293 DCC'GT NO.
293 DCC'GT NO.
L' NIT Pilgrim 1 DATE    12/13 /82
L' NIT Pilgrim 1 12/13 /82 DATE COMPLETED BY G.G. Whitney
                                                                ~
~
COMPLETED BY       G.G. Whitney
TELEPHONE 617-746-7900 MONTH NOVEMBER, 1982 DAY AVERAGE DAILY POWER LEVEL 0 e.Y AVERAGE DAILY POWER LEVEL (Mwe-Net)
                              -                                                                TELEPHONE 617-746-7900 NOVEMBER, 1982 MONTH DAY           AVERAGE DAILY POWER LEVEL                       0 e.Y     AVERAGE DAILY POWER LEVEL (Mwe-Net)                                                   (MWe-Net) g 664.         .
(MWe-Net) 664.
g7       .            665 2     ._
665 g
350.                                   18                     664.
g7 2
3                       0.                                 39                     665.
350.
: 0.                                                         666.
18 664.
4                                                           20 5
3 0.
                          ~
39 665.
448.                                   21                     6s8.
0.
                                '618.                                   ,;                    664.
666.
6        -
4 20 5
663.                                  23 664.
448.
7                                                                                                              .
21 6s8.
664.    .,                                  ,
~
'618.
664.
664.
g 663.                                   25 665.
6 664.
9 10                                                           26 637.                                   ,-                    665.
663.
23 7
664.
664.
g 663.
665.
9 25 10 26 637.
665.
33.
33.
g3                    664.                                   23                     592.
592.
66L                                   29                     667-13 i 621.                                   30                   665.
664.
14 664.                                                           NA 15                                                           33 16                     665.
23 g3 13 i 66L 29 667-14 621.
3 INSTRUCTIONS                 -
30 665.
On this format.!ist the average ds5y unit power levelin MWe. Net for each day in the reporting month. Compute to t h* "e2 rest whole merswatt.
NA 664.
O   KQ       g
33 15 16 665.
                            .          PDR                                                                             tol77)
3 INSTRUCTIONS On this format.!ist the average ds5y unit power levelin MWe. Net for each day in the reporting month. Compute to t * "e2 rest whole merswatt.
L_____                                                                                                                         m
h O
KQ g
PDR tol77)
L_____
m


