Forwards Special Rept, Quad-Cities Nuclear Power Station Unit 1 Summary Status of Fuel Performance EOC 13 Jul 1994
ML20071J532
Person / Time
Site: Quad Cities 
Issue date: 07/19/1994
From: Campbell G
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GGC-94-105, NUDOCS 9407280245
Download: ML20071J532 (2)


Text

r o

[: ;.

rs

.l Commonweilth Edison Quad Cities Nuclear Power Station 22710 200 Avenue North Corcova, Illinois 61242 Telephone 309/654-2241 GGC-94-105 July 19. 1994 i

[

U. S. Nuclear Regulatory Commission

(

ATTN:

Document Control Desk i

Washington, D.C.

20555 i

SUBJECT:

Quad Cities Nuclear Power Station Unit 1 Summary Status of Fuel Performance NRC Docket Number 50-714 Enclosed is the Special Re) ort, "Ouad-Cities Nuclear Power Station.

Unit 1. Summary Status of ruel Performance. End of Cycle 13. July 1994 letter."

This report is submitted to you in accordance with the Special Report Requirements of Table 6.6-1. Docket Number 50-254. DPR-29.

i Very truly yours.

A g G.

Campbell-Stat' 1 Manager Quad ties Nuclear Power Station GGC/DC/kjv Enclosure StM %)m cc:

^ B. Davis. Regional Administrator C. Miller. Senior Resident Inspector E. Kraft. Commonwealth Edison T. Rieck, Commonwealth Edison File i

l

'J,u,.,c-an vvv 00

\\

STMGR47893.RLB 94o7280245 940719 i

PDR ADOCK 05000254 P

PDR

,.s, i

OUAD-CITIES NUCLEAR POWER STATION UNIT ONE

SUMMARY

STATUS OF FUEL PERFORMANCE END OF CYCLE THIRTEEN JULY 1994 At the end of this reporting period, Quad-Cities Unit One has completed thirteen Reactor cycles of operation.

During that time, 2,808 fuel assemblies had seen duty in the Unit One core.

No sipping was performed on the reload fuel assemblies at the end of cycle thirteen.

This decision was based on chemical and radiochemical data collected during cycle thirteen, which showed no indication of' leakage or fuel failure.

For Unit One Cycle 14,144 new YJ8-GE10 (barrier clad) assemblies were visually inspected and loaded into the Unit One Reactor.