PEACH BOTTOM ATOMIC POWER STATION               .
PEACH BOTTOM ATOMIC POWER STATION NARRATIVE  
NARRATIVE  


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCES JUNE 1981 UNIT 2 OPERATIONS The unit remained shutdown for repairs to d ao "B" Recirculation Pump / Motor and the HPSV piping downstnam of the 113 valve. While the unit was being returned to service on June 10, the 2A main transformer experienced an internal fault prior to attaining full operating voltage. Repairs were nade to the transformer
OF OPERATING EXPERIENCES JUNE 1981 UNIT 2 OPERATIONS The unit remained shutdown for repairs to d ao "B"
            , and the unit was placed in service on June 21. On June 22, tho unit tripped on low reactor water level rssulting from loss of feedwater.
Recirculation Pump / Motor and the HPSV piping downstnam of the 113 valve. While the unit was being returned to service on June 10, the 2A main transformer experienced an internal fault prior to attaining full operating voltage. Repairs were nade to the transformer
The loss of feedwater was due to the tripping of two condensato pumps when the number 213kv bus tripped due to water leakage into the 2Gk breaker grounding the bus. The unit was returned to service on June 23     The unit was removed from service within a few minutes in an effort to maintain condenser vacuum following high hydrogen concentration trips of the Recombiner mechanical compressors. Over the next few days, the unit was cycled on and off a number of times for the same reason.                                                .
, and the unit was placed in service on June 21. On June 22, tho unit tripped on low reactor water level rssulting from loss of feedwater.
The loss of feedwater was due to the tripping of two condensato pumps when the number 213kv bus tripped due to water leakage into the 2Gk breaker grounding the bus. The unit was returned to service on June 23 The unit was removed from service within a few minutes in an effort to maintain condenser vacuum following high hydrogen concentration trips of the Recombiner mechanical compressors. Over the next few days, the unit was cycled on and off a number of times for the same reason.
It was determined that the high hydrogen concentrations at the outlet of the recombiner were the result of oil leakage into the con 6cnsate from the water seal drain system of the "A" Reactor Feed Pump.
It was determined that the high hydrogen concentrations at the outlet of the recombiner were the result of oil leakage into the con 6cnsate from the water seal drain system of the "A" Reactor Feed Pump.
The unit was returned to service June 25 with major load drops required periodically over the next several days to maintain condenser vacuum each time the Recombiner mechanical compressors tripped on high hydrogen concentration. The situation continued to improve as the oil was removed by special resin used in the condensate demineralizers.
The unit was returned to service June 25 with major load drops required periodically over the next several days to maintain condenser vacuum each time the Recombiner mechanical compressors tripped on high hydrogen concentration. The situation continued to improve as the oil was removed by special resin used in the condensate demineralizers.
UNIT 3 OPERATIONS The unit remains shutdown to accommodate refueling, modifications and maintenance work. The Suppression Pool modifications are complete with sand blasting and recoating remaining. The feedwater nozzle machining and sparger replacement is complete.
UNIT 3 OPERATIONS The unit remains shutdown to accommodate refueling, modifications and maintenance work. The Suppression Pool modifications The feedwater are complete with sand blasting and recoating remaining.
The in-drywell Oore Spray piping replacement has been completed and replacement of the in-drywell Reactor Vater Cleanup i               piping is in progress. Repair of the 2B Recirculation pump motor continues.
nozzle machining and sparger replacement is complete.
8107200218 810713                                                               .
The in-drywell Oore Spray piping replacement has been completed and replacement of the in-drywell Reactor Vater Cleanup i
PDR ADOCK 05000277 R                 PDR
piping is in progress. Repair of the 2B Recirculation pump motor continues.
8107200218 810713 PDR ADOCK 05000277 R
PDR


OPER ATING DATA RE PORT DOCKET NO. 50 - 277 OATE JULY 13. 1981 COMPLETED SY PHILADELPHI A ELECTRIC COMPANY W.M.ALDEN E NG INE E R-IN-CHARGE NUCLEAR SECTION GENER ATION DIVI 510N-NUCLE AR TELEPHONE (2153 841-5022 OPERATING Siaius
OPER ATING DATA RE PORT DOCKET NO. 50 - 277 OATE JULY 13. 1981 COMPLETED SY PHILADELPHI A ELECTRIC COMPANY W.M.ALDEN E NG INE E R-IN-CHARGE NUCLEAR SECTION GENER ATION DIVI 510N-NUCLE AR TELEPHONE (2153 841-5022 OPERATING Siaius
: 1. UNIT NAMES PE ACH toiTOM UNIT 2                                         l                                                         l
: 1. UNIT NAMES PE ACH toiTOM UNIT 2 l
                              ....... .........................                      I                                                          g
l I
: 2. REPORTING PER100               JUNE, 1981                             l                                                         l
g
                                        ...... .................                                                                              g
: 2. REPORTING PER100 JUNE, 1981 l
: 3. LICEN5ED THERM AL P(b6ER(Muilt                             3293                                                                   l
l g
                                                    ................                I                                                         g
: 3. LICEN5ED THERM AL P(b6ER(Muilt 3293 l
: 4. NAMEPL ATE RAIING (GROS 5 MwE)*                           1152
I g
                                                      ...............              g
: 4. NAMEPL ATE RAIING (GROS 5 MwE)*
: 5. DESIGN ELECTRICAL RATING (NET MWE)I                         1065       l
1152 g
                                                                .........          g                                                           3
: 5. DESIGN ELECTRICAL RATING (NET MWE)I 1065 l
: 6. MAAIMUM DEPENOABLE CAPACITY (GROSS MWE): 1098                         l                                                           l
g 3
                                                                        ....        g                                                          g
: 6. MAAIMUM DEPENOABLE CAPACITY (GROSS MWE): 1098 l
: 7. MAA1 MUM DEPENDASLE CAPACITY (NET MWEls                    1051
l g
                                                                    ......        .I...... ................................l
g
.I......................................l
: 7. MAA1 MUM DEPENDASLE CAPACITY (NET MWEls 1051
: a. IF CHANGES DCCUR IN CAPACITY R ATINGS (ITEMS NUMSER 3 THROUGH 7) SINCE LAST REPORio GIVE RE A50N$8
: a. IF CHANGES DCCUR IN CAPACITY R ATINGS (ITEMS NUMSER 3 THROUGH 7) SINCE LAST REPORio GIVE RE A50N$8
: 9. PJdCR LEVEL TO WHICH RE5f alCTED. IF ANY (NET MWEls
: 9. PJdCR LEVEL TO WHICH RE5f alCTED. IF ANY (NET MWEls
: 13. PE ASONS FOR RE51RICTION$ e IF ANY8 THIS MONTH           YR-TO-DATE               CUMUL A T IV E
: 13. PE ASONS FOR RE51RICTION$ e IF ANY8 THIS MONTH YR-TO-DATE CUMUL A T IV E
: 11. htJk) IN REP 3RilNG PERIOD                                                     720                   *e343                 61.271
: 11. htJk) IN REP 3RilNG PERIOD 720
: 12. NJM6cR OF HOURS RE ACTOR WA5 CRITICAL                                       310.8               2 950.9                 45,503.4
*e343 61.271
: 13. ki&CTOR RESERVE SHUTOOWN H3URS                                                 00                     0.0                     0.0
: 12. NJM6cR OF HOURS RE ACTOR WA5 CRITICAL 310.8 2 950.9 45,503.4
: 14. HJURS GEhERATOR ON*LINE                                                     167.6               2e764 6                 44s27T.4
: 13. ki&CTOR RESERVE SHUTOOWN H3URS 00 0.0 0.0
: 15. 0%!i RE5ERVs 5HUTDO=N HOURS                                                   0.0                     0.0                     0.0
: 14. HJURS GEhERATOR ON*LINE 167.6 2e764 6 44s27T.4
: 16. GRJ%S THERMAL EPERGY GEhEst ATED (MmHI                                     176.784           8.326.154           128.747.226
: 15. 0%!i RE5ERVs 5HUTDO=N HOURS 0.0 0.0 0.0
: 17. G4055 ELELTRICAL ENERGY GENER A TE3 (MkH)                                   46.740           2,792,340             42.405,440 lo. Nii CLECTRIC AL FNERGY GENERATED (MdH)                                     39.598           2.690.048             40 649.712 19'. UNIT SERVICE F ACTOR                                                         23.3                   63.7                   72.3
: 16. GRJ%S THERMAL EPERGY GEhEst ATED (MmHI 176.784 8.326.154 128.747.226
: 20. UNIT AVAILadlLITY FACTOR                                                     23.3                   63.7                   72.3
: 17. G4055 ELELTRICAL ENERGY GENER A TE3 (MkH) 46.740 2,792,340 42.405,440 lo. Nii CLECTRIC AL FNERGY GENERATED (MdH) 39.598 2.690.048 40 649.712 19'. UNIT SERVICE F ACTOR 23.3 63.7 72.3
: 21. UNIT C APACITY F ACT0k (U5tha MDC NET)                                         52                     58.9                   63.1
: 20. UNIT AVAILadlLITY FACTOR 23.3 63.7 72.3
: 22. UNii C AP AC1!Y F ACTOR tus!NG DER NEil                                       5.2                   58 2                   62 3
: 21. UNIT C APACITY F ACT0k (U5tha MDC NET) 52 58.9 63.1
: 23. UNIT FORCEO 001 AGE R ATE                                                     76.7                   36.3                     8.8
: 22. UNii C AP AC1!Y F ACTOR tus!NG DER NEil 5.2 58 2 62 3
: 23. UNIT FORCEO 001 AGE R ATE 76.7 36.3 8.8
: 24. 5 NUT 00sps5 SCHEDULED DVER NEAT 6 MONTHS (Tf PE, DATE, AND OURATION OF EACH)8
: 24. 5 NUT 00sps5 SCHEDULED DVER NEAT 6 MONTHS (Tf PE, DATE, AND OURATION OF EACH)8
: 25. IF 5HU TDOW N AT EhD 0F REPORT PERIOD. E5flMATED DATE OF STARTUP 1       26. UNITS IN TESI STATUS (PR104 TO C3MMERCIAL OPERATION):                               FORECAST           ACHIEVED INITIAL CRITICALITV                                                           ........
: 25. IF 5HU TDOW N AT EhD 0F REPORT PERIOD. E5flMATED DATE OF STARTUP 1
INITIAL tLECTRICITY COMMERCIAL OPERATION
: 26. UNITS IN TESI STATUS (PR104 TO C3MMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITV INITIAL tLECTRICITY COMMERCIAL OPERATION