f5           -.
f5 OPERATING DATA REPORT.
OPERATING DATA REPORT.
50-293 DOCKET NO.
DOCKET NO. 50-293 DATE- 12/13 /82 COMPLETED BY     C.C.Whitne TELEPHONE .617-746-79b0 OPERATING STATUS Pilgrim 1               ~ Notes g,g,;,g,,,
DATE-12/13 /82 COMPLETED BY C.C.Whitne TELEPHONE.617-746-79b0 OPERATING STATUS Pilgrim 1
~ Notes g,g,;,g,,,
November, 1982
November, 1982
            - 2. Reporting Period:
- 2. Reporting Period:
1998.
1998.
: 3. Licensed Thermal Power (MWt):
: 3. Licensed Thermal Power (MWt):
678.
678.
: 4. Nameplate Rating (Gross MWe):
: 4. Nameplate Rating (Gross MWe):
655.                         -
655.
: 5. Design Electrical Rating (Net MWe):
: 5. Design Electrical Rating (Net MWe):
: 6. Maximum Dependable Capacity (Gross MWe): 690.
: 6. Maximum Dependable Capacity (Gross MWe): 690.
670.
: 7. Maximum Dependable Capacity (Net MWe):
: 7. Maximum Dependable Capacity (Net MWe):
670.
: 8. -If Changes Occur in Capacity Ratings (Items Number-3 Through 7) Since Last Report, Give Reasons:
: 8. -If Changes Occur in Capacity Ratings (Items Number-3 Through 7) Since Last Report, Give Reasons:
None None 9.' Power Level To Which Restricted,If Any (Net MWe):
None None 9.' Power Level To Which Restricted,If Any (Net MWe):
N/A
: 10. Reasons For Restrictions,If Any:
: 10. Reasons For Restrictions,If Any:
N/A a
a This Month Yr to-Date Cu-alstive 8016.0 87456.0
This Month             Yr to-Date         Cu- alstive 720.0          '
: 11. Hours la ' Reporting Period-720.0 686.6 5238.4 61271.7
8016.0             87456.0
: 12. Number Of Hours Reactor Was Critical 0.0 0.0 0.0
: 11. Hours la ' Reporting Period-686.6                 5238.4             61271.7
: 13. Reactor Reserv-Shutdown Hours 4930.7 59208.6 661.4
: 12. Number Of Hours Reactor Was Critical                                                                   0.0 0.0                   0.0                                       ;
: 14. Hours Generator On-Line 0.0 0.0 0.0 15.' Unit Reserve Shutdown Hours.
: 13. Reactor Reserv- Shutdown Hours
1279920.0-
                                                            -            661.4                4930.7             59208.6
.605368.0
: 14. Hours Generator On-Line                                                           0.0                   0.0 0.0 15.' Unit Reserve Shutdown Hours .                                           .605368.0         .101423256.0 1279920.0-                                                    ,
.101423256.0
: 16. Gross Thermal Energy Generated (MWH)                                                         33875874.0 445910.0             2964640.0 l 17.: Gross Electrical Energy Generated (MWH)                             ,
: 16. Gross Thermal Energy Generated (MWH) 445910.0 2964640.0 33875874.0 l 17.: Gross Electrical Energy Generated (MWH) 429039.0
32547526.0 2
-2853042.0 32547526.0 2
429039.0           -2853042.0
: 18. Net Electr: cal Energy Generated (MWH) 91.9 61.!
: 18. Net Electr: cal Energy Generated (MWH)                                                                 67.7 91.9                   61.!
67.7
(         ' 19. Unit Service Fator'                     ,
(
61.5                 67.7
' 19. Unit Service Fator' 91.9 61.5 67.7
: 20. . Unit Availability Factor ,                             91.9 88.9                    53.1                  55.5 21.- Unit Capacity Factor (Using MDC Net) -                                                                 56.8 91.0                    54.3 i           22. Unit Capacity Factor (Ucing DER Net)~                                               7.5                 9.8 8.1
: 20.. Unit Availability Factor,
: 23. Unit Forced Outage Rate :           ,
21.- Unit Capacity Factor (Using MDC Net) -
88.9 53.1 55.5 i
: 22. Unit Capacity Factor (Ucing DER Net)~
91.0 54.3 56.8 8.1 7.5 9.8
: 23. Unit Forced Outage Rate :
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:
NONE UNIT OPERATING
NONE UNIT OPERATING
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26.~ Units in Test Status (Prior to Commercial Operation):                       Forecast           Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (o/77 L                                                                                                                                 ,
26.~ Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (o/77 L


y UNITSilVTDOWNS AND POWER RECUCTIONS                               DOCKET NO.           50-293 UNIT NAME           Pi*1er'm 1
y UNITSilVTDOWNS AND POWER RECUCTIONS DOCKET NO.
                                                                                                                                                        ~
50-293 UNIT NAME Pi*1er'm 1 DATE 12,t]3 /82
DATE       12,t]3 /82 COMPLETED BY             G.G. Whitney REl' ORT MONTil NOVEMBER, 1982 TELErilONE           617-7t.6-7900 r6 "i                                     -
~
c .    .re     .3 sa :
REl' ORT MONTil NOVEMBER, 1982 COMPLETED BY G.G. Whitney TELErilONE 617-7t.6-7900 r6 "i
U!!c i,     .2 ,e         E g .5 X       Licensee            E't,      5''l c                     Cause & Corrective N" .             '
c
H R       58           5   _c s E       Event
.re
                                                                                        ,#0 Y-     81 v Action io
.3 sa :
[3 E         cE j5g         Report #                                               Psevent Recurrence d                                                                   .
Licensee E't, 5''l Cause & Corrective i,
t 29     82/11/02     F     58.6     i H           1     82-01i/01T           . HB '   VALVEX     Incorr nt setting on safety valve requiwd drywell entry to affect fix.
.2,e E
l                                                                                                                                 .
g.5 X c
l                                                                                     .
N".
I                     2                                                   3                                     4 F: Forced           Reason:                                                     Methtxt:                           Exhibit G-Instructions S: Scheduled         A. Equipment Failure (Explain)                             l-Manual                           for Pseparation of Data D Maintenance of Test                                       2-Manual Scram.                     Entry Sheets for 1.icensee C Refueling                                                 J. Automatic Scram.                 Event ReporI (1.ER) File (NURI:G-
U!!c R
                  ,          D Regulatory Restriction                                   4-01her (Explain)                   0161)
58 5
E Operator Training & License Examination F Administrative                                                                         5 G Operational Eeror (Explain)                                                                   Exhibit ' Same Source
_c s E Event Y-81 Action io H
    < <p 7 )                 Il Othe; (Explain)
[3 E cE j5g Report #
,#0 v
Psevent Recurrence d
t 29 82/11/02 F
58.6 i
H 1
82-01i/01T
. HB '
VALVEX Incorr nt setting on safety valve requiwd drywell entry to affect fix.
l l
I 2
3 4
F: Forced Reason:
Methtxt:
Exhibit G-Instructions S: Scheduled A. Equipment Failure (Explain) l-Manual for Pseparation of Data D Maintenance of Test 2-Manual Scram.
Entry Sheets for 1.icensee C Refueling J. Automatic Scram.
Event ReporI (1.ER) File (NURI:G-D Regulatory Restriction 4-01her (Explain) 0161)
E Operator Training & License Examination F Administrative 5
G Operational Eeror (Explain)
Exhibit ' Same Source
< <p 7 )
Il Othe; (Explain)


