ML20074A852: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:-                         .                                  .
{{#Wiki_filter:-
TENAS UTILITIES GENERATING COMI%NY 2t Wit IlltY %N 11M B04 D glJ AN.'ll:.LW 7 fat 11:ts Cd)
TENAS UTILITIES GENERATING COMI%NY 2t Wit IlltY %N 11M B04 D glJ AN.'ll:.LW 7 fat 11:ts Cd)
R. J. GARY                                           May 9, 1983
May 9, 1983 R. J. GARY
                '"Z7'.!1'!",'.1%"
'"Z7'.!1'!",'.1%"
Mr. Harold R. Denton Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Mr. Harold R. Denton Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555


==SUBJECT:==
==SUBJECT:==
Line 27: Line 28:


==Dear Mr. Denton:==
==Dear Mr. Denton:==
 
In accordance with 10 CFR Part 50 (c) (1) (i), Texas Utilities Generating Company, as lead Applicant and as agent for the Owners and Applicants (Dallas Po.'er & Light Company, Texas Electric Service Company, Texas Power & Light Company, Texas Municipal Power Agency, i
In accordance with 10 CFR Part 50 (c) (1) (i), Texas Utilities Generating Company, as lead Applicant and as agent for the Owners and Applicants (Dallas Po.'er & Light Company, Texas Electric Service Company, Texas Power & Light Company, Texas Municipal Power Agency, i                           Brazos Electric Power Cooperative, Inc. and Tex-La Electric Cooperative of Texas, Inc.), herewith submits Amendment 40 of the Final Safety Analysis Report (FSAR).
Brazos Electric Power Cooperative, Inc. and Tex-La Electric Cooperative of Texas, Inc.), herewith submits Amendment 40 of the Final Safety Analysis Report (FSAR).
I                           Enclosed are the following prescribed documents and the number of each:
I Enclosed are the following prescribed documents and the number of each:
FINAL SAFETY ANALYSIS REPORT - 3 signed (and sworn)
FINAL SAFETY ANALYSIS REPORT - 3 signed (and sworn)
AMENDMENT 40                                         originals and 60 copies Respectfully submitted, R. J. Gary RJG:grr l
AMENDMENT 40 originals and 60 copies Respectfully submitted, R. J. Gary RJG:grr l
0 i         W 8305160138 830509 PDR ADOCK 05000445                                                                         ,
0 i W 8305160138 830509 PDR ADOCK 05000445 l
l            M                       PDR
M PDR


UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of                                           )
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of
                                                                  )
)
TEXAS UTILITIES GENERATING COMPANY                         ) Docket Nos. 50-445
)
                                                                  )             50-446 (Comanche Peak Steam Electric                             )
TEXAS UTILITIES GENERATING COMPANY
Station, Units 1 and 2)                                     )
)
Docket Nos. 50-445
)
50-446 (Comanche Peak Steam Electric
)
Station, Units 1 and 2)
)
AFFIDAVIT R. J. Gary being duly sworn, hereby deposes and says that he is Executive Vice President and General Manager of Texas Utilities Generating Company, the Applicant herein; that he is duly authorized to sign and file with the Nuclear Regulatory Commission this Amendment to its Application and supporting documentation for Operating Licenses for the captioned facilities; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information and belief.
AFFIDAVIT R. J. Gary being duly sworn, hereby deposes and says that he is Executive Vice President and General Manager of Texas Utilities Generating Company, the Applicant herein; that he is duly authorized to sign and file with the Nuclear Regulatory Commission this Amendment to its Application and supporting documentation for Operating Licenses for the captioned facilities; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information and belief.
R.J/ Gary     [
R.J/ Gary
[
Executive Vice President and General Manager l
Executive Vice President and General Manager l
l STATE OF TEXAS           )
l STATE OF TEXAS
                                )       ss COUNTY OF DALLAS         )
)
Subscribed and sworn to before me, a Notary Public in and for M S>m *4 , on this 9d day of h                                 , 19f.
)
sea 1 Notary Public My commission expires bb .                 /7     ,19[
ss COUNTY OF DALLAS
)
Subscribed and sworn to before me, a Notary Public in and for M S>m *4, on this 9d day of h
, 19f.
sea 1 Notary Public My commission expires bb.
/7
,19[


