ML20071G739: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:'
{{#Wiki_filter:Sf-gy.-000 npsindustries.inc.
Sf-gy.-000 npsindustries.inc.
onehormon plozo secoucus.newjersey c7o94 May 16, 1983
onehormon plozo secoucus.newjersey c7o94         May 16, 1983
.e 2o1-865-655o telex 14-1435 NPSI-01-3290 US Nuclear Regulatory Commission Washington, D.C.
  .e         2o1-865-655o telex 14-1435       NPSI-01-3290 US Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Mr. Richard C. DeYoung Director, Office of Inspection and Enforcement
20555 Attention: Mr. Richard C. DeYoung Director, Office of Inspection and Enforcement


==Subject:==
==Subject:==
Line 29: Line 29:
For South Texas Project (HL&P) a total of 2 Class 1 supports are affected.
For South Texas Project (HL&P) a total of 2 Class 1 supports are affected.
The products were supplied to these sites by our Austin, Texas Plant. The defect is that the bolting parts greater than 2 inch size require but did not receive MT or PT examination.
The products were supplied to these sites by our Austin, Texas Plant. The defect is that the bolting parts greater than 2 inch size require but did not receive MT or PT examination.
The lack of required NDE was revealed durinq an internal QA audit at the Austin Plant. This was followed by an investigation to determine the affected products and facilities, for which a final determination was made on May 12, 1983. Noti-fication to the affected facilities was made immediately following the verbal notification to you, and written confirmations are being issued which identify the affected supports by Mark Number.
The lack of required NDE was revealed durinq an internal QA audit at the Austin Plant. This was followed by an investigation to determine the affected products and facilities, for which a final determination was made on May 12, 1983.
Noti-fication to the affected facilities was made immediately following the verbal notification to you, and written confirmations are being issued which identify the affected supports by Mark Number.
It is our intention to supply replacement bolting materials with the proper NDE for the affected parts, and to ship these to the facilities no later than June 30, 1983.
It is our intention to supply replacement bolting materials with the proper NDE for the affected parts, and to ship these to the facilities no later than June 30, 1983.
Sincerely, 8305240356 830516                                       '
Sincerely, 8305240356 830516 PDR ADOCK 05000445 S
PDR ADOCK 05000445 S                         PDR                         'h Leo Hovi LH:dmp                                     Senior Vice President cc:     J. Barton                                                           g J. Takeuchi                                                           w T. O'Connell                                                           5 -
PDR
A. Adolff                                                                    'l C}
'h Leo Hovi LH:dmp Senior Vice President cc:
R. Maurici                                                             > T
J. Barton g
                                                                                            /
J. Takeuchi w
T. O'Connell 5
l C}
A. Adolff R. Maurici
> T
/
r/O
r/O
                                                                  .}}
.}}

Latest revision as of 06:37, 15 December 2024

Part 21 Rept Re Bolting Parts for ASME III Nf Class 1 Pipe Supports on Rigid Struts or Pipe Clamps for Struts or Snubbers.Initially Reported on 830513.Bolting Parts Greater than 2-inch Size Not Examined
ML20071G739
Person / Time
Site: South Texas, Comanche Peak, 05000000
Issue date: 05/16/1983
From: Hovi L
NPS INDUSTRIES, INC.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
REF-PT21-83-876-000 NPSI-01-3290, NPSI-1-3290, PT21-83-876, PT21-83-876-000, NUDOCS 8305240356
Download: ML20071G739 (1)


Text

Sf-gy.-000 npsindustries.inc.

onehormon plozo secoucus.newjersey c7o94 May 16, 1983

.e 2o1-865-655o telex 14-1435 NPSI-01-3290 US Nuclear Regulatory Commission Washington, D.C.

20555 Attention: Mr. Richard C. DeYoung Director, Office of Inspection and Enforcement

Subject:

10 CFR 21 Notification Gentlemen:

This report is to confirm a Part 21 notification made verbally by myself on May 13, 1983 to Mr. Lauden of your Division of Emergency Preparedness.

The basic components requiring notification are bolting parts for ASME III NF Class 1 pipe supports, as furnished on rigid struts, or on pipe clamps for struts or snubbers.

For Comanche Peak Plant (TUSI) a total of 11 Class 1 supports, and 2 struts not assigned to a specific support are affected.

For South Texas Project (HL&P) a total of 2 Class 1 supports are affected.

The products were supplied to these sites by our Austin, Texas Plant. The defect is that the bolting parts greater than 2 inch size require but did not receive MT or PT examination.

The lack of required NDE was revealed durinq an internal QA audit at the Austin Plant. This was followed by an investigation to determine the affected products and facilities, for which a final determination was made on May 12, 1983.

Noti-fication to the affected facilities was made immediately following the verbal notification to you, and written confirmations are being issued which identify the affected supports by Mark Number.

It is our intention to supply replacement bolting materials with the proper NDE for the affected parts, and to ship these to the facilities no later than June 30, 1983.

Sincerely, 8305240356 830516 PDR ADOCK 05000445 S

PDR

'h Leo Hovi LH:dmp Senior Vice President cc:

J. Barton g

J. Takeuchi w

T. O'Connell 5

l C}

A. Adolff R. Maurici

> T

/

r/O

.