4
4
~
~
t
t OPER AI!4G D AI A RE PORT S
        ,    .                                              OPER AI!4G D AI A RE PORT S
DOCKET NO. 50 - 218 I
DOCKET NO. 50 - 218 I                                                                                                     DATE JULY 13. 1981 COMPLETED BY PHILADELPHI A ELECTRIC COMPANY f                                                                                                               .............................
DATE JULY 13. 1981 COMPLETED BY PHILADELPHI A ELECTRIC COMPANY f
W.M.ALDEN EhGINEER-IN-CHARGE 4                                                                                                             NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 4                                                                                                             .............................
W.M.ALDEN EhGINEER-IN-CHARGE 4
OPERATING STAIUS I             1. UNIT NAME s PE ACH 80Tf 0M UNIT 3                                           l NOTEst THIS UNIT 15 00WN FOR                                 l
NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 4
                                        ....... .........................                          g                                                             g
OPERATING STAIUS I
: 2. REPORil86G PsR1008               JUNE 1981                                 l           REFUELING AND MAINTENANCE.                       I g                                             .........................                      g                                                             g J. LICENSED THERM AL POWER (MNT):                                 3293         l                                                               l
: 1. UNIT NAME s PE ACH 80Tf 0M UNIT 3 l NOTEst THIS UNIT 15 00WN FOR l
                                                                  ................                  g l
g g
4            4. NAMEPL ATE RAi!NG (GR055 MWil                                   1152         l
: 2. REPORil86G PsR1008 JUNE 1981 l
                                                                    ...............                g
REFUELING AND MAINTENANCE.
: 5. DESIGN ELECTRICAL RATING (NET MWE)I                           1065         l                                                             1 g                                                                       .........            g                                                             g
I g
: 6. MAAIMUM DEPENJABLE CAPACITY (GROSS MhEls 1098                                 l                                                             l
g g
                                                                                      ....          g                                                              g
J. LICENSED THERM AL POWER (MNT):
:0                 7. MAAIMUM DEPENOABLE CAPACITY (NET M6 E ):                       1035         l                                                             l
3293 l
: 8. IF CHANGES DCCUR IN CAPACITY RATING 5 (liEMS NUMBER 3 THROUGH 73 SINCE LAST REPORio GIVE RE A50N$8
l g
l 4
: 4. NAMEPL ATE RAi!NG (GR055 MWil 1152 l
g
: 5. DESIGN ELECTRICAL RATING (NET MWE)I 1065 l
1 g
g g
: 6. MAAIMUM DEPENJABLE CAPACITY (GROSS MhEls 1098 l
l g
g
:0
: 7. MAAIMUM DEPENOABLE CAPACITY (NET M6 E ):
1035 l
l 8.
IF CHANGES DCCUR IN CAPACITY RATING 5 (liEMS NUMBER 3 THROUGH 73 SINCE LAST REPORio GIVE RE A50N$8
: 9. PJdE4 LEVEL 10 dHICH RL51RICTED. IF ANY (NET MWEls 8
: 9. PJdE4 LEVEL 10 dHICH RL51RICTED. IF ANY (NET MWEls 8
: 10. REASONS FOR RESTRICTIONS IF ANY:
: 10. REASONS FOR RESTRICTIONS IF ANY:
4 THIS MONTH             YR-TO-DATE               CUMULATIVE
4 THIS MONTH YR-TO-DATE CUMULATIVE
'4
' 4
: 11. HOURS IN REPORTING PER100                                                           720                   4.343                   57.167 e
: 11. HOURS IN REPORTING PER100 720 4.343 57.167 e
: 12. NJM8ER OF HJURS PE ALTOR h A5 CR111C AL                                               o                 1.541.7               43.709.9
: 12. NJM8ER OF HJURS PE ALTOR h A5 CR111C AL o
: 13. mE ACTOR RESERVE 5HUTD0wN HOURS                                                     0.0                     0.0                         0.0 t                                                                                     ............            ............              ............
1.541.7 43.709.9
14 HJURS GENERATOR ON*LINE                                                             0.0                 1.541.8               42.566 6
: 13. mE ACTOR RESERVE 5HUTD0wN HOURS 0.0 0.0 0.0 t
: 15. UNIT RESERVE SHUID3hN M0045                                                         0.0                     0.0                         0.0
14 HJURS GENERATOR ON*LINE 0.0 1.541.8 42.566 6
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                                                   0             4.932.216             128,775.165
: 15. UNIT RESERVE SHUID3hN M0045 0.0 0.0 0.0
: 17. GA055 ELECTRIC AL E NtRGY Gtkf R ATE 3 (==H)                                           0             1.643.900             39.745.940 lo. NET LLECid! CAL EhEkGY GthERA1E0 (MaH)                               *          -5,016             1.571
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 4.932.216 128,775.165
                                                                                          ............            ........ 722
: 17. GA055 ELECTRIC AL E NtRGY Gtkf R ATE 3 (==H) 0 1.643.900 39.745.940 lo. NET LLECid! CAL EhEkGY GthERA1E0 (MaH)
                                                                                                                                  ...       ....38150.565 9 UNIT SERVICE FACTOR I'.                                                                                      0.0                     35.5                       74.5 4                                                                                       ............            ............            ............
-5,016 1.571
: 20. UNIT AVAILASILITY FACTUR                                                             00                     35.5                       74.5
........ 722
: 21. Us!T CAPAC1IY FACIOk tuSING MDC NE T)                                               0.0                     35.0                     64.5
.... 150.565 38 I'. UNIT SERVICE FACTOR 0.0 35.5 74.5 9
: 22. UN!! CAPACITY F ACTOR tUSING DER NET)                                               0.0                     34.0                     62.7
4
(                                                                                       ............              ..... .....              ............
: 20. UNIT AVAILASILITY FACTUR 00 35.5 74.5
: 23. UNIT FDRChe OUTAGE RATE                                                             0.0                     11                         7.3 s
: 21. Us!T CAPAC1IY FACIOk tuSING MDC NE T) 0.0 35.0 64.5
: 24. $dJfJJwNS SCHEDULE 0 OVER NE AT 610NiH5 (TYPE                             DATE, AND DUR A!!DN OF EACHl 8 REFUELING /M AINTENANCE. 3/06/81. ThENTYTHREE WEEKS
: 22. UN!! CAPACITY F ACTOR tUSING DER NET) 0.0 34.0 62.7
(
: 23. UNIT FDRChe OUTAGE RATE 0.0 11 7.3 s
: 24. $dJfJJwNS SCHEDULE 0 OVER NE AT 610NiH5 (TYPE DATE, AND DUR A!!DN OF EACHl 8 REFUELING /M AINTENANCE. 3/06/81. ThENTYTHREE WEEKS
: 22. IF SHJiD0dh AI END OF REPO4T PER100. E5I1M ATED D ATE OF STARTUPI
: 22. IF SHJiD0dh AI END OF REPO4T PER100. E5I1M ATED D ATE OF STARTUPI
* F06ECAsi
: 20. UNITS IN TE51 ST ATUS (PRIOR TO COMMERCI AL GPER ATION):
: 20. UNITS IN TE51 ST ATUS (PRIOR TO COMMERCI AL GPER ATION):                                                       ACHIEVED INITIA 6     41TICALITY i                                                                                                             .........          ........
F06ECAsi ACHIEVED INITIA 41TICALITY 6
INiilAL ELECTalCITY COMMinCIAL UPERATION I             e - h; Gall h VA.JL ALP 0kil F0is CJNS MIE NCf dITH FEDER AL ENE6Y REGUL ATORf COMil5510N R E PO415.
i INiilAL ELECTalCITY COMMinCIAL UPERATION I
e - h; Gall h VA.JL ALP 0kil F0is CJNS MIE NCf dITH FEDER AL ENE6Y REGUL ATORf COMil5510N R E PO415.
'a 4
'a 4
4 L
4 L
          -c   ,      -
-c