TENAS UTILITIES GENERATING COMPANY 2(Mit lit 4L\N h lWEli 13 \lJ.\% TEX \M 7&bl44klM O         n. a. uny                                                       May 9, 1983
TENAS UTILITIES GENERATING COMPANY 2(Mit lit 4L\\N h lWEli 13 \\lJ.\\% TEX \\M 7&bl44klM O
          "::;" L':'"ll Mr. Harold R. Denton Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555
May 9, 1983
: n. a. uny
"::;" L':'"ll Mr. Harold R. Denton Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555


==SUBJECT:==
==SUBJECT:==
Line 55: Line 72:


==Dear Mr. Denton:==
==Dear Mr. Denton:==
 
In accordance with 10 CFR Part 50 (c) (1) (i), Texas Utilities Generating Company, as lead Applicant and as agent for the Owners and Applicants (Dallas Power & Light Company, Texas Electric Service Company, Texas Power & Light Company, Texas Municipal Power Agency, Brazos Electric Power Cooperative, Inc. and Tex-La Electric Cooperative s
In accordance with 10 CFR Part 50 (c) (1) (i), Texas Utilities Generating Company, as lead Applicant and as agent for the Owners and Applicants (Dallas Power & Light Company, Texas Electric Service Company, Texas Power & Light Company, Texas Municipal Power Agency, s                Brazos Electric Power Cooperative, Inc. and Tex-La Electric Cooperative of Texas, Inc.), herewith submits Amendment 40 of the Final Safety Analysis Report (FSAR).
of Texas, Inc.), herewith submits Amendment 40 of the Final Safety Analysis Report (FSAR).
Enclosed are the following prescribed documents and the number of each:
Enclosed are the following prescribed documents and the number of each:
FINAL SAFETY ANALYSIS REPORT - 3 signed (and sworn)
FINAL SAFETY ANALYSIS REPORT - 3 signed (and sworn)
AMENDMENT 40                                                         originals and 60 copies Respectfully submitted, R. . Gary RJG:grr l
AMENDMENT 40 originals and 60 copies Respectfully submitted, R.
. Gary RJG:grr l


UNITED STATES OF AMERICA O                         wuclt^a aeGu'Atoav consission In the Matter of                                           )
UNITED STATES OF AMERICA O
                                                              )
wuclt^a aeGu'Atoav consission In the Matter of
TEXAS UTILITIES GENERATING COMPANY                         ) Docket Nos. 50-445
)
                                                              )             50-446 (Comanche Peak Steam Electric                             )
)
Station, Units 1 and 2)                                   )
TEXAS UTILITIES GENERATING COMPANY
AFFIDAVIT R. J. Gary being duly sworn, hereby deposes and says that he is Executive Vice President and General Manager of Texas Utilities Generating Company, the Applicant herein; that he is duly authorized to sign and file with the Nuclear Regulatory Commission this Anendment to its Application and supporting documentation for Operating Licenses for the captioned facilities; that he is familiar with the content thereof; O end thet the metters set forth therein ere true end correct to the best of his knowledge, information and belief.
)
R.JfGary     [
Docket Nos. 50-445
Executive Vice President and General Manager STATE OF TEXAS       )
)
                          ) ss COUNTY OF DALLAS )
50-446 (Comanche Peak Steam Electric
Subscribed and sworn to before me, a Notary Public in and for d>10+ dent on this QY day of                       /)kg       ,19M Notary Public My commission expires k/r.             /7     ,19[
)
Station, Units 1 and 2)
)
AFFIDAVIT R. J. Gary being duly sworn, hereby deposes and says that he is Executive Vice President and General Manager of Texas Utilities Generating Company, the Applicant herein; that he is duly authorized to sign and file with the Nuclear Regulatory Commission this Anendment to its Application and supporting documentation for Operating Licenses for the captioned facilities; that he is familiar with the content thereof; O
end thet the metters set forth therein ere true end correct to the best of his knowledge, information and belief.
R.JfGary
[
Executive Vice President and General Manager STATE OF TEXAS
)
)
ss COUNTY OF DALLAS )
Subscribed and sworn to before me, a Notary Public in and for d>10+ dent on this QY day of
/)kg
,19M Notary Public My commission expires k/r.
/7
,19[
l
l
_ - - - _ .      _    __-}}
__-}}

