OPERATING DATA REPORT DOCKET NO. 50-255 DATE | OPERATING DATA REPORT DOCKET NO. | ||
: 1. Unit Name: | 50-255 DATE e-2-01 COMPLETED BY DAPeterson TELEPHONE c16 764-8913 OPERATING STATUS | ||
: 2. Reporting Period: | : 1. Unit Name: | ||
: 3. Licensed Thermal Power (MWt): | Pslisades N tes | ||
: 4. Nameplate Rating (Gross MWe): | : 2. Reporting Period: | ||
: 6. Maximum Dependable Capacity (Gross MWe): | 810501-810531 | ||
: 7. Maximum Dependsble Capacity (Net MWe): | : 3. Licensed Thermal Power (MWt): | ||
2530 | |||
: 4. Nameplate Rating (Gross MWe): | |||
011*I S. Design Electrical Rating (Net MWe): | |||
805 | |||
: 6. Maximum Dependable Capacity (Gross MWe): | |||
*675 | |||
: 7. Maximum Dependsble Capacity (Net MWe): | |||
*635 | |||
: 8. If Changes Occer in Capacity Ratings (!! ems Number 3 Through 7) Since Last Report,Give Reasons: | : 8. If Changes Occer in Capacity Ratings (!! ems Number 3 Through 7) Since Last Report,Give Reasons: | ||
: 9. Power Level To Which Restricted,If Any (Net MWe): | : 9. Power Level To Which Restricted,If Any (Net MWe): | ||
: 10. Reasons For Restrictions.If Any: | : 10. Reasons For Restrictions.If Any: | ||
( | ( | ||
This Month | This Month Yr..to Date Cumulative | ||
: 11. Hours in Reporting Period | : 11. Hours in Reporting Period Thh 3623 82.838 | ||
: 12. Number Of Hours Reactor Was Critical | : 12. Number Of Hours Reactor Was Critical Thh 3602.h h7,124.8 | ||
: 13. Reactor Reserve Shutdown Hours | |||
: 13. Reactor Reserve Shutdown Hours | ~ | ||
: 14. Houis Generator On.Line | ~ | ||
74h | : 14. Houis Generator On.Line 74h 3594.9 hh,788.h | ||
: 15. Unit Reserve Shutdo. n Hours | : 15. Unit Reserve Shutdo. n Hours | ||
: 16. Gross Thermal Energy ver-sted (MWH) | : 16. Gross Thermal Energy ver-sted (MWH) 1,% 1,384 8,720,712 88,424,h8 | ||
: 17. Gross Electrical Energy Generated (MWF) | : 17. Gross Electrical Energy Generated (MWF) 521,010 _, | ||
: 20. Unit Availability Factor | 2,733,530 27,297,9ho | ||
: 21. Unit Capacity Factor (Using MDC Net) | : 18. Net Electrical Energy Generated (MWH) 491,609 l | ||
: 23. Unit Forced Outage Rate | : 19. Unit Service factor 100 | ||
. 2,590,813 25,6hl,117 i | |||
99 2 sh.1 | |||
: 20. Unit Availability Factor 100 99.2 Sh.1 | |||
: 21. Unit Capacity Factor (Using MDC Net) 10h.1 112.6 h8.8 l | |||
: 22. Unit Capacity Factor (Using DER Net) 82 1 88.8 38 h I | |||
: 23. Unit Forced Outage Rate 0 | |||
0.78 33.1 | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Dste.and Duration of Each): | : 24. Shutdowns Scheduled Over Next 6 Months (Type. Dste.and Duration of Each): | ||
ReNeline. Auemt 8. antroxirtately 100 day duration. | ReNeline. Auemt 8. antroxirtately 100 day duration. | ||
l | l | ||
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | : 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | ||
: 26. Units in Test Status (Prior to Commercial Operation): | : 26. Units in Test Status (Prior to Commercial Operation): | ||
Forecast Achieved INITIA L CRITICALITY INITIA L ELECTRIClTY COMMERCIA L OPERATION | |||
