ML20065L796: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:wr 9. | ||
wr 9. | BomTAN EDISON COMPANY orwenac arricco son savtefou starry SoSfoN MAasACHug TTE03199 A. V. M O RISI l | ||
BomTAN EDISON COMPANY orwenac arricco son savtefou starry SoSfoN MAasACHug TTE03199 A. V. M O RISI | MANAGER f | ||
NUCLEAR OPERATIONS SUPPORT DEFh4TMENT October 7,1982 BECo. Ltr. #82-266 | NUCLEAR OPERATIONS SUPPORT DEFh4TMENT October 7,1982 BECo. Ltr. #82-266 l | ||
Mr. Ronald C. Haynes, Director Office of Inspection and Enforcement Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA. | |||
Office of Inspection and Enforcement | 19406 License No. DPR-35 Docket No. 50-293 | ||
Region I U.S. Nuclear Regulatory Commission 631 Park Avenue | |||
King of Prussia, PA. | |||
==Subject:== | ==Subject:== | ||
| Line 30: | Line 28: | ||
==Dear Sir:== | ==Dear Sir:== | ||
In.the second response contained in Reference (A), Bo-ton Edison committed to | i In.the second response contained in Reference (A), Bo-ton Edison committed to complete IE Bulletin 80-06 related surveillance testing prior to start-up from Refueling Outage #5 (RF0 5). At start-up from RF0 5 we believed this commit-ment had been fully satisfied. | ||
However, after Pilgrim returned to service an additional review was conducted | However, after Pilgrim returned to service an additional review was conducted i | ||
to ensure the adecuacy and completeness of the Bulletin 80-06 tests. This re-view determined that a modified station surveillance procedure, Temporary l | |||
( | Proced_ure 81-64, PCIS Valve Testing (TP81-64) had the following inadequacies: | ||
To correct the identified inadequacies, the Operations Review Comittee approved two new temporary procedures, TP82-38, Balance of Plant isolation "A" and TP82-39, | (1) it inadvertantly overlooked the testing of the H2 Analyzer Isolation Valves; l | ||
(2) it did not identify the individual Standby Gas Treatment System Isolation | |||
( | |||
Valves; (3) it incorrectly indicated that the 02 Analyzer Valves are closed after i | |||
reset, when the valves are actually open. | |||
The logic tested consistent with its wiring schemes, satisfactorily concluding this | To correct the identified inadequacies, the Operations Review Comittee approved two new temporary procedures, TP82-38, Balance of Plant isolation "A" and TP82-39, | ||
( | |||
t | Balance of Plant Isolation "B". During the unscheduled shutdown commencing August 13, 1982, th ! additional testing was conducted. | ||
This cesting revealed that wiring l | |||
I | to the H2 Analyzer valves was incorrect. We developed and' implemented corrective i | ||
actions, developed appropriate new test procedures and conducted a test of the logic. | |||
L The logic tested consistent with its wiring schemes, satisfactorily concluding this | |||
~ | |||
t test. | |||
LER 82-025/01T-0 has been issued to satisfy reporting requirements. | |||
I 82101{0{21 PDR A O 0 | |||
3 pnR G | |||
,II | |||
\\' | |||
BDCTON EOCON COMPANY Mr. Ronald C. Haynes, Director October _7, 1982 Page 2 We believe the actions contained in this submittal satisfactorily address the issue; should you wish further information after reviewing it, please contact us. | BDCTON EOCON COMPANY Mr. Ronald C. Haynes, Director October _7, 1982 Page 2 We believe the actions contained in this submittal satisfactorily address the issue; should you wish further information after reviewing it, please contact us. | ||
Very truly yours, | Very truly yours, I | ||
.}} | |||
Latest revision as of 19:28, 16 December 2024
| ML20065L796 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 10/07/1982 |
| From: | Morisi A BOSTON EDISON CO. |
| To: | Haynes R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| REF-SSINS-6820 82-266, IEB-80-06, IEB-80-6, NUDOCS 8210190721 | |
| Download: ML20065L796 (2) | |
Text
wr 9.
BomTAN EDISON COMPANY orwenac arricco son savtefou starry SoSfoN MAasACHug TTE03199 A. V. M O RISI l
MANAGER f
NUCLEAR OPERATIONS SUPPORT DEFh4TMENT October 7,1982 BECo. Ltr. #82-266 l
Mr. Ronald C. Haynes, Director Office of Inspection and Enforcement Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA.
19406 License No. DPR-35 Docket No. 50-293
Subject:
IE Bulletin 80-06 Reference (A). Boston Edison Letter dated June 27, 1980 from Mr. G. Carl Andognini to Mr. Boyce H. Grier (B): LER 82-025/01T-0
Dear Sir:
i In.the second response contained in Reference (A), Bo-ton Edison committed to complete IE Bulletin 80-06 related surveillance testing prior to start-up from Refueling Outage #5 (RF0 5). At start-up from RF0 5 we believed this commit-ment had been fully satisfied.
However, after Pilgrim returned to service an additional review was conducted i
to ensure the adecuacy and completeness of the Bulletin 80-06 tests. This re-view determined that a modified station surveillance procedure, Temporary l
Proced_ure 81-64, PCIS Valve Testing (TP81-64) had the following inadequacies:
(1) it inadvertantly overlooked the testing of the H2 Analyzer Isolation Valves; l
(2) it did not identify the individual Standby Gas Treatment System Isolation
(
Valves; (3) it incorrectly indicated that the 02 Analyzer Valves are closed after i
reset, when the valves are actually open.
To correct the identified inadequacies, the Operations Review Comittee approved two new temporary procedures, TP82-38, Balance of Plant isolation "A" and TP82-39,
(
Balance of Plant Isolation "B". During the unscheduled shutdown commencing August 13, 1982, th ! additional testing was conducted.
This cesting revealed that wiring l
to the H2 Analyzer valves was incorrect. We developed and' implemented corrective i
actions, developed appropriate new test procedures and conducted a test of the logic.
L The logic tested consistent with its wiring schemes, satisfactorily concluding this
~
t test.
LER 82-025/01T-0 has been issued to satisfy reporting requirements.
I 82101{0{21 PDR A O 0
3 pnR G
,II
\\'
BDCTON EOCON COMPANY Mr. Ronald C. Haynes, Director October _7, 1982 Page 2 We believe the actions contained in this submittal satisfactorily address the issue; should you wish further information after reviewing it, please contact us.
Very truly yours, I
.