ML20065B527: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 14: | Line 14: | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| page count = 1 | | page count = 1 | ||
| project = | |||
| stage = Other | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:'' | ||
Dock:t No. 50-397 50.55 (e) Report p | |||
washington Public Power Supply System tg (509)372-5000 P.O. Box 968 3000 GeorgeWashingtonWay Richtand, Washington 99352 Docket No. 50-397 Vg February 2, 1983 | |||
'4 G02-83-87 Mr. R. H. Engelken Regional Administrator U.S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 | |||
==Subject:== | |||
NUCLEAR PROEJCT N0. 1 REPORTABLE 10CFR50.55'e) CONDITIONS #221, NAMC0 EA-180 AND EA-740 LIMIT SUITCHES AND #226, 125VDC MOTOR OPERATOR CONNECTED TO A 250VDC POWER SOURCE | |||
==References:== | |||
a. | |||
Telecon dated January 4, 1983 (QA2-83-003), L.C. Floyd to J. Elin b. | |||
Telecon dated January 7, 1983 (QA2-83-010), L.C. Floyd to J. Elin In accordance with the provisions of 10CFR50.55(e), your office was inform-ed, by telephone, of the above potentially reportable conditions. Attach-ments I and II provide the Project's interim reports'on the above condi-tions. We will continue to provide your office with quarterly updates until resolved. The next report will be submitted by April 26, 1983. | |||
If you have any questions regarding these subjects, please contact Roger Johnson, WNP-2 Project QA Manager, (509) 377-2501, extension 2712. | |||
f 3,fProgram Director, WNP-2 LCF/kd Attachments: | |||
(2) As stated cc: | |||
W.S. Chin, BPA - Site A. Forrest, Burns and Roe - HAPO N.D. Lewis, NRC l | |||
J. Plunkett, NRC l | |||
A. Toth, NRC Resident Inspector - Site | |||
/ | |||
WNP-2 Files - 917B i | |||
8302230205 830202 | |||
^ | |||
PDR ADOCK 05000397 C | |||
PDR | |||
-,}} | |||
Latest revision as of 20:04, 16 December 2024
| ML20065B527 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 02/02/1983 |
| From: | Matlock R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML20065B530 | List: |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, GO2-83-87, NUDOCS 8302230205 | |
| Download: ML20065B527 (1) | |
Text
Dock:t No. 50-397 50.55 (e) Report p
washington Public Power Supply System tg (509)372-5000 P.O. Box 968 3000 GeorgeWashingtonWay Richtand, Washington 99352 Docket No. 50-397 Vg February 2, 1983
'4 G02-83-87 Mr. R. H. Engelken Regional Administrator U.S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596
Subject:
NUCLEAR PROEJCT N0. 1 REPORTABLE 10CFR50.55'e) CONDITIONS #221, NAMC0 EA-180 AND EA-740 LIMIT SUITCHES AND #226, 125VDC MOTOR OPERATOR CONNECTED TO A 250VDC POWER SOURCE
References:
a.
Telecon dated January 4, 1983 (QA2-83-003), L.C. Floyd to J. Elin b.
Telecon dated January 7, 1983 (QA2-83-010), L.C. Floyd to J. Elin In accordance with the provisions of 10CFR50.55(e), your office was inform-ed, by telephone, of the above potentially reportable conditions. Attach-ments I and II provide the Project's interim reports'on the above condi-tions. We will continue to provide your office with quarterly updates until resolved. The next report will be submitted by April 26, 1983.
If you have any questions regarding these subjects, please contact Roger Johnson, WNP-2 Project QA Manager, (509) 377-2501, extension 2712.
f 3,fProgram Director, WNP-2 LCF/kd Attachments:
(2) As stated cc:
W.S. Chin, BPA - Site A. Forrest, Burns and Roe - HAPO N.D. Lewis, NRC l
J. Plunkett, NRC l
A. Toth, NRC Resident Inspector - Site
/
WNP-2 Files - 917B i
8302230205 830202
^
PDR ADOCK 05000397 C
-,