Text

-~

293 DCC'GT NO.

L' NIT Pilgrim 1 12/13 /82 DATE COMPLETED BY G.G. Whitney

~

TELEPHONE 617-746-7900 MONTH NOVEMBER, 1982 DAY AVERAGE DAILY POWER LEVEL 0 e.Y AVERAGE DAILY POWER LEVEL (Mwe-Net)

(MWe-Net) 664.

665 g

g7 2

350.

18 664.

3 0.

39 665.

0.

666.

4 20 5

448.

21 6s8.

~

'618.

664.

6 664.

663.

23 7

664.

664.

g 663.

665.

9 25 10 26 637.

665.

33.

592.

664.

23 g3 13 i 66L 29 667-14 621.

30 665.

NA 664.

33 15 16 665.

3 INSTRUCTIONS On this format.!ist the average ds5y unit power levelin MWe. Net for each day in the reporting month. Compute to t * "e2 rest whole merswatt.

h O

KQ g

PDR tol77)

L_____

m

f5 OPERATING DATA REPORT.

50-293 DOCKET NO.

DATE-12/13 /82 COMPLETED BY C.C.Whitne TELEPHONE.617-746-79b0 OPERATING STATUS Pilgrim 1

~ Notes g,g,;,g,,,

November, 1982

- 2. Reporting Period:

1998.

3. Licensed Thermal Power (MWt):

678.

4. Nameplate Rating (Gross MWe):

655.

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 690.

670.

7. Maximum Dependable Capacity (Net MWe):
8. -If Changes Occur in Capacity Ratings (Items Number-3 Through 7) Since Last Report, Give Reasons:

None None 9.' Power Level To Which Restricted,If Any (Net MWe):

N/A

10. Reasons For Restrictions,If Any:

a This Month Yr to-Date Cu-alstive 8016.0 87456.0

11. Hours la ' Reporting Period-720.0 686.6 5238.4 61271.7
12. Number Of Hours Reactor Was Critical 0.0 0.0 0.0
13. Reactor Reserv-Shutdown Hours 4930.7 59208.6 661.4
14. Hours Generator On-Line 0.0 0.0 0.0 15.' Unit Reserve Shutdown Hours.

1279920.0-

.605368.0

.101423256.0

16. Gross Thermal Energy Generated (MWH) 445910.0 2964640.0 33875874.0 l 17.: Gross Electrical Energy Generated (MWH) 429039.0

-2853042.0 32547526.0 2

18. Net Electr: cal Energy Generated (MWH) 91.9 61.!

67.7

(

' 19. Unit Service Fator' 91.9 61.5 67.7

20.. Unit Availability Factor,

21.- Unit Capacity Factor (Using MDC Net) -

88.9 53.1 55.5 i

22. Unit Capacity Factor (Ucing DER Net)~

91.0 54.3 56.8 8.1 7.5 9.8

23. Unit Forced Outage Rate :
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:

NONE UNIT OPERATING

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

26.~ Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (o/77 L

y UNITSilVTDOWNS AND POWER RECUCTIONS DOCKET NO.

50-293 UNIT NAME Pi*1er'm 1 DATE 12,t]3 /82

~

REl' ORT MONTil NOVEMBER, 1982 COMPLETED BY G.G. Whitney TELErilONE 617-7t.6-7900 r6 "i

c

.re

.3 sa :

Licensee E't, 5l Cause & Corrective i,

.2,e E

g.5 X c

N".

U!!c R

58 5

_c s E Event Y-81 Action io H

[3 E cE j5g Report #

,#0 v

Psevent Recurrence d

t 29 82/11/02 F

58.6 i

H 1

82-01i/01T

. HB '

VALVEX Incorr nt setting on safety valve requiwd drywell entry to affect fix.

l l

I 2

3 4

F: Forced Reason:

Methtxt:

Exhibit G-Instructions S: Scheduled A. Equipment Failure (Explain) l-Manual for Pseparation of Data D Maintenance of Test 2-Manual Scram.

Entry Sheets for 1.icensee C Refueling J. Automatic Scram.

Event ReporI (1.ER) File (NURI:G-D Regulatory Restriction 4-01her (Explain) 0161)

E Operator Training & License Examination F Administrative 5

G Operational Eeror (Explain)

Exhibit ' Same Source

< <p 7 )

Il Othe; (Explain)

P 11.(.R I fl NilCl.EAlt POWl'.R STATION i

o MATOR SAFETY RELATED MAV ENANCE MONTH NOVFMBER. 1982

~ '

I CORREC"'iVE ACTl']N Y ST Ett COMPONENT MALFUNCTION

__ _. CAUSE

. MAINTENANCE TO PREVENT RECURRENCE ASSOCIATED LER LGI C RCIC Pump Low Flow Change in Sect.