AVERAGE dally ONIT PO4ER LEVEL ObCKET N3. 50 - 277                                                       -
AVERAGE dally ONIT PO4ER LEVEL O
O .
j ObCKET N3. 50 - 277
j
]
]                                                                    UNIT PEACH BOTTOM UNIT 2                                             O i i                                                                       .............................
UNIT PEACH BOTTOM UNIT 2 O
DATE JULY 13. 1981 g i 4
i i
CdMPANY PHIL ADELPHI A ELECTRIC COMPANY
DATE JULY 13. 1981 i
{                                                                         d.M.ALDEN                                                       4 1
g CdMPANY PHIL ADELPHI A ELECTRIC COMPANY 4
ENG!bu!R-IN-CHARGE NUCLEAR SECTIDN i                                                                         GENERAT10N DIVISION-NUCLEAR 1
{
9 TELEPHONE (215) 841-5022 i                                                                                                                                         S i
d.M.ALDEN 4
MONTH                     JUNE 1981 g
1 ENG!bu!R-IN-CHARGE NUCLEAR SECTIDN i
d sAY       AVERAGE DAILY PDhER LEVEL           DAY     AVERAGE DAILY P0 DER LEVEL (MdE-NET)                                   (MkE-NET)                                   9 f                               1                     0                 17                         0 s \
GENERAT10N DIVISION-NUCLEAR 9
,                                2                     0                 16                         0 3                     0                 19                         0                                   9
1 TELEPHONE (215) 841-5022 S
i i
MONTH JUNE 1981 g
d sAY AVERAGE DAILY PDhER LEVEL DAY AVERAGE DAILY P0 DER LEVEL (MdE-NET)
(MkE-NET) 9 f
1 0
17 0
s
\\
2 0
16 0
3 0
19 0
9
)
)
* O                 20                         0 I
O 20 0
4 5                     0                 21                     108 1
I 4
6                     0                 22                     190                                     1 7                     0                 23                         0 8                     0                 24                         9                                     l 9                     0                 25                       61                                     e 10                     0                 26                     129 4
5 0
11                     0                 27                     197 12                     0                 28                     362                                     e 13                     0                 29                     319 14                     0                 30                     420 P
21 108 1
15                     0                                                                                   .
6 0
r                              10                     0
22 190 1
7 0
23 0
8 0
24 9
l 9
0 25 61 e
10 0
26 129 4
11 0
27 197 12 0
28 362 e
13 0
29 319 14 0
30 420 15 0
P 10 0
r
}
}
5
5


                                                                                                              '4.
'4.
AVERAGE DAILY UNIT P0 DER LEVEL O
AVERAGE DAILY UNIT P0 DER LEVEL O
DOCKET N3. 50 - 276
i
      ~
~
i UNIT PEACH 8GTTOM UNIT 3                                   9
DOCKET N3. 50 - 276 UNIT PEACH 8GTTOM UNIT 3 9
,                                                  DATE JULY 13, 1981 db   :
DATE JULY 13, 1981 db COMPANY PHILADELPHIA ELECTRIC CGMPANY d.M.ALDEN 4
COMPANY PHILADELPHIA ELECTRIC CGMPANY                               '
EhGINEER-IN-CHARGE l
d.M.ALDEN                                             4
NUCLEAR SECTION GENERATION DIVISIGN-NUCLEAR S
;                                                      EhGINEER-IN-CHARGE l                                                       NUCLEAR SECTION GENERATION DIVISIGN-NUCLEAR                           S i                                            TELEPHO.NE (215) 841-5022 S
TELEPHO.NE (215) 841-5022 i
j    M0hTH           JUNE 1981                                                                             *
S j
            ..............                                                                                    g DAY     A/ERAGE DAILY POWER LEVEL               DAY       AVERAGE DAILY P0 DER LEVEL                         !
M0hTH JUNE 1981 g
)                         (MwE-NET)                                           (MdE-NET)                       e i
DAY A/ERAGE DAILY POWER LEVEL DAY AVERAGE DAILY P0 DER LEVEL
1                     0                       17                           0 2
)
2                    0                       16                           0 3                     0                       19                           0                         t i
(MwE-NET)
4                     0                       20                           0 4
(MdE-NET) e i
5                    0                       21                           0 j         e,                   0                       22                           0                         *
1 0
.        7                     0                       23                           0 l                                                                                                               ,
17 0
o                    0                       24                           0 9                     0                       25                           0 10                     0                     26                           0 11                     0                     27                           0 12                     0                     26                           0                         ,
2 2
13                     0                     29                           0
0 16 0
!      14                     0                       30                           C 15                     0                                                                             ,
3 0
lo                     0 l
19 0
t i
4 0
20 0
4 5
0 21 0
j e,
0 22 0
7 0
23 0
l o
0 24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
26 0
13 0
29 0
14 0
30 C
15 0
lo 0
l


