| title = Revises Response to NRC | | title = Revises Response to NRC Re Violations Noted in Insp Repts 50-254/93-25 & 50-265/93-25,revising Listed Commitment to 950515 to Allow for Completion of Independent Assessment of IST Program & Recommended Procedure Changes | ||
| author name = Tucker L | | author name = Tucker L | ||
| author affiliation = COMMONWEALTH EDISON CO. | | author affiliation = COMMONWEALTH EDISON CO. | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 9408190214 | | document report number = NUDOCS 9408190214 | ||
| title reference date = 10-26-1993 | |||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE | ||
| page count = 1 | | page count = 1 | ||
| Line 23: | Line 24: | ||
==Reference:== | ==Reference:== | ||
E. Greenman letter to M. Wallace dated October 26,1993, transmitting Notice of Violation. | E. Greenman letter to M. Wallace dated October 26,1993, transmitting Notice of Violation. | ||
Inspection Repor; 50-254/93025; 50-265/93025 Enclosed is Commonwealth Edison's revision to the response to the Notice of Violation (NOV) transmitted with the referenced letter. The NOV cited four level IV | Inspection Repor; 50-254/93025; 50-265/93025 Enclosed is Commonwealth Edison's revision to the response to the Notice of Violation (NOV) transmitted with the referenced letter. The NOV cited four level IV violations involving; 1) missed 50.72 reporting, 2) inadequate corrective actions, 3) inadequate procedures and 4) inadequate test control of core spray valves. | ||
violations involving; 1) missed 50.72 reporting, 2) inadequate corrective actions, 3) inadequate procedures and 4) inadequate test control of core spray valves. | |||
In the response for the notice of violation for inadequate test control of core spray valves, the following commitment was made: | In the response for the notice of violation for inadequate test control of core spray valves, the following commitment was made: | ||
: 1) The test requirement to perform the high pressure seat leakage test each refueling outage will be added to the next revision of the IST program which is l | : 1) The test requirement to perform the high pressure seat leakage test each refueling outage will be added to the next revision of the IST program which is l | ||
| Line 32: | Line 32: | ||
If there are any questions or comments concerning this letter, please refer them to Ron Baumer, Regulatory Assurance at (319) 654-2241 extension 3102. | If there are any questions or comments concerning this letter, please refer them to Ron Baumer, Regulatory Assurance at (319) 654-2241 extension 3102. | ||
I Respectfully, | I Respectfully, | ||
/ | |||
UM /w 1 | |||
UM /w L. J. Tucker l | l L. J. Tucker l | ||
ech nical Superintendent ab Cities Station Attachment cc: J. Martin, Regional Administrator, Rill C. Patel, Project Manager, NRR l | |||
C. Miller, Senior Resident inspector, Quad Cities I | |||
*\\ | |||
W o h4 I | |||
o g | |||
PDR | |||
.}} | |||
Latest revision as of 05:36, 15 December 2024
| ML20072D728 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 08/12/1994 |
| From: | Tucker L COMMONWEALTH EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9408190214 | |
| Download: ML20072D728 (1) | |
Text
0 August 12,1994 U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attn: Document Control Desk
Subject:
Quad Cities Power Station Units 1 and 2; NRC Docket Number 50-254 and 50-265; NRC inspection Report Numbers 50-254(265)/93025
Reference:
E. Greenman letter to M. Wallace dated October 26,1993, transmitting Notice of Violation.
Inspection Repor; 50-254/93025; 50-265/93025 Enclosed is Commonwealth Edison's revision to the response to the Notice of Violation (NOV) transmitted with the referenced letter. The NOV cited four level IV violations involving; 1) missed 50.72 reporting, 2) inadequate corrective actions, 3) inadequate procedures and 4) inadequate test control of core spray valves.
In the response for the notice of violation for inadequate test control of core spray valves, the following commitment was made:
- 1) The test requirement to perform the high pressure seat leakage test each refueling outage will be added to the next revision of the IST program which is l
expected to be submitted by September 15,1994.
The station is revising the above commitment to 5/15/95 to allow for the completion of the independent assessment of the IST program and to allow for all recommended procedure changes to be incorporated by this time.
l l
If there are any questions or comments concerning this letter, please refer them to Ron Baumer, Regulatory Assurance at (319) 654-2241 extension 3102.
I Respectfully,
/
UM /w 1
l L. J. Tucker l
ech nical Superintendent ab Cities Station Attachment cc: J. Martin, Regional Administrator, Rill C. Patel, Project Manager, NRR l