P 11.(.R I fl NilCl.EAlt POWl'.R STATION                                 ,
P 11.(.R I fl NilCl.EAlt POWl'.R STATION i
i o                 ,*
o MATOR SAFETY RELATED MAV ENANCE MONTH NOVFMBER. 1982
                              ,                            MATOR SAFETY RELATED MAV ENANCE                               MONTH NOVFMBER. 1982
~ '
  ~ '
I CORREC"'iVE ACTl']N Y ST Ett COMPONENT MALFUNCTION
I                                                                                   CORREC"'iVE ACTl']N Y ST Ett       COMPONENT     MALFUNCTION           __ _ . CAUSE             . MAINTENANCE               TO PREVENT RECURRENCE           ASSOCIATED LER LGI C       RCIC Pump         Low Flow             Change in Sect.         Inspected internals         Pump capable v. performing       None XI tearlings                                         intendd function. No wear                   ,.
__ _. CAUSE
                                                                                                ~
. MAINTENANCE TO PREVENT RECURRENCE ASSOCIATED LER LGI C RCIC Pump Low Flow Change in Sect.
noted, change test conditions to address variable speed prime mover.
Inspected internals Pump capable v.
Fire       Jockey Fire         Failed- Motor       Salt water             Rewound Motor and         . Salt environment failure wts Pump               burnt out           Environment             rebuilt pumps             first in ten years.
performing None XI tearlings intendd function. No wear noted, change test conditions
itPCI       M02301-3           Ground               Steam leak             Tightened packing         HPCI inop. (1 hr.)                 LER 82-046/01T-0 Clegned MOVs             Dressed up stem Replaced limit switch and torque swit'ch                                   ,
~
RCIC       M01301-17           Steam Leak         ~ Stem problem           Backseat                 Repair during outage of suf-ficient duration Main         'A' Safety Vlv. Incorrect               Personnel error         Replaced valve           Counseled personnel and clari- LER 82-049/01T-0 Steam                         setting                                                               fled procedure           .
to address variable speed prime mover.
o
Fire Jockey Fire Failed-Motor Salt water Rewound Motor and
!(C IC     Turbine             Burned out           .A;s                     Repaired resistor         None - isolated event - first     LER 82-955/03L-0 Governor           res stor                                                               in RCIC Covernor a
. Salt environment failure wts Pump burnt out Environment rebuilt pumps first in ten years.
itPCI M02301-3 Ground Steam leak Tightened packing HPCI inop. (1 hr.)
LER 82-046/01T-0 Clegned MOVs Dressed up stem Replaced limit switch and torque swit'ch RCIC M01301-17 Steam Leak
~ Stem problem Backseat Repair during outage of suf-ficient duration Main
'A' Safety Vlv.
Incorrect Personnel error Replaced valve Counseled personnel and clari-LER 82-049/01T-0 Steam setting fled procedure o
!(C IC Turbine Burned out
.A;s Repaired resistor None - isolated event - first LER 82-955/03L-0 Governor res stor in RCIC Covernor a


