsystems, trains, or other
(a) a test schedule for n systems, subsystems, trains, or other designated components obtained by dividing the specified test
      .^-                  designated components obtained by dividing the specified test a                  interval into n equal subi subsystem, train or otherdesignated ntervals; components (b) the testing   of beginning one system, at the               of each subinterval.                                                                       ,
. ^ -
Y. Source Check - A source check shall be the qualitative assessment of channel response when the channel senser is exposed to a radioactive source.
subsystem, train or other ntervals; (b) the testing of one system, interval into n equal subi a
Z. Offsite Dese Calculation Manual (ODCM) - An offsite dose calculation                 //
designated components at the beginning of each subinterval.
Mogy             manual (ODCM) shall be a manuBI containing the current methodology                       :
Y.
and parameters to be used for the calculation of offsite doses due                     /
Source Check - A source check shall be the qualitative assessment of channel response when the channel senser is exposed to a radioactive source.
'
//
70 PMf-           to radioactive gaseous and liquid effluents, the calculation of                       /
Z.
g                 gaseous and liquid effluent monitoring instrumentation alarm / trip setpoints, and the conduct of the Radiological Environmental Monitoring Program.
Offsite Dese Calculation Manual (ODCM) - An offsite dose calculation Mogy manual (ODCM) shall be a manuBI containing the current methodology and parameters to be used for the calculation of offsite doses due
/
70 PMf-to radioactive gaseous and liquid effluents, the calculation of
/
g gaseous and liquid effluent monitoring instrumentation alarm / trip setpoints, and the conduct of the Radiological Environmental Monitoring Program.
v E
v E
V Amendment No.     ,                                                                        Sa l
V Sa Amendment No.
J
l J


                                                                            .
po.,.
po . , .
>EF/Miny l.0 DEFINITIONS (Continued) go 4,
  >EF/Miny l .0     DEFINITIONS (Continued) go       4,
; g o vt.D
; g o vt.D     ,AA.- Action - Action shall be that part of a specification which prescribes HERt.           remedial measures required under designated conditions.
,AA.-
Action - Action shall be that part of a specification which prescribes HERt.
remedial measures required under designated conditions.
D0L TD
D0L TD
  ~Ar g BB.         Member (s) of the PublicI - Member (s) of the public shall include all
~Ar g BB.
  -op g              persons who are not occupationally associated with the plant. This category does not include employees of the utility, its contractors, or DcFinm00           vendors. Also excluded from this category are persons who enter the
Member (s) of the PublicI - Member (s) of the public shall include all persons who are not occupationally associated with the plant. This
-op g category does not include employees of the utility, its contractors, or DcFinm00 vendors. Also excluded from this category are persons who enter the
:
:
* g st             site to service equipment or to make deliveries. This category does include persons who use portions of the site for recreational, occupational or other purposes not associated with the site.
* g st site to service equipment or to make deliveries. This category does include persons who use portions of the site for recreational, occupational or other purposes not associated with the site.
CC, Sitr__Boundarvi . The site boundary is shown in Figure 1.6-1 in the
CC, Sitr__Boundarvi. The site boundary is shown in Figure 1.6-1 in the FSAR.
_
DD, Radwaste Treatment System 1.
FSAR.
Gaseous Radwaste Treatment System - The gaseous radwaste treatment system is that system identified in Figure 4.8-2.
DD, Radwaste Treatment System
2.
: 1. Gaseous Radwaste Treatment System - The gaseous radwaste treatment system is that system identified in Figure 4.8-2.
Liouid Radwaste Treatment System - The liquid radwaste treatment system is that system identified in Figure 4.8-1.
: 2. Liouid Radwaste Treatment System - The liquid radwaste treatment system is that system identified in Figure 4.8-1.
EE.
EE. Automatic Primary Containment Isolation Valvel - Are primary                   '
Automatic Primary Containment Isolation Valvel - Are primary containment isolation valves which receive an automatic primary containment group isolation signal.
containment isolation valves which receive an automatic primary containment group isolation signal.
L 1
                                                                                                      !
See FSAR Figure:1.6-1 Revisionh Amendment No.
        ,,
Sb
        --                                                                                            ;
--}}
                                                                                                .
L               1 See FSAR Figure:1.6-1 Revisionh Amendment No.                                                               Sb
                                                                                                  --}}

