ML20072E036: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:,
{{#Wiki_filter:,
I Southern Nuclear Operat;ng Company                                                                   l Post O*fice Box 1295                                                                                 j Birmingham, Alabama 35201                                                                           i Teleonone (205) 868 5131 L
I Southern Nuclear Operat;ng Company Post O*fice Box 1295 j
o.v. uo,.y                                         Southern Nudear Operating Company              -
Birmingham, Alabama 35201 i
vice Pres. cent ran te Pro;ect                                                           the southern e'ectnc system August 12, 1994 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Joseph M. Farley Nuclear Plant Monthly Ooerating Data Renort Gentlemen:
Teleonone (205) 868 5131 L
Southern Nudear Operating Company o.v. uo,.y vice Pres. cent ran te Pro;ect the southern e'ectnc system August 12, 1994 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Joseph M. Farley Nuclear Plant Monthly Ooerating Data Renort Gentlemen:
Attached are the July 1994 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units I and 2, as required by Section 6.9.1.10 of the Technical Specifications.
Attached are the July 1994 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units I and 2, as required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
If you have any questions, please advise.
Respectfully submitted, gf) 7A Dave Morey RWC:jgp(mor)
Respectfully submitted, gf) 7A Dave Morey RWC:jgp(mor)
Attachments
Attachments cc:
!        cc:       Mr. S. D. Ebneter l                   Mr. B. L. Siegel Mr. T. M. Ross i
Mr. S. D. Ebneter l
Mr. B. L. Siegel Mr. T. M. Ross i
l
l
                                  * (1 * \ f +*
* (1 * \\ f
.10 V L C(' D
[p
[p
                                .10 V L C(' D 940G22OO93 940731                                                                     I /:
+*
l         PDR       ADOCK 05000348 l
940G22OO93 940731 I /:
l R                           PDR                                                           I\
l PDR ADOCK 05000348 I\\
l R
PDR l


Joseph M. Farley Nuclear Plant
Joseph M. Farley Nuclear Plant Unit 1 Narrative Summary of Operations r
      -                                                                Unit 1 Narrative Summary of Operations r                                                 July 1994 At 0138 on 07/02/94, the unit was ramped down to 15 percent power to modify the IC reactor coolant pump motor so that future oil additions can be made to the lower oil reservoir without reducing power.
July 1994 At 0138 on 07/02/94, the unit was ramped down to 15 percent power to modify the IC reactor coolant pump motor so that future oil additions can be made to the lower oil reservoir without reducing power.
The unit was returned to 100 percent p er at 2250 on 7/2/94.
The unit was returned to 100 percent p er at 2250 on 7/2/94.
There was no major safety related maintenance perfonned during the month.
There was no major safety related maintenance perfonned during the month.
1 I
1 I
l
l a
  .      .. -        - - - - _ _  ---    -_ -                      - - - _ - _ -          - - _ -- -_ - _ - - - - - - - - - -_        a