              - 7 4
- 7 4
t, . y
t,. y 9.[; [ <
                                                                              ~
~
9.[;     [<                                                                                   ibOS70f ED150N CO.931 o                                                                                                       ~
ibOS70f ED150N CO.931 o
: g.                                                                                           . PILCRIM NUCLEAR POWER- STATION Sumr.a ry _ of Opera tisns for - NOVEMBER, 1982, . /         ,
~
g.
. PILCRIM NUCLEAR POWER-STATION Sumr.a ry _ of Opera tisns for - NOVEMBER, 1982,.
/
:v,
:v,
        ~
~
LThe. month began.with>the station at:99%' power.
l LThe. month began.with>the station at:99%' power.
                                        ~
~
l
                              ~
At 1543 on 11/2/82Zth'e-turbine was taken'off.line and the reactor-brought to
At 1543 on 11/2/82Zth'e-turbine was taken'off.line and the reactor-brought to
      ,7                  ,
~
cold: shutdown . to allow replacement of - the ."A'' . Main Steam Safety Valve. _The drywell was entered, repairs made~and the unit placed back in service _at                       '
cold: shutdown. to allow replacement of - the."A''. Main Steam Safety Valve. _The
I
,7 drywell was entered, repairs made~and the unit placed back in service _at
:0220fon~11/5/82.-                                                                         ,
:0220fon~11/5/82.-
The station operated at an average power' level of 99% due to main steam
I The station operated at an average power' level of 99% due to main steam
                                ' relief valve simmer. considerations. Other conaiderations affecting station
' relief valve simmer. considerations. Other conaiderations affecting station
                              -powerflevel were fuel conditioning, condenser fouling, conden, sate demineralizer-
-powerflevel were fuel conditioning, condenser fouling, conden, sate demineralizer-
                                                                                      ~
~
                                -differential pressure and control rod pattern changes.
-differential pressure and control rod pattern changes.
N                                                                                                                                         . 1
N 1
#                                During this period the -jockey fire pump ' failed and was' repaired. Control rod 10-31' experienced drive difficulties which were co'rrected. Probleme were corrected lLn the' HPCI control- circuitry and in motor operated valve 2301-03 which is. located.in:the HPCI: System..
During this period the -jockey fire pump ' failed and was' repaired. Control rod 10-31' experienced drive difficulties which were co'rrected. Probleme were corrected lLn the' HPCI control-circuitry and in motor operated valve 2301-03 which is. located.in:the HPCI: System..
The condensate demineralizers were backwashed frequently due to high differ-ential pressure.
The condensate demineralizers were backwashed frequently due to high differ-ential pressure.
RCIC pump operation was investigated du to low flow indication.(Ref. Maint. Summary) 01 11/11/82 power was ' reduced to 60% when the '!D" MSIV's had to be closed to-           2 JallowfinsestigatiYn of'an apparent malfunctioning reactor' protection system                     ~
RCIC pump operation was investigated du to low flow indication.(Ref. Maint. Summary) 01 11/11/82 power was ' reduced to 60% when the '!D" MSIV's had to be closed to-2 JallowfinsestigatiYn of'an apparent malfunctioning reactor' protection system (relay.- Ref.: cLER 82-054/03L-0.
(relay.- Ref.: cLER 82-054/03L-0.
~
:L oni11/27/82 power was reduced to 50% due to main condenser fouling. The
:L oni11/27/82 power was reduced to 50% due to main condenser fouling. The
: main condense was backwashed.. heat treated and the ut.it returned to full power.
: main condense was backwashed.. heat treated and the ut.it returned to full power.
The month, ended at.99% with HPCI inoperable, awaiting repair of the HPcI 2301-3 motor; operated valve.
The month, ended at.99% with HPCI inoperable, awaiting repair of the HPcI 2301-3 motor; operated valve.
I,.
I,.
                                                                                ' SAFETY /RELIFF VALVE CHALLENGES - MONTH OF NOVEMBER, 1,982 No Safety / Relief Valve challenges occurred during the
' SAFETY /RELIFF VALVE CHALLENGES - MONTH OF NOVEMBER, 1,982 No Safety / Relief Valve challenges occurred during the
                                                                                -month of November, 1982.
-month of November, 1982.
s                                                               .
s
                        ~-
~-
a if e
a if f
f
e


