ML20069D143: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:.
Cp&L 0
Carolina Power & Light Company O
e myn y, V -
~
u p' y'8
' 'i Brunswick Steam Electric Plant
//4k /g P. O. Box 10429 4/8' Yf Southport, NC 28461-0429 March 11, 1983 FILE: B09-13510C SERIAL: BSEP/83-797 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II, Suite 3100 101 Marietta Street N.W.
Atlanta, GA 30303 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-324/
LICENSE NO. DPR-62 SPECIAL REPORT PER TECHNICAL SPECIFICATION 3.7.8
 
==Dear Mr. O'Reilly:==
During a Unit No. 1 refueling outage concurrent with power operation on Unit No. 2, 15 Unit No. 1 and 5 Unit No. 2 fire barrier LCOs with respective issuance dates of February 13, 19, and 21, 1983, were generated to permit the performance of work in the Control and Service Water Baildings required for the installation of five plant modifications. Due to the complexity of the work involved with these modifications, the seven-day specified time frame of each subject LCO has been exceeded. Until the completion of the involved modification work and cancellation of the subject LCOs, appropriate stationed fire watches will remain in effect.
Very truly yours, f
G C. R. Dietz, General Manager Brunswick Steam Electric Plant MJPjr/dj/LETDJ4 cc:
Mr. R. C. DeYoung NRC Document Control Desk I
.omcatcorr 8303180274 930311 74 c2 A_/
PDR ADOCK 05000324 S
PDR
-...}}

Latest revision as of 11:04, 16 December 2024

Ro:Limiting Conditions for Operation,Issued on 830213,19 & 20 to Permit Work in Control & Svc Water Bldgs Required for Plant Mods,Exceeded 7-day Specified Time Frame
ML20069D143
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 03/11/1983
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
BSEP-83-797, NUDOCS 8303180274
Download: ML20069D143 (1)


Text

.

Cp&L 0

Carolina Power & Light Company O

e myn y, V -

~

u p' y'8

' 'i Brunswick Steam Electric Plant

//4k /g P. O. Box 10429 4/8' Yf Southport, NC 28461-0429 March 11, 1983 FILE: B09-13510C SERIAL: BSEP/83-797 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II, Suite 3100 101 Marietta Street N.W.

Atlanta, GA 30303 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-324/

LICENSE NO. DPR-62 SPECIAL REPORT PER TECHNICAL SPECIFICATION 3.7.8

Dear Mr. O'Reilly:

During a Unit No. 1 refueling outage concurrent with power operation on Unit No. 2, 15 Unit No. 1 and 5 Unit No. 2 fire barrier LCOs with respective issuance dates of February 13, 19, and 21, 1983, were generated to permit the performance of work in the Control and Service Water Baildings required for the installation of five plant modifications. Due to the complexity of the work involved with these modifications, the seven-day specified time frame of each subject LCO has been exceeded. Until the completion of the involved modification work and cancellation of the subject LCOs, appropriate stationed fire watches will remain in effect.

Very truly yours, f

G C. R. Dietz, General Manager Brunswick Steam Electric Plant MJPjr/dj/LETDJ4 cc:

Mr. R. C. DeYoung NRC Document Control Desk I

.omcatcorr 8303180274 930311 74 c2 A_/

PDR ADOCK 05000324 S

PDR

-...