                                                                -.                  .. . - . . .                - . - - . - . .        = ..       _ - - . . - -
=..
i
i OPERATING DATA REPORT DOCKET NO.
    -.;            ;                                                                                                                                                1 OPERATING DATA REPORT DOCKET NO.                         50-348 DATE     August 5,1994 COMPLETED BY                     R. D. Hill TELEPHONE                   (205) 899-5156
50-348 DATE August 5,1994 COMPLETED BY R. D. Hill TELEPHONE (205) 899-5156
                                                                                                                                                                    )
)
i l
i OfERATINGSTATUS i
OfERATINGSTATUS                                                                                                                                               I i
1.
1
Unit Name:
: 1.      Unit Name:                                       Joseph M. Farley - Unit 1               Notes                                                   i
Joseph M. Farley - Unit 1 Notes i
    - 2.         Reporting Period:                                                             July 1994   I) Cumuletive data since 12-01-77, date
- 2.
: 3.       Licensed Thermal Power (MWt):                                                     2,652   of commercial operation.
Reporting Period:
: 4.       Nameplate Rating (Gross MWe):                                                       860
July 1994 I) Cumuletive data since 12-01-77, date 3.
: 5.       Design Electrical Rating (Net MWe):                                                 829
Licensed Thermal Power (MWt):
: 6.       Maximum Dependable Capacity (Gross MWe):                     _
2,652 of commercial operation.
855.7
4.
: 7.         Maximum Dependable Capacity (Net MWe):                                             812
Nameplate Rating (Gross MWe):
: 8.         If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason     N/A
860 5.
: 9.         Power Level To Which Restricted, If Any (Net MWe N/A
Design Electrical Rating (Net MWe):
: 10.       Reasons For Restrictions,If Any:                               N/A This Month               Yr.to Date               Cumulative               i i1.       Ilours in Reporting Period                                                       744.0                     5,087.0             146,087.0
829 6.
: 12.     Number OfIlours Reactor Was Critical                                               744.0                     3,919.9             115,583.8
Maximum Dependable Capacity (Gross MWe):
: 13.       Reactor Reserve Shutdown liours                                                     0.0                         0.0             3,650.0
855.7 7.
: 14.       Ilours Generator On-line                                                           744.0                     3,874.3           113,780.9
Maximum Dependable Capacity (Net MWe):
: 15.       Unit Reserve Shutdown Ilours                                                         0.0                         0.0                       0.0 '
812 8.
16,       Gross Thermal Energy Generated (MWil)                                       1,946,859.7           9,911,808.2             292,404,213.4
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason N/A 9.
. 17.       Gross Electrical Energy Generated (MWil)                                     630,509.0           3,216,086.0               94,231,132.0
Power Level To Which Restricted, If Any (Net MWe N/A 10.
: 18.       Net Electrical Energy Generated (MWII)                                       598,421.0           3,034,960.0               88,975,114.0
Reasons For Restrictions,If Any:
: 19.       Unit Service Factor                                                               100.0                         76.2                   77.9
N/A This Month Yr.to Date Cumulative i
: 20.       ' Unit Availabilty Factor                                                           100.0 -                       76.2                   77.9 l'
i1.
    ~ 21,       Unit Capacity Factor (Using MDC Net)                                               99.1                         73.5_                   74.8
Ilours in Reporting Period 744.0 5,087.0 146,087.0 12.
: 22.       Unit Capacity Factor (Using DER Net) .                                             97.0                         72.0                   73.5
Number OfIlours Reactor Was Critical 744.0 3,919.9 115,583.8 13.
: 23.       Unit Forcer Outage Rate -                                                             0.0                         0.0                       6.2 24,       Shutdowns Geheduled Over Next 6 Months (Type, Date, and Duration of Each):
Reactor Reserve Shutdown liours 0.0 0.0 3,650.0 14.
Ilours Generator On-line 744.0 3,874.3 113,780.9 15.
Unit Reserve Shutdown Ilours 0.0 0.0 0.0 '
16, Gross Thermal Energy Generated (MWil) 1,946,859.7 9,911,808.2 292,404,213.4 17.
Gross Electrical Energy Generated (MWil) 630,509.0 3,216,086.0 94,231,132.0 18.
Net Electrical Energy Generated (MWII) 598,421.0 3,034,960.0 88,975,114.0 19.
Unit Service Factor 100.0 76.2 77.9 l '
20.
' Unit Availabilty Factor 100.0 -
76.2 77.9
~ 21, Unit Capacity Factor (Using MDC Net) 99.1 73.5_
74.8 22.
Unit Capacity Factor (Using DER Net).
97.0 72.0 73.5 23.
Unit Forcer Outage Rate -
0.0 0.0 6.2 24, Shutdowns Geheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
N/A
: 25. ' If Shut Down at Eol Of Report Period, Estimated Date of Startupi                                 N/A                                                     l i ?26. --Units In Test Status (Prior To Commercial Operation):                                                 Forecast                     Achieved 1-
: 25. ' If Shut Down at Eol Of Report Period, Estimated Date of Startupi N/A l
  ,                                        Initial Criticality                                                 08/0607                   - 08/09/77 inittal Electricity                                                 03GD01                       03!1302' Commercial Operation                                                12/0191                      12/Oln7
i ?26. --Units In Test Status (Prior To Commercial Operation):
Forecast Achieved 1-Initial Criticality 08/0607
- 08/09/77 inittal Electricity 03GD01 03!1302'
{
{
m       ,            . - -                  ,          - , . . . -
Commercial Operation 12/0191 12/Oln7 m
e


