ML20070R037: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 19: | Line 19: | ||
{{#Wiki_filter:-~ | {{#Wiki_filter:-~ | ||
293 DCC'GT NO. | 293 DCC'GT NO. | ||
L' NIT Pilgrim 1 | L' NIT Pilgrim 1 12/13 /82 DATE COMPLETED BY G.G. Whitney | ||
~ | |||
COMPLETED BY | TELEPHONE 617-746-7900 MONTH NOVEMBER, 1982 DAY AVERAGE DAILY POWER LEVEL 0 e.Y AVERAGE DAILY POWER LEVEL (Mwe-Net) | ||
(MWe-Net) 664. | |||
g7 | 665 g | ||
350. | g7 2 | ||
3 | 350. | ||
18 664. | |||
4 | 3 0. | ||
39 665. | |||
448. | 0. | ||
666. | |||
4 20 5 | |||
448. | |||
21 6s8. | |||
~ | |||
'618. | |||
664. | 664. | ||
g 663. | 6 664. | ||
9 10 | 663. | ||
23 7 | |||
664. | |||
664. | |||
g 663. | |||
665. | |||
9 25 10 26 637. | |||
665. | |||
33. | 33. | ||
592. | |||
66L | 664. | ||
23 g3 13 i 66L 29 667-14 621. | |||
3 INSTRUCTIONS | 30 665. | ||
On this format.!ist the average ds5y unit power levelin MWe. Net for each day in the reporting month. Compute to t | NA 664. | ||
O | 33 15 16 665. | ||
3 INSTRUCTIONS On this format.!ist the average ds5y unit power levelin MWe. Net for each day in the reporting month. Compute to t * "e2 rest whole merswatt. | |||
L_____ | h O | ||
KQ g | |||
PDR tol77) | |||
L_____ | |||
m | |||
f5 | f5 OPERATING DATA REPORT. | ||
OPERATING DATA REPORT. | 50-293 DOCKET NO. | ||
DOCKET NO. | DATE-12/13 /82 COMPLETED BY C.C.Whitne TELEPHONE.617-746-79b0 OPERATING STATUS Pilgrim 1 | ||
~ Notes g,g,;,g,,, | |||
November, 1982 | November, 1982 | ||
- 2. Reporting Period: | |||
1998. | 1998. | ||
: 3. Licensed Thermal Power (MWt): | : 3. Licensed Thermal Power (MWt): | ||
678. | 678. | ||
: 4. Nameplate Rating (Gross MWe): | : 4. Nameplate Rating (Gross MWe): | ||
655. | 655. | ||
: 5. Design Electrical Rating (Net MWe): | : 5. Design Electrical Rating (Net MWe): | ||
: 6. Maximum Dependable Capacity (Gross MWe): 690. | : 6. Maximum Dependable Capacity (Gross MWe): 690. | ||
670. | |||
: 7. Maximum Dependable Capacity (Net MWe): | : 7. Maximum Dependable Capacity (Net MWe): | ||
: 8. -If Changes Occur in Capacity Ratings (Items Number-3 Through 7) Since Last Report, Give Reasons: | : 8. -If Changes Occur in Capacity Ratings (Items Number-3 Through 7) Since Last Report, Give Reasons: | ||
None None 9.' Power Level To Which Restricted,If Any (Net MWe): | None None 9.' Power Level To Which Restricted,If Any (Net MWe): | ||
N/A | |||
: 10. Reasons For Restrictions,If Any: | : 10. Reasons For Restrictions,If Any: | ||
a This Month Yr to-Date Cu-alstive 8016.0 87456.0 | |||
This Month | : 11. Hours la ' Reporting Period-720.0 686.6 5238.4 61271.7 | ||
8016.0 | : 12. Number Of Hours Reactor Was Critical 0.0 0.0 0.0 | ||
: 11. Hours la ' Reporting Period-686.6 | : 13. Reactor Reserv-Shutdown Hours 4930.7 59208.6 661.4 | ||
: 12. Number Of Hours Reactor Was Critical | : 14. Hours Generator On-Line 0.0 0.0 0.0 15.' Unit Reserve Shutdown Hours. | ||
: 13. Reactor Reserv- Shutdown Hours | 1279920.0- | ||
.605368.0 | |||
: 14. Hours Generator On-Line | .101423256.0 | ||
: 16. Gross Thermal Energy Generated (MWH) | : 16. Gross Thermal Energy Generated (MWH) 445910.0 2964640.0 33875874.0 l 17.: Gross Electrical Energy Generated (MWH) 429039.0 | ||
-2853042.0 32547526.0 2 | |||