9;'
9;'
            .w , ;
.w, ;
REFUELING INFOE'1ATION
REFUELING INFOE'1ATION
                                                                                                                                        ^             '
^
The following . refueling inforration is included in the Monthly Report as                                             ,
The following. refueling inforration is included in the Monthly Report as requested in a :1etter to Mr. G. C. Andognini dated January 18, 1978:
requested in a :1etter to Mr. G. C. Andognini dated January 18, 1978:
. For your convenience, the information supplied has been enumerated so that each number corresponds to equiv ient notation utilized'in the request.
                        . For your convenience, the information supplied has been enumerated so that each number corresponds to equiv ient notation utilized'in the request.
1.
: 1. The name-of this facility is Pilgrim Nuclear Power Station, Docket Number 50-293.
The name-of this facility is Pilgrim Nuclear Power Station, Docket Number 50-293.
: 2. Scheduled date for'next Refueling Shutdown: September,1983,
2.
: 3. ~ Scheduled date for rea, tart following refueling:~ November, 1983                                                   ,
Scheduled date for'next Refueling Shutdown: September,1983,
: 4.                    .
: 3. ~ Scheduled date for rea, tart following refueling:~ November, 1983 4.
        .                  5. Due to their similarity, requests 4, 5, & 6 are responded to collectively:
5.
6.. ' The fuel, 'which had been , loaded. during the 1981 scheduled refueling outage, is of the same P8x8R desi.gn, as loaded the previous outage , con-sisting of 112 P8DRB282 assemblies.and 60 P8DRB265 as'semblies.
Due to their similarity, requests 4, 5, & 6 are responded to collectively:
: 7. - (a). There are 580 fuel' assemblies in the core.                                                               ~
6.. ' The fuel, 'which had been, loaded. during the 1981 scheduled refueling outage, is of the same P8x8R desi.gn, as loaded the previous outage, con-sisting of 112 P8DRB282 assemblies.and 60 P8DRB265 as'semblies.
: 7. - (a). There are 580 fuel' assemblies in the core.
~
(b) There are'* 936 fuel assemblies' in the speIt fuel pool.
(b) There are'* 936 fuel assemblies' in the speIt fuel pool.
                          - 8.   (a) The station is present1u licensed to store 2320 spent fuel assemblies.
- 8.
(a) The station is present1u licensed to store 2320 spent fuel assemblies.
The acten1 spent fuel. storage capacity 'is 1770 fuel assemblies at present.
The acten1 spent fuel. storage capacity 'is 1770 fuel assemblies at present.
                                . (b) The planned spent fuel storage capacity is 2320 fuel assemblies.
. (b) The planned spent fuel storage capacity is 2320 fuel assemblies.
                          . 9. With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 834 fuel assemblies.
. 9.
e
With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 834 fuel assemblies.
* e f
e e
e
f e
* e e
e e
4
4
                                                  +
+
4 L                                                                                                                                                     ,
4 L
                                                                                                                                  -_}}
-_}}

Latest revision as of 09:13, 16 December 2024

Monthly Operating Rept for Nov 1982
ML20070R037
Person / Time
Site: Pilgrim
Issue date: 12/13/1982
From: Whitney G
BOSTON EDISON CO.
To:
Shared Package
ML20070R036 List:
References
NUDOCS 8301270251
Download: ML20070R037 (6)


Text

-~

293 DCC'GT NO.

L' NIT Pilgrim 1 12/13 /82 DATE COMPLETED BY G.G. Whitney

~

TELEPHONE 617-746-7900 MONTH NOVEMBER, 1982 DAY AVERAGE DAILY POWER LEVEL 0 e.Y AVERAGE DAILY POWER LEVEL (Mwe-Net)

(MWe-Net) 664.

665 g

g7 2

350.

18 664.

3 0.

39 665.

0.

666.

4 20 5

448.

21 6s8.

~

'618.

664.

6 664.

663.

23 7

664.

664.

g 663.

665.

9 25 10 26 637.

