ML20065T008: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:Vc res Engincenng and constNct:en Deholt Edison EEEF">>e October 28, 1982 EF2 - 60,310 Mr. L. L. Kintner U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing Washington, D. C. 20555 | ||
==Dear Mr. Kintner:== | |||
==Reference:== | |||
Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341 | |||
==Subject:== | |||
Radiological Emergency-Response Plan Section B Onsite Emergency Organization Table B.1 Staffing for Fermi 2 Emergency Response Organization The augmentation times of 30/90 listed in the last two columns of Table B.1 under Alert or Above and Site Area or General Emergency will be changed to 30/60(a) with a change in Footnote (a) to read: | |||
(a) | |||
The 30/60 augmentation criteria is a goal for staffing the ERFs on a timely basis as stated in Subsection B.1.2 on Page B-2 and as iden-tified in Supplement 1 to NUREG-0737 This change will be reflected in Revision 2 to the Plan. | |||
Sincerely, f/ | |||
cc: | |||
Mr. B. Little 8211020136 021028 PDR ADOCK 05000341 F | |||
PDR l}} | |||
Latest revision as of 18:58, 16 December 2024
| ML20065T008 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 10/28/1982 |
| From: | Tauber H DETROIT EDISON CO. |
| To: | Kintner L Office of Nuclear Reactor Regulation |
| References | |
| EF2-60-310, NUDOCS 8211020136 | |
| Download: ML20065T008 (1) | |
Text
Vc res Engincenng and constNct:en Deholt Edison EEEF">>e October 28, 1982 EF2 - 60,310 Mr. L. L. Kintner U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing Washington, D. C. 20555
Dear Mr. Kintner:
Reference:
Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341
Subject:
Radiological Emergency-Response Plan Section B Onsite Emergency Organization Table B.1 Staffing for Fermi 2 Emergency Response Organization The augmentation times of 30/90 listed in the last two columns of Table B.1 under Alert or Above and Site Area or General Emergency will be changed to 30/60(a) with a change in Footnote (a) to read:
(a)
The 30/60 augmentation criteria is a goal for staffing the ERFs on a timely basis as stated in Subsection B.1.2 on Page B-2 and as iden-tified in Supplement 1 to NUREG-0737 This change will be reflected in Revision 2 to the Plan.
Sincerely, f/
cc:
Mr. B. Little 8211020136 021028 PDR ADOCK 05000341 F