: 18. Net Electr: cal Energy Generated (MWH) 91.9 61.! | |||
: 18. Net Electr: cal Energy Generated (MWH) | 67.7 | ||
( | ( | ||
61.5 | ' 19. Unit Service Fator' 91.9 61.5 67.7 | ||
: 20. . Unit Availability Factor , | : 20.. Unit Availability Factor, | ||
: 23. Unit Forced Outage Rate : | 21.- Unit Capacity Factor (Using MDC Net) - | ||
88.9 53.1 55.5 i | |||
: 22. Unit Capacity Factor (Ucing DER Net)~ | |||
91.0 54.3 56.8 8.1 7.5 9.8 | |||
: 23. Unit Forced Outage Rate : | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1: | : 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1: | ||
NONE UNIT OPERATING | NONE UNIT OPERATING | ||
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | : 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | ||
26.~ Units in Test Status (Prior to Commercial Operation): | 26.~ Units in Test Status (Prior to Commercial Operation): | ||
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (o/77 L | |||
y UNITSilVTDOWNS AND POWER RECUCTIONS | y UNITSilVTDOWNS AND POWER RECUCTIONS DOCKET NO. | ||
50-293 UNIT NAME Pi*1er'm 1 DATE 12,t]3 /82 | |||
DATE | ~ | ||
c | REl' ORT MONTil NOVEMBER, 1982 COMPLETED BY G.G. Whitney TELErilONE 617-7t.6-7900 r6 "i | ||
c | |||
.re | |||
.3 sa : | |||
[3 E | Licensee E't, 5''l Cause & Corrective i, | ||
t 29 | .2,e E | ||
l | g.5 X c | ||
l | N". | ||
I | U!!c R | ||
58 5 | |||
E Operator Training & License Examination F Administrative | _c s E Event Y-81 Action io H | ||
[3 E cE j5g Report # | |||
,#0 v | |||
Psevent Recurrence d | |||
t 29 82/11/02 F | |||
58.6 i | |||
H 1 | |||
82-01i/01T | |||
. HB ' | |||
VALVEX Incorr nt setting on safety valve requiwd drywell entry to affect fix. | |||
l l | |||
I 2 | |||
3 4 | |||
F: Forced Reason: | |||
Methtxt: | |||
Exhibit G-Instructions S: Scheduled A. Equipment Failure (Explain) l-Manual for Pseparation of Data D Maintenance of Test 2-Manual Scram. | |||
Entry Sheets for 1.icensee C Refueling J. Automatic Scram. | |||
Event ReporI (1.ER) File (NURI:G-D Regulatory Restriction 4-01her (Explain) 0161) | |||
E Operator Training & License Examination F Administrative 5 | |||
G Operational Eeror (Explain) | |||
Exhibit ' Same Source | |||
< <p 7 ) | |||
Il Othe; (Explain) | |||
P 11.(.R I fl NilCl.EAlt POWl'.R STATION | P 11.(.R I fl NilCl.EAlt POWl'.R STATION i | ||
o MATOR SAFETY RELATED MAV ENANCE MONTH NOVFMBER. 1982 | |||
~ ' | |||
I CORREC"'iVE ACTl']N Y ST Ett COMPONENT MALFUNCTION | |||
I | __ _. CAUSE | ||
. MAINTENANCE TO PREVENT RECURRENCE ASSOCIATED LER LGI C RCIC Pump Low Flow Change in Sect. | |||
noted, change test conditions to address variable speed prime mover. | Inspected internals Pump capable v. | ||
Fire | performing None XI tearlings intendd function. No wear noted, change test conditions | ||
itPCI | ~ | ||
RCIC | to address variable speed prime mover. | ||
o | Fire Jockey Fire Failed-Motor Salt water Rewound Motor and | ||
. Salt environment failure wts Pump burnt out Environment rebuilt pumps first in ten years. | |||
itPCI M02301-3 Ground Steam leak Tightened packing HPCI inop. (1 hr.) | |||
LER 82-046/01T-0 Clegned MOVs Dressed up stem Replaced limit switch and torque swit'ch RCIC M01301-17 Steam Leak | |||
