ML20078L089: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML20078L089 | | number = ML20078L089 | ||
| issue date = 10/13/1983 | | issue date = 10/13/1983 | ||
| title = Forwards Ltr | | title = Forwards Ltr to Replace Re Tech Specs.Original Ltr Missing Signatures | ||
| author name = Harris D | | author name = Harris D | ||
| author affiliation = RENSSELAER POLYTECHNIC INSTITUTE, TROY, NY | | author affiliation = RENSSELAER POLYTECHNIC INSTITUTE, TROY, NY | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 8310200051 | | document report number = NUDOCS 8310200051 | ||
| title reference date = 10-12-1983 | |||
| package number = ML20078L091 | | package number = ML20078L091 | ||
| document type = CORRESPONDENCE-LETTERS, EDUCATIONAL INSTITUTION TO NRC, INCOMING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, EDUCATIONAL INSTITUTION TO NRC, INCOMING CORRESPONDENCE | ||
| Line 18: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. | {{#Wiki_filter:. | ||
Department of Nuclear Engineering | |||
. my Rensselaer Polytechnic Institute Troy, New York 12181 October 13, 1983 Mr. Cecil 0. Thomas, Chief Standardization and Special Projects Branch Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. | |||
20555 | |||
==Dear Mr. Thomas:== | ==Dear Mr. Thomas:== | ||
Enclosed is a {{letter dated|date=October 12, 1983|text=letter dated October 12, 1983}} in reference to Technical Specifi-cations which was recently sent to you on October 5,1983. | |||
Enclosed is a letter dated October 12, 1983 in reference to Technical Specifi-cations which was recently sent to you on October 5,1983. | The {{letter dated|date=October 5, 1983|text=October 5, 1983 letter}}, however, was missing my signature. | ||
Please substitute the enclosed letter for the October 5,1983 letter as it contains both signatures, and place it with the previous enclosures that were sent with the October 5,1983 letter. Thank you. | Please substitute the enclosed letter for the {{letter dated|date=October 5, 1983|text=October 5,1983 letter}} as it contains both signatures, and place it with the previous enclosures that were sent with the {{letter dated|date=October 5, 1983|text=October 5,1983 letter}}. Thank you. | ||
Sincerely, | Sincerely, i | ||
Dr. Do ald R. Harris Di rector DRH:rlp Enclosure FN h | |||
kbob O! | |||
b25 P | |||
PDR 6 | |||
O~ f | |||
.}} | |||
Latest revision as of 00:27, 15 December 2024
| ML20078L089 | |
| Person / Time | |
|---|---|
| Site: | Rensselaer Polytechnic Institute |
| Issue date: | 10/13/1983 |
| From: | Harris D RENSSELAER POLYTECHNIC INSTITUTE, TROY, NY |
| To: | Thomas C Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20078L091 | List: |
| References | |
| NUDOCS 8310200051 | |
| Download: ML20078L089 (1) | |
Text
.
Department of Nuclear Engineering
. my Rensselaer Polytechnic Institute Troy, New York 12181 October 13, 1983 Mr. Cecil 0. Thomas, Chief Standardization and Special Projects Branch Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Thomas:
Enclosed is a letter dated October 12, 1983 in reference to Technical Specifi-cations which was recently sent to you on October 5,1983.
The October 5, 1983 letter, however, was missing my signature.
Please substitute the enclosed letter for the October 5,1983 letter as it contains both signatures, and place it with the previous enclosures that were sent with the October 5,1983 letter. Thank you.
Sincerely, i
Dr. Do ald R. Harris Di rector DRH:rlp Enclosure FN h
kbob O!
b25 P
PDR 6
O~ f
.