665.

33.

592.

664.

23 g3 13 i 66L 29 667-14 621.

30 665.

NA 664.

33 15 16 665.

3 INSTRUCTIONS On this format.!ist the average ds5y unit power levelin MWe. Net for each day in the reporting month. Compute to t * "e2 rest whole merswatt.

h O

KQ g

PDR tol77)

L_____

m

f5 OPERATING DATA REPORT.

50-293 DOCKET NO.

DATE-12/13 /82 COMPLETED BY C.C.Whitne TELEPHONE.617-746-79b0 OPERATING STATUS Pilgrim 1

~ Notes g,g,;,g,,,

November, 1982

- 2. Reporting Period:

1998.

3. Licensed Thermal Power (MWt):

678.

4. Nameplate Rating (Gross MWe):

655.

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 690.

670.

7. Maximum Dependable Capacity (Net MWe):
8. -If Changes Occur in Capacity Ratings (Items Number-3 Through 7) Since Last Report, Give Reasons:

None None 9.' Power Level To Which Restricted,If Any (Net MWe):

N/A

10. Reasons For Restrictions,If Any:

a This Month Yr to-Date Cu-alstive 8016.0 87456.0

11. Hours la ' Reporting Period-720.0 686.6 5238.4 61271.7
12. Number Of Hours Reactor Was Critical 0.0 0.0 0.0
13. Reactor Reserv-Shutdown Hours 4930.7 59208.6 661.4
14. Hours Generator On-Line 0.0 0.0 0.0 15.' Unit Reserve Shutdown Hours.

1279920.0-

.605368.0

.101423256.0

16. Gross Thermal Energy Generated (MWH) 445910.0 2964640.0 33875874.0 l 17.: Gross Electrical Energy Generated (MWH) 429039.0

-2853042.0 32547526.0 2

18. Net Electr: cal Energy Generated (MWH) 91.9 61.!

67.7

(

' 19. Unit Service Fator' 91.9 61.5 67.7

20.. Unit Availability Factor,

21.- Unit Capacity Factor (Using MDC Net) -

88.9 53.1 55.5 i

22. Unit Capacity Factor (Ucing DER Net)~

91.0 54.3 56.8 8.1 7.5 9.8

23. Unit Forced Outage Rate :
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:

NONE UNIT OPERATING

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

26.~ Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (o/77 L

y UNITSilVTDOWNS AND POWER RECUCTIONS DOCKET NO.

50-293 UNIT NAME Pi*1er'm 1 DATE 12,t]3 /82

~

REl' ORT MONTil NOVEMBER, 1982 COMPLETED BY G.G. Whitney TELErilONE 617-7t.6-7900 r6 "i

c

.re

.3 sa :

Licensee E't, 5l Cause & Corrective i,

.2,e E

g.5 X c

N".

U!!c R

58 5

_c s E Event Y-81 Action io H

[3 E cE j5g Report #

,#0 v

Psevent Recurrence d

t 29 82/11/02 F

58.6 i

H 1

82-01i/01T

. HB '

VALVEX Incorr nt setting on safety valve requiwd drywell entry to affect fix.

l l

I 2

3 4

F: Forced Reason:

Methtxt:

Exhibit G-Instructions S: Scheduled A. Equipment Failure (Explain) l-Manual for Pseparation of Data D Maintenance of Test 2-Manual Scram.

Entry Sheets for 1.icensee C Refueling J. Automatic Scram.

Event ReporI (1.ER) File (NURI:G-D Regulatory Restriction 4-01her (Explain) 0161)

E Operator Training & License Examination F Administrative 5

G Operational Eeror (Explain)

Exhibit ' Same Source

< <p 7 )

Il Othe; (Explain)

P 11.(.R I fl NilCl.EAlt POWl'.R STATION i

o MATOR SAFETY RELATED MAV ENANCE MONTH NOVFMBER. 1982

~ '

I CORREC"'iVE ACTl']N Y ST Ett COMPONENT MALFUNCTION

__ _. CAUSE

. MAINTENANCE TO PREVENT RECURRENCE ASSOCIATED LER LGI C RCIC Pump Low Flow Change in Sect.

Inspected internals Pump capable v.

performing None XI tearlings intendd function. No wear noted, change test conditions

~

to address variable speed prime mover.