T O
T O
O UNIT SHJT30dNS AND P0 DER REDUCTIONS                         D3C(ET NO. 50 - 2Ti UNIT NAME PLACH B3TTOM UNIT 2                     (D DATE JULY 13, 1981
O UNIT SHJT30dNS AND P0 DER REDUCTIONS D3C(ET NO. 50 - 2Ti UNIT NAME PLACH B3TTOM UNIT 2 (D
                                                                                                                  .............................          g kEPORT MONTH           JUNE, 1981                     COMPLETED BY PHILADELPHI A ELECTRIC CDMPANY W.M.ALDEN                             4 ENGINEER-IN-CHARGE NUCLEAR SECTION G% NER AT I Or) DIVISION-NUCLEAR       $
DATE JULY 13, 1981 g
TELEPHONE (215) 841-5022 l       l     l           l         l METHOD OF l LICENSEE ISYSTEMICOMPONENTl CAUSE AND CURRECTIVE
kEPORT MONTH JUNE, 1981 COMPLETED BY PHILADELPHI A ELECTRIC CDMPANY W.M.ALDEN 4
* l        lTYPElDURATIONIREASONISNUTTING 00ahl               EVENS     I COGE i     CODE I       ACTION TO NO.I     DATE 1 (1)! (HJURS)I (2) l RE ACTOR (3) l REPORT C l                   (4) 1     (5)   l PREVENT RECURRENCE                                 G l         l     l           i         l               l               l         l           I 13 I b10001 1 F l       41.0     l     A 3       1       i NA             l CE I MOTORX ! CONTINUING OUTAGE DUE TO 2B REACTDR I                           l S
ENGINEER-IN-CHARGE NUCLEAR SECTION G% NER AT I Or) DIVISION-NUCLEAR TELEPHONE (215) 841-5022 l
l     l                     l               1               i         i         i RECIRCULATION PU1P MOTOR 8E ARING FAILURE.
l l
I       I     i           l         i               i               I         I         i 14 I 613b02 l F l 1o5.0         l     A l       4       i NA             l SB l PIPE *X       l CR AC(5 FOUND IN HPSd LINE, *8' LDOP,               $
l l METHOD OF l LICENSEE ISYSTEMICOMPONENTl CAUSE AND CURRECTIVE l
l        i     l           l         i               i               l         l           I RESULTING IN OUTAGE EX TENSION.
lTYPElDURATIONIREASONISNUTTING 00ahl EVENS I COGE i CODE I ACTION TO NO.I DATE 1 (1)! (HJURS)I (2) l RE ACTOR (3) l REPORT C l (4) 1 (5) l PREVENT RECURRENCE G
I       !    l           l         l               1               l         l           l 15 1 610610 1 F l 435 2 l               A l       4       l   NA         l EB i TRANSF l HIGH COMBUSTIBLES ON THE                   'A' PHASE       4 i       l     I           l         i               i               I         i           l TRANSFORMER. REPLACED TRANSFDRMER.
l l
I       i     I           i         l               I               I         i           I QUTAGE CONTINUES.
l i
I       l     l           l         l               l               1         1           I                                                     e 16 1 810620 l F 1       27.o     l     A I       3       i   NA         l CC l VALVEX l           71-H RELIEF VALVE DPENED AT 750 PSIG.
l l
l       l     l           l         l               l               l         l           l VALVE WAS THEN REPLACED. DUTAGE CONTINUES.
l l
1       I     I           l         i               l               l         I           l                                                     4 17 l 810622 i F l       24.7     l     B l       3       i NA           l EB 1 CKTBRK l REACTOR SCRAM DN L0d LEVEL DUE TO LDSS OF l       l     l           l         l               l               l         l           l 13KV BUS WHICH TRIPPED TW3 CONDENSATE PUMPS, I       l     l           l         l               l               l         l           1 TWO CIRCULATION PUMPS AND ONE RECIRCULATION         $
I 13 I b10001 1 F l 41.0 l
l       l     l           l         l                8               l         l           l   PUMP. WATER DRAINED INTO 134V BREAKER CAUSING l       1     l           l         l               l               l         5 l ITS "B" PHASE TO SH3RT TO GROUND AND TRIPPED l       l     l           1         l               l               3         l           l NUMBER 2 START-UP BUS.                               a l       I     i           !        l               I               l         i           I 18 i 610623 l f l       Is.o     l     A i       4       1 2-81-35-1-Pl       XX l XXXXXX       l GENERATOR WAS MANUALLY T A(EN OFF LINE AS A I       I     l           l         l               l               l         l           l RESULT OF "A" REACT 3R FEED PUMP LUBE DIL           A s
A 3 1
(1)                         (2)                                                     (3)                           (4)
i NA l CE I MOTORX ! CONTINUING OUTAGE DUE TO 2B REACTDR S
F - FGRCLD         REASON                                                       ML TH3 0                       EXh! BIT G - INSTRsCTIONS               ,
I l
5 - SCH DULED     A     cLUIPMENT F AILURE (EXPLAIN)                           1 - MAhMAL                     FOR PREPARATION GE CATA o - MAINTENANCE OR TEST                                     2 - M A NJ AL SCRAM.           ENTRY SHEETS FGa LICENGEE L - REFUELING                                               3 - AUTOMATIC SCRAM.           EVENT REPGRT (LER)                       ,
l l
D - REGULATLAY 4tSTRICTIGN                                   4 - O T HE R (EXPLAIN)             FILE (NURES-Diol) i - JPt4 ATJ A T R Alt.ING + LICENSE EA&MINATION F - A DM I NI 5 TA A T Ivt                                                                             (5)
l 1
i i
i RECIRCULATION PU1P MOTOR 8E ARING FAILURE.
I I
i l
i i
I I
i 14 I 613b02 l F l 1o5.0 l
A l 4
i NA l SB l PIPE *X l CR AC(5 FOUND IN HPSd LINE,
*8' LDOP, l
i l
l i
i l
l I RESULTING IN OUTAGE EX TENSION.
I l
l l
1 l
l l
15 1 610610 1 F l 435 2 l A
l 4
l NA l EB i TRANSF l HIGH COMBUSTIBLES ON THE 'A' PHASE 4
i l
I l
i i
I i
l TRANSFORMER. REPLACED TRANSFDRMER.
I i
I i
l I
I i
I QUTAGE CONTINUES.
I l
l l
l l
1 1
I e
16 1 810620 l F 1 27.o l
A I 3
i NA l CC l VALVEX l 71-H RELIEF VALVE DPENED AT 750 PSIG.
l l
l l
l l
l l
l VALVE WAS THEN REPLACED. DUTAGE CONTINUES.
1 I
I l
i l
l I
l 4
17 l 810622 i F l 24.7 l
B l 3
i NA l EB 1 CKTBRK l REACTOR SCRAM DN L0d LEVEL DUE TO LDSS OF l
l l
l l
l l
l l 13KV BUS WHICH TRIPPED TW3 CONDENSATE PUMPS, I
l l
l l
l l
l 1 TWO CIRCULATION PUMPS AND ONE RECIRCULATION l
l l
l l
8 l
l l
PUMP. WATER DRAINED INTO 134V BREAKER CAUSING l
1 l
l l
l l
5 l ITS "B" PHASE TO SH3RT TO GROUND AND TRIPPED l
l l
1 l
l 3
l l NUMBER 2 START-UP BUS.
a l
I i
l I
l i
I 18 i 610623 l f l Is.o l
A i
4 1 2-81-35-1-Pl XX l XXXXXX l GENERATOR WAS MANUALLY T A(EN OFF LINE AS A I
I l
l l
l l
l l RESULT OF "A" REACT 3R FEED PUMP LUBE DIL A
s (1)
(2)
(3)
(4)
F - FGRCLD REASON ML TH3 0 EXh! BIT G - INSTRsCTIONS 5 - SCH DULED A
cLUIPMENT F AILURE (EXPLAIN) 1 - MAhMAL FOR PREPARATION GE CATA o - MAINTENANCE OR TEST 2 - M A NJ AL SCRAM.
ENTRY SHEETS FGa LICENGEE L - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPGRT (LER)
D - REGULATLAY 4tSTRICTIGN 4 - O T HE R (EXPLAIN)
FILE (NURES-Diol) i - JPt4 ATJ A T R Alt.ING + LICENSE EA&MINATION F - A DM I NI 5 TA A T Ivt (5)
G - Op:4ATIGrAL LEA:4 ( t XLL Alt.)
G - Op:4ATIGrAL LEA:4 ( t XLL Alt.)
H - ST,E R( cXF AIN J                                                                       EAmISIT I - SA =; 2; a:E
H - ST,E R( cXF AIN J EAmISIT I - SA =; 2; a:E


e
e
                                                                                                                                                    ' C)
' C)
                                                                                                                                                  .C) e O
.C) e O
UNIT SnJT00wNS AND P0 DER REDUCTIONS                         D3CKE T NO. 50 - 277 UNIT NAME PEACH B3TTON UNIT 2                       O D4TE JULY 13, 1981
UNIT SnJT00wNS AND P0 DER REDUCTIONS D3CKE T NO. 50 - 277 UNIT NAME PEACH B3TTON UNIT 2 O
                                                                                                            ........... ................        . g REPORT MONTH           JuhE. 1981                   CDMPLETED BY PHILADELPHI A ELECTRIC CDNPANY W.M.ALDEN                                 $
D4TE JULY 13, 1981 g
ENGINEER-IN-CHARGE NUCLEAR SECTION
REPORT MONTH JuhE. 1981 CDMPLETED BY PHILADELPHI A ELECTRIC CDNPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR S
* GENERATION DIVISION-NUCLEAR               S TELEPHONE (215) 841-5022 I         l     l         l       1 METHOD OF l LICENSEE ISYSTEMICOMPONENTI CAUSE AND CORRECTIVE I         (TYPilDJRATIONIREASONISnJTTING D0dhi             EVENT     l CODE l     CODE I       ACTION TD NO.i   CATE I (lit (HJURS)L       (2) l REACTOR (3) l REPORT = l (4) l                 (5)   l PREVENT RECURRENCE                                   $
TELEPHONE (215) 841-5022 I
i        1     i         l       i             i                 l       1           1 ENTERING THE CONDENSER AND INCRE ASING THE 1         i     l         I         l             i                 l       i           l HYDR 3 GEN CONTENT OF DFF-GAS TO THE RECOMBINER.     S I         l     l         I         i             l                 l       l           1 19 l 810e24 i F l       6.7   i     A I       4       l 2-81-35-1-Pl     XI   l XXXXXX l SAME RE ASON AS STATED ABOVE.
l l
1         I     I         I       i             i                 l       l           l                                                       D 20 l 810624 l F l       J.2   i     A I       4     l 2-81-35-1-Pl       XX l XXXXXX l SAME REASON AS STATED ABOVE.
l 1 METHOD OF l LICENSEE ISYSTEMICOMPONENTI CAUSE AND CORRECTIVE I
I       I     I ----- 1           I             i               1         1           1 I         i     i 552.4   I         I             I                 i       1           1                                                       4 4
(TYPilDJRATIONIREASONISnJTTING D0dhi EVENT l CODE l CODE I ACTION TD NO.i CATE I (lit (HJURS)L (2) l REACTOR (3) l REPORT = l (4) l (5) l PREVENT RECURRENCE i
(1)                       (2)                                                   (3)                           (4)
1 i
F - FORCED         REASJN                                                 METH30                         EXHIBIT 0 - INSTRJCTIONS                   f 5 - SCHELULED       A - Ecu1PMENT FAILURE (EXPLAlh)                         1 - M A NU AL                 FOR PREPARATION OF DATA 8 - MAINTENANCE Ok TEST                                 2 - M ANJ AL SCR AM.           ENTRY SHEETS FOR LICENSEE C - REFUELING                                           3 - AUTOMATIC SCRAM.           EVENT REPORT (LER)                         3 0 - REGULATORY RESTRICTION                             4 - OTHER (EXPLAIN)             FILE (NUREG-0161)
l i
L - OPERAT0R TRAlblNG + LICENSE EXAMINATION F - ADMINISTsAT!vE                                                                               (5)                             e G - JPERATIONAL ERRDR (EXPLAlh) n - JTnERt E AFLAIN)                                                                   EXHIBIT 1 - SAME SOURCE e
i l
1 1 ENTERING THE CONDENSER AND INCRE ASING THE 1
i l
I l
i l
i l HYDR 3 GEN CONTENT OF DFF-GAS TO THE RECOMBINER.
S I
l l
I i
l l
l 1
19 l 810e24 i F l 6.7 i
A I 4
l 2-81-35-1-Pl XI l XXXXXX l SAME RE ASON AS STATED ABOVE.
1 I
I I
i i
l l
l D
20 l 810624 l F l J.2 i
A I 4
l 2-81-35-1-Pl XX l XXXXXX l SAME REASON AS STATED ABOVE.
I I
I ----- 1 I
i 1
1 1
I i
i 552.4 I
I I
i 1
1 4
4 (1)
(2)
(3)
(4)
F - FORCED REASJN METH30 EXHIBIT 0 - INSTRJCTIONS f
5 - SCHELULED A - Ecu1PMENT FAILURE (EXPLAlh) 1 - M A NU AL FOR PREPARATION OF DATA 8 - MAINTENANCE Ok TEST 2 - M ANJ AL SCR AM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER) 3 0 - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161)
L - OPERAT0R TRAlblNG + LICENSE EXAMINATION F - ADMINISTsAT!vE (5) e G - JPERATIONAL ERRDR (EXPLAlh) n - JTnERt E AFLAIN)
EXHIBIT 1 - SAME SOURCE e
o
o