Latest revision as of 18:39, 23 December 2024

Proposed Tech Specs Re Definition of Surveillance Frequency
ML19351A548
Person / Time
Site: Pilgrim
Issue date: 12/07/1989
From:
BOSTON EDISON CO.
To:
Shared Package
ML19351A546 List:
References
NUDOCS 8912190284
Download: ML19351A548 (5)


Text

-

1.0 DEFINITIONS (Continued)

U.

Surveillance Freguency - Each Surveillance Requirement shall be performed within the specified surveillance interval with a maximum allowable extension not to exceed 25 percent of the specified surveillance interval.

-The Surveillance Frequency establishes the limit for which the specified time interval for Surveillance Requirements may be extended.

It permits an allowable extension of the normal surveillance interval to facilitate surveillance schedule and consideration of plant operating conditions that may not be suitable for conducting the surveillance; e.g., transient conditions or other ongoing surveillance or maintenance activities.

It is not intended that this provision be used repeatedly as a convenience to extend surveillance intervals beyond that specified for surveillances that are not performed during refueling outages.

The limitation of Definition "U" is based on engineering judgment and the recognition that the most probable result of any particular surveillance being performed is the verification of conformance with the Surveillance Requirements.

This provision is sufficient to ensure that the reliability ensured through surveillance activities is not significantly degraded beyond that obtained from the specified surveillance interval.

V.

Surveillance Interval - The surveillance interval is the calendar timo between surveillance tests, checks, calibrations, and examinations to be performed upon an instrument or component when it i

is required to be operable.

These tests may be waived when the 1

instrument, component, or system is not required to be operable, but the instrument, component, or system shall be tested prior to being declared operable. The operating cycle interval is 18 months and the 25% tolerance given in Definition "U" is applicable.

H.

Fire Sunoression Water System - A fire suppression water system shall consist of: a water source (s); gravity tank (s) or pump (s);

and distribution piping with associated sectionalizing control or isolation valves.

Such valves shall include hydrant post indicator valves and the first valve ahead of the water flow alarm device on each sprinkler, hose standpipe or spray system riser.

X.

Staggered Test Basis - A staggered test basis shall consist of:

(a) a test schedule for D systems, subsystems, trains, or other i

designated components obtained by dividing the specified test interval into n equal subintervals; (b) the testing of one system, subsystem, train or other designated components at the beginning of each subinterval.

Y.

Source Check - A source check shall be the qualitative assessment of channel response when the channel sensor is exposed to a radioactive source.

Amendment No. 42, 89 Sa 8912190284 891207 PDR ADOCK 0500029.?

P PDC

^

i

]

r 1:0 DEFINITIONS (Continued) 2.

Offsite Dose Calculation Manual (ODCM) - An offsite dose calculation manual (ODCM) shall be a manual containing the current methodology and parameters to be used for the calculation of offsite doses due to i

l radioactive gaseous ard liquid effluents, the calculation of gaseous and liquid effluent monitoring instrumentation alarm / trip setpoints, and the conduct of the Radiological Environmental Monitoring Program.

AA.

Action - Action shall be that part of a specification which prescribes remedial measures required under designated conditions.

BB.

Member (s) of the PublicI - Member (s) of the public shall include all i

persons who are not occupationally associated with the plant.

This i

category does not include employees of the utility, its contractors, or 1

vendors. Also excluded from this category are persons who enter the site to service equipment or to make deliveries.

This category does include persons who use portions of the site for recreational, i

occupational or other purposes not associated with the site.

CC.

Site Boundarvi - The site boundary is shown in Figure 1.6-1 in the FSAR.

DD.

Radwaste Treatment System 1.

