ML20078E735: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:.
GPU Nuclear Corporation f$
f$ '
W
GPU Nuclear Corporation g a ye One Upper Pond Road W
        '                    g a ye                                                               One Upper Pond Road I   w wGu                                                                     Parsippany, New Jersey 07054 201-316-7000 TELEX 136-482 Writers Direct Dial Number C321-94-2277 November 7, 1994 5000-94-0049 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:
I w wGu Parsippany, New Jersey 07054 201-316-7000 TELEX 136-482 Writers Direct Dial Number C321-94-2277 November 7, 1994 5000-94-0049 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:


==Subject:==
==Subject:==
Oyster Creek Nuclear Generating Station Docket No. 50-219 Facility Operating License No. DPR-16 Core Operating Limits Report (COLR) Revision As required by Technical Specification 6.9.1.f.4, a revision to the COLR for Oyster Creek Cycle 15 operation is attached for NRC staff information.
Oyster Creek Nuclear Generating Station Docket No. 50-219 Facility Operating License No. DPR-16 Core Operating Limits Report (COLR) Revision As required by Technical Specification 6.9.1.f.4, a revision to the COLR for Oyster Creek Cycle 15 operation is attached for NRC staff information.
This COLR revision (Revision 6) contains a change to the Minimum Critical Power Ratio operating limit from 1.51 to 1.50 based on the reload core design for Cycle
This COLR revision (Revision 6) contains a change to the Minimum Critical Power Ratio operating limit from 1.51 to 1.50 based on the reload core design for Cycle
: 15. MAPLHGR and LLHGR limits for two GE9 fuel designs (GE9-348B and GE9-338B) are incorporated for the first time with the Cycle 15 reload.                               In addition, MAPLHGR and LLHGR limits for the GE-299Z fuel type are deleted since it is not used in the Cycle 15 core.
: 15. MAPLHGR and LLHGR limits for two GE9 fuel designs (GE9-348B and GE9-338B) are incorporated for the first time with the Cycle 15 reload.
Very truly yours, AvM R. W. Keaten Vice President & Director Technical Functions RWK/PFC cc:     Administrate , Region I Senior NRC Resident Inspector Oyster Creek NRC Project Manager
In addition, MAPLHGR and LLHGR limits for the GE-299Z fuel type are deleted since it is not used in the Cycle 15 core.
                                ;tWOM                                                                                                 ,
Very truly yours, AvM R. W. Keaten Vice President & Director Technical Functions RWK/PFC cc:
9411150035 9411o7 PDR P
Administrate, Region I Senior NRC Resident Inspector Oyster Creek NRC Project Manager
ADOCK 05000219                                                                         '  '
;tWOM 9411150035 9411o7 PDR ADOCK 05000219 P
PDR                                                                     '  I GPU Nuclear Corporatton is a subsidiary of General Pubhc Utsties Corporat.on                     r l '}}
PDR I
l GPU Nuclear Corporatton is a subsidiary of General Pubhc Utsties Corporat.on r
.}}

Latest revision as of 00:43, 15 December 2024

Forwards Rev 6 to Oyster Creek Cycle 15 COLR Topical Rept 066
ML20078E735
Person / Time
Site: Oyster Creek
Issue date: 11/07/1994
From: Keaten R
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20078E739 List:
References
5000-94-0049, 5000-94-49, NUDOCS 9411150035
Download: ML20078E735 (1)


Text

.

f$ '

GPU Nuclear Corporation g a ye One Upper Pond Road W

I w wGu Parsippany, New Jersey 07054 201-316-7000 TELEX 136-482 Writers Direct Dial Number C321-94-2277 November 7, 1994 5000-94-0049 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Facility Operating License No. DPR-16 Core Operating Limits Report (COLR) Revision As required by Technical Specification 6.9.1.f.4, a revision to the COLR for Oyster Creek Cycle 15 operation is attached for NRC staff information.

This COLR revision (Revision 6) contains a change to the Minimum Critical Power Ratio operating limit from 1.51 to 1.50 based on the reload core design for Cycle

15. MAPLHGR and LLHGR limits for two GE9 fuel designs (GE9-348B and GE9-338B) are incorporated for the first time with the Cycle 15 reload.

In addition, MAPLHGR and LLHGR limits for the GE-299Z fuel type are deleted since it is not used in the Cycle 15 core.

Very truly yours, AvM R. W. Keaten Vice President & Director Technical Functions RWK/PFC cc:

Administrate, Region I Senior NRC Resident Inspector Oyster Creek NRC Project Manager

tWOM 9411150035 9411o7 PDR ADOCK 05000219 P

PDR I

l GPU Nuclear Corporatton is a subsidiary of General Pubhc Utsties Corporat.on r

.