# Based on Condenser Back Pressure. | |||
(9/77) 8106120) | (9/77) 8106120) | ||
AVER AGE DAILY UNIT POWER LEVEL 50-255 h | AVER AGE DAILY UNIT POWER LEVEL DOCKET NO. | ||
Palisades UNIT DATE | 50-255 h | ||
Palisades UNIT DATE 6-3-81 DAPeterson COMPLETED BY TELEPHONE (616176h-8913 MONTH Mw 1061 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) | |||
1 | (gw,,g,) | ||
1 Th2 37 675 Th6 h52 2 | |||
is 731 255 3 | |||
10 | g, 4 | ||
708 20 268 690 537 5 | |||
4hn 15 | 21 6 | ||
l | 22 4-A 7 | ||
Th6 23 657 i{ | |||
g 731 628 3 | |||
739 9 | |||
6% | |||
10 7U 662 26 | |||
.Thi gg, 12 7'8 23 668 Th2 637 13 29 14 30 4hn 15 Tho 681 y | |||
a 737 l | |||
l INS 1RUC110NS 1 | |||
On this format. fist the average daGy unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. | On this format. fist the average daGy unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. | ||
-( | |||
(9/77) i l | |||
1 | |||
_ _ _ _ _. ~. _,.... _,. _. _ _. _,. _. _,., _ | |||
UNITSilUIDOWNS AND FOWER REDUCTIONS | UNITSilUIDOWNS AND FOWER REDUCTIONS DOCKET NO. | ||
50-255 | |||
REPORT MONTil | . UNIT NAME Palisades DATE 6-7-81 REPORT MONTil Mmr. lo81 COMi*LETED ilY D Va"DenBerg TELEPilONE (616) 761_8913 4 | ||
a 1 | |||
) | |||
m II Q M j | |||
5 | |||
Repos a 6 | } | ||
2 | ' C Causc & Cosrective No. | ||
Condenser vacuurn problems 3 | Date | ||
Condenser vacuum problem reoccurred 4 | $3 c2 U dj =j! | ||
l | Repos a | ||
,fid Ed A' lion du 2 | |||
6 Psevent Recutscuce 6 | |||
I | 2 810517 y | ||
0 11 N/A Condenser vacuurn problems 3 | |||
810518 y | |||
0 N/A Condenser vacuum problem reoccurred 4 | |||
l OO | |||
;:c3 s | |||
I suf* | |||
I 2 | |||
3 4 | |||
17: Foiced Reason: | |||
Method: | |||
Exhibit G Insisus-sions "g" | |||
S: Scheduled A-Eiguipmens Failuse(Explain) 1 Manual for Psepasation of Data ll Maintenance of Test 2-Manual Scra m. | |||
linesy Sheets (os 1.icensee I | |||
C Refueling 3-Automatic Scram. | |||
Event Repost (LERI File INURI Cr D Regulatory Resteietion 4-Othes (Explain) 0161) 1: Opesator Tsaining & license Examination F Adudnistrative 5 | |||
G Opesational I.isor (limplain) | |||
Esinbu I-Same Sousce 19/77) | |||
Il-Othes (lixplaiu) | |||
.d | .d | ||
| Line 86: | Line 128: | ||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE FOR MAY 1981 | OF OPERATING EXPERIENCE FOR MAY 1981 I | ||
Power reduction occurred on May 17 and again on May 18 as a result of unexplained loeses in condenser vacuta. Problems with the inner con-denser loop seal were corrected and the plant returned to approximately 90% power. | |||
I 1 | I 1 | ||
i i | i i | ||
| Line 93: | Line 135: | ||
i 4 | i 4 | ||
i k | i k | ||
i | i i | ||
t i | |||
i | 1 a}} | ||
Latest revision as of 10:48, 23 December 2024
| ML20004E483 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 06/02/1981 |
| From: | Peterson D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | |
| Shared Package | |
| ML20004E479 | List: |
| References | |
| NUDOCS 8106120249 | |
| Download: ML20004E483 (4) | |
Text
.
OPERATING DATA REPORT DOCKET NO.
