ML20065C655: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 14: | Line 14: | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE | ||
| page count = 1 | | page count = 1 | ||
| project = | |||
| stage = Supplement | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:i | ||
*- i Southsen Nuclear Operating Company Post Omce Der 1295 Birmingham Alabama 35201 Te'ephone (205) 808-5131 g | |||
E-m Southern Nudcar Operating Company | |||
: o. e uo,ev Vice Prwdent Far!oy Prog,ct the southern electoc system April 1, 1994 Docket No. 50-348 10 CFR 50.90 U. S. Nuclear Regulatory Commission ATTN.: Document Control Desk Washington. D, C. 20555 Joseph M. Farley Nuclear Plant - Unit 1 Technical Specification Changes Associated With Steam Generator Tube Support Plate Interim Repair Criteria Gentlemen: | |||
By {{letter dated|date=December 9, 1993|text=letter dated December 9,1993}}, Southern Nuclear Operating Company (SNC) submitted a Steam Generator Tube Support Plate interim Plugging Criteria amendment request for Farley Unit 1. This proposed amendment was supplemented by {{letter dated|date=February 23, 1994|text=letter dated February 23,1994}}. In the supplement, Bases page B3/4 4-3 should have been updated to include reference to the SNC February 23,1994 transmittalletter; however, this reference was inadvertently omitted. Attached is the revised Bases page. | |||
If there are any questions, please advise. | |||
Respectfully submitted, b'h )Luf EI Dave Morey BLM/ cit:sgipcrev. doc SWORN TO AND SUBSCRIBED BEFORE ME Attachment THIS /4 DAY OF llA 1994 I | |||
cc: | |||
Mr. S. D. Ebneter F | |||
Q Mr. T. A. Reed dt 6 | |||
<dIL <6/CY Mr. B. L. Siegel Notary Publ(d Mr. T. M. Ross Dr. D. E. Williamson My Commission Expires: 7/WMdo/; M97 9404050269 940401 PDR ADOCK 05000349 | |||
'I P | |||
PDR 1 | |||
1 L. | |||
.}} | |||
Latest revision as of 19:59, 16 December 2024
| ML20065C655 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 04/01/1994 |
| From: | Dennis Morey SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20065C658 | List: |
| References | |
| NUDOCS 9404050269 | |
| Download: ML20065C655 (1) | |
Text
i
- - i Southsen Nuclear Operating Company Post Omce Der 1295 Birmingham Alabama 35201 Te'ephone (205) 808-5131 g
E-m Southern Nudcar Operating Company
- o. e uo,ev Vice Prwdent Far!oy Prog,ct the southern electoc system April 1, 1994 Docket No. 50-348 10 CFR 50.90 U. S. Nuclear Regulatory Commission ATTN.: Document Control Desk Washington. D, C. 20555 Joseph M. Farley Nuclear Plant - Unit 1 Technical Specification Changes Associated With Steam Generator Tube Support Plate Interim Repair Criteria Gentlemen:
By letter dated December 9,1993, Southern Nuclear Operating Company (SNC) submitted a Steam Generator Tube Support Plate interim Plugging Criteria amendment request for Farley Unit 1. This proposed amendment was supplemented by letter dated February 23,1994. In the supplement, Bases page B3/4 4-3 should have been updated to include reference to the SNC February 23,1994 transmittalletter; however, this reference was inadvertently omitted. Attached is the revised Bases page.
If there are any questions, please advise.
Respectfully submitted, b'h )Luf EI Dave Morey BLM/ cit:sgipcrev. doc SWORN TO AND SUBSCRIBED BEFORE ME Attachment THIS /4 DAY OF llA 1994 I
cc:
Mr. S. D. Ebneter F
Q Mr. T. A. Reed dt 6
<dIL <6/CY Mr. B. L. Siegel Notary Publ(d Mr. T. M. Ross Dr. D. E. Williamson My Commission Expires: 7/WMdo/; M97 9404050269 940401 PDR ADOCK 05000349
'I P
PDR 1
1 L.
.