DOCKET No.       50-348 UNIT         I DATE August 5,1994 COMPLETED BY       R. D. Hill TELEPilONE (205) 899-5156 _
DOCKET No.
MONTH             July DAY       AVERAGE DAILY POWER LEVEL               DAY   AVERAGE DAILY POWER LEVEL (MWe-Net)                                         (MWe-Net) 1                     820                       17                     814 2                       442                       18                     814 3                       812                       19                     814 4                       813                       20                     817 5                       815                       21                     815 6                       821                       22                     814 7                       820                       23                     817             I 8                       816                       24                     816 l
50-348 UNIT I
9                      817                       25                     816             ,
DATE August 5,1994 COMPLETED BY R. D. Hill TELEPilONE (205) 899-5156 _
10                       816                       26                     817 11                       817                       27                     818 12                       816                       28                     818 13                       817                       29                     821 14     _
MONTH July DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
817                       30                     819 15                       816                       31                     819 16     __
(MWe-Net) 1 820 17 814 2
814 INSIRUCIIOMi On thu format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
442 18 814 3
812 19 814 4
813 20 817 5
815 21 815 6
821 22 814 7
820 23 817 8
816 24 816 9
817 25 816 10 816 26 817 11 817 27 818 12 816 28 818 13 817 29 821 14 817 30 819 15 816 31 819 16 814 INSIRUCIIOMi On thu format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.


UNIT SIIUTDOWNS AND POWER REDUCTIONS                                                                                                                                       ,,
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
DOCKET NO.             50-348 UNIT NAME L M, Farley - Unit 1                                                       -
50-348 UNIT NAME L M, Farley - Unit 1 DATE_ August 5.1994 COMPLETED BY R. D. Ilill REPORT MONTH July TELEPilONE (205)S99-5156 i
DATE_ August 5.1994 COMPLETED BY               R. D. Ilill REPORT MONTH                   July                                                             TELEPilONE       (205)S99-5156 i                                                     8
8
                                                                                                                                                                                                                                                        !i
!i f
  !'                                                      f                                MEllioD of       LICENSEE                                               CAUSE AND CORRECTIVE                                                               li i                                                                                                                                                                                             4 j DURATloN                         SHUTTING   lt EVENT           SYSTEM     COMPONENT '                           ACI'loN To                                                               !
MEllioD of LICENSEE CAUSE AND CORRECTIVE li i
!                                                        ;                                                                                                                                                                                              I; j       NO                             DATE   iTYPE (1)! IloURS           REASON (2) DoWN REACTOR (3Q REPORT # ,_ CODE (4)               COD.E (5)         _
4 j DURATloN SHUTTING l EVENT SYSTEM COMPONENT '
PRI; VENT RECURRENCE _                                                   _ _ j!
ACI'loN To t
j 004                             07/02/94     S     I 21_2               B             N/A             N/A l         N/A         NIA         At 0138 on 7/2/94, the unit was ramped down to                                                 ll 15 percent power to modify the IC reactor                                                       ji l
I; j
i                                                                                                                                                        coolant pump motor so that future oil additions                                                 }!
NO DATE iTYPE (1)! IloURS REASON (2) DoWN REACTOR (3Q REPORT #,_ CODE (4)
can be made without reducing power.                                                             i The unit was returned to 100 percent power at
COD.E (5)
  !                                                                                                                                                      2250 on 7/2/94.                                                                                 1 li                                                                                                                                                                                                                                                         !
PRI; VENT RECURRENCE _
l s                                                                                                    a                                                                                                   _
_ _ j!
                                                                                                                                                                                                                                                    )0 1:                                       2:                                                     3:                           4:                                       5:
j 004 07/02/94 S
F. rorced                                 Reason                                                     Method                     Exhibit G- Instructions for             Exhibit ! - Same Source S: Scheduled                               A - Equipment Fadure (Explain)                           1 - Manual                 Preparanons of Date Entry B - Maintenance or Test                                 2 - Manual Scram           Sheets for Licensee Event C - Refuelmg                                             3 - Automatic Scram         Repon (LER) File (NUREG_0161)
I 21_2 B
D - Regulatory Restriction                               4 - Other (Explain)
N/A N/A l N/A NIA At 0138 on 7/2/94, the unit was ramped down to ll l
E - operator Training & License Exammation F- Administratise G - operational Error (Explam) 1I - other(Explain)
15 percent power to modify the IC reactor ji i
coolant pump motor so that future oil additions
}!
can be made without reducing power.
i The unit was returned to 100 percent power at 2250 on 7/2/94.
1 li l
a
)0 s
1:
2:
3:
4:
5:
F. rorced Reason Method Exhibit G-Instructions for Exhibit ! - Same Source S: Scheduled A - Equipment Fadure (Explain) 1 - Manual Preparanons of Date Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refuelmg 3 - Automatic Scram Repon (LER) File (NUREG_0161)
D - Regulatory Restriction 4 - Other (Explain)
E - operator Training & License Exammation F-Administratise G - operational Error (Explam) 1I - other(Explain)


