ML20069D942

From kanterella
Jump to navigation Jump to search
Forwards Rev 7 to Security Plan.Rev Withheld (Ref 10CFR73.21)
ML20069D942
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/28/1983
From: Sinclair J
VERMONT YANKEE NUCLEAR POWER CORP.
To: Vassallo D
Office of Nuclear Reactor Regulation
References
FVY-83-7, GL-82-39, VYV-83-7, NUDOCS 8303210129
Download: ML20069D942 (2)


Text

o VERMONT YANKEE NUCLEAR POWER CORPORATION VYV 83-7 2.C.2.1 FVY 83-7 RD 5. Box 169, Ferry Road, Brattleboro, VT 05301 y,

g ENGINEERING OFFICE 1671 WORCESTER ROAD g

January 28, 1983 FRAMINGHAM, MASSACHUSETTS 01701 TEL EPHONE 617-872-8100 United F.ates Nuclear Regulatory Commission Wa shington, D. C. 20555 Attention:

Office of Nuclear Reactor Regulation Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing

References:

(a) License No. DPR-28 (Docket No. 50-271)

(b) Letter, USNRC to VYNPC, Generic Letter 82-39, dated December 22, 1982 Subj ec t :

Revision 7 to the Vermont Yankee Physical Security Plan

(^')

Dear Sir:

V This letter provides Revision 7 to the Vermont Yankee Physical Security Plan which makes several changes as explained in Attachment A.

We have determined that this change does not result in a decrease of the ef fectiveness of the Plan, and therefore, it is forwarded for your information and use.

Both the Security Plan and Attachment A are considered Safeguards Information and as such, shall be withheld from public disclosure pursuant to 10CFR73.21.

Included with each copy of the change is a Change Transmittal Form.

Please insure that the forms are completed and returned to us as required by Section 13.8 of the Plan.

In addition, since we are sending a sixth copy (3E) for the first time as required by Ref erence (b), please insure tha t the custody form at tached to copy 3E is returned.

8303210129 830128 PDR ADOCK 05000271 F

PDR i

Document Transmitted When Separated f rom Herewith Contains Enclosures, Handle This I

SAFEGUARDS INFORMATION Document as Decontrelled

^

I'O i

  • Sool I 5-fN 7 1-wjras.ce.ards m

..a..,,a a a. m e u....m., ua. -

7s.o., + 2a he< 7 Yo ^!a n / M 1

United States Nuclear Regulatory Commission January 28, 1983 Attentipn: Mr. Domenic B. Vassallo Page 2 I'x,))

We trust this information is adequate; botiever, should you have any questions, please contact !!r. Warren P. Murphy, Vice President and Manager of Operations, at our Brattleboro, Vermont offices.

Very truly yours, VERIONT YANKEE NUCLEAR POWER CORPORATION e

.b/

m ames. B. Sinclair Licensing Engineer JBS/dd

Enclosures:

1.

Attachment A 2.

Revision 7 to Vermont Yankee Physical Security Plan O

i l

Document Tt

.itted When Separated from

[J 1

!!crewith Cont is Enclosures, Handle This i

SAFEGUARDS INFO. ' ATION Document as Decontrolled

.-.