()
()
C) e 9
C) e 9
UNIT SHJTDOWNS AND POWER Rf ?UCTIONS                           D3CKET NO. 50 - 278 JNIT NAME PEACH 83TTOM UNIT 3                 $
UNIT SHJTDOWNS AND POWER Rf ?UCTIONS D3CKET NO. 50 - 278 JNIT NAME PEACH 83TTOM UNIT 3 DATE JULY 13. 1981 g
DATE JULY 13. 1981
REPORT MONTH JuhE. 1981 COMPLETED BY PHILADELPHI A ELECTRIC CDNPANY W.M. ALDE N ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION
                                                                                                                ......... ................      g REPORT MONTH           JuhE . 1981                   COMPLETED BY PHILADELPHI A ELECTRIC CDNPANY W.M. ALDE N                         $
* NUCLEAR S
ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION
TELEPHONE (215) 841-5022 g
* NUCLEAR       S TELEPHONE (215) 841-5022
i l
................. ............................................... ..........................................................                      g i       l     1         l         l METHOD OF l LICENSEE ISYSTEMICOMPONENTI CAUSE AND CORRECTIVE l       lTYPElDJRATIONidEASONISHJTTING 00ahl             EVENT     l CODE l     CODE I       ACTION TO ih0 1 DATE I (1)l (H3RRS)l         (2) I kEACTOR (3) l REPORT C 1             (4) 1       (5)   l PREVENT RECURRENCE                             9 I       I     l         l         l               l               I       1           1 6 l 610601 1   3 1 723.0   l     C l       1       1 NA             I RA I FUELXX l CONTINUING REFUELING OUTAGE.                           $
1 l
1       I     i -----
l METHOD OF l LICENSEE ISYSTEMICOMPONENTI CAUSE AND CORRECTIVE l
1        I               I               I       I           I I       i   1 723.0   l         l               l               l       1           1 6
lTYPElDJRATIONidEASONISHJTTING 00ahl EVENT l CODE l CODE I ACTION TO ih0 1 DATE I (1)l (H3RRS)l (2) I kEACTOR (3) l REPORT C 1 (4) 1 (5) l PREVENT RECURRENCE 9
(1)                     (2)                                                       (3)                         (4)                       e
I I
[F - FORCLG       R c A SON                                                 METHOD                         EXHIBIT G - INSTRUCTIONS iS - SChtDJLE3     A - EQUIPMENT     FAILURE (EXPLAIN)                     1 - M A NU AL                 FOR PREPARATION OF DATA               e o - MAINTENANCE Ok TEST                                   2 - M A NJ AL SCR AM.         ENTRY SHEETS FOR LICENSEE C - REFUELING                                             3 - AUTOMATIC SCRAM.           EVENT REPORT (Lek) 0 - REGULATGkV MESTRICTION                               4 - DTHER (EXPLAIN)               F ILE (NUREG-01613                 s E - JPER ATLR TRAINING
l l
* LICENSE EX AMINATION F - ADMINISTkATIVt                                                                                   (5)
l l
G - JPERATILNAL LEn0R (EX3 LAIN)                                                                                               e H - JinER(EXPLAIN)                                                                       EAHIBIT I - SAME SOURCE F
I 1
1 6 l 610601 1 3 1 723.0 l
C l 1
1 NA I RA I FUELXX l CONTINUING REFUELING OUTAGE.
1 I
i 1
I I
I I
I I
i 1 723.0 l
l l
l 1
1 6
(1)
(2)
(3)
(4) e
[F - FORCLG R c A SON METHOD EXHIBIT G - INSTRUCTIONS iS - SChtDJLE3 A
EQUIPMENT FAILURE (EXPLAIN) 1 - M A NU AL FOR PREPARATION OF DATA e
o - MAINTENANCE Ok TEST 2 - M A NJ AL SCR AM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (Lek) 0 - REGULATGkV MESTRICTION 4
DTHER (EXPLAIN)
F ILE (NUREG-01613 s
E - JPER ATLR TRAINING
* LICENSE EX AMINATION F
ADMINISTkATIVt (5)
G - JPERATILNAL LEn0R (EX3 LAIN) e H - JinER(EXPLAIN)
EAHIBIT I - SAME SOURCE F
k
k


g   Ducnet L. t.u ,
g Ducnet L.
Attacksunt to Monthly Operata(; nupv.-
t.u Attacksunt to Monthly Operata(; nupv.-
l For June, 1984 6
l For June, 1984 6
            .,                          REFUELING INFORMATION                                 l l
REFUELING INFORMATION l
: 1. Name of facility:
1.
l                         Peach Bottom Unit 2 l
Name of facility:
: 2. hhadulad date for next reiheling shutdown:
l Peach Bottom Unit 2 l
January 2, 1982 3   Scheduled date for restart following reiteling:
2.
hhadulad date for next reiheling shutdown:
January 2, 1982 3
Scheduled date for restart following reiteling:
hbruary 13, 1982 l
hbruary 13, 1982 l
4   Will re h ling or zeaumption of operation thoroafter requiru a l                   technical specification change or other licenso amendment't Yes.
4 Will re h ling or zeaumption of operation thoroafter requiru a l
technical specification change or other licenso amendment't Yes.
l If answer in you, what,'in conoral, will thouo bo*/
l If answer in you, what,'in conoral, will thouo bo*/
Tonhn b 1 Spooitications to accommodato roload b l.
Tonhn b 1 Spooitications to accommodato roload b l.
Modificationa to reactor coro operat'ing limito are expuutod.
Modificationa to reactor coro operat'ing limito are expuutod.
l               5   scheduled date(s) for submitting pmpooed 11conoing action and
l 5
)                   supporting infonnation:
scheduled date(s) for submitting pmpooed 11conoing action and
l                         November 13, 1981
)
!              6. Important 11oonsing considerationu accooiated with rofuuling, u.g. ,
supporting infonnation:
I                   new or different h l donign or supplior, unroviewod douign or l                   Performance analysis methodo, significant chan6co in h l duuica,             l new operating proceduros:
l November 13, 1981 6.
Important 11oonsing considerationu accooiated with rofuuling, u.g.,
I new or different h l donign or supplior, unroviewod douign or l
Performance analysis methodo, significant chan6co in h l duuica, new operating proceduros:
Nono expootod.
Nono expootod.
7   The number of h1 auoomblica (a) in tho coro and (b) in tho upunt 61 storago pool:
7 The number of h1 auoomblica (a) in tho coro and (b) in tho upunt 61 storago pool:
Coro - 7 % h l Aroumbliou                                        I (a}
(a} h l Pool - 910 h l Asuomblica Coro - 7 % h l Aroumbliou (b) 8.
(b)  h l Pool - 910 h l Asuomblica                                   l
The procent 11conued upont h l pool storo60 capacity and thu ulzu of any incroaco in liconued storu69 capacity that hau boon ruquouted or lo plannod, in number of N1 auuombliou:
: 8. The procent 11conued upont h l pool storo60 capacity and thu ulzu of any incroaco in liconued storu69 capacity that hau boon ruquouted or lo plannod, in number of N1 auuombliou:
The opent tuul pool utcrage capacity hao buon rulicunuud for 2816 h 1 accumblico.
The opent tuul pool utcrage capacity hao buon rulicunuud for 2816 h 1 accumblico.
9   Thu prejuotud dato of the laut ruiboling that can bo diucharcud to tho upont h l pool auuuning thu pruount licunuud capacity.
9 Thu prejuotud dato of the laut ruiboling that can bo diucharcud to tho upont h l pool auuuning thu pruount licunuud capacity.
Septembur, 1990
Septembur, 1990