Joseph M. Farley Nuclear Plant Unit 2 Narrative Summary of Operations July 1994 There were no unit shutdowns or major power reductions during the month.
Joseph M. Farley Nuclear Plant Unit 2 Narrative Summary of Operations July 1994 There were no unit shutdowns or major power reductions during the month.
Line 107: Line 151:
{
{


1
}
                                                                                                                                                            }
j OPERATING DATA REPORT
.                                                                                                                                                              l
\\
                          *.                                                                                                                                j OPERATING DATA REPORT                                                                               \
- DOCKET NO.
                                                                                                      - DOCKET NO.                     50-364 DATE             Auget 5, !994 COMPLETED IW                   .R. D. Hill TELEPIIONE               (205) 899-S i S6-           i 1
50-364 DATE Auget 5, !994 COMPLETED IW
OPERATINGJiTATMS
.R. D. Hill TELEPIIONE (205) 899-S i S6-1 i
: l.       Unit Name:                                         Joseph M. Farley - Unit 2         Notes
OPERATINGJiTATMS l.
: 2.       Reporting Period:                                                       July 1994     I) Cumulative data since 07-30-81, date
Unit Name:
: 3.       Licensed Thermal Power (MWt):                                             2,652     of commercial operation.
Joseph M. Farley - Unit 2 Notes 2.
: 4.     . Nameplate Rating (Gross MWe):                                                 860
Reporting Period:
: 5.       Design Electrical Rating (Net MWe):                                           829
July 1994 I) Cumulative data since 07-30-81, date 3.
: 6.       Maximum Dependable Capacity (Gross MWe):                                   863.6
Licensed Thermal Power (MWt):
      ' 7.       Maximum Dependable Capacity (Net MWe):                                       822
2,652 of commercial operation.
: 8.       If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason     N/A                                                                                                   ,,
4.
      -9.         Power Level To Which Restricted,if Any (Net MWe N/A
. Nameplate Rating (Gross MWe):
;        10.      Reasons For Restrictions, If Any:                         N/A I
860 5.
I This Month                 Yr.to Date               Cumulative             l
Design Electrical Rating (Net MWe):
          ! 1. Hours in Reporting Period                                                 744.0                 5,087 0                 114,000.0         )
829 6.
: 12.     Number Of Ilours Reactor Was Critical                                     744.0                 5,087.0                 98,040.7
Maximum Dependable Capacity (Gross MWe):
: 13.     Reactor Reserve Shutdown Hours                                                 0.0                   0.0 _                   138.0
863.6
: 14.     Ilours Generator On-line                                                   744.0                 5,087.0                 96,648.8
' 7.
: 15.     Unit Reserve Shutdown llours                                                   0.0                   0.0                       0.0
Maximum Dependable Capacity (Net MWe):
: 16.     Gross Thermal Energy Generated (MWil)                               1,973,016.9           13,422,349.4           246,957,702.2
822 8.
: 17. _ Gross Electrical Energy Generated (MWil)                                 643,528.0             4,421,273.0             80,970,734.0
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason N/A
: 18.     Net Electrical Energy Generated (MWil)                                 613,152.0           4,212,505.0             76,787,594.0
-9.
: 19.     Unit Service Factor                                                         100.0                 100.0                       84.8
Power Level To Which Restricted,if Any (Net MWe N/A Reasons For Restrictions, If Any:
: 20.     Unit Availabilty Factor                                                     100.0                 100.0                       84.8
N/A 10.
: 21.     Unit Capacity Factor (Using MDC . Net)                                     100.3                 100.7                       82.1
I This Month Yr.to Date Cumulative
: 22.     Unit Capacity Factor (Using DER Net)                                         99.4 -                 99.9                       81.3
! 1.
: 23.     Unit Forced Outage Rate                                                       0.0                   0.0                       4.0
Hours in Reporting Period 744.0 5,087 0 114,000.0 12.
      ; 24.       Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Number Of Ilours Reactor Was Critical 744.0 5,087.0 98,040.7 13.
Reactor Reserve Shutdown Hours 0.0 0.0 _
138.0 14.
Ilours Generator On-line 744.0 5,087.0 96,648.8 15.
Unit Reserve Shutdown llours 0.0 0.0 0.0 16.
Gross Thermal Energy Generated (MWil) 1,973,016.9 13,422,349.4 246,957,702.2
: 17. _ Gross Electrical Energy Generated (MWil) 643,528.0 4,421,273.0 80,970,734.0 18.
Net Electrical Energy Generated (MWil) 613,152.0 4,212,505.0 76,787,594.0 19.
Unit Service Factor 100.0 100.0 84.8 20.
Unit Availabilty Factor 100.0 100.0 84.8 21.
Unit Capacity Factor (Using MDC. Net) 100.3 100.7 82.1 22.
Unit Capacity Factor (Using DER Net) 99.4 -
99.9 81.3 23.
Unit Forced Outage Rate 0.0 0.0 4.0
; 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A 25.
If Shut Down at End Of Report Period, Estimated Date of Startup:
N/A
N/A
,        25.      If Shut Down at End Of Report Period, Estimated Date of Startup:                    N/A
- 26.
      - 26.       Units in Test Status (Prior To Commercial Operation)!                                     Forecast                 Achieved Initial Criticality                                           05!0bl81.                 05/0381 Initial Electricity                                           021481                   05!2281 Commercial Operation                                           01/0u11.                 01/30lEl.
Units in Test Status (Prior To Commercial Operation)!
J n.- n
Forecast Achieved Initial Criticality 05!0bl81.
05/0381 Initial Electricity 021481 05!2281 Commercial Operation 01/0u11.
01/30lEl.
J n.-
n n


