ML20057A388: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:0; 1 l
{{#Wiki_filter:0; l
1
1
        .y'                                                                             .l' DukeIbu;er Company                                                             T C M<unus V         McGuire Mrlear Generation Department                                           lice hesident
.y'
        ' 12700 Hagers ferry Road (MG01A)                                               (704)b 75-4800 ll:aaerwdle. AC2kGib-89k5                                                     (704)S75-4809 Itt I
.l' 1
DukeIbu;er Company T C M<unus V
McGuire Mrlear Generation Department lice hesident
' 12700 Hagers ferry Road (MG01A)
(704)b 75-4800 ll:aaerwdle. AC2kGib-89k5 (704)S75-4809 Itt I
DUKEPOWER i
DUKEPOWER i
September 5,1993 Document Control Desk U.S. Nuclear Regulatory Commission j
September 5,1993 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C.
Washington, D.C. 20555 p  
20555 j
p


==Subject:==
==Subject:==
McGuire Nuclear Station, Unit 2                                                           f Docket No: 50-370                                                                         l r
McGuire Nuclear Station, Unit 2 f
Docket No: 50-370 l
r


==Dear Sir:==
==Dear Sir:==
 
The attached McGuire Unit 2 Steam Leak Investigation and Report describes investigation and actions that were taken and are planned as a result of the steam leak through Unit j
The attached McGuire Unit 2 Steam Leak Investigation and Report describes investigation                       ,
2 "A" steam generator secondary side drain line.
and actions that were taken and are planned as a result of the steam leak through Unit                         j 2 "A" steam generator secondary side drain line.                                                               i The report is the product of two investigations:                                                               f A.       A comprehensive review of the actions prior to, during, and in recovery from the                   j event has been conducted under the leadership of E. M. Geddie, Station Manager.
i The report is the product of two investigations:
L Corrective actions were identified and inc!uded in the Report.                                       !
f A.
i B.       An independent examination was conducted by a Significant Event inspection Team (SEIT) under the leadership of W. M. Sample, Safety Assurance Manager,                       -i L'             from our Nuclear Services Department.                                                               ;
A comprehensive review of the actions prior to, during, and in recovery from the j
event has been conducted under the leadership of E. M. Geddie, Station Manager.
L Corrective actions were identified and inc!uded in the Report.
i' B.
An independent examination was conducted by a Significant Event inspection Team (SEIT) under the leadership of W. M. Sample, Safety Assurance Manager,
-i L'
from our Nuclear Services Department.
The rcsulting recommendations have been reviewed and appropriate actions taken or planned as described in the Report.
The rcsulting recommendations have been reviewed and appropriate actions taken or planned as described in the Report.
l 1 look forward to hearing the results of the NRC Augmented Inspection Team.
l 1 look forward to hearing the results of the NRC Augmented Inspection Team.
f i
f i
L                                                                 .                                                !
L e
e                                                          (         -
(
12'1 i                       T. C. McMeekin                                             ,
12'1 i T. C. McMeekin t
t i
i
?                                                                                                           5-9309140136 PDP                930905   @;                                                        /
?
6         _      " _ ADOCK"05000370             '
9309140136 930905
                                                                                                                \;
/
5-6
" _ ADOCK 05000370 PDP
\\;
v
v


McGuire Nuclear Station, Unit 2 Docket No: 50-370 Page 2 xc: Mr. S.D. Ebneter Administrator, Region 11 U.S. Nuclear Regulatory Commission 101 Marietta St., NW, Suite 2900 Atlanta, Ga. 30323 Mr. Victor Nerses U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C. 20555 Mr. G.F. Maxwell NRC Resident inspector McGuire Nuclear Station U. S. Nuclear Regulatory Commission}}
McGuire Nuclear Station, Unit 2 Docket No: 50-370 Page 2 xc: Mr. S.D. Ebneter Administrator, Region 11 U.S. Nuclear Regulatory Commission 101 Marietta St., NW, Suite 2900 Atlanta, Ga. 30323 Mr. Victor Nerses U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C. 20555 Mr. G.F. Maxwell NRC Resident inspector McGuire Nuclear Station U. S. Nuclear Regulatory Commission}}

Latest revision as of 12:33, 17 December 2024

Forwards Investigation Rept, DPC McGuire Nuclear Station, Unit 2 Steam Leak,930831
ML20057A388
Person / Time
Site: Mcguire
Issue date: 09/05/1993
From: Mcmeekin T
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20057A389 List:
References
NUDOCS 9309140136
Download: ML20057A388 (2)


Text

0; l

1

.y'

.l' 1

DukeIbu;er Company T C M<unus V

McGuire Mrlear Generation Department lice hesident

' 12700 Hagers ferry Road (MG01A)

(704)b 75-4800 ll:aaerwdle. AC2kGib-89k5 (704)S75-4809 Itt I

DUKEPOWER i

September 5,1993 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C.

20555 j

p

Subject:

McGuire Nuclear Station, Unit 2 f

Docket No: 50-370 l

r

Dear Sir:

The attached McGuire Unit 2 Steam Leak Investigation and Report describes investigation and actions that were taken and are planned as a result of the steam leak through Unit j

2 "A" steam generator secondary side drain line.

i The report is the product of two investigations:

f A.

A comprehensive review of the actions prior to, during, and in recovery from the j

event has been conducted under the leadership of E. M. Geddie, Station Manager.

L Corrective actions were identified and inc!uded in the Report.

i' B.

An independent examination was conducted by a Significant Event inspection Team (SEIT) under the leadership of W. M. Sample, Safety Assurance Manager,

-i L'

from our Nuclear Services Department.

The rcsulting recommendations have been reviewed and appropriate actions taken or planned as described in the Report.

l 1 look forward to hearing the results of the NRC Augmented Inspection Team.

f i

L e

(

12'1 i T. C. McMeekin t

i

?

9309140136 930905

/

5-6

" _ ADOCK 05000370 PDP

\\;

v

McGuire Nuclear Station, Unit 2 Docket No: 50-370 Page 2 xc: Mr. S.D. Ebneter Administrator, Region 11 U.S. Nuclear Regulatory Commission 101 Marietta St., NW, Suite 2900 Atlanta, Ga. 30323 Mr. Victor Nerses U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C. 20555 Mr. G.F. Maxwell NRC Resident inspector McGuire Nuclear Station U. S. Nuclear Regulatory Commission