ML20069D143: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:. | ||
Cp&L Carolina Power & Light Company | Cp&L 0 | ||
Carolina Power & Light Company O | |||
e myn y, V - | |||
myn | ~ | ||
u p' y'8 | |||
Atlanta, GA | ' 'i Brunswick Steam Electric Plant | ||
//4k /g P. O. Box 10429 4/8' Yf Southport, NC 28461-0429 March 11, 1983 FILE: B09-13510C SERIAL: BSEP/83-797 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II, Suite 3100 101 Marietta Street N.W. | |||
Atlanta, GA 30303 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-324/ | |||
LICENSE NO. DPR-62 SPECIAL REPORT PER TECHNICAL SPECIFICATION 3.7.8 | LICENSE NO. DPR-62 SPECIAL REPORT PER TECHNICAL SPECIFICATION 3.7.8 | ||
==Dear Mr. O'Reilly:== | ==Dear Mr. O'Reilly:== | ||
During a Unit No. 1 refueling outage concurrent with power operation on Unit No. 2, 15 Unit No. 1 and 5 Unit No. 2 fire barrier LCOs with respective issuance dates of February 13, 19, and 21, 1983, were generated to permit the performance of work in the Control and Service Water Baildings required for the installation of five plant modifications. Due to the complexity of the work involved with these modifications, the seven-day specified time frame of each subject LCO has been exceeded. Until the completion of the involved modification work and cancellation of the subject LCOs, appropriate stationed fire watches will remain in effect. | During a Unit No. 1 refueling outage concurrent with power operation on Unit No. 2, 15 Unit No. 1 and 5 Unit No. 2 fire barrier LCOs with respective issuance dates of February 13, 19, and 21, 1983, were generated to permit the performance of work in the Control and Service Water Baildings required for the installation of five plant modifications. Due to the complexity of the work involved with these modifications, the seven-day specified time frame of each subject LCO has been exceeded. Until the completion of the involved modification work and cancellation of the subject LCOs, appropriate stationed fire watches will remain in effect. | ||
Very truly yours, f | Very truly yours, f | ||
G C. R. Dietz, General Manager Brunswick Steam Electric Plant MJPjr/dj/LETDJ4 cc: | |||
S | Mr. R. C. DeYoung NRC Document Control Desk I | ||
.omcatcorr 8303180274 930311 74 c2 A_/ | |||
PDR ADOCK 05000324 S | |||
PDR | |||
-...}} | |||
Latest revision as of 11:04, 16 December 2024
| ML20069D143 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 03/11/1983 |
| From: | Dietz C CAROLINA POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| BSEP-83-797, NUDOCS 8303180274 | |
| Download: ML20069D143 (1) | |
Text
.
Cp&L 0
Carolina Power & Light Company O
e myn y, V -
~
u p' y'8
' 'i Brunswick Steam Electric Plant
//4k /g P. O. Box 10429 4/8' Yf Southport, NC 28461-0429 March 11, 1983 FILE: B09-13510C SERIAL: BSEP/83-797 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II, Suite 3100 101 Marietta Street N.W.
Atlanta, GA 30303 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-324/
LICENSE NO. DPR-62 SPECIAL REPORT PER TECHNICAL SPECIFICATION 3.7.8
Dear Mr. O'Reilly:
During a Unit No. 1 refueling outage concurrent with power operation on Unit No. 2, 15 Unit No. 1 and 5 Unit No. 2 fire barrier LCOs with respective issuance dates of February 13, 19, and 21, 1983, were generated to permit the performance of work in the Control and Service Water Baildings required for the installation of five plant modifications. Due to the complexity of the work involved with these modifications, the seven-day specified time frame of each subject LCO has been exceeded. Until the completion of the involved modification work and cancellation of the subject LCOs, appropriate stationed fire watches will remain in effect.
Very truly yours, f
G C. R. Dietz, General Manager Brunswick Steam Electric Plant MJPjr/dj/LETDJ4 cc:
Mr. R. C. DeYoung NRC Document Control Desk I
.omcatcorr 8303180274 930311 74 c2 A_/
PDR ADOCK 05000324 S
-...