DOCKET NO.       50-364
DOCKET NO.
                  -                                                          UNIT         2 DATE August 5,1994 CO%IPLETED BY     R. D. Hill rELEPilONE (205)899-5156 MONTli             July DAY           AVERAGE DAILY POWER LEVEL             DAY   AVERAGE DAILY POWER LEVEL (MWe-Net)                                         (MWe-Net) 1                         827                       17                 _ 822 2                         823                       18                     822 3                         854                       19                     823 4                         821                 _
50-364 UNIT 2
20                     826 5                         822                       21                     823
DATE August 5,1994 CO%IPLETED BY R. D. Hill rELEPilONE (205)899-5156 MONTli July DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
                                                                                                  ~
(MWe-Net) 1 827 17
6                          827                       22                     824 7                         828                       23                     826 8                         823                       24                     824 9                         824                       25                     824             l l
_ 822 2
10                         824                       26                     865 l
823 18 822 3
11-                       825                       27                     866 12                         824                       28                     826             ,
854 19 823 4
13                         823                       29                     826 14                         824                       30                     826 15                         824                       31                     827 16                         821 INSIRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
821 20 826 5
822 21 823 6
827 22 824
~
7 828 23 826 8
823 24 824 9
824 25 824 10 824 26 865 11-825 27 866 12 824 28 826 13 823 29 826 14 824 30 826 15 824 31 827 16 821 INSIRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.


UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.             50-364                                                     -
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME J. M. Farley - Unit 2                                                     .
50-364 UNIT NAME J. M. Farley - Unit 2 DATE August 5,1994 COMPLETED BY R. D. Hill REPORT MONTH Jtily TELEPHONE (205) 899-5156
DATE     August 5,1994 COMPLETED BY             R. D. Hill REPORT MONTH                   Jtily                                                               TELEPHONE       (205) 899-5156 7                                    - = - - . -                   --.              - - - - ,                  _ _ = = -       - - - - - - -                    ---=====q l                                                                                                                                                                                                                                                               l METHOD OF     LICENSEE                                                             CAUSE AND CORRECTIVE f'
- = - -. -
DURATION                         SilUTTING       EVENT         SYSTEM           COMPONENT                                 ACTION TO                                                               ,
_ _ = = -
NO                         DATE           TYPE 11) . IlOURSJREASON Q,L DOWH REACTOR (3g REPORT #                       CODEJ               CODE (5)                         PREVENT RFCURRENCE C~
---=====q 7
                                                                                                                                                                                                            ~~
l l
lThere were no shutdowns or power reductions during the month.                                           [~
f METHOD OF LICENSEE CAUSE AND CORRECTIVE DURATION SilUTTING EVENT SYSTEM COMPONENT ACTION TO NO DATE TYPE 11). IlOURSJREASON Q,L DOWH REACTOR (3g REPORT #
CODEJ CODE (5)
PREVENT RFCURRENCE lThere were no shutdowns or power reductions during the month.
[~
C~
~~
I
I
[L__a                                   ___                                            _
[L__a 1
1                -                                                                                                                              w 1:                                           2:                                                     3:                           4:                                         5:
w 1:
F: Forced                                     Reason                                                   Method                           Exhibit G- Instructions for             Exhibit I - Same Source S: Scheduled                                   A - Equipment Failure (Explain)                         1 - Manual                         Preparations of Date Entry B - Maintenance or Test                                 2 - Manual Scram                 Sheets for Licensee Event C - Refuelmg                                           3 - Automatic Scram               Report (1 ER) File (NUREG-0161)
2:
D - Regulatory Restriction                             4 - Other (Explain)
3:
E - Operator Trainmg & License Examination F- Admmistrative G - Operational Error (Explain) 11 - Other (Explain) ppsen?WWW m                                 intmnWWvnmQpMm&T*W"""NW7M.nm~mMYWWWWnece??%w:vymn::WmmnvWmwnymmW.'m*'~&7.w n,wm ne ws ki2CO L u n e M u?22.LkuE~                                                   > - sw L Rhadhlu:W. N ah2DeM2aDh.::e 0:dk5%:O                                                       - EM D L
4:
                                                                                                                                                                                                                ,a.     ' ~:2kmn.e4
5:
_ _ - _ _ _ _ _ _ _ _ - .          .            .                                                                                                                                                  ..    - _ _ _ _ _ _ _ _ _ _ _ _ _ .}}
F: Forced Reason Method Exhibit G-Instructions for Exhibit I - Same Source S: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparations of Date Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refuelmg 3 - Automatic Scram Report (1 ER) File (NUREG-0161)
D - Regulatory Restriction 4 - Other (Explain)
E - Operator Trainmg & License Examination F-Admmistrative G - Operational Error (Explain) 11 - Other (Explain) ppsen?WWW m intmnWWvnmQpMm&T*W"""NW7M.nm~mMYWWWWnece??%w:vymn::WmmnvWmwnymmW.'m*'~&7.w n,wm ne ws ki2CO L u n e M u?22.LkuE~
> - sw L Rhadhlu:W. N ah2DeM2aDh.::e 0:dk5%:O
- EM D L,a.
' ~:2kmn.e4
.}}

Latest revision as of 05:34, 15 December 2024

Monthly Operating Rept for Jul 1994 for Jm Farley Nuclear Plant
ML20072E036
Person / Time
Site: Farley  
Issue date: 07/31/1994
From: Hill R, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9408220083
Download: ML20072E036 (9)


Text

,

I Southern Nuclear Operat;ng Company Post O*fice Box 1295 j

Birmingham, Alabama 35201 i

Teleonone (205) 868 5131 L

Southern Nudear Operating Company o.v. uo,.y vice Pres. cent ran te Pro;ect the southern e'ectnc system August 12, 1994 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Joseph M. Farley Nuclear Plant Monthly Ooerating Data Renort Gentlemen:

Attached are the July 1994 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units I and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, gf) 7A Dave Morey RWC:jgp(mor)

Attachments cc:

Mr. S. D. Ebneter l

Mr. B. L. Siegel Mr. T. M. Ross i

l

  • (1 * \\ f

.10 V L C(' D

[p

+*

940G22OO93 940731 I /:

l PDR ADOCK 05000348 I\\

l R

PDR l

Joseph M. Farley Nuclear Plant Unit 1 Narrative Summary of Operations r

July 1994 At 0138 on 07/02/94, the unit was ramped down to 15 percent power to modify the IC reactor coolant pump motor so that future oil additions can be made to the lower oil reservoir without reducing power.

The unit was returned to 100 percent p er at 2250 on 7/2/94.

There was no major safety related maintenance perfonned during the month.

1 I

l a

=..

i OPERATING DATA REPORT DOCKET NO.

50-348 DATE August 5,1994 COMPLETED BY R. D. Hill TELEPHONE (205) 899-5156

)

i OfERATINGSTATUS i

1.

Unit Name:

Joseph M. Farley - Unit 1 Notes i

- 2.