Inspected internals Pump capable v.

performing None XI tearlings intendd function. No wear noted, change test conditions

~

to address variable speed prime mover.

Fire Jockey Fire Failed-Motor Salt water Rewound Motor and

. Salt environment failure wts Pump burnt out Environment rebuilt pumps first in ten years.

itPCI M02301-3 Ground Steam leak Tightened packing HPCI inop. (1 hr.)

LER 82-046/01T-0 Clegned MOVs Dressed up stem Replaced limit switch and torque swit'ch RCIC M01301-17 Steam Leak

~ Stem problem Backseat Repair during outage of suf-ficient duration Main

'A' Safety Vlv.

Incorrect Personnel error Replaced valve Counseled personnel and clari-LER 82-049/01T-0 Steam setting fled procedure o

!(C IC Turbine Burned out

.A;s Repaired resistor None - isolated event - first LER 82-955/03L-0 Governor res stor in RCIC Covernor a

- 7 4

t,. y 9.[; [ <

~

ibOS70f ED150N CO.931 o

~

g.

. PILCRIM NUCLEAR POWER-STATION Sumr.a ry _ of Opera tisns for - NOVEMBER, 1982,.

/

v,

~

l LThe. month began.with>the station at:99%' power.

~

At 1543 on 11/2/82Zth'e-turbine was taken'off.line and the reactor-brought to

~

cold: shutdown. to allow replacement of - the."A. Main Steam Safety Valve. _The

,7 drywell was entered, repairs made~and the unit placed back in service _at

0220fon~11/5/82.-

I The station operated at an average power' level of 99% due to main steam

' relief valve simmer. considerations. Other conaiderations affecting station

-powerflevel were fuel conditioning, condenser fouling, conden, sate demineralizer-

~

-differential pressure and control rod pattern changes.

N 1

During this period the -jockey fire pump ' failed and was' repaired. Control rod 10-31' experienced drive difficulties which were co'rrected. Probleme were corrected lLn the' HPCI control-circuitry and in motor operated valve 2301-03 which is. located.in:the HPCI: System..

The condensate demineralizers were backwashed frequently due to high differ-ential pressure.

RCIC pump operation was investigated du to low flow indication.(Ref. Maint. Summary) 01 11/11/82 power was ' reduced to 60% when the '!D" MSIV's had to be closed to-2 JallowfinsestigatiYn of'an apparent malfunctioning reactor' protection system (relay.- Ref.: cLER 82-054/03L-0.

~

L oni11/27/82 power was reduced to 50% due to main condenser fouling. The
main condense was backwashed.. heat treated and the ut.it returned to full power.

The month, ended at.99% with HPCI inoperable, awaiting repair of the HPcI 2301-3 motor; operated valve.

I,.

' SAFETY /RELIFF VALVE CHALLENGES - MONTH OF NOVEMBER, 1,982 No Safety / Relief Valve challenges occurred during the

-month of November, 1982.

s

~-

a if f

e

9;'

.w, ;

REFUELING INFOE'1ATION

^

The following. refueling inforration is included in the Monthly Report as requested in a :1etter to Mr. G. C. Andognini dated January 18, 1978:

. For your convenience, the information supplied has been enumerated so that each number corresponds to equiv ient notation utilized'in the request.

1.

The name-of this facility is Pilgrim Nuclear Power Station, Docket Number 50-293.

2.

Scheduled date for'next Refueling Shutdown: September,1983,

3. ~ Scheduled date for rea, tart following refueling:~ November, 1983 4.

5.

Due to their similarity, requests 4, 5, & 6 are responded to collectively:

6.. ' The fuel, 'which had been, loaded. during the 1981 scheduled refueling outage, is of the same P8x8R desi.gn, as loaded the previous outage, con-sisting of 112 P8DRB282 assemblies.and 60 P8DRB265 as'semblies.

7. - (a). There are 580 fuel' assemblies in the core.

~

(b) There are'* 936 fuel assemblies' in the speIt fuel pool.

- 8.

(a) The station is present1u licensed to store 2320 spent fuel assemblies.

The acten1 spent fuel. storage capacity 'is 1770 fuel assemblies at present.

. (b) The planned spent fuel storage capacity is 2320 fuel assemblies.

. 9.

With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 834 fuel assemblies.

e e

f e

e e

4

+

4 L

-_