| number = ML20080P842 | | number = ML20080P842 | ||
| issue date = 10/03/1983 | | issue date = 10/03/1983 | ||
| title = Provides Quarterly Status Rept in Response to | | title = Provides Quarterly Status Rept in Response to . Schedule Unchanged.Fuel Load Scheduled for Apr 1984 W/ Commercial Operation Scheduled for Late 1984 or Early 1985 | ||
| author name = Schnell D | | author name = Schnell D | ||
| author affiliation = UNION ELECTRIC CO. | | author affiliation = UNION ELECTRIC CO. | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = ULNRC-671, NUDOCS 8310120069 | | document report number = ULNRC-671, NUDOCS 8310120069 | ||
| title reference date = 05-27-1981 | |||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| page count = 1 | | page count = 1 | ||
| Line 17: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNION ELECTRIC COM PANY 1908 GRATIOT STREE T ST. Louts, MISSOURI MAILING ADDRESS: | {{#Wiki_filter:UNION ELECTRIC COM PANY 1908 GRATIOT STREE T ST. Louts, MISSOURI MAILING ADDRESS: | ||
October 3, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20S55 | October 3, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. | ||
20S55 | |||
==Dear Mr. Denton:== | ==Dear Mr. Denton:== | ||
| Line 23: | Line 25: | ||
==Reference:== | ==Reference:== | ||
ULNRC-644 dated June 30, 1983 This is a quarterly follow-up response to your letter of May 27, 1981, regarding progress of our Callaway Plant. Our schedule remains unchanged since our last re-port, which was transmitted by the referenced letter. | ULNRC-644 dated June 30, 1983 This is a quarterly follow-up response to your letter of May 27, 1981, regarding progress of our Callaway Plant. | ||
Our schedule remains unchanged since our last re-port, which was transmitted by the referenced letter. | |||
Fuel load is scheduled for April, 1984 with commercial operation scheduled for late 1984 or early 1985. | Fuel load is scheduled for April, 1984 with commercial operation scheduled for late 1984 or early 1985. | ||
Sincerely, DS/ls cc: | Sincerely, DS/ls cc: | ||
C. J. Dougherty E. K. Dille | |||
8310120069 831003 | \\ | ||
8310120069 831003 PDR ADOCK 05000483 1 0 R | |||
PDR | |||
O | O PPat Pennsylvania Power & Light Company Two North Ninth Street | ||
* Allentown, PA 18101 | * Allentown, PA 18101 | ||
* 215 1 770 5151 Norman W. Curtir Vice President-Engineering & Construction-Nuclear 215/770-7501 OCT 0 61983 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Bra:r,h No. 2 Division of Licensing U. S. Nuclear Regulatory Ccanission Washington, DC | * 215 1 770 5151 Norman W. Curtir Vice President-Engineering & Construction-Nuclear 215/770-7501 OCT 0 61983 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Bra:r,h No. 2 Division of Licensing U. S. Nuclear Regulatory Ccanission Washington, DC 20555 SUSQUDIANNA STEAM ELECIRIC STATICN FSAR SECTION 7.6 ER 100508 FILE 841-1 PIA-1836 Docket No. 50-388 | ||
==Dear Mr. Schwencer:== | ==Dear Mr. Schwencer:== | ||
In order to support obtaining an operating license for Susquehanna SES Unit 2, enclosed is a revised Section 7.6 of the Susquehanna SES FSAR. The revisions to this section are as follows: | In order to support obtaining an operating license for Susquehanna SES Unit 2, enclosed is a revised Section 7.6 of the Susquehanna SES FSAR. The revisions to this section are as follows: | ||
7.6.la.4.3.8.1 - This section has been revised to show a clarification that a pressure indicator monitors the pressure between the inner and outer head seal ring. | 7.6.la.4.3.8.1 - This section has been revised to show a clarification that a pressure indicator monitors the pressure between the inner and outer head seal ring. | ||
7.6.lb.l.2.4.1 - This section has been revised to add a discussion on the additional non-Class IE tenperature sensors for Unit 2. | 7.6.lb.l.2.4.1 - This section has been revised to add a discussion on the additional non-Class IE tenperature sensors for Unit 2. | ||
Table 7.6-5 | Table 7.6-5 | ||
1 | - This table has been revised to include the APRM Upscale Thermal Trip. | ||
1 These revisions will be incorporated into the next amendment to the FSAR. | |||
Very truly s, | |||
N. E Curtis Vice President-Engineering & Construction-Nuclear Enclosure cc: | b) u# | ||
i | N. E Curtis Vice President-Engineering & Construction-Nuclear Enclosure cc: | ||
R. L. Perch NBC y | |||
1 i | |||
i l | |||
8310120067 831006 PDR ADOCK 05000388 A | |||
PDR | |||
.}} | |||
Latest revision as of 08:49, 14 December 2024
| ML20080P842 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 10/03/1983 |
| From: | Schnell D UNION ELECTRIC CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| ULNRC-671, NUDOCS 8310120069 | |
| Download: ML20080P842 (1) | |
Text
UNION ELECTRIC COM PANY 1908 GRATIOT STREE T ST. Louts, MISSOURI MAILING ADDRESS:
October 3, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20S55
Dear Mr. Denton:
ULNRC-671 DOCKET NUMBER 50-483 CALLAWAY PLANT, UNIT 1 QUARTERLY PROGRESS UPDATE
Reference:
ULNRC-644 dated June 30, 1983 This is a quarterly follow-up response to your letter of May 27, 1981, regarding progress of our Callaway Plant.
Our schedule remains unchanged since our last re-port, which was transmitted by the referenced letter.
Fuel load is scheduled for April, 1984 with commercial operation scheduled for late 1984 or early 1985.
Sincerely, DS/ls cc:
C. J. Dougherty E. K. Dille
\\
8310120069 831003 PDR ADOCK 05000483 1 0 R
O PPat Pennsylvania Power & Light Company Two North Ninth Street
- Allentown, PA 18101
- 215 1 770 5151 Norman W. Curtir Vice President-Engineering & Construction-Nuclear 215/770-7501 OCT 0 61983 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Bra:r,h No. 2 Division of Licensing U. S. Nuclear Regulatory Ccanission Washington, DC 20555 SUSQUDIANNA STEAM ELECIRIC STATICN FSAR SECTION 7.6 ER 100508 FILE 841-1 PIA-1836 Docket No. 50-388
Dear Mr. Schwencer:
In order to support obtaining an operating license for Susquehanna SES Unit 2, enclosed is a revised Section 7.6 of the Susquehanna SES FSAR. The revisions to this section are as follows:
7.6.la.4.3.8.1 - This section has been revised to show a clarification that a pressure indicator monitors the pressure between the inner and outer head seal ring.
7.6.lb.l.2.4.1 - This section has been revised to add a discussion on the additional non-Class IE tenperature sensors for Unit 2.
Table 7.6-5
- This table has been revised to include the APRM Upscale Thermal Trip.
1 These revisions will be incorporated into the next amendment to the FSAR.
Very truly s,
b) u#
N. E Curtis Vice President-Engineering & Construction-Nuclear Enclosure cc:
R. L. Perch NBC y
1 i
i l
8310120067 831006 PDR ADOCK 05000388 A
.