~ Stem problem Backseat Repair during outage of suf-ficient duration Main | |||
'A' Safety Vlv. | |||
Incorrect Personnel error Replaced valve Counseled personnel and clari-LER 82-049/01T-0 Steam setting fled procedure o | |||
!(C IC Turbine Burned out | |||
.A;s Repaired resistor None - isolated event - first LER 82-955/03L-0 Governor res stor in RCIC Covernor a | |||
- 7 4 | |||
t, . y | t,. y 9.[; [ < | ||
~ | |||
9.[; | ibOS70f ED150N CO.931 o | ||
~ | |||
g. | |||
. PILCRIM NUCLEAR POWER-STATION Sumr.a ry _ of Opera tisns for - NOVEMBER, 1982,. | |||
/ | |||
:v, | :v, | ||
~ | |||
LThe. month began.with>the station at:99%' power. | l LThe. month began.with>the station at:99%' power. | ||
~ | |||
At 1543 on 11/2/82Zth'e-turbine was taken'off.line and the reactor-brought to | At 1543 on 11/2/82Zth'e-turbine was taken'off.line and the reactor-brought to | ||
~ | |||
cold: shutdown . to allow replacement of - the ."A'' . Main Steam Safety Valve. _The drywell was entered, repairs made~and the unit placed back in service _at | cold: shutdown. to allow replacement of - the."A''. Main Steam Safety Valve. _The | ||
,7 drywell was entered, repairs made~and the unit placed back in service _at | |||
:0220fon~11/5/82.- | :0220fon~11/5/82.- | ||
The station operated at an average power' level of 99% due to main steam | I The station operated at an average power' level of 99% due to main steam | ||
' relief valve simmer. considerations. Other conaiderations affecting station | |||
-powerflevel were fuel conditioning, condenser fouling, conden, sate demineralizer- | |||
~ | |||
-differential pressure and control rod pattern changes. | |||
N | N 1 | ||
During this period the -jockey fire pump ' failed and was' repaired. Control rod 10-31' experienced drive difficulties which were co'rrected. Probleme were corrected lLn the' HPCI control-circuitry and in motor operated valve 2301-03 which is. located.in:the HPCI: System.. | |||
The condensate demineralizers were backwashed frequently due to high differ-ential pressure. | The condensate demineralizers were backwashed frequently due to high differ-ential pressure. | ||
RCIC pump operation was investigated du to low flow indication.(Ref. Maint. Summary) 01 11/11/82 power was ' reduced to 60% when the '!D" MSIV's had to be closed to- | RCIC pump operation was investigated du to low flow indication.(Ref. Maint. Summary) 01 11/11/82 power was ' reduced to 60% when the '!D" MSIV's had to be closed to-2 JallowfinsestigatiYn of'an apparent malfunctioning reactor' protection system (relay.- Ref.: cLER 82-054/03L-0. | ||
(relay.- Ref.: cLER 82-054/03L-0. | ~ | ||
:L oni11/27/82 power was reduced to 50% due to main condenser fouling. The | :L oni11/27/82 power was reduced to 50% due to main condenser fouling. The | ||
: main condense was backwashed.. heat treated and the ut.it returned to full power. | : main condense was backwashed.. heat treated and the ut.it returned to full power. | ||
The month, ended at.99% with HPCI inoperable, awaiting repair of the HPcI 2301-3 motor; operated valve. | The month, ended at.99% with HPCI inoperable, awaiting repair of the HPcI 2301-3 motor; operated valve. | ||
I,. | I,. | ||
' SAFETY /RELIFF VALVE CHALLENGES - MONTH OF NOVEMBER, 1,982 No Safety / Relief Valve challenges occurred during the | |||