hv i. 1.v . Lu .:'/v Attachmont to Monthly Opuratisw hopvrt.
hv i. 1.v. Lu.:'/v Attachmont to Monthly Opuratisw hopvrt.
For June, 1961 REFUELING INWRMATION
For June, 1961 REFUELING INWRMATION 1.
: 1. Name of facility:
Name of facility:
Peach Botton Unit 3
Peach Botton Unit 3 2.
: 2. Scheduled date for next refueling shutdowns Refueling Began March 6, 1531 3   Scheduled dato for ruutart following refueling August 114, 19d1 16 Will refueling or resumption of operation thoruartor requiru a tonhniaa' specification change or other licenuo amendmunt?
Scheduled date for next refueling shutdowns Refueling Began March 6, 1531 3
Yes.                          .
Scheduled dato for ruutart following refueling August 114, 19d1 16 Will refueling or resumption of operation thoruartor requiru a tonhniaa' specification change or other licenuo amendmunt?
Yes.
If answer is yes,' wbt, in general, will thouo bo?
If answer is yes,' wbt, in general, will thouo bo?
Technical opooitication oh.angou to accomuodatu ruload fuul.
Technical opooitication oh.angou to accomuodatu ruload fuul.
Modifications to roaotor core operating limitu aro expected.
Modifications to roaotor core operating limitu aro expected.
: 5. W " lad dato(s) for cubmitting proposed 11oonuing action ai t supporting informations Submitted March 30, 1981
5.
: 6. Important 11oan= Lng considerationa acuooiated with rufuoling, u.c.,
W " lad dato(s) for cubmitting proposed 11oonuing action ai t supporting informations Submitted March 30, 1981 6.
Important 11oan= Lng considerationa acuooiated with rufuoling, u.c.,
now or different fuel doelen or supplior, unruviewod doulen or porfav= anne analysia mothods, si6nificant chan600 in abol duuica, now operating procoduruus Mone expected.
now or different fuel doelen or supplior, unruviewod doulen or porfav= anne analysia mothods, si6nificant chan600 in abol duuica, now operating procoduruus Mone expected.
: 7. The number of fuel auuombliou (u) in tho coro and (b) in thu upunt ibol storago pools a   Coro - 761; Fuul Auuombliou b   Fuol Pool - 712 Irradiated Fuel Aouombliou D. The present liconood upont Ivol pool utorasu capacity taid thu uizu of any incroan in 11oonuod atoru60 capacity that hau boun ruquuutad or 10 plannod, in number of fuel auuumblieu Tho upont hol pool utorago capacity hau buon rulicuuuvd for 2616 fuol auuumbliou.
7.
9 Tho projootod dato of tho laut reiboling that can bu diochar6cd to tho opont tuol pool auuumint the pruuont liconuud capacity:
The number of fuel auuombliou (u) in tho coro and (b) in thu upunt ibol storago pools a
SeptumberP, 1991}}
Coro - 761; Fuul Auuombliou b
Fuol Pool - 712 Irradiated Fuel Aouombliou D.
The present liconood upont Ivol pool utorasu capacity taid thu uizu of any incroan in 11oonuod atoru60 capacity that hau boun ruquuutad or 10 plannod, in number of fuel auuumblieu Tho upont hol pool utorago capacity hau buon rulicuuuvd for 2616 fuol auuumbliou.
9 Tho projootod dato of tho laut reiboling that can bu diochar6cd to tho opont tuol pool auuumint the pruuont liconuud capacity:
SeptumberP, 1991
,}}

Latest revision as of 01:20, 23 December 2024

Monthly Operating Repts for June 1981
ML20009C046
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 07/13/1981
From: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20009C044 List:
References
NUDOCS 8107200218
Download: ML20009C046 (10)


Text

.

PEACH BOTTOM ATOMIC POWER STATION NARRATIVE

SUMMARY

OF OPERATING EXPERIENCES JUNE 1981 UNIT 2 OPERATIONS The unit remained shutdown for repairs to d ao "B"

Recirculation Pump / Motor and the HPSV piping downstnam of the 113 valve. While the unit was being returned to service on June 10, the 2A main transformer experienced an internal fault prior to attaining full operating voltage. Repairs were nade to the transformer

, and the unit was placed in service on June 21. On June 22, tho unit tripped on low reactor water level rssulting from loss of feedwater.

The loss of feedwater was due to the tripping of two condensato pumps when the number 213kv bus tripped due to water leakage into the 2Gk breaker grounding the bus. The unit was returned to service on June 23 The unit was removed from service within a few minutes in an effort to maintain condenser vacuum following high hydrogen concentration trips of the Recombiner mechanical compressors. Over the next few days, the unit was cycled on and off a number of times for the same reason.

It was determined that the high hydrogen concentrations at the outlet of the recombiner were the result of oil leakage into the con 6cnsate from the water seal drain system of the "A" Reactor Feed Pump.

The unit was returned to service June 25 with major load drops required periodically over the next several days to maintain condenser vacuum each time the Recombiner mechanical compressors tripped on high hydrogen concentration. The situation continued to improve as the oil was removed by special resin used in the condensate demineralizers.

UNIT 3 OPERATIONS The unit remains shutdown to accommodate refueling, modifications and maintenance work. The Suppression Pool modifications The feedwater are complete with sand blasting and recoating remaining.

nozzle machining and sparger replacement is complete.

The in-drywell Oore Spray piping replacement has been completed and replacement of the in-drywell Reactor Vater Cleanup i

piping is in progress. Repair of the 2B Recirculation pump motor continues.

8107200218 810713 PDR ADOCK 05000277 R

PDR

OPER ATING DATA RE PORT DOCKET NO. 50 - 277 OATE JULY 13. 1981 COMPLETED SY PHILADELPHI A ELECTRIC COMPANY W.M.ALDEN E NG INE E R-IN-CHARGE NUCLEAR SECTION GENER ATION DIVI 510N-NUCLE AR TELEPHONE (2153 841-5022 OPERATING Siaius

1. UNIT NAMES PE ACH toiTOM UNIT 2 l

l I

g

2. REPORTING PER100 JUNE, 1981 l

l g

3. LICEN5ED THERM AL P(b6ER(Muilt 3293 l

I g

4. NAMEPL ATE RAIING (GROS 5 MwE)*

1152 g

5. DESIGN ELECTRICAL RATING (NET MWE)I 1065 l

g 3

6. MAAIMUM DEPENOABLE CAPACITY (GROSS MWE): 1098 l

l g

g

.I......................................l

7. MAA1 MUM DEPENDASLE CAPACITY (NET MWEls 1051
a. IF CHANGES DCCUR IN CAPACITY R ATINGS (ITEMS NUMSER 3 THROUGH 7) SINCE LAST REPORio GIVE RE A50N$8
9. PJdCR LEVEL TO WHICH RE5f alCTED. IF ANY (NET MWEls
13. PE ASONS FOR RE51RICTION$ e IF ANY8 THIS MONTH YR-TO-DATE CUMUL A T IV E
11. htJk) IN REP 3RilNG PERIOD 720
  • e343 61.271
12. NJM6cR OF HOURS RE ACTOR WA5 CRITICAL 310.8 2 950.9 45,503.4
13. ki&CTOR RESERVE SHUTOOWN H3URS 00 0.0 0.0
14. HJURS GEhERATOR ON*LINE 167.6 2e764 6 44s27T.4
15. 0%!i RE5ERVs 5HUTDO=N HOURS 0.0 0.0 0.0
16. GRJ%S THERMAL EPERGY GEhEst ATED (MmHI 176.784 8.326.154 128.747.226
17. G4055 ELELTRICAL ENERGY GENER A TE3 (MkH) 46.740 2,792,340 42.405,440 lo. Nii CLECTRIC AL FNERGY GENERATED (MdH) 39.598 2.690.048 40 649.712 19'. UNIT SERVICE F ACTOR 23.3 63.7 72.3
20. UNIT AVAILadlLITY FACTOR 23.3 63.7 72.3
21. UNIT C APACITY F ACT0k (U5tha MDC NET) 52 58.9 63.1
22. UNii C AP AC1!Y F ACTOR tus!NG DER NEil 5.2 58 2 62 3
23. UNIT FORCEO 001 AGE R ATE 76.7 36.3 8.8
24. 5 NUT 00sps5 SCHEDULED DVER NEAT 6 MONTHS (Tf PE, DATE, AND OURATION OF EACH)8
25. IF 5HU TDOW N AT EhD 0F REPORT PERIOD. E5flMATED DATE OF STARTUP 1
26. UNITS IN TESI STATUS (PR104 TO C3MMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITV INITIAL tLECTRICITY COMMERCIAL OPERATION

4

~

t OPER AI!4G D AI A RE PORT S

DOCKET NO. 50 - 218 I

DATE JULY 13. 1981 COMPLETED BY PHILADELPHI A ELECTRIC COMPANY f

W.M.ALDEN EhGINEER-IN-CHARGE 4

NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 4

OPERATING STAIUS I

1. UNIT NAME s PE ACH 80Tf 0M UNIT 3 l NOTEst THIS UNIT 15 00WN FOR l

g g

2. REPORil86G PsR1008 JUNE 1981 l

REFUELING AND MAINTENANCE.

