ML20038D060: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:_ | {{#Wiki_filter:_ | ||
Commonwealth Edison i )' One First NItional Pl.tra. Chicago, tilinois C | Commonwealth Edison i )' One First NItional Pl.tra. Chicago, tilinois C | ||
Mr. Harold R. Denton, Director | ~7 Address Reply to: Post Office Box 767 Chicago, lilinois 60690 December 7, 1981 Sh Yf. | ||
Office of Nuclear Reactor Regulation | !^ | ||
Mr. Harold R. Denton, Director ltE " k | |||
* k'C;,i7 'l jg ^) | |||
Office of Nuclear Reactor Regulation | |||
'M C | |||
'/ | |||
U.S. Nuclear Regulatory Commission g | |||
/ | |||
Washington, DC 20555 A | |||
==Subject:== | ==Subject:== | ||
Byron Station Units 1 and 2 | Byron Station Units 1 and 2 b | ||
NRC Docket Nos. 50-454/455/456/457 References (a): | sNfj pg\\p. | ||
(b): | Braidwood Station Units 1 and 2 Control Room Design Review ws NRC Docket Nos. 50-454/455/456/457 References (a): | ||
November 9, 1981, summary of November 3, 1981, meeting. | |||
(b): | |||
{{letter dated|date=October 5, 1981|text=October 5, 1981, letter}} from F. G. Lentine to H. | |||
R. Denton. | |||
==Dear Mr. Denton:== | ==Dear Mr. Denton:== | ||
This is to inform you of a change to our schedule for initiation of the detailed control room review at Byron and Braidwood in accorandance'with NUREG 0700. | This is to inform you of a change to our schedule for initiation of the detailed control room review at Byron and Braidwood in accorandance'with NUREG 0700. | ||
As indicated in reference (a), the NRC staf f has agreed to provide comments on the detailed control room review program plan described in Attachment 1 to reference (b) . Commonwealth Edison is now preparing a similar plan which will be used in all future such design reviews of Commonwealth Edison plants. This review plan will be submitted for NRC revirw on March 1, 1982, and is the one which will be used for the Byro.1/Braidwood review. Approval of the plan attached to reference (b) is no longer revquired. | As indicated in reference (a), the NRC staf f has agreed to provide comments on the detailed control room review program plan described in Attachment 1 to reference (b). | ||
Commonwealth Edison is now preparing a similar plan which will be used in all future such design reviews of Commonwealth Edison plants. | |||
This review plan will be submitted for NRC revirw on March 1, 1982, and is the one which will be used for the Byro.1/Braidwood review. | |||
Approval of the plan attached to reference (b) is no longer revquired. | |||
Please address further questions regarding this matter to this office. | Please address further questions regarding this matter to this office. | ||
One (1) signed original and fif ty-nine (59) copies of this letter are provided for your use. | One (1) signed original and fif ty-nine (59) copies of this letter are provided for your use. | ||
Very truly yours, Sool k M. | Very truly yours, Sool k M. | ||
[ T. R. Tramm | [ T. R. | ||
Tramm | |||
[ | [ | ||
Nuclear Licensing Administrator 1m 2998N | g Nuclear Licensing Administrator 1m 2998N 8112160030'811207 | ||
~ | |||
PDR ADOCK 05000454 A | |||
PDR | |||
-.}} | |||
Latest revision as of 00:48, 20 December 2024
| ML20038D060 | |
| Person / Time | |
|---|---|
| Site: | Byron, Braidwood |
| Issue date: | 12/07/1981 |
| From: | Tramm T COMMONWEALTH EDISON CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8112160030 | |
| Download: ML20038D060 (1) | |
Text
_
Commonwealth Edison i )' One First NItional Pl.tra. Chicago, tilinois C
~7 Address Reply to: Post Office Box 767 Chicago, lilinois 60690 December 7, 1981 Sh Yf.
!^
Mr. Harold R. Denton, Director ltE " k
- k'C;,i7 'l jg ^)
Office of Nuclear Reactor Regulation
'M C
'/
U.S. Nuclear Regulatory Commission g
/
Washington, DC 20555 A
Subject:
Byron Station Units 1 and 2 b
sNfj pg\\p.
Braidwood Station Units 1 and 2 Control Room Design Review ws NRC Docket Nos. 50-454/455/456/457 References (a):
November 9, 1981, summary of November 3, 1981, meeting.
(b):
October 5, 1981, letter from F. G. Lentine to H.
R. Denton.
Dear Mr. Denton:
This is to inform you of a change to our schedule for initiation of the detailed control room review at Byron and Braidwood in accorandance'with NUREG 0700.
As indicated in reference (a), the NRC staf f has agreed to provide comments on the detailed control room review program plan described in Attachment 1 to reference (b).
Commonwealth Edison is now preparing a similar plan which will be used in all future such design reviews of Commonwealth Edison plants.
This review plan will be submitted for NRC revirw on March 1, 1982, and is the one which will be used for the Byro.1/Braidwood review.
Approval of the plan attached to reference (b) is no longer revquired.
Please address further questions regarding this matter to this office.
One (1) signed original and fif ty-nine (59) copies of this letter are provided for your use.
Very truly yours, Sool k M.
[ T. R.
Tramm
[
g Nuclear Licensing Administrator 1m 2998N 8112160030'811207
~
PDR ADOCK 05000454 A
-.