-month of November, 1982. | |||
s | s | ||
~- | |||
a if e | a if f | ||
e | |||
9;' | 9;' | ||
.w, ; | |||
REFUELING INFOE'1ATION | REFUELING INFOE'1ATION | ||
^ | |||
The following . refueling inforration is included in the Monthly Report as | The following. refueling inforration is included in the Monthly Report as requested in a :1etter to Mr. G. C. Andognini dated January 18, 1978: | ||
requested in a :1etter to Mr. G. C. Andognini dated January 18, 1978: | . For your convenience, the information supplied has been enumerated so that each number corresponds to equiv ient notation utilized'in the request. | ||
1. | |||
The name-of this facility is Pilgrim Nuclear Power Station, Docket Number 50-293. | |||
2. | |||
: 3. ~ Scheduled date for rea, tart following refueling:~ November, 1983 | Scheduled date for'next Refueling Shutdown: September,1983, | ||
: 3. ~ Scheduled date for rea, tart following refueling:~ November, 1983 4. | |||
5. | |||
6.. ' The fuel, 'which had been , loaded. during the 1981 scheduled refueling outage, is of the same P8x8R desi.gn, as loaded the previous outage , con-sisting of 112 P8DRB282 assemblies.and 60 P8DRB265 as'semblies. | Due to their similarity, requests 4, 5, & 6 are responded to collectively: | ||
: 7. - (a). There are 580 fuel' assemblies in the core. | 6.. ' The fuel, 'which had been, loaded. during the 1981 scheduled refueling outage, is of the same P8x8R desi.gn, as loaded the previous outage, con-sisting of 112 P8DRB282 assemblies.and 60 P8DRB265 as'semblies. | ||
: 7. - (a). There are 580 fuel' assemblies in the core. | |||
~ | |||
(b) There are'* 936 fuel assemblies' in the speIt fuel pool. | (b) There are'* 936 fuel assemblies' in the speIt fuel pool. | ||
- 8. | |||
(a) The station is present1u licensed to store 2320 spent fuel assemblies. | |||
The acten1 spent fuel. storage capacity 'is 1770 fuel assemblies at present. | The acten1 spent fuel. storage capacity 'is 1770 fuel assemblies at present. | ||
. (b) The planned spent fuel storage capacity is 2320 fuel assemblies. | |||
. 9. | |||
e | With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 834 fuel assemblies. | ||
e e | |||
e | f e | ||
e e | |||
4 | 4 | ||
+ | |||
4 L | 4 L | ||
-_}} | |||
Latest revision as of 09:13, 16 December 2024
| ML20070R037 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 12/13/1982 |
| From: | Whitney G BOSTON EDISON CO. |
| To: | |
| Shared Package | |
| ML20070R036 | List: |
| References | |
| NUDOCS 8301270251 | |
| Download: ML20070R037 (6) | |
Text
-~
293 DCC'GT NO.
L' NIT Pilgrim 1 12/13 /82 DATE COMPLETED BY G.G. Whitney
~
TELEPHONE 617-746-7900 MONTH NOVEMBER, 1982 DAY AVERAGE DAILY POWER LEVEL 0 e.Y AVERAGE DAILY POWER LEVEL (Mwe-Net)
(MWe-Net) 664.
665 g
g7 2
350.
18 664.
3 0.
39 665.
0.
666.
4 20 5
448.
21 6s8.
~
'618.
664.
6 664.
663.
23 7
664.
664.
g 663.
665.
9 25 10 26 637.
665.
33.
592.
664.
23 g3 13 i 66L 29 667-14 621.
30 665.
NA 664.
33 15 16 665.
3 INSTRUCTIONS On this format.!ist the average ds5y unit power levelin MWe. Net for each day in the reporting month. Compute to t * "e2 rest whole merswatt.
h O
KQ g
PDR tol77)
L_____
m
f5 OPERATING DATA REPORT.
