ML20076M081: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:r_,m._ _ _ | {{#Wiki_filter:r_,m._ _ _ | ||
LONG ISLAND LIGHTING COMPANY | |||
{ | |||
huw.e- % u m c.o. ,f | ( | ||
SHOREHAM NUCLEAR POWER STATION w | |||
huw.e- % u m c.o. | |||
,f P.O. BOX G18, NORTH COUNTRY ROAD. WADING RIVER, N.Y.11792 Dkut Dbl Numkr June 27, 1983 SNRC-917 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. | |||
20555 Equipment Environmental Qualification Safety Evaluation Report (SER) Issue No. 9 Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322 | |||
==Dear Mr. Denton:== | ==Dear Mr. Denton:== | ||
As part of our effort to completely resolve Safety Evaluation Report (SER) outstanding issue number nine (9) we hereby enclose forty (40) controlled copies of revised pages of the document entitled " Environmental Qualification Report for Class IE Equipment for Shoreham Nuclear Power Station - | As part of our effort to completely resolve Safety Evaluation Report (SER) outstanding issue number nine (9) we hereby enclose forty (40) controlled copies of revised pages of the document entitled " Environmental Qualification Report for Class IE Equipment for Shoreham Nuclear Power Station - | ||
Unit 1." These pages comprise revision 5, June 1983. | Unit 1." | ||
These pages comprise revision 5, June 1983. | |||
Significant changes from revision 4 are briefly described as follows: | Significant changes from revision 4 are briefly described as follows: | ||
1) | |||
The report was revised to ensure that our EQ Program is in compliance with the requirements of 10CFR50.49, 2) | |||
The results of recent calculations have prodmced new service conditions for the remote shutdown panel, 3) | |||
Section II.B.2, and | Appendix E was revised to show conformance with FSAR Section II.B.2, and I | ||
4) | |||
8307200141 830627 PDR ADOCK 05000322 | Appendix H justifications for interin operation were updated to reflect the current status of the equipment qualification program. | ||
8307200141 830627 PDR ADOCK 05000322 PDR E | |||
y | |||
7 - -. | 7 - -. | ||
E. | E. | ||
June 27, 1983 SNRC-917 Page 2 It is our understanding that this submittal, in conjunction with describing our compliance with 10CFR50.49 and our updated response to NRC request 223.11, will provide sufficient information for the resolution of SER open item number 9. Do not hesitate to call should you have any questions on this subject. | June 27, 1983 SNRC-917 Page 2 It is our understanding that this submittal, in conjunction with describing our compliance with 10CFR50.49 and our updated response to NRC request 223.11, will provide sufficient information for the resolution of SER open item number 9. | ||
Do not hesitate to call should you have any questions on this subject. | |||
Very truly yours, | Very truly yours, | ||
= | |||
J. L. Smith Manager, Special Projects Shoreham Nuclear Power Station - Unit 1 GJG:bc Enclosure cc: | J. | ||
L. Smith Manager, Special Projects Shoreham Nuclear Power Station - Unit 1 GJG:bc Enclosure cc: | |||
J. | |||
Higgins All Parties Listed in Attachment 1 h | |||
i 4 | i 4 | ||
l l | l l | ||
l | l | ||
=s-_. | |||
p | |||
-~, | |||
y | |||
_m,% | |||
,y | |||
,}} | |||
Latest revision as of 02:15, 15 December 2024
| ML20076M081 | |
| Person / Time | |
|---|---|
| Site: | Shoreham File:Long Island Lighting Company icon.png |
| Issue date: | 06/27/1983 |
| From: | James Smith LONG ISLAND LIGHTING CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20076M084 | List: |
| References | |
| SNRC-917, NUDOCS 8307200141 | |
| Download: ML20076M081 (2) | |
Text
r_,m._ _ _
LONG ISLAND LIGHTING COMPANY
{
(
SHOREHAM NUCLEAR POWER STATION w
huw.e- % u m c.o.
,f P.O. BOX G18, NORTH COUNTRY ROAD. WADING RIVER, N.Y.11792 Dkut Dbl Numkr June 27, 1983 SNRC-917 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Equipment Environmental Qualification Safety Evaluation Report (SER) Issue No. 9 Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322
Dear Mr. Denton:
As part of our effort to completely resolve Safety Evaluation Report (SER) outstanding issue number nine (9) we hereby enclose forty (40) controlled copies of revised pages of the document entitled " Environmental Qualification Report for Class IE Equipment for Shoreham Nuclear Power Station -
Unit 1."
These pages comprise revision 5, June 1983.
Significant changes from revision 4 are briefly described as follows:
1)
The report was revised to ensure that our EQ Program is in compliance with the requirements of 10CFR50.49, 2)
The results of recent calculations have prodmced new service conditions for the remote shutdown panel, 3)
Appendix E was revised to show conformance with FSAR Section II.B.2, and I
4)
Appendix H justifications for interin operation were updated to reflect the current status of the equipment qualification program.
8307200141 830627 PDR ADOCK 05000322 PDR E
y
7 - -.
E.
June 27, 1983 SNRC-917 Page 2 It is our understanding that this submittal, in conjunction with describing our compliance with 10CFR50.49 and our updated response to NRC request 223.11, will provide sufficient information for the resolution of SER open item number 9.
Do not hesitate to call should you have any questions on this subject.
Very truly yours,
=
J.
L. Smith Manager, Special Projects Shoreham Nuclear Power Station - Unit 1 GJG:bc Enclosure cc:
J.
Higgins All Parties Listed in Attachment 1 h
i 4
l l
l
=s-_.
p
-~,
y
_m,%
,y
,