Gaseous Radwaste Treatment System - The gaseous radwaste treatment system is that system identified in Figure 4.8-2.

2.

Liouid Radwaste Treatment System - The liquid radwaste treatment system is that system identified in Figure 4.8-1.

EE.

Automatic Primary Containment Isolation Valves - Are primary containment isolation valves which receive an automatic primary containment group isolation signal, n

3 See FSAR Figure 1.6-1 i

i I-Revision l

Amendment No. 89, 173 Sb i

-w

. e- -.

...d ATTACHMENT C a

t 4.

p.-_

k t

.)

i l.0 DEFINITIONS (Continued)

Surveil 1 Y recuency - Unless otherwi [sts, c U.

stated thes specificat

's, peri ic surv 111ance/e ks, c bration,

and exam tions s 11 be p formed,Atthint specif) d survei nce inte vals.

ese int vals ma e adjupted plus $7..

The 1 maxim combined interv 1 time f any t ree cons utive mb6PEC tes) shall n exceed

.25 tim the sp ified i

erval, he WT4 dtv Qgrating le inte al is c sidere o be 18 nths a the tated o

icabl.

'EF/4m V.

Surveillance Interval - The surveillance interval is the calendar time between surveillance tests, checks, Calibrations, and examinations to be performed upon an instrument or component when it is required to be operable.

These tests may be waived when the instrument, component, or system is not required to be operable, but qO the instrument, component, or system shall be tested prior to being declared operable.f '

se--

SECTtrXL Q

p AbDtJ)

H.

Fire SupDre3Tio? rwa'tFFTyMA fire suppression water system shall consist of; a water source (s); gravity tank (s) or pump (s);

and distribution piping with associated sectionalizing control or isolation valves.

Such valves shall include hydrant post indicator valves and the first valve ahead of the water flow alarm device on each sprinkler, hose standpipe or spray system riser.

X.

Staggered Test Basis - A staggered test basis shall consist of:

(a) a test schedule for n systems, subsystems, trains, or other designated components obtained by dividing the specified test

. ^ -

subsystem, train or other ntervals; (b) the testing of one system, interval into n equal subi a

designated components at the beginning of each subinterval.

Y.

Source Check - A source check shall be the qualitative assessment of channel response when the channel senser is exposed to a radioactive source.

//

Z.

Offsite Dese Calculation Manual (ODCM) - An offsite dose calculation Mogy manual (ODCM) shall be a manuBI containing the current methodology and parameters to be used for the calculation of offsite doses due

/

70 PMf-to radioactive gaseous and liquid effluents, the calculation of

/

g gaseous and liquid effluent monitoring instrumentation alarm / trip setpoints, and the conduct of the Radiological Environmental Monitoring Program.

v E

V Sa Amendment No.

l J

po.,.

>EF/Miny l.0 DEFINITIONS (Continued) go 4,

g o vt.D

,AA.-

Action - Action shall be that part of a specification which prescribes HERt.

remedial measures required under designated conditions.

D0L TD

~Ar g BB.

Member (s) of the PublicI - Member (s) of the public shall include all persons who are not occupationally associated with the plant. This

-op g category does not include employees of the utility, its contractors, or DcFinm00 vendors. Also excluded from this category are persons who enter the

  • g st site to service equipment or to make deliveries. This category does include persons who use portions of the site for recreational, occupational or other purposes not associated with the site.

CC, Sitr__Boundarvi. The site boundary is shown in Figure 1.6-1 in the FSAR.

DD, Radwaste Treatment System 1.

Gaseous Radwaste Treatment System - The gaseous radwaste treatment system is that system identified in Figure 4.8-2.

2.

Liouid Radwaste Treatment System - The liquid radwaste treatment system is that system identified in Figure 4.8-1.

EE.

Automatic Primary Containment Isolation Valvel - Are primary containment isolation valves which receive an automatic primary containment group isolation signal.

L 1

See FSAR Figure:1.6-1 Revisionh Amendment No.

Sb

--