Fire Jockey Fire Failed-Motor Salt water Rewound Motor and

. Salt environment failure wts Pump burnt out Environment rebuilt pumps first in ten years.

itPCI M02301-3 Ground Steam leak Tightened packing HPCI inop. (1 hr.)

LER 82-046/01T-0 Clegned MOVs Dressed up stem Replaced limit switch and torque swit'ch RCIC M01301-17 Steam Leak

~ Stem problem Backseat Repair during outage of suf-ficient duration Main

'A' Safety Vlv.

Incorrect Personnel error Replaced valve Counseled personnel and clari-LER 82-049/01T-0 Steam setting fled procedure o

!(C IC Turbine Burned out

.A;s Repaired resistor None - isolated event - first LER 82-955/03L-0 Governor res stor in RCIC Covernor a

- 7 4

t,. y 9.[; [ <

~

ibOS70f ED150N CO.931 o

~

g.

. PILCRIM NUCLEAR POWER-STATION Sumr.a ry _ of Opera tisns for - NOVEMBER, 1982,.

/

v,

~

l LThe. month began.with>the station at:99%' power.

~

At 1543 on 11/2/82Zth'e-turbine was taken'off.line and the reactor-brought to

~

cold: shutdown. to allow replacement of - the."A. Main Steam Safety Valve. _The

,7 drywell was entered, repairs made~and the unit placed back in service _at

0220fon~11/5/82.-

I The station operated at an average power' level of 99% due to main steam

' relief valve simmer. considerations. Other conaiderations affecting station

-powerflevel were fuel conditioning, condenser fouling, conden, sate demineralizer-

~

-differential pressure and control rod pattern changes.

N 1

During this period the -jockey fire pump ' failed and was' repaired. Control rod 10-31' experienced drive difficulties which were co'rrected. Probleme were corrected lLn the' HPCI control-circuitry and in motor operated valve 2301-03 which is. located.in:the HPCI: System..

The condensate demineralizers were backwashed frequently due to high differ-ential pressure.

RCIC pump operation was investigated du to low flow indication.(Ref. Maint. Summary) 01 11/11/82 power was ' reduced to 60% when the '!D" MSIV's had to be closed to-2 JallowfinsestigatiYn of'an apparent malfunctioning reactor' protection system (relay.- Ref.: cLER 82-054/03L-0.

~

L oni11/27/82 power was reduced to 50% due to main condenser fouling. The
main condense was backwashed.. heat treated and the ut.it returned to full power.

The month, ended at.99% with HPCI inoperable, awaiting repair of the HPcI 2301-3 motor; operated valve.

I,.

' SAFETY /RELIFF VALVE CHALLENGES - MONTH OF NOVEMBER, 1,982 No Safety / Relief Valve challenges occurred during the

-month of November, 1982.

s

~-

a if f

e

9;'

.w, ;

REFUELING INFOE'1ATION

^

The following. refueling inforration is included in the Monthly Report as requested in a :1etter to Mr. G. C. Andognini dated January 18, 1978:

. For your convenience, the information supplied has been enumerated so that each number corresponds to equiv ient notation utilized'in the request.

1.

The name-of this facility is Pilgrim Nuclear Power Station, Docket Number 50-293.

2.

Scheduled date for'next Refueling Shutdown: September,1983,

3. ~ Scheduled date for rea, tart following refueling:~ November, 1983 4.

5.

Due to their similarity, requests 4, 5, & 6 are responded to collectively:

6.. ' The fuel, 'which had been, loaded. during the 1981 scheduled refueling outage, is of the same P8x8R desi.gn, as loaded the previous outage, con-sisting of 112 P8DRB282 assemblies.and 60 P8DRB265 as'semblies.

7. - (a). There are 580 fuel' assemblies in the core.

~

(b) There are'* 936 fuel assemblies' in the speIt fuel pool.

- 8.

(a) The station is present1u licensed to store 2320 spent fuel assemblies.

The acten1 spent fuel. storage capacity 'is 1770 fuel assemblies at present.

. (b) The planned spent fuel storage capacity is 2320 fuel assemblies.

. 9.

With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 834 fuel assemblies.

e e

f e

e e

4

+

4 L

-_