ML20072H317: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:"RTELEDYNE ENGINEERING SERVCES 130 SECOND AVENUE | {{#Wiki_filter:"RTELEDYNE ENGINEERING SERVCES 130 SECOND AVENUE | ||
( | ( | ||
In response to the Commission Order and Staff Letter which established the DCNPP-1 Independent Design Verification Program, TES as IDVP Program l | WALTH AM. M ASSAOHUSETTS 02254 (617) 890s3350 TWX (710) 324 7508 June 22, 1983 5511-410 Mr. G.A. Maneatis, Senior Vice-President Facilities Development Pacific Gas & Electric Company 77 Beale Street San Francisco, CA 94106 Mr. H.R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comission Washington, D.C. 20555 Mr. J.B. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Re: Docket No. 50-275, OL-DPR-76 Diablo Canyon Unit No. 1 O | ||
subsect: | |||
iDve rINAt REe0a1 - eIrra tex 1 SUBMITTAL Gentlemen: | |||
In response to the Commission Order and Staff Letter which established the DCNPP-1 Independent Design Verification Program, TES as IDVP Program l | |||
Manager provides the fif th text submittal of the IDVP Final Report. | |||
As indicated in IDVP-SM-March 1983, the IDVP has combined the two Phase j | |||
Reports into a single final report. | |||
l Enclosed is the following text: | l Enclosed is the following text: | ||
Table of Contents | Table of Contents Revision 3 Subsection 4.2.4 Revision 0 Appendix D.3 Revision 0 Appendix E | ||
8306290405 830622 | Revision 0 Appendix F.2 Revision 0 l | ||
Appendix G | |||
l | Revision 0 The final submittal of text is scheduled for June 30, 1983. | ||
It is anti-l cipated that there will be another partial submittal before that date. | |||
8306290405 830622 bw | |||
[DRADOCK05000 J | |||
l t 7 l | |||
( | ( | ||
ENGINEERS AND METALLURGISTS | ENGINEERS AND METALLURGISTS | ||
'RTELEDYNE ENGNEERING SEFNICES Pacific Gas & Electric Co. | |||
Very truly yours, TELEDYNE ENGINEERING SERVICES | 5511-510 June'22, 1983 The text submitted by this letter is considered to be complete except as specifically indicated. | ||
Very truly yours, TELEDYNE ENGINEERING SERVICES f. | |||
v W.E. Cooper Project Manager-5511 WEC/ao Enclosures cc: | |||
H.E. Schierling (NRC) (85) | |||
R.R. Fray (PGandE) (30+220) | R.R. Fray (PGandE) (30+220) | ||
E. Denison (RLCA) (6) | E. Denison (RLCA) (6) | ||
| Line 37: | Line 49: | ||
D.F Fleischaker, Esq. | D.F Fleischaker, Esq. | ||
J. Reynolds, Esq./J.R. Phillips, Esq. | J. Reynolds, Esq./J.R. Phillips, Esq. | ||
B. Norton, Esq. | O B. Norton, Esq. | ||
A.C. Gehr, Esq. | |||
R.B. Hubbard J. Roesset M.J. Strumwasser, Esq. | R.B. Hubbard J. Roesset M.J. Strumwasser, Esq. | ||
l O | l O | ||
-}} | |||
Latest revision as of 05:11, 15 December 2024
| ML20072H317 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 06/22/1983 |
| From: | Cooper W TELEDYNE ENGINEERING SERVICES |
| To: | Harold Denton, Maneatis G, Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V), Office of Nuclear Reactor Regulation, PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML20072H319 | List: |
| References | |
| 5511-410, NUDOCS 8306290405 | |
| Download: ML20072H317 (2) | |
Text
"RTELEDYNE ENGINEERING SERVCES 130 SECOND AVENUE
(
WALTH AM. M ASSAOHUSETTS 02254 (617) 890s3350 TWX (710) 324 7508 June 22, 1983 5511-410 Mr. G.A. Maneatis, Senior Vice-President Facilities Development Pacific Gas & Electric Company 77 Beale Street San Francisco, CA 94106 Mr. H.R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comission Washington, D.C. 20555 Mr. J.B. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Re: Docket No. 50-275, OL-DPR-76 Diablo Canyon Unit No. 1 O
subsect:
iDve rINAt REe0a1 - eIrra tex 1 SUBMITTAL Gentlemen:
In response to the Commission Order and Staff Letter which established the DCNPP-1 Independent Design Verification Program, TES as IDVP Program l
Manager provides the fif th text submittal of the IDVP Final Report.
As indicated in IDVP-SM-March 1983, the IDVP has combined the two Phase j
Reports into a single final report.
l Enclosed is the following text:
Table of Contents Revision 3 Subsection 4.2.4 Revision 0 Appendix D.3 Revision 0 Appendix E
Revision 0 Appendix F.2 Revision 0 l
Appendix G
Revision 0 The final submittal of text is scheduled for June 30, 1983.
It is anti-l cipated that there will be another partial submittal before that date.
8306290405 830622 bw
[DRADOCK05000 J
l t 7 l
(
ENGINEERS AND METALLURGISTS
'RTELEDYNE ENGNEERING SEFNICES Pacific Gas & Electric Co.
5511-510 June'22, 1983 The text submitted by this letter is considered to be complete except as specifically indicated.
Very truly yours, TELEDYNE ENGINEERING SERVICES f.
v W.E. Cooper Project Manager-5511 WEC/ao Enclosures cc:
H.E. Schierling (NRC) (85)
R.R. Fray (PGandE) (30+220)
E. Denison (RLCA) (6)
R.F. Reedy (RFR)(6)
F. Sestak (SWEC) (10)
D.F Fleischaker, Esq.
J. Reynolds, Esq./J.R. Phillips, Esq.
O B. Norton, Esq.
A.C. Gehr, Esq.
R.B. Hubbard J. Roesset M.J. Strumwasser, Esq.
l O
-