ML20069D942: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:o VERMONT YANKEE NUCLEAR POWER CORPORATION                                                                 VYV 83-7 2.C.2.1 RD 5. Box 169, Ferry Road, Brattleboro, VT 05301 FVY 83-7 y,
{{#Wiki_filter:o VERMONT YANKEE NUCLEAR POWER CORPORATION VYV 83-7 2.C.2.1 FVY 83-7 RD 5. Box 169, Ferry Road, Brattleboro, VT 05301 y,
g g-ENGINEERING OFFICE 1671 WORCESTER ROAD January 28, 1983         FRAMINGHAM, MASSACHUSETTS 01701
g ENGINEERING OFFICE 1671 WORCESTER ROAD g
* TEL EPHONE 617-872-8100 United F.ates Nuclear Regulatory Commission Wa shington, D. C. 20555 Attention:       Office of Nuclear Reactor Regulation Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing
January 28, 1983 FRAMINGHAM, MASSACHUSETTS 01701 TEL EPHONE 617-872-8100 United F.ates Nuclear Regulatory Commission Wa shington, D. C. 20555 Attention:
Office of Nuclear Reactor Regulation Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing


==References:==
==References:==
(a) License No. DPR-28 (Docket No. 50-271)
(a) License No. DPR-28 (Docket No. 50-271)
(b) Letter, USNRC to VYNPC, Generic Letter 82-39, dated December 22, 1982 Subj ec t :       Revision 7 to the Vermont Yankee Physical Security Plan
(b) Letter, USNRC to VYNPC, Generic Letter 82-39, dated December 22, 1982 Subj ec t :
Revision 7 to the Vermont Yankee Physical Security Plan
(^')
(^')
V


==Dear Sir:==
==Dear Sir:==
 
V This letter provides Revision 7 to the Vermont Yankee Physical Security Plan which makes several changes as explained in Attachment A.
This letter provides Revision 7 to the Vermont Yankee Physical Security Plan which makes several changes as explained in Attachment A.
We have determined that this change does not result in a decrease of the ef fectiveness of the Plan, and therefore, it is forwarded for your information and use.
We have determined that this change does not result in a decrease of the ef fectiveness of the Plan, and therefore, it is forwarded for your information and use.
Both the Security Plan and Attachment A are considered Safeguards Information and as such, shall be withheld from public disclosure pursuant to 10CFR73.21.
Both the Security Plan and Attachment A are considered Safeguards Information and as such, shall be withheld from public disclosure pursuant to 10CFR73.21.
Included with each copy of the change is a Change Transmittal Form.
Included with each copy of the change is a Change Transmittal Form.
Please insure that the forms are completed and returned to us as required by Section 13.8 of the Plan. In addition, since we are sending a sixth copy (3E) for the first time as required by Ref erence (b), please insure tha t the custody form at tached to copy 3E is returned.
Please insure that the forms are completed and returned to us as required by Section 13.8 of the Plan.
8303210129 830128 PDR ADOCK 05000271 F                     PDR i
In addition, since we are sending a sixth copy (3E) for the first time as required by Ref erence (b), please insure tha t the custody form at tached to copy 3E is returned.
Document Transmitted                                               When Separated f rom Herewith Contains                                                 Enclosures, Handle This I   ^      SAFEGUARDS INFORMATION                                             Document as Decontrelled I
8303210129 830128 PDR ADOCK 05000271 F
i
PDR i
  'O
Document Transmitted When Separated f rom Herewith Contains Enclosures, Handle This I
* Sool I 5- fN 7 1-wjras.ce.ards
SAFEGUARDS INFORMATION Document as Decontrelled
                            ..a ..,,a a a . m e u....m., ua. -
^
m 1
I'O i
7s.o., + 2a he< 7                         Yo ^!a n / M
* Sool I 5-fN 7 1-wjras.ce.ards m
..a..,,a a a. m e u....m., ua. -
7s.o., + 2a he< 7 Yo ^!a n / M 1


