ML20065F223: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 20: Line 20:
=Text=
=Text=
{{#Wiki_filter:L EBOEU F, LAM B, LElBY Sr. MACRAE A RANTNER9 MIP GNCLuOING PROFE ss40N AL CORRORAf TONS 1333 New HAMPSHIRE AVENUE, N.W.
{{#Wiki_filter:L EBOEU F, LAM B, LElBY Sr. MACRAE A RANTNER9 MIP GNCLuOING PROFE ss40N AL CORRORAf TONS 1333 New HAMPSHIRE AVENUE, N.W.
:          iAO mROAOwAv                           WAS HINGToN, D.C. 200 36                               47 eER=ELEv sOuaRE NEw YORM, N.Y. B0005                                                                         LONDON WlX SDB, E NGLANO 2aa-aSe.teOO                                     202-4s7-7s00                             TELEPHONE- 01-493-7331 TELEM 440274           TE LE CO P:E R . 202-457-7543 83 CENTRAL STREET                                                                               SOO MEARNs BulLDING BOSTON,MA 02809                                                                                   r3e BOUTH M AIN etF.4sl+03es                                                                             SA6T LAn t CITY, UT 84600 801 355-6915 333 Pave 1TEvlLLE STREET MALL P.O. Box 7s0                                                                                 441 PEOuCT AVENut RA LEtGM, NC 27802                                                                             SouYHPORT, CT 06490 September 30, 1982 Mr. Harold Denton Director Office of the Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC           20555 Re:     The Detroit Edison Company Enrico Fermi Atomic Power Plant Unit 2 - Docket No. 50-341 i
iAO mROAOwAv WAS HINGToN, D.C. 200 36 47 eER=ELEv sOuaRE NEw YORM, N.Y. B0005 LONDON WlX SDB, E NGLANO TELEPHONE- 01-493-7331 2aa-aSe.teOO 202-4s7-7s00 TELEM 440274 TE LE CO P:E R. 202-457-7543 83 CENTRAL STREET SOO MEARNs BulLDING BOSTON,MA 02809 r3e BOUTH M AIN etF.4sl+03es SA6T LAn t CITY, UT 84600 801 355-6915 333 Pave 1TEvlLLE STREET MALL P.O. Box 7s0 441 PEOuCT AVENut RA LEtGM, NC 27802 SouYHPORT, CT 06490 September 30, 1982 Mr. Harold Denton Director Office of the Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Re:
The Detroit Edison Company Enrico Fermi Atomic Power Plant Unit 2 - Docket No. 50-341 i


==Dear Mr. Denton:==
==Dear Mr. Denton:==
As counsel for Detroit Edison, we enclose the following:
As counsel for Detroit Edison, we enclose the following:
(1) Three (3) originals and nineteen (19) copies of Amendment No. 44 to the Amended and Substituted Application for Licenses; and (2) -Sixty-three (63) copies, including three (3) originals, of certain additions and modifications to the Company's Final Safety Analysis Report.
(1)
i                                                                     Very truly yours, l                                                                     LeBOEUF, LAMB, LEIBY & MacRAE i
Three (3) originals and nineteen (19) copies of Amendment No. 44 to the Amended and Substituted Application for Licenses; and (2) -Sixty-three (63) copies, including three (3) originals, of certain additions and modifications to the Company's Final Safety Analysis Report.
l                                                                                       -
i Very truly yours, l
By             -
LeBOEUF, LAMB, LEIBY & MacRAE i
L. Charles Landgraf Enclosures
l By L. Charles Landgraf Enclosures 3o0\\
'                                                            3o0\
ql#
ql#
O210010289 820930 PDR ADDCK 05000341 K                             PDR}}
O210010289 820930 PDR ADDCK 05000341 K
PDR}}

Latest revision as of 19:51, 16 December 2024

Forwards Amend 44 to Application for Ol,Consisting of Amend 44 to FSAR
ML20065F223
Person / Time
Site: Fermi 
Issue date: 09/30/1982
From: Landgraf L
DETROIT EDISON CO., LEBOEUF, LAMB, LEIBY & MACRAE
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20065F227 List:
References
NUDOCS 8210010289
Download: ML20065F223 (1)


Text

L EBOEU F, LAM B, LElBY Sr. MACRAE A RANTNER9 MIP GNCLuOING PROFE ss40N AL CORRORAf TONS 1333 New HAMPSHIRE AVENUE, N.W.

iAO mROAOwAv WAS HINGToN, D.C. 200 36 47 eER=ELEv sOuaRE NEw YORM, N.Y. B0005 LONDON WlX SDB, E NGLANO TELEPHONE- 01-493-7331 2aa-aSe.teOO 202-4s7-7s00 TELEM 440274 TE LE CO P:E R. 202-457-7543 83 CENTRAL STREET SOO MEARNs BulLDING BOSTON,MA 02809 r3e BOUTH M AIN etF.4sl+03es SA6T LAn t CITY, UT 84600 801 355-6915 333 Pave 1TEvlLLE STREET MALL P.O. Box 7s0 441 PEOuCT AVENut RA LEtGM, NC 27802 SouYHPORT, CT 06490 September 30, 1982 Mr. Harold Denton Director Office of the Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Re:

The Detroit Edison Company Enrico Fermi Atomic Power Plant Unit 2 - Docket No. 50-341 i

Dear Mr. Denton:

As counsel for Detroit Edison, we enclose the following:

(1)

Three (3) originals and nineteen (19) copies of Amendment No. 44 to the Amended and Substituted Application for Licenses; and (2) -Sixty-three (63) copies, including three (3) originals, of certain additions and modifications to the Company's Final Safety Analysis Report.

i Very truly yours, l

LeBOEUF, LAMB, LEIBY & MacRAE i

l By L. Charles Landgraf Enclosures 3o0\\

ql#

O210010289 820930 PDR ADDCK 05000341 K

PDR