50-293 DOCKET NO.
DATE-12/13 /82 COMPLETED BY C.C.Whitne TELEPHONE.617-746-79b0 OPERATING STATUS Pilgrim 1
~ Notes g,g,;,g,,,
November, 1982
- 2. Reporting Period:
1998.
- 3. Licensed Thermal Power (MWt):
678.
- 4. Nameplate Rating (Gross MWe):
655.
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe): 690.
670.
- 7. Maximum Dependable Capacity (Net MWe):
- 8. -If Changes Occur in Capacity Ratings (Items Number-3 Through 7) Since Last Report, Give Reasons:
None None 9.' Power Level To Which Restricted,If Any (Net MWe):
N/A
- 10. Reasons For Restrictions,If Any:
a This Month Yr to-Date Cu-alstive 8016.0 87456.0
- 11. Hours la ' Reporting Period-720.0 686.6 5238.4 61271.7
- 12. Number Of Hours Reactor Was Critical 0.0 0.0 0.0
- 13. Reactor Reserv-Shutdown Hours 4930.7 59208.6 661.4
- 14. Hours Generator On-Line 0.0 0.0 0.0 15.' Unit Reserve Shutdown Hours.
1279920.0-
.605368.0
.101423256.0
- 16. Gross Thermal Energy Generated (MWH) 445910.0 2964640.0 33875874.0 l 17.: Gross Electrical Energy Generated (MWH) 429039.0
-2853042.0 32547526.0 2
- 18. Net Electr: cal Energy Generated (MWH) 91.9 61.!
67.7
(
' 19. Unit Service Fator' 91.9 61.5 67.7
- 20.. Unit Availability Factor,
21.- Unit Capacity Factor (Using MDC Net) -
88.9 53.1 55.5 i
- 22. Unit Capacity Factor (Ucing DER Net)~
91.0 54.3 56.8 8.1 7.5 9.8
- 23. Unit Forced Outage Rate :
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:
NONE UNIT OPERATING
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26.~ Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (o/77 L
y UNITSilVTDOWNS AND POWER RECUCTIONS DOCKET NO.
50-293 UNIT NAME Pi*1er'm 1 DATE 12,t]3 /82
~
REl' ORT MONTil NOVEMBER, 1982 COMPLETED BY G.G. Whitney TELErilONE 617-7t.6-7900 r6 "i
c
.re
.3 sa :
Licensee E't, 5l Cause & Corrective i,
.2,e E
g.5 X c
N".
U!!c R
58 5
_c s E Event Y-81 Action io H
[3 E cE j5g Report #
,#0 v
Psevent Recurrence d
t 29 82/11/02 F
58.6 i
H 1
82-01i/01T
. HB '
VALVEX Incorr nt setting on safety valve requiwd drywell entry to affect fix.
l l
I 2
3 4
F: Forced Reason:
Methtxt:
Exhibit G-Instructions S: Scheduled A. Equipment Failure (Explain) l-Manual for Pseparation of Data D Maintenance of Test 2-Manual Scram.
Entry Sheets for 1.icensee C Refueling J. Automatic Scram.
Event ReporI (1.ER) File (NURI:G-D Regulatory Restriction 4-01her (Explain) 0161)
E Operator Training & License Examination F Administrative 5
G Operational Eeror (Explain)
Exhibit ' Same Source
< <p 7 )
Il Othe; (Explain)
P 11.(.R I fl NilCl.EAlt POWl'.R STATION i
o MATOR SAFETY RELATED MAV ENANCE MONTH NOVFMBER. 1982
~ '
I CORREC"'iVE ACTl']N Y ST Ett COMPONENT MALFUNCTION
__ _. CAUSE
. MAINTENANCE TO PREVENT RECURRENCE ASSOCIATED LER LGI C RCIC Pump Low Flow Change in Sect.
Inspected internals Pump capable v.
performing None XI tearlings intendd function. No wear noted, change test conditions
~
to address variable speed prime mover.
Fire Jockey Fire Failed-Motor Salt water Rewound Motor and
. Salt environment failure wts Pump burnt out Environment rebuilt pumps first in ten years.
itPCI M02301-3 Ground Steam leak Tightened packing HPCI inop. (1 hr.)