Reporting Period:

July 1994 I) Cumuletive data since 12-01-77, date 3.

Licensed Thermal Power (MWt):

2,652 of commercial operation.

4.

Nameplate Rating (Gross MWe):

860 5.

Design Electrical Rating (Net MWe):

829 6.

Maximum Dependable Capacity (Gross MWe):

855.7 7.

Maximum Dependable Capacity (Net MWe):

812 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason N/A 9.

Power Level To Which Restricted, If Any (Net MWe N/A 10.

Reasons For Restrictions,If Any:

N/A This Month Yr.to Date Cumulative i

i1.

Ilours in Reporting Period 744.0 5,087.0 146,087.0 12.

Number OfIlours Reactor Was Critical 744.0 3,919.9 115,583.8 13.

Reactor Reserve Shutdown liours 0.0 0.0 3,650.0 14.

Ilours Generator On-line 744.0 3,874.3 113,780.9 15.

Unit Reserve Shutdown Ilours 0.0 0.0 0.0 '

16, Gross Thermal Energy Generated (MWil) 1,946,859.7 9,911,808.2 292,404,213.4 17.

Gross Electrical Energy Generated (MWil) 630,509.0 3,216,086.0 94,231,132.0 18.

Net Electrical Energy Generated (MWII) 598,421.0 3,034,960.0 88,975,114.0 19.

Unit Service Factor 100.0 76.2 77.9 l '

20.

' Unit Availabilty Factor 100.0 -

76.2 77.9

~ 21, Unit Capacity Factor (Using MDC Net) 99.1 73.5_

74.8 22.

Unit Capacity Factor (Using DER Net).

97.0 72.0 73.5 23.

Unit Forcer Outage Rate -

0.0 0.0 6.2 24, Shutdowns Geheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. ' If Shut Down at Eol Of Report Period, Estimated Date of Startupi N/A l

i ?26. --Units In Test Status (Prior To Commercial Operation):

Forecast Achieved 1-Initial Criticality 08/0607

- 08/09/77 inittal Electricity 03GD01 03!1302'

{

Commercial Operation 12/0191 12/Oln7 m

e

DOCKET No.

50-348 UNIT I

DATE August 5,1994 COMPLETED BY R. D. Hill TELEPilONE (205) 899-5156 _

MONTH July DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 820 17 814 2

442 18 814 3

812 19 814 4

813 20 817 5

815 21 815 6

821 22 814 7

820 23 817 8

816 24 816 9

817 25 816 10 816 26 817 11 817 27 818 12 816 28 818 13 817 29 821 14 817 30 819 15 816 31 819 16 814 INSIRUCIIOMi On thu format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-348 UNIT NAME L M, Farley - Unit 1 DATE_ August 5.1994 COMPLETED BY R. D. Ilill REPORT MONTH July TELEPilONE (205)S99-5156 i

8

!i f

MEllioD of LICENSEE CAUSE AND CORRECTIVE li i

4 j DURATloN SHUTTING l EVENT SYSTEM COMPONENT '

ACI'loN To t

I; j

NO DATE iTYPE (1)! IloURS REASON (2) DoWN REACTOR (3Q REPORT #,_ CODE (4)

COD.E (5)

PRI; VENT RECURRENCE _

_ _ j!

j 004 07/02/94 S

I 21_2 B

N/A N/A l N/A NIA At 0138 on 7/2/94, the unit was ramped down to ll l

15 percent power to modify the IC reactor ji i

coolant pump motor so that future oil additions

}!

can be made without reducing power.

i The unit was returned to 100 percent power at 2250 on 7/2/94.

1 li l

a

)0 s

1:

2:

3:

4:

5:

F. rorced Reason Method Exhibit G-Instructions for Exhibit ! - Same Source S: Scheduled A - Equipment Fadure (Explain) 1 - Manual Preparanons of Date Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refuelmg 3 - Automatic Scram Repon (LER) File (NUREG_0161)

D - Regulatory Restriction 4 - Other (Explain)

E - operator Training & License Exammation F-Administratise G - operational Error (Explam) 1I - other(Explain)

Joseph M. Farley Nuclear Plant Unit 2 Narrative Summary of Operations July 1994 There were no unit shutdowns or major power reductions during the month.

There was no major safety related maintenance perfonned during the month.

l l

l 1

i

{

}

j OPERATING DATA REPORT

\\

- DOCKET NO.