United States Nuclear Regulatory Commission                       January 28, 1983 Attentipn: Mr. Domenic B. Vassallo                                 Page 2 I'x,))
United States Nuclear Regulatory Commission January 28, 1983 Attentipn: Mr. Domenic B. Vassallo Page 2 I'x,))
We trust this information is adequate; botiever, should you have any questions, please contact !!r. Warren P. Murphy, Vice President and Manager of Operations, at our Brattleboro, Vermont offices.
We trust this information is adequate; botiever, should you have any questions, please contact !!r. Warren P. Murphy, Vice President and Manager of Operations, at our Brattleboro, Vermont offices.
Very truly yours, VERIONT YANKEE NUCLEAR POWER CORPORATION
Very truly yours, VERIONT YANKEE NUCLEAR POWER CORPORATION e
                                                                        .      e m      .
.b/
b/
m ames. B. Sinclair Licensing Engineer JBS/dd
ames. B. Sinclair Licensing Engineer JBS/dd


==Enclosures:==
==Enclosures:==
: 1. Attachment A
1.
: 2. Revision 7 to Vermont Yankee Physical Security Plan O
Attachment A 2.
Revision 7 to Vermont Yankee Physical Security Plan O
i l
i l
l Document Tt     .itted                                   When Separated from         l i
Document Tt
[J 1 !!crewith Cont   is SAFEGUARDS INFO. ' ATION Enclosures, Handle This Document as Decontrolled
.itted When Separated from
                                        - -          -                                      .-.}}
[J 1
!!crewith Cont is Enclosures, Handle This i
SAFEGUARDS INFO. ' ATION Document as Decontrolled
.-.}}

Latest revision as of 10:59, 16 December 2024

Forwards Rev 7 to Security Plan.Rev Withheld (Ref 10CFR73.21)
ML20069D942
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/28/1983
From: Sinclair J
VERMONT YANKEE NUCLEAR POWER CORP.
To: Vassallo D
Office of Nuclear Reactor Regulation
References
FVY-83-7, GL-82-39, VYV-83-7, NUDOCS 8303210129
Download: ML20069D942 (2)


Text

o VERMONT YANKEE NUCLEAR POWER CORPORATION VYV 83-7 2.C.2.1 FVY 83-7 RD 5. Box 169, Ferry Road, Brattleboro, VT 05301 y,

g ENGINEERING OFFICE 1671 WORCESTER ROAD g

January 28, 1983 FRAMINGHAM, MASSACHUSETTS 01701 TEL EPHONE 617-872-8100 United F.ates Nuclear Regulatory Commission Wa shington, D. C. 20555 Attention:

Office of Nuclear Reactor Regulation Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing

References:

(a) License No. DPR-28 (Docket No. 50-271)

(b) Letter, USNRC to VYNPC, Generic Letter 82-39, dated December 22, 1982 Subj ec t :

Revision 7 to the Vermont Yankee Physical Security Plan

(^')

Dear Sir:

V This letter provides Revision 7 to the Vermont Yankee Physical Security Plan which makes several changes as explained in Attachment A.

We have determined that this change does not result in a decrease of the ef fectiveness of the Plan, and therefore, it is forwarded for your information and use.

Both the Security Plan and Attachment A are considered Safeguards Information and as such, shall be withheld from public disclosure pursuant to 10CFR73.21.

Included with each copy of the change is a Change Transmittal Form.

Please insure that the forms are completed and returned to us as required by Section 13.8 of the Plan.

In addition, since we are sending a sixth copy (3E) for the first time as required by Ref erence (b), please insure tha t the custody form at tached to copy 3E is returned.

8303210129 830128 PDR ADOCK 05000271 F

PDR i

Document Transmitted When Separated f rom Herewith Contains Enclosures, Handle This I

SAFEGUARDS INFORMATION Document as Decontrelled

^

I'O i

  • Sool I 5-fN 7 1-wjras.ce.ards m

..a..,,a a a. m e u....m., ua. -

7s.o., + 2a he< 7 Yo ^!a n / M 1

United States Nuclear Regulatory Commission January 28, 1983 Attentipn: Mr. Domenic B. Vassallo Page 2 I'x,))

We trust this information is adequate; botiever, should you have any questions, please contact !!r. Warren P. Murphy, Vice President and Manager of Operations, at our Brattleboro, Vermont offices.

Very truly yours, VERIONT YANKEE NUCLEAR POWER CORPORATION e

.b/

m ames. B. Sinclair Licensing Engineer JBS/dd

Enclosures:

1.

Attachment A 2.

Revision 7 to Vermont Yankee Physical Security Plan O

i l

Document Tt

.itted When Separated from

[J 1

!!crewith Cont is Enclosures, Handle This i

SAFEGUARDS INFO. ' ATION Document as Decontrolled

.-.