{{#Wiki_filter:r                                                                                       o
{{#Wiki_filter:r o
[: . ;. rs
[: ;.
                                                                                        .l Commonweilth Edison                                               l Quad Cities Nuclear Power Station 22710 200 Avenue North Corcova, Illinois 61242 Telephone 309/654-2241 GGC-94-105 July 19. 1994 i
rs
.l Commonweilth Edison Quad Cities Nuclear Power Station 22710 200 Avenue North Corcova, Illinois 61242 Telephone 309/654-2241 GGC-94-105 July 19. 1994 i
[
[
U. S. Nuclear Regulatory Commission                                     (
U. S. Nuclear Regulatory Commission
ATTN:     Document Control Desk                                         i Washington, D.C. 20555                                                 i
(
ATTN:
Document Control Desk i
Washington, D.C.
20555 i


==SUBJECT:==
==SUBJECT:==
Quad Cities Nuclear Power Station                     .
Quad Cities Nuclear Power Station Unit 1 Summary Status of Fuel Performance NRC Docket Number 50-714 Enclosed is the Special Re) ort, "Ouad-Cities Nuclear Power Station.
Unit 1 Summary Status of Fuel Performance             ,
Unit 1. Summary Status of ruel Performance. End of Cycle 13. July 1994 letter."
NRC Docket Number 50-714 Enclosed is the Special Re) ort, "Ouad-Cities Nuclear Power Station.
This report is submitted to you in accordance with the Special Report Requirements of Table 6.6-1. Docket Number 50-254. DPR-29.
Unit 1. Summary Status of ruel Performance. End of Cycle 13. July 1994 letter."                                                               '
i Very truly yours.
This report is submitted to you in accordance with the Special Report Requirements of Table 6.6-1. Docket Number 50-254. DPR-29.             i Very truly yours.                                                       '
A g G.
A g G.Stat' 1Campbell-Manager                                                       .
Campbell-Stat' 1 Manager Quad ties Nuclear Power Station GGC/DC/kjv Enclosure StM %)m cc:
Quad     ties Nuclear Power Station GGC/DC/kjv                                                             ,
^ B. Davis. Regional Administrator C. Miller. Senior Resident Inspector E. Kraft. Commonwealth Edison T. Rieck, Commonwealth Edison File i
Enclosure                                                               !
StM %)m                                                       ;
cc:     ^ B. Davis. Regional Administrator C. Miller. Senior Resident Inspector                           :
E. Kraft. Commonwealth Edison                                 '
T. Rieck, Commonwealth Edison                                 ;
File                                                           !
i l
l
l
            'J,u,.,c-an vvv 00 STMGR47893.RLB                                                   \
'J,u,.,c-an vvv 00
94o7280245 940719                                                           i PDR     ADOCK 05000254                                                     I P                           PDR
\\
        -_                                                                              l
STMGR47893.RLB 94o7280245 940719 i
PDR ADOCK 05000254 P
PDR


    ,.s,                                                                                     ,
,.s, i
i l
OUAD-CITIES NUCLEAR POWER STATION UNIT ONE
OUAD-CITIES NUCLEAR POWER STATION UNIT ONE


==SUMMARY==
==SUMMARY==
STATUS OF FUEL PERFORMANCE END OF CYCLE THIRTEEN JULY 1994                                 !
STATUS OF FUEL PERFORMANCE END OF CYCLE THIRTEEN JULY 1994 At the end of this reporting period, Quad-Cities Unit One has completed thirteen Reactor cycles of operation.
At the end of this reporting period, Quad-Cities Unit One has completed             ,
During that time, 2,808 fuel assemblies had seen duty in the Unit One core.
thirteen Reactor cycles of operation. During that time, 2,808 fuel assemblies       ,
No sipping was performed on the reload fuel assemblies at the end of cycle thirteen.
had seen duty in the Unit One core.
This decision was based on chemical and radiochemical data collected during cycle thirteen, which showed no indication of' leakage or fuel failure.
No sipping was performed on the reload fuel assemblies at the end of cycle thirteen. This decision was based on chemical and radiochemical data collected during cycle thirteen, which showed no indication of' leakage or fuel     -
failure.                                                                            .
For Unit One Cycle 14,144 new YJ8-GE10 (barrier clad) assemblies were visually inspected and loaded into the Unit One Reactor.
For Unit One Cycle 14,144 new YJ8-GE10 (barrier clad) assemblies were visually inspected and loaded into the Unit One Reactor.
e i
e i
l l
l STMGR$7893 RLB
I STMGR$7893 RLB                                                               I
-}}
                                . . .                .  .                - - . -      -}}

Latest revision as of 06:23, 15 December 2024

Forwards Special Rept, Quad-Cities Nuclear Power Station Unit 1 Summary Status of Fuel Performance EOC 13 Jul 1994
ML20071J532
Person / Time
Site: Quad Cities 
Issue date: 07/19/1994
From: Campbell G
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GGC-94-105, NUDOCS 9407280245
Download: ML20071J532 (2)


Text

r o

[: ;.

rs

.l Commonweilth Edison Quad Cities Nuclear Power Station 22710 200 Avenue North Corcova, Illinois 61242 Telephone 309/654-2241 GGC-94-105 July 19. 1994 i

[

U. S. Nuclear Regulatory Commission

(

ATTN:

Document Control Desk i

Washington, D.C.

20555 i

SUBJECT:

Quad Cities Nuclear Power Station Unit 1 Summary Status of Fuel Performance NRC Docket Number 50-714 Enclosed is the Special Re) ort, "Ouad-Cities Nuclear Power Station.

Unit 1. Summary Status of ruel Performance. End of Cycle 13. July 1994 letter."

This report is submitted to you in accordance with the Special Report Requirements of Table 6.6-1. Docket Number 50-254. DPR-29.

i Very truly yours.

A g G.

Campbell-Stat' 1 Manager Quad ties Nuclear Power Station GGC/DC/kjv Enclosure StM %)m cc:

^ B. Davis. Regional Administrator C. Miller. Senior Resident Inspector E. Kraft. Commonwealth Edison T. Rieck, Commonwealth Edison File i

l

'J,u,.,c-an vvv 00

\\

STMGR47893.RLB 94o7280245 940719 i

PDR ADOCK 05000254 P

PDR

,.s, i

OUAD-CITIES NUCLEAR POWER STATION UNIT ONE

SUMMARY

STATUS OF FUEL PERFORMANCE END OF CYCLE THIRTEEN JULY 1994 At the end of this reporting period, Quad-Cities Unit One has completed thirteen Reactor cycles of operation.

During that time, 2,808 fuel assemblies had seen duty in the Unit One core.

No sipping was performed on the reload fuel assemblies at the end of cycle thirteen.

This decision was based on chemical and radiochemical data collected during cycle thirteen, which showed no indication of' leakage or fuel failure.

For Unit One Cycle 14,144 new YJ8-GE10 (barrier clad) assemblies were visually inspected and loaded into the Unit One Reactor.

e i

l STMGR$7893 RLB

-