I g

g g

J. LICENSED THERM AL POWER (MNT):

3293 l

l g

l 4

4. NAMEPL ATE RAi!NG (GR055 MWil 1152 l

g

5. DESIGN ELECTRICAL RATING (NET MWE)I 1065 l

1 g

g g

6. MAAIMUM DEPENJABLE CAPACITY (GROSS MhEls 1098 l

l g

g

0
7. MAAIMUM DEPENOABLE CAPACITY (NET M6 E ):

1035 l

l 8.

IF CHANGES DCCUR IN CAPACITY RATING 5 (liEMS NUMBER 3 THROUGH 73 SINCE LAST REPORio GIVE RE A50N$8

9. PJdE4 LEVEL 10 dHICH RL51RICTED. IF ANY (NET MWEls 8
10. REASONS FOR RESTRICTIONS IF ANY:

4 THIS MONTH YR-TO-DATE CUMULATIVE

' 4

11. HOURS IN REPORTING PER100 720 4.343 57.167 e
12. NJM8ER OF HJURS PE ALTOR h A5 CR111C AL o

1.541.7 43.709.9

13. mE ACTOR RESERVE 5HUTD0wN HOURS 0.0 0.0 0.0 t

14 HJURS GENERATOR ON*LINE 0.0 1.541.8 42.566 6

15. UNIT RESERVE SHUID3hN M0045 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 4.932.216 128,775.165
17. GA055 ELECTRIC AL E NtRGY Gtkf R ATE 3 (==H) 0 1.643.900 39.745.940 lo. NET LLECid! CAL EhEkGY GthERA1E0 (MaH)

-5,016 1.571

........ 722

.... 150.565 38 I'. UNIT SERVICE FACTOR 0.0 35.5 74.5 9

4

20. UNIT AVAILASILITY FACTUR 00 35.5 74.5
21. Us!T CAPAC1IY FACIOk tuSING MDC NE T) 0.0 35.0 64.5
22. UN!! CAPACITY F ACTOR tUSING DER NET) 0.0 34.0 62.7

(

23. UNIT FDRChe OUTAGE RATE 0.0 11 7.3 s
24. $dJfJJwNS SCHEDULE 0 OVER NE AT 610NiH5 (TYPE DATE, AND DUR A!!DN OF EACHl 8 REFUELING /M AINTENANCE. 3/06/81. ThENTYTHREE WEEKS
22. IF SHJiD0dh AI END OF REPO4T PER100. E5I1M ATED D ATE OF STARTUPI
20. UNITS IN TE51 ST ATUS (PRIOR TO COMMERCI AL GPER ATION):

F06ECAsi ACHIEVED INITIA 41TICALITY 6

i INiilAL ELECTalCITY COMMinCIAL UPERATION I

e - h; Gall h VA.JL ALP 0kil F0is CJNS MIE NCf dITH FEDER AL ENE6Y REGUL ATORf COMil5510N R E PO415.

'a 4

4 L

-c

AVERAGE dally ONIT PO4ER LEVEL O

j ObCKET N3. 50 - 277

]

UNIT PEACH BOTTOM UNIT 2 O

i i

DATE JULY 13. 1981 i

g CdMPANY PHIL ADELPHI A ELECTRIC COMPANY 4

{

d.M.ALDEN 4

1 ENG!bu!R-IN-CHARGE NUCLEAR SECTIDN i

GENERAT10N DIVISION-NUCLEAR 9

1 TELEPHONE (215) 841-5022 S

i i

MONTH JUNE 1981 g

d sAY AVERAGE DAILY PDhER LEVEL DAY AVERAGE DAILY P0 DER LEVEL (MdE-NET)

(MkE-NET) 9 f

1 0

17 0

s

\\

2 0

16 0

3 0

19 0

9

)

O 20 0

I 4

5 0

21 108 1

6 0

22 190 1

7 0

23 0

8 0

24 9

l 9

0 25 61 e

10 0

26 129 4

11 0

27 197 12 0

28 362 e

13 0

29 319 14 0

30 420 15 0

P 10 0

r

}

5

'4.

AVERAGE DAILY UNIT P0 DER LEVEL O

i

~

DOCKET N3. 50 - 276 UNIT PEACH 8GTTOM UNIT 3 9

DATE JULY 13, 1981 db COMPANY PHILADELPHIA ELECTRIC CGMPANY d.M.ALDEN 4

EhGINEER-IN-CHARGE l

NUCLEAR SECTION GENERATION DIVISIGN-NUCLEAR S

TELEPHO.NE (215) 841-5022 i

S j

M0hTH JUNE 1981 g

DAY A/ERAGE DAILY POWER LEVEL DAY AVERAGE DAILY P0 DER LEVEL

)

(MwE-NET)

(MdE-NET) e i

1 0

17 0

2 2

0 16 0

3 0

19 0

t i

4 0

20 0

4 5

0 21 0

j e,

0 22 0

7 0

23 0

l o

0 24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

26 0

13 0

29 0

14 0

30 C

15 0

lo 0

l

T O

O UNIT SHJT30dNS AND P0 DER REDUCTIONS D3C(ET NO. 50 - 2Ti UNIT NAME PLACH B3TTOM UNIT 2 (D

DATE JULY 13, 1981 g

kEPORT MONTH JUNE, 1981 COMPLETED BY PHILADELPHI A ELECTRIC CDMPANY W.M.ALDEN 4

ENGINEER-IN-CHARGE NUCLEAR SECTION G% NER AT I Or) DIVISION-NUCLEAR TELEPHONE (215) 841-5022 l

l l

l l METHOD OF l LICENSEE ISYSTEMICOMPONENTl CAUSE AND CURRECTIVE l

lTYPElDURATIONIREASONISNUTTING 00ahl EVENS I COGE i CODE I ACTION TO NO.I DATE 1 (1)! (HJURS)I (2) l RE ACTOR (3) l REPORT C l (4) 1 (5) l PREVENT RECURRENCE G

l l

l i

l l

l l

I 13 I b10001 1 F l 41.0 l

A 3 1

i NA l CE I MOTORX ! CONTINUING OUTAGE DUE TO 2B REACTDR S

I l

l l

l 1

i i

i RECIRCULATION PU1P MOTOR 8E ARING FAILURE.

I I

i l

i i

I I

i 14 I 613b02 l F l 1o5.0 l

A l 4

i NA l SB l PIPE *X l CR AC(5 FOUND IN HPSd LINE,

  • 8' LDOP, l

i l

l i

i l

l I RESULTING IN OUTAGE EX TENSION.

I l

l l

1 l

l l

15 1 610610 1 F l 435 2 l A

l 4

l NA l EB i TRANSF l HIGH COMBUSTIBLES ON THE 'A' PHASE 4

i l

I l

i i

I i

l TRANSFORMER. REPLACED TRANSFDRMER.

I i

I i

l I

I i

I QUTAGE CONTINUES.

I l

l l

l l

1 1

I e

16 1 810620 l F 1 27.o l

A I 3

i NA l CC l VALVEX l 71-H RELIEF VALVE DPENED AT 750 PSIG.

l l

l l

l l

l l

l VALVE WAS THEN REPLACED. DUTAGE CONTINUES.

