ML20069D942: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:o VERMONT YANKEE NUCLEAR POWER CORPORATION VYV 83-7 2.C.2.1 FVY 83-7 RD 5. Box 169, Ferry Road, Brattleboro, VT 05301 y, | ||
g ENGINEERING OFFICE 1671 WORCESTER ROAD g | |||
January 28, 1983 FRAMINGHAM, MASSACHUSETTS 01701 TEL EPHONE 617-872-8100 United F.ates Nuclear Regulatory Commission Wa shington, D. C. 20555 Attention: | |||
Office of Nuclear Reactor Regulation Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing | |||
==References:== | |||
(a) License No. DPR-28 (Docket No. 50-271) | |||
(b) Letter, USNRC to VYNPC, Generic Letter 82-39, dated December 22, 1982 Subj ec t : | |||
Revision 7 to the Vermont Yankee Physical Security Plan | |||
(^') | |||
==Dear Sir:== | |||
V This letter provides Revision 7 to the Vermont Yankee Physical Security Plan which makes several changes as explained in Attachment A. | |||
We have determined that this change does not result in a decrease of the ef fectiveness of the Plan, and therefore, it is forwarded for your information and use. | |||
Both the Security Plan and Attachment A are considered Safeguards Information and as such, shall be withheld from public disclosure pursuant to 10CFR73.21. | |||
Included with each copy of the change is a Change Transmittal Form. | |||
Please insure that the forms are completed and returned to us as required by Section 13.8 of the Plan. | |||
In addition, since we are sending a sixth copy (3E) for the first time as required by Ref erence (b), please insure tha t the custody form at tached to copy 3E is returned. | |||
8303210129 830128 PDR ADOCK 05000271 F | |||
PDR i | |||
Document Transmitted When Separated f rom Herewith Contains Enclosures, Handle This I | |||
SAFEGUARDS INFORMATION Document as Decontrelled | |||
^ | |||
I'O i | |||
* Sool I 5-fN 7 1-wjras.ce.ards m | |||
..a..,,a a a. m e u....m., ua. - | |||
7s.o., + 2a he< 7 Yo ^!a n / M 1 | |||
United States Nuclear Regulatory Commission January 28, 1983 Attentipn: Mr. Domenic B. Vassallo Page 2 I'x,)) | |||
We trust this information is adequate; botiever, should you have any questions, please contact !!r. Warren P. Murphy, Vice President and Manager of Operations, at our Brattleboro, Vermont offices. | |||
Very truly yours, VERIONT YANKEE NUCLEAR POWER CORPORATION e | |||
.b/ | |||
m ames. B. Sinclair Licensing Engineer JBS/dd | |||
==Enclosures:== | |||
1. | |||
Attachment A 2. | |||
Revision 7 to Vermont Yankee Physical Security Plan O | |||
i l | |||
Document Tt | |||
.itted When Separated from | |||
[J 1 | |||
!!crewith Cont is Enclosures, Handle This i | |||
SAFEGUARDS INFO. ' ATION Document as Decontrolled | |||
.-.}} | |||
Latest revision as of 10:59, 16 December 2024
| ML20069D942 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 01/28/1983 |
| From: | Sinclair J VERMONT YANKEE NUCLEAR POWER CORP. |
| To: | Vassallo D Office of Nuclear Reactor Regulation |
| References | |
| FVY-83-7, GL-82-39, VYV-83-7, NUDOCS 8303210129 | |
| Download: ML20069D942 (2) | |
Text
o VERMONT YANKEE NUCLEAR POWER CORPORATION VYV 83-7 2.C.2.1 FVY 83-7 RD 5. Box 169, Ferry Road, Brattleboro, VT 05301 y,
g ENGINEERING OFFICE 1671 WORCESTER ROAD g
January 28, 1983 FRAMINGHAM, MASSACHUSETTS 01701 TEL EPHONE 617-872-8100 United F.ates Nuclear Regulatory Commission Wa shington, D. C. 20555 Attention:
Office of Nuclear Reactor Regulation Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing
References:
(a) License No. DPR-28 (Docket No. 50-271)
(b) Letter, USNRC to VYNPC, Generic Letter 82-39, dated December 22, 1982 Subj ec t :
Revision 7 to the Vermont Yankee Physical Security Plan
(^')
Dear Sir:
V This letter provides Revision 7 to the Vermont Yankee Physical Security Plan which makes several changes as explained in Attachment A.
We have determined that this change does not result in a decrease of the ef fectiveness of the Plan, and therefore, it is forwarded for your information and use.
Both the Security Plan and Attachment A are considered Safeguards Information and as such, shall be withheld from public disclosure pursuant to 10CFR73.21.
Included with each copy of the change is a Change Transmittal Form.
Please insure that the forms are completed and returned to us as required by Section 13.8 of the Plan.
In addition, since we are sending a sixth copy (3E) for the first time as required by Ref erence (b), please insure tha t the custody form at tached to copy 3E is returned.
8303210129 830128 PDR ADOCK 05000271 F
PDR i
Document Transmitted When Separated f rom Herewith Contains Enclosures, Handle This I
SAFEGUARDS INFORMATION Document as Decontrelled
^
I'O i
- Sool I 5-fN 7 1-wjras.ce.ards m
..a..,,a a a. m e u....m., ua. -
7s.o., + 2a he< 7 Yo ^!a n / M 1
United States Nuclear Regulatory Commission January 28, 1983 Attentipn: Mr. Domenic B. Vassallo Page 2 I'x,))
We trust this information is adequate; botiever, should you have any questions, please contact !!r. Warren P. Murphy, Vice President and Manager of Operations, at our Brattleboro, Vermont offices.
Very truly yours, VERIONT YANKEE NUCLEAR POWER CORPORATION e
.b/
m ames. B. Sinclair Licensing Engineer JBS/dd
Enclosures:
1.
Attachment A 2.
Revision 7 to Vermont Yankee Physical Security Plan O
i l
Document Tt
.itted When Separated from
[J 1
!!crewith Cont is Enclosures, Handle This i
SAFEGUARDS INFO. ' ATION Document as Decontrolled
.-.