50-364 DATE Auget 5, !994 COMPLETED IW

.R. D. Hill TELEPIIONE (205) 899-S i S6-1 i

OPERATINGJiTATMS l.

Unit Name:

Joseph M. Farley - Unit 2 Notes 2.

Reporting Period:

July 1994 I) Cumulative data since 07-30-81, date 3.

Licensed Thermal Power (MWt):

2,652 of commercial operation.

4.

. Nameplate Rating (Gross MWe):

860 5.

Design Electrical Rating (Net MWe):

829 6.

Maximum Dependable Capacity (Gross MWe):

863.6

' 7.

Maximum Dependable Capacity (Net MWe):

822 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason N/A

-9.

Power Level To Which Restricted,if Any (Net MWe N/A Reasons For Restrictions, If Any:

N/A 10.

I This Month Yr.to Date Cumulative

! 1.

Hours in Reporting Period 744.0 5,087 0 114,000.0 12.

Number Of Ilours Reactor Was Critical 744.0 5,087.0 98,040.7 13.

Reactor Reserve Shutdown Hours 0.0 0.0 _

138.0 14.

Ilours Generator On-line 744.0 5,087.0 96,648.8 15.

Unit Reserve Shutdown llours 0.0 0.0 0.0 16.

Gross Thermal Energy Generated (MWil) 1,973,016.9 13,422,349.4 246,957,702.2

17. _ Gross Electrical Energy Generated (MWil) 643,528.0 4,421,273.0 80,970,734.0 18.

Net Electrical Energy Generated (MWil) 613,152.0 4,212,505.0 76,787,594.0 19.

Unit Service Factor 100.0 100.0 84.8 20.

Unit Availabilty Factor 100.0 100.0 84.8 21.

Unit Capacity Factor (Using MDC. Net) 100.3 100.7 82.1 22.

Unit Capacity Factor (Using DER Net) 99.4 -

99.9 81.3 23.

Unit Forced Outage Rate 0.0 0.0 4.0

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A 25.

If Shut Down at End Of Report Period, Estimated Date of Startup:

N/A

- 26.

Units in Test Status (Prior To Commercial Operation)!

Forecast Achieved Initial Criticality 05!0bl81.

05/0381 Initial Electricity 021481 05!2281 Commercial Operation 01/0u11.

01/30lEl.

J n.-

n n

DOCKET NO.

50-364 UNIT 2

DATE August 5,1994 CO%IPLETED BY R. D. Hill rELEPilONE (205)899-5156 MONTli July DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 827 17

_ 822 2

823 18 822 3

854 19 823 4

821 20 826 5

822 21 823 6

827 22 824

~

7 828 23 826 8

823 24 824 9

824 25 824 10 824 26 865 11-825 27 866 12 824 28 826 13 823 29 826 14 824 30 826 15 824 31 827 16 821 INSIRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-364 UNIT NAME J. M. Farley - Unit 2 DATE August 5,1994 COMPLETED BY R. D. Hill REPORT MONTH Jtily TELEPHONE (205) 899-5156

- = - -. -

_ _ = = -

---=====q 7

l l

f METHOD OF LICENSEE CAUSE AND CORRECTIVE DURATION SilUTTING EVENT SYSTEM COMPONENT ACTION TO NO DATE TYPE 11). IlOURSJREASON Q,L DOWH REACTOR (3g REPORT #

CODEJ CODE (5)

PREVENT RFCURRENCE lThere were no shutdowns or power reductions during the month.

[~

C~

~~

I

[L__a 1

w 1:

2:

3:

4:

5:

F: Forced Reason Method Exhibit G-Instructions for Exhibit I - Same Source S: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparations of Date Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refuelmg 3 - Automatic Scram Report (1 ER) File (NUREG-0161)

D - Regulatory Restriction 4 - Other (Explain)

E - Operator Trainmg & License Examination F-Admmistrative G - Operational Error (Explain) 11 - Other (Explain) ppsen?WWW m intmnWWvnmQpMm&T*W"""NW7M.nm~mMYWWWWnece??%w:vymn::WmmnvWmwnymmW.'m*'~&7.w n,wm ne ws ki2CO L u n e M u?22.LkuE~

> - sw L Rhadhlu:W. N ah2DeM2aDh.::e 0:dk5%:O

- EM D L,a.

' ~:2kmn.e4

.