1 I

I l

i l

l I

l 4

17 l 810622 i F l 24.7 l

B l 3

i NA l EB 1 CKTBRK l REACTOR SCRAM DN L0d LEVEL DUE TO LDSS OF l

l l

l l

l l

l l 13KV BUS WHICH TRIPPED TW3 CONDENSATE PUMPS, I

l l

l l

l l

l 1 TWO CIRCULATION PUMPS AND ONE RECIRCULATION l

l l

l l

8 l

l l

PUMP. WATER DRAINED INTO 134V BREAKER CAUSING l

1 l

l l

l l

5 l ITS "B" PHASE TO SH3RT TO GROUND AND TRIPPED l

l l

1 l

l 3

l l NUMBER 2 START-UP BUS.

a l

I i

l I

l i

I 18 i 610623 l f l Is.o l

A i

4 1 2-81-35-1-Pl XX l XXXXXX l GENERATOR WAS MANUALLY T A(EN OFF LINE AS A I

I l

l l

l l

l l RESULT OF "A" REACT 3R FEED PUMP LUBE DIL A

s (1)

(2)

(3)

(4)

F - FGRCLD REASON ML TH3 0 EXh! BIT G - INSTRsCTIONS 5 - SCH DULED A

cLUIPMENT F AILURE (EXPLAIN) 1 - MAhMAL FOR PREPARATION GE CATA o - MAINTENANCE OR TEST 2 - M A NJ AL SCRAM.

ENTRY SHEETS FGa LICENGEE L - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPGRT (LER)

D - REGULATLAY 4tSTRICTIGN 4 - O T HE R (EXPLAIN)

FILE (NURES-Diol) i - JPt4 ATJ A T R Alt.ING + LICENSE EA&MINATION F - A DM I NI 5 TA A T Ivt (5)

G - Op:4ATIGrAL LEA:4 ( t XLL Alt.)

H - ST,E R( cXF AIN J EAmISIT I - SA =; 2; a:E

e

' C)

.C) e O

UNIT SnJT00wNS AND P0 DER REDUCTIONS D3CKE T NO. 50 - 277 UNIT NAME PEACH B3TTON UNIT 2 O

D4TE JULY 13, 1981 g

REPORT MONTH JuhE. 1981 CDMPLETED BY PHILADELPHI A ELECTRIC CDNPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR S

TELEPHONE (215) 841-5022 I

l l

l 1 METHOD OF l LICENSEE ISYSTEMICOMPONENTI CAUSE AND CORRECTIVE I

(TYPilDJRATIONIREASONISnJTTING D0dhi EVENT l CODE l CODE I ACTION TD NO.i CATE I (lit (HJURS)L (2) l REACTOR (3) l REPORT = l (4) l (5) l PREVENT RECURRENCE i

1 i

l i

i l

1 1 ENTERING THE CONDENSER AND INCRE ASING THE 1

i l

I l

i l

i l HYDR 3 GEN CONTENT OF DFF-GAS TO THE RECOMBINER.

S I

l l

I i

l l

l 1

19 l 810e24 i F l 6.7 i

A I 4

l 2-81-35-1-Pl XI l XXXXXX l SAME RE ASON AS STATED ABOVE.

1 I

I I

i i

l l

l D

20 l 810624 l F l J.2 i

A I 4

l 2-81-35-1-Pl XX l XXXXXX l SAME REASON AS STATED ABOVE.

I I

I ----- 1 I

i 1

1 1

I i

i 552.4 I

I I

i 1

1 4

4 (1)

(2)

(3)

(4)

F - FORCED REASJN METH30 EXHIBIT 0 - INSTRJCTIONS f

5 - SCHELULED A - Ecu1PMENT FAILURE (EXPLAlh) 1 - M A NU AL FOR PREPARATION OF DATA 8 - MAINTENANCE Ok TEST 2 - M ANJ AL SCR AM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT (LER) 3 0 - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

FILE (NUREG-0161)

L - OPERAT0R TRAlblNG + LICENSE EXAMINATION F - ADMINISTsAT!vE (5) e G - JPERATIONAL ERRDR (EXPLAlh) n - JTnERt E AFLAIN)

EXHIBIT 1 - SAME SOURCE e

o

()

C) e 9

UNIT SHJTDOWNS AND POWER Rf ?UCTIONS D3CKET NO. 50 - 278 JNIT NAME PEACH 83TTOM UNIT 3 DATE JULY 13. 1981 g

REPORT MONTH JuhE. 1981 COMPLETED BY PHILADELPHI A ELECTRIC CDNPANY W.M. ALDE N ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION

  • NUCLEAR S

TELEPHONE (215) 841-5022 g

i l

1 l

l METHOD OF l LICENSEE ISYSTEMICOMPONENTI CAUSE AND CORRECTIVE l

lTYPElDJRATIONidEASONISHJTTING 00ahl EVENT l CODE l CODE I ACTION TO ih0 1 DATE I (1)l (H3RRS)l (2) I kEACTOR (3) l REPORT C 1 (4) 1 (5) l PREVENT RECURRENCE 9

I I

l l

l l

I 1

1 6 l 610601 1 3 1 723.0 l

C l 1

1 NA I RA I FUELXX l CONTINUING REFUELING OUTAGE.

1 I

i 1

I I

I I

I I

i 1 723.0 l

l l

l 1

1 6

(1)

(2)

(3)

(4) e

[F - FORCLG R c A SON METHOD EXHIBIT G - INSTRUCTIONS iS - SChtDJLE3 A

EQUIPMENT FAILURE (EXPLAIN) 1 - M A NU AL FOR PREPARATION OF DATA e

o - MAINTENANCE Ok TEST 2 - M A NJ AL SCR AM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT (Lek) 0 - REGULATGkV MESTRICTION 4

DTHER (EXPLAIN)

F ILE (NUREG-01613 s

E - JPER ATLR TRAINING

  • LICENSE EX AMINATION F

ADMINISTkATIVt (5)

G - JPERATILNAL LEn0R (EX3 LAIN) e H - JinER(EXPLAIN)

EAHIBIT I - SAME SOURCE F

k

g Ducnet L.

t.u Attacksunt to Monthly Operata(; nupv.-

l For June, 1984 6

REFUELING INFORMATION l

1.

Name of facility:

l Peach Bottom Unit 2 l

2.

hhadulad date for next reiheling shutdown:

January 2, 1982 3

Scheduled date for restart following reiteling:

hbruary 13, 1982 l

4 Will re h ling or zeaumption of operation thoroafter requiru a l

technical specification change or other licenso amendment't Yes.

l If answer in you, what,'in conoral, will thouo bo*/

Tonhn b 1 Spooitications to accommodato roload b l.

Modificationa to reactor coro operat'ing limito are expuutod.

l 5

scheduled date(s) for submitting pmpooed 11conoing action and

)

supporting infonnation:

l November 13, 1981 6.

Important 11oonsing considerationu accooiated with rofuuling, u.g.,

I new or different h l donign or supplior, unroviewod douign or l

Performance analysis methodo, significant chan6co in h l duuica, new operating proceduros:

Nono expootod.

7 The number of h1 auoomblica (a) in tho coro and (b) in tho upunt 61 storago pool:

(a} h l Pool - 910 h l Asuomblica Coro - 7 % h l Aroumbliou (b) 8.

The procent 11conued upont h l pool storo60 capacity and thu ulzu of any incroaco in liconued storu69 capacity that hau boon ruquouted or lo plannod, in number of N1 auuombliou:

The opent tuul pool utcrage capacity hao buon rulicunuud for 2816 h 1 accumblico.

9 Thu prejuotud dato of the laut ruiboling that can bo diucharcud to tho upont h l pool auuuning thu pruount licunuud capacity.

Septembur, 1990

hv i. 1.v. Lu.:'/v Attachmont to Monthly Opuratisw hopvrt.

For June, 1961 REFUELING INWRMATION 1.

Name of facility:

Peach Botton Unit 3 2.

Scheduled date for next refueling shutdowns Refueling Began March 6, 1531 3

Scheduled dato for ruutart following refueling August 114, 19d1 16 Will refueling or resumption of operation thoruartor requiru a tonhniaa' specification change or other licenuo amendmunt?

Yes.

If answer is yes,' wbt, in general, will thouo bo?

Technical opooitication oh.angou to accomuodatu ruload fuul.

Modifications to roaotor core operating limitu aro expected.

5.

W " lad dato(s) for cubmitting proposed 11oonuing action ai t supporting informations Submitted March 30, 1981 6.

Important 11oan= Lng considerationa acuooiated with rufuoling, u.c.,

now or different fuel doelen or supplior, unruviewod doulen or porfav= anne analysia mothods, si6nificant chan600 in abol duuica, now operating procoduruus Mone expected.

7.

The number of fuel auuombliou (u) in tho coro and (b) in thu upunt ibol storago pools a

Coro - 761; Fuul Auuombliou b

Fuol Pool - 712 Irradiated Fuel Aouombliou D.

The present liconood upont Ivol pool utorasu capacity taid thu uizu of any incroan in 11oonuod atoru60 capacity that hau boun ruquuutad or 10 plannod, in number of fuel auuumblieu Tho upont hol pool utorago capacity hau buon rulicuuuvd for 2616 fuol auuumbliou.

9 Tho projootod dato of tho laut reiboling that can bu diochar6cd to tho opont tuol pool auuumint the pruuont liconuud capacity:

SeptumberP, 1991

,