ML20062K016: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20062K016
| number = ML20062K016
| issue date = 07/28/1982
| issue date = 07/28/1982
| title = Responds to NRC 820622 Ltr Re Violations Noted in IE Insp Repts 50-424/82-11 & 50-425/82-11.Corrective Actions: Contractor Directed to Be More Selective in Choosing Pipe Spool Storage Areas & Assign Addl Personnel to Monitor Area
| title = Responds to NRC Re Violations Noted in IE Insp Repts 50-424/82-11 & 50-425/82-11.Corrective Actions: Contractor Directed to Be More Selective in Choosing Pipe Spool Storage Areas & Assign Addl Personnel to Monitor Area
| author name = Foster D
| author name = Foster D
| author affiliation = GEORGIA POWER CO.
| author affiliation = GEORGIA POWER CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = GN-183, NUDOCS 8208160524
| document report number = GN-183, NUDOCS 8208160524
| title reference date = 06-22-1982
| package number = ML20062J966
| package number = ML20062J966
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
Line 17: Line 18:


=Text=
=Text=
{{#Wiki_filter:,    ,
{{#Wiki_filter:,
e Georgia Power Company                   *,J;         -
e Georgia Power Company
Post Offee Box 4545                                     .
*,J; Post Offee Box 4545 Atlanta, Georgia ?0302 Telephone 404 522-6060 g
Atlanta, Georgia ?0302 Telephone 404 522-6060               g                         Vogtle Proj.ect 2 ~S 7~   ^2       16 Southern Company Servces, Inc.
2 ~S 7~ ^ 2 16 Vogtle Proj.ect Southern Company Servces, Inc.
Post Offee Box 2625 Bamingham, Alabama 35202 Telephone 205 870-6011 July 28, 1982 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region II - Suite 3100 101 Marietta Strect                           File: X7BG10 Atlanta, Georgia 30303                       Log:     GN-183
Post Offee Box 2625 Bamingham, Alabama 35202 Telephone 205 870-6011 July 28, 1982 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region II - Suite 3100 101 Marietta Strect File: X7BG10 Atlanta, Georgia 30303 Log:
GN-183


==Reference:==
==Reference:==
ID:     II:
ID:
50-424/82-11 50-425/82-11 Attention:       F. J. Long Gentlemen:
II:
50-424/82-11 50-425/82-11 Attention:
F. J. Long Gentlemen:
The Georgia Power Company wishes to submit the following infonnation concerning the violations discussed in your inspection report 50-424/82-11 and 50-425/82-11.
The Georgia Power Company wishes to submit the following infonnation concerning the violations discussed in your inspection report 50-424/82-11 and 50-425/82-11.
We concur with the finding identified concerning failure to control the storage and preservation of material. The reason for the violation was failure to properly follow procedures in storing the piping assemblies.
We concur with the finding identified concerning failure to control the storage and preservation of material. The reason for the violation was failure to properly follow procedures in storing the piping assemblies.
The affected pipe spools have been stored correctly. Contractors have been directed to use more care in the storage of pipe spools. The contractor will be more selective in requisitioning pipe spools in order to reduce the amount of storage required. The contractor will be more selective in choosing spool storage areas and will assign additional personnel to monitor the storage.
The affected pipe spools have been stored correctly. Contractors have been directed to use more care in the storage of pipe spools. The contractor will be more selective in requisitioning pipe spools in order to reduce the amount of storage required. The contractor will be more selective in choosing spool storage areas and will assign additional personnel to monitor the storage.
Full compliance was achieved on May 11, 1982.
Full compliance was achieved on May 11, 1982.
We concur with the finding identified concerning failure to have survey procedures. The reason for the violation was the sarvey procedures that existed were deleted because experience indicated that normal survey
We concur with the finding identified concerning failure to have survey procedures. The reason for the violation was the sarvey procedures that existed were deleted because experience indicated that normal survey practice was adequate to ensure quality work.
,            practice was adequate to ensure quality work.
A new field procedure to control survey activities was approved on July 25,1982. Our ongoing training program on procedure requirements and audit program on procedure implementation should prevent reoccurrence of further violations.
A new field procedure to control survey activities was approved on July 25,1982. Our ongoing training program on procedure requirements and audit program on procedure implementation should prevent reoccurrence of further violations.
Full compliance should be achieved by August 13, 1982.
Full compliance should be achieved by August 13, 1982.
8208160524 820804 PDR ADOCK 05000424 O                 PDR
8208160524 820804 PDR ADOCK 05000424 O
: f. J. Long
PDR
    . 50-424/82-11; 50-425/82-11                                               l July 28, 1982                                                           :
: f. J. Long 50-424/82-11; 50-425/82-11 l
Page 2 i
July 28, 1982 Page 2 i
This response contains no proprietary infonnation and may be placed ;
This response contains no proprietary infonnation and may be placed in the fiRC Public Document Room upon receipt.
in the fiRC Public Document Room upon receipt.                           ;
Yours truly,
Yours truly,                       !
,o
                                                ,o   /
/
                                              .  . Foster Project General Manager             i D0F/CWH/tlp xc:   U. S. Nuclear Regulatory Commission Attn: Victor J. Stello, Jr. , Director Office of Inspection and Enforcement llashington, D. C. 20555 R. J. Kelly R. E. conway G. F. Head J. T. Beckham, Jr.
Foster Project General Manager i
J. H. Boykin D. E. Dutton R. H. Pinson l             D. L. McCrary
D0F/CWH/tlp xc:
'            R. A. Thomas J. A. Bailey
U. S. Nuclear Regulatory Commission Attn: Victor J. Stello, Jr., Director Office of Inspection and Enforcement llashington, D. C.
20555 R. J. Kelly R. E. conway G. F. Head J. T. Beckham, Jr.
J. H. Boykin D. E. Dutton R. H. Pinson l
D. L. McCrary
{
R. A. Thomas J. A. Bailey
: 0. Batum H. H. Gregory, III E. D. Groover L. T. Gucwa M. Malcom C. R. Miles, Jr.
: 0. Batum H. H. Gregory, III E. D. Groover L. T. Gucwa M. Malcom C. R. Miles, Jr.
M. Manry P. D. Rice R. W. Staffa J. L. Vota W. F. Sanders - Resident Inspector l
M. Manry P. D. Rice R. W. Staffa J. L. Vota W. F. Sanders - Resident Inspector l
l I
l I
l}}
l}}