LER 82-046/01T-0 Clegned MOVs Dressed up stem Replaced limit switch and torque swit'ch RCIC M01301-17 Steam Leak
~ Stem problem Backseat Repair during outage of suf-ficient duration Main
'A' Safety Vlv.
Incorrect Personnel error Replaced valve Counseled personnel and clari-LER 82-049/01T-0 Steam setting fled procedure o
!(C IC Turbine Burned out
.A;s Repaired resistor None - isolated event - first LER 82-955/03L-0 Governor res stor in RCIC Covernor a
- 7 4
t,. y 9.[; [ <
~
ibOS70f ED150N CO.931 o
~
g.
. PILCRIM NUCLEAR POWER-STATION Sumr.a ry _ of Opera tisns for - NOVEMBER, 1982,.
/
- v,
~
l LThe. month began.with>the station at:99%' power.
~
At 1543 on 11/2/82Zth'e-turbine was taken'off.line and the reactor-brought to
~
cold: shutdown. to allow replacement of - the."A. Main Steam Safety Valve. _The
,7 drywell was entered, repairs made~and the unit placed back in service _at
- 0220fon~11/5/82.-
I The station operated at an average power' level of 99% due to main steam
' relief valve simmer. considerations. Other conaiderations affecting station
-powerflevel were fuel conditioning, condenser fouling, conden, sate demineralizer-
~
-differential pressure and control rod pattern changes.
N 1
During this period the -jockey fire pump ' failed and was' repaired. Control rod 10-31' experienced drive difficulties which were co'rrected. Probleme were corrected lLn the' HPCI control-circuitry and in motor operated valve 2301-03 which is. located.in:the HPCI: System..
The condensate demineralizers were backwashed frequently due to high differ-ential pressure.
RCIC pump operation was investigated du to low flow indication.(Ref. Maint. Summary) 01 11/11/82 power was ' reduced to 60% when the '!D" MSIV's had to be closed to-2 JallowfinsestigatiYn of'an apparent malfunctioning reactor' protection system (relay.- Ref.: cLER 82-054/03L-0.
~
- L oni11/27/82 power was reduced to 50% due to main condenser fouling. The
- main condense was backwashed.. heat treated and the ut.it returned to full power.
The month, ended at.99% with HPCI inoperable, awaiting repair of the HPcI 2301-3 motor; operated valve.
I,.
' SAFETY /RELIFF VALVE CHALLENGES - MONTH OF NOVEMBER, 1,982 No Safety / Relief Valve challenges occurred during the
-month of November, 1982.
s
~-
a if f
e
9;'
.w, ;
REFUELING INFOE'1ATION
^
The following. refueling inforration is included in the Monthly Report as requested in a :1etter to Mr. G. C. Andognini dated January 18, 1978:
. For your convenience, the information supplied has been enumerated so that each number corresponds to equiv ient notation utilized'in the request.
1.
The name-of this facility is Pilgrim Nuclear Power Station, Docket Number 50-293.
2.
Scheduled date for'next Refueling Shutdown: September,1983,
- 3. ~ Scheduled date for rea, tart following refueling:~ November, 1983 4.
5.
Due to their similarity, requests 4, 5, & 6 are responded to collectively:
6.. ' The fuel, 'which had been, loaded. during the 1981 scheduled refueling outage, is of the same P8x8R desi.gn, as loaded the previous outage, con-sisting of 112 P8DRB282 assemblies.and 60 P8DRB265 as'semblies.
- 7. - (a). There are 580 fuel' assemblies in the core.
~
(b) There are'* 936 fuel assemblies' in the speIt fuel pool.
- 8.
(a) The station is present1u licensed to store 2320 spent fuel assemblies.
The acten1 spent fuel. storage capacity 'is 1770 fuel assemblies at present.
. (b) The planned spent fuel storage capacity is 2320 fuel assemblies.
. 9.
With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 834 fuel assemblies.
e e
f e
e e
4
+
4 L
-_