50-255 DATE e-2-01 COMPLETED BY DAPeterson TELEPHONE c16 764-8913 OPERATING STATUS
- 1. Unit Name:
Pslisades N tes
- 2. Reporting Period:
810501-810531
- 3. Licensed Thermal Power (MWt):
2530
- 4. Nameplate Rating (Gross MWe):
011*I S. Design Electrical Rating (Net MWe):
805
- 6. Maximum Dependable Capacity (Gross MWe):
- 675
- 7. Maximum Dependsble Capacity (Net MWe):
- 635
- 8. If Changes Occer in Capacity Ratings (!! ems Number 3 Through 7) Since Last Report,Give Reasons:
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
(
This Month Yr..to Date Cumulative
- 11. Hours in Reporting Period Thh 3623 82.838
- 12. Number Of Hours Reactor Was Critical Thh 3602.h h7,124.8
- 13. Reactor Reserve Shutdown Hours
~
~
- 14. Houis Generator On.Line 74h 3594.9 hh,788.h
- 15. Unit Reserve Shutdo. n Hours
- 16. Gross Thermal Energy ver-sted (MWH) 1,% 1,384 8,720,712 88,424,h8
- 17. Gross Electrical Energy Generated (MWF) 521,010 _,
2,733,530 27,297,9ho
- 18. Net Electrical Energy Generated (MWH) 491,609 l
- 19. Unit Service factor 100
. 2,590,813 25,6hl,117 i
99 2 sh.1
- 20. Unit Availability Factor 100 99.2 Sh.1
- 21. Unit Capacity Factor (Using MDC Net) 10h.1 112.6 h8.8 l
- 22. Unit Capacity Factor (Using DER Net) 82 1 88.8 38 h I
- 23. Unit Forced Outage Rate 0
0.78 33.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Dste.and Duration of Each):
ReNeline. Auemt 8. antroxirtately 100 day duration.
l
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIA L CRITICALITY INITIA L ELECTRIClTY COMMERCIA L OPERATION
- Based on Condenser Back Pressure.
(9/77) 8106120)
AVER AGE DAILY UNIT POWER LEVEL DOCKET NO.
50-255 h
Palisades UNIT DATE 6-3-81 DAPeterson COMPLETED BY TELEPHONE (616176h-8913 MONTH Mw 1061 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(gw,,g,)
1 Th2 37 675 Th6 h52 2
is 731 255 3
g, 4
708 20 268 690 537 5
21 6
22 4-A 7
Th6 23 657 i{
g 731 628 3
739 9
6%
10 7U 662 26
.Thi gg, 12 7'8 23 668 Th2 637 13 29 14 30 4hn 15 Tho 681 y
a 737 l
l INS 1RUC110NS 1
On this format. fist the average daGy unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
-(
(9/77) i l
1
_ _ _ _ _. ~. _,.... _,. _. _ _. _,. _. _,., _
UNITSilUIDOWNS AND FOWER REDUCTIONS DOCKET NO.
50-255
. UNIT NAME Palisades DATE 6-7-81 REPORT MONTil Mmr. lo81 COMi*LETED ilY D Va"DenBerg TELEPilONE (616) 761_8913 4
a 1
)
m II Q M j
5
}
' C Causc & Cosrective No.
Date
$3 c2 U dj =j!
Repos a
,fid Ed A' lion du 2
6 Psevent Recutscuce 6
2 810517 y
0 11 N/A Condenser vacuurn problems 3
810518 y
0 N/A Condenser vacuum problem reoccurred 4
l OO
- c3 s
I suf*
I 2
3 4
17: Foiced Reason:
Method:
Exhibit G Insisus-sions "g"
S: Scheduled A-Eiguipmens Failuse(Explain) 1 Manual for Psepasation of Data ll Maintenance of Test 2-Manual Scra m.
linesy Sheets (os 1.icensee I
C Refueling 3-Automatic Scram.
Event Repost (LERI File INURI Cr D Regulatory Resteietion 4-Othes (Explain) 0161) 1: Opesator Tsaining & license Examination F Adudnistrative 5
G Opesational I.isor (limplain)
Esinbu I-Same Sousce 19/77)
Il-Othes (lixplaiu)
.d
't
SUMMARY
OF OPERATING EXPERIENCE FOR MAY 1981 I
Power reduction occurred on May 17 and again on May 18 as a result of unexplained loeses in condenser vacuta. Problems with the inner con-denser loop seal were corrected and the plant returned to approximately 90% power.
I 1
i i
I t
i 4
i k
i i
t i
1 a