Latest revision as of 22:41, 16 December 2024

Responds to NRC Re Violations Noted in IE Insp Repts 50-424/82-11 & 50-425/82-11.Corrective Actions: Contractor Directed to Be More Selective in Choosing Pipe Spool Storage Areas & Assign Addl Personnel to Monitor Area
ML20062K016
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/28/1982
From: Foster D
GEORGIA POWER CO.
To: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20062J966 List:
References
GN-183, NUDOCS 8208160524
Download: ML20062K016 (2)


Text

,

e Georgia Power Company

  • ,J; Post Offee Box 4545 Atlanta, Georgia ?0302 Telephone 404 522-6060 g

2 ~S 7~ ^ 2 16 Vogtle Proj.ect Southern Company Servces, Inc.

Post Offee Box 2625 Bamingham, Alabama 35202 Telephone 205 870-6011 July 28, 1982 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region II - Suite 3100 101 Marietta Strect File: X7BG10 Atlanta, Georgia 30303 Log:

GN-183

Reference:

ID:

II:

50-424/82-11 50-425/82-11 Attention:

F. J. Long Gentlemen:

The Georgia Power Company wishes to submit the following infonnation concerning the violations discussed in your inspection report 50-424/82-11 and 50-425/82-11.

We concur with the finding identified concerning failure to control the storage and preservation of material. The reason for the violation was failure to properly follow procedures in storing the piping assemblies.

The affected pipe spools have been stored correctly. Contractors have been directed to use more care in the storage of pipe spools. The contractor will be more selective in requisitioning pipe spools in order to reduce the amount of storage required. The contractor will be more selective in choosing spool storage areas and will assign additional personnel to monitor the storage.

Full compliance was achieved on May 11, 1982.

We concur with the finding identified concerning failure to have survey procedures. The reason for the violation was the sarvey procedures that existed were deleted because experience indicated that normal survey practice was adequate to ensure quality work.

A new field procedure to control survey activities was approved on July 25,1982. Our ongoing training program on procedure requirements and audit program on procedure implementation should prevent reoccurrence of further violations.

Full compliance should be achieved by August 13, 1982.

8208160524 820804 PDR ADOCK 05000424 O

PDR

f. J. Long 50-424/82-11; 50-425/82-11 l

July 28, 1982 Page 2 i

This response contains no proprietary infonnation and may be placed in the fiRC Public Document Room upon receipt.

Yours truly,

,o

/

Foster Project General Manager i

D0F/CWH/tlp xc:

U. S. Nuclear Regulatory Commission Attn: Victor J. Stello, Jr., Director Office of Inspection and Enforcement llashington, D. C.

20555 R. J. Kelly R. E. conway G. F. Head J. T. Beckham, Jr.

J. H. Boykin D. E. Dutton R. H. Pinson l

D. L. McCrary

{

R. A. Thomas J. A. Bailey

0. Batum H. H. Gregory, III E. D. Groover L. T. Gucwa M. Malcom C. R. Miles, Jr.

M. Manry P. D. Rice R. W. Staffa J. L. Vota W. F. Sanders - Resident Inspector l

l I

l