Latest revision as of 03:09, 15 December 2024

Forwards Amend 40 to FSAR
ML20074A852
Person / Time
Site: Comanche Peak  
Issue date: 05/09/1983
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20074A853 List:
References
NUDOCS 8305160138
Download: ML20074A852 (2)


Text

-

TENAS UTILITIES GENERATING COMI%NY 2t Wit IlltY %N 11M B04 D glJ AN.'ll:.LW 7 fat 11:ts Cd)

May 9, 1983 R. J. GARY

'"Z7'.!1'!",'.1%"

Mr. Harold R. Denton Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL OF AMENDMENT

Dear Mr. Denton:

In accordance with 10 CFR Part 50 (c) (1) (i), Texas Utilities Generating Company, as lead Applicant and as agent for the Owners and Applicants (Dallas Po.'er & Light Company, Texas Electric Service Company, Texas Power & Light Company, Texas Municipal Power Agency, i

Brazos Electric Power Cooperative, Inc. and Tex-La Electric Cooperative of Texas, Inc.), herewith submits Amendment 40 of the Final Safety Analysis Report (FSAR).

I Enclosed are the following prescribed documents and the number of each:

FINAL SAFETY ANALYSIS REPORT - 3 signed (and sworn)

AMENDMENT 40 originals and 60 copies Respectfully submitted, R. J. Gary RJG:grr l

0 i W 8305160138 830509 PDR ADOCK 05000445 l

M PDR

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of

)

)

TEXAS UTILITIES GENERATING COMPANY

)

Docket Nos. 50-445

)

50-446 (Comanche Peak Steam Electric

)

Station, Units 1 and 2)

)

AFFIDAVIT R. J. Gary being duly sworn, hereby deposes and says that he is Executive Vice President and General Manager of Texas Utilities Generating Company, the Applicant herein; that he is duly authorized to sign and file with the Nuclear Regulatory Commission this Amendment to its Application and supporting documentation for Operating Licenses for the captioned facilities; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information and belief.

R.J/ Gary

[

Executive Vice President and General Manager l

l STATE OF TEXAS

)

)

ss COUNTY OF DALLAS

)

Subscribed and sworn to before me, a Notary Public in and for M S>m *4, on this 9d day of h

, 19f.

sea 1 Notary Public My commission expires bb.

/7

,19[

TENAS UTILITIES GENERATING COMPANY 2(Mit lit 4L\\N h lWEli 13 \\lJ.\\% TEX \\M 7&bl44klM O

May 9, 1983

n. a. uny

"::;" L':'"ll Mr. Harold R. Denton Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL OF AMENDMENT

Dear Mr. Denton:

In accordance with 10 CFR Part 50 (c) (1) (i), Texas Utilities Generating Company, as lead Applicant and as agent for the Owners and Applicants (Dallas Power & Light Company, Texas Electric Service Company, Texas Power & Light Company, Texas Municipal Power Agency, Brazos Electric Power Cooperative, Inc. and Tex-La Electric Cooperative s

of Texas, Inc.), herewith submits Amendment 40 of the Final Safety Analysis Report (FSAR).

Enclosed are the following prescribed documents and the number of each:

FINAL SAFETY ANALYSIS REPORT - 3 signed (and sworn)

AMENDMENT 40 originals and 60 copies Respectfully submitted, R.

. Gary RJG:grr l

UNITED STATES OF AMERICA O

wuclt^a aeGu'Atoav consission In the Matter of

)

)

TEXAS UTILITIES GENERATING COMPANY

)

Docket Nos. 50-445

)

50-446 (Comanche Peak Steam Electric

)

Station, Units 1 and 2)

)

AFFIDAVIT R. J. Gary being duly sworn, hereby deposes and says that he is Executive Vice President and General Manager of Texas Utilities Generating Company, the Applicant herein; that he is duly authorized to sign and file with the Nuclear Regulatory Commission this Anendment to its Application and supporting documentation for Operating Licenses for the captioned facilities; that he is familiar with the content thereof; O

end thet the metters set forth therein ere true end correct to the best of his knowledge, information and belief.

R.JfGary

[

Executive Vice President and General Manager STATE OF TEXAS

)

)

ss COUNTY OF DALLAS )

Subscribed and sworn to before me, a Notary Public in and for d>10+ dent on this QY day of

/)kg

,19M Notary Public My commission expires k/r.

/7

,19[

l

__-