Line 2: Line 2:
| number = ML20080P842
| number = ML20080P842
| issue date = 10/03/1983
| issue date = 10/03/1983
| title = Provides Quarterly Status Rept in Response to 810527 Ltr. Schedule Unchanged.Fuel Load Scheduled for Apr 1984 W/ Commercial Operation Scheduled for Late 1984 or Early 1985
| title = Provides Quarterly Status Rept in Response to . Schedule Unchanged.Fuel Load Scheduled for Apr 1984 W/ Commercial Operation Scheduled for Late 1984 or Early 1985
| author name = Schnell D
| author name = Schnell D
| author affiliation = UNION ELECTRIC CO.
| author affiliation = UNION ELECTRIC CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = ULNRC-671, NUDOCS 8310120069
| document report number = ULNRC-671, NUDOCS 8310120069
| title reference date = 05-27-1981
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
| page count = 1
Line 17: Line 18:
=Text=
=Text=
{{#Wiki_filter:UNION ELECTRIC COM PANY 1908 GRATIOT STREE T ST. Louts, MISSOURI MAILING ADDRESS:
{{#Wiki_filter:UNION ELECTRIC COM PANY 1908 GRATIOT STREE T ST. Louts, MISSOURI MAILING ADDRESS:
October 3, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20S55
October 3, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20S55


==Dear Mr. Denton:==
==Dear Mr. Denton:==
Line 23: Line 25:


==Reference:==
==Reference:==
ULNRC-644 dated June 30, 1983 This is a quarterly follow-up response to your letter of May 27, 1981, regarding progress of our Callaway Plant. Our schedule remains unchanged since our last re-port, which was transmitted by the referenced letter.
ULNRC-644 dated June 30, 1983 This is a quarterly follow-up response to your letter of May 27, 1981, regarding progress of our Callaway Plant.
Our schedule remains unchanged since our last re-port, which was transmitted by the referenced letter.
Fuel load is scheduled for April, 1984 with commercial operation scheduled for late 1984 or early 1985.
Fuel load is scheduled for April, 1984 with commercial operation scheduled for late 1984 or early 1985.
Sincerely, DS/ls cc:     C. J. Dougherty E. K. Dille
Sincerely, DS/ls cc:
                                                                                            \
C. J. Dougherty E. K. Dille
8310120069 831003                                                                               0 PDR ADOCK 05000483 PDR 1
\\
R
8310120069 831003 PDR ADOCK 05000483 1 0 R
PDR


O
O PPat Pennsylvania Power & Light Company Two North Ninth Street
      -                    PPat       Pennsylvania Power & Light Company Two North Ninth Street
* Allentown, PA 18101
* Allentown, PA 18101
* 215 1 770 5151 Norman W. Curtir Vice President-Engineering & Construction-Nuclear 215/770-7501 OCT 0 61983 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Bra:r,h No. 2 Division of Licensing U. S. Nuclear Regulatory Ccanission Washington, DC         20555 SUSQUDIANNA STEAM ELECIRIC STATICN FSAR SECTION 7.6 ER 100508                     FILE 841-1 PIA-1836                                                                   Docket No. 50-388
* 215 1 770 5151 Norman W. Curtir Vice President-Engineering & Construction-Nuclear 215/770-7501 OCT 0 61983 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Bra:r,h No. 2 Division of Licensing U. S. Nuclear Regulatory Ccanission Washington, DC 20555 SUSQUDIANNA STEAM ELECIRIC STATICN FSAR SECTION 7.6 ER 100508 FILE 841-1 PIA-1836 Docket No. 50-388


==Dear Mr. Schwencer:==
==Dear Mr. Schwencer:==
In order to support obtaining an operating license for Susquehanna SES Unit 2, enclosed is a revised Section 7.6 of the Susquehanna SES FSAR. The revisions to this section are as follows:
In order to support obtaining an operating license for Susquehanna SES Unit 2, enclosed is a revised Section 7.6 of the Susquehanna SES FSAR. The revisions to this section are as follows:
7.6.la.4.3.8.1 - This section has been revised to show a clarification that a pressure indicator monitors the pressure between the inner and outer head seal ring.
7.6.la.4.3.8.1 - This section has been revised to show a clarification that a pressure indicator monitors the pressure between the inner and outer head seal ring.
7.6.lb.l.2.4.1 - This section has been revised to add a discussion on the additional non-Class IE tenperature sensors for Unit 2.
7.6.lb.l.2.4.1 - This section has been revised to add a discussion on the additional non-Class IE tenperature sensors for Unit 2.
Table 7.6-5         - This table has been revised to include the APRM Upscale Thermal Trip.
Table 7.6-5
1
- This table has been revised to include the APRM Upscale Thermal Trip.
:          These revisions will be incorporated into the next amendment to the FSAR.
1 These revisions will be incorporated into the next amendment to the FSAR.
,          Very truly         s, b) u#
Very truly s,
N. E Curtis Vice President-Engineering & Construction-Nuclear Enclosure cc:     R. L. Perch     NBC                                               y 1
b) u#
i i
N. E Curtis Vice President-Engineering & Construction-Nuclear Enclosure cc:
l 8310120067 831006 PDR ADOCK 05000388 A                     PDR
R. L. Perch NBC y
                      .}}
1 i
i l
8310120067 831006 PDR ADOCK 05000388 A
PDR
.}}

Latest revision as of 08:49, 14 December 2024

Provides Quarterly Status Rept in Response to . Schedule Unchanged.Fuel Load Scheduled for Apr 1984 W/ Commercial Operation Scheduled for Late 1984 or Early 1985
ML20080P842
Person / Time
Site: Callaway 
Issue date: 10/03/1983
From: Schnell D
UNION ELECTRIC CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
ULNRC-671, NUDOCS 8310120069
Download: ML20080P842 (1)


Text

UNION ELECTRIC COM PANY 1908 GRATIOT STREE T ST. Louts, MISSOURI MAILING ADDRESS:

October 3, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20S55

Dear Mr. Denton:

ULNRC-671 DOCKET NUMBER 50-483 CALLAWAY PLANT, UNIT 1 QUARTERLY PROGRESS UPDATE

Reference:

ULNRC-644 dated June 30, 1983 This is a quarterly follow-up response to your letter of May 27, 1981, regarding progress of our Callaway Plant.

Our schedule remains unchanged since our last re-port, which was transmitted by the referenced letter.

Fuel load is scheduled for April, 1984 with commercial operation scheduled for late 1984 or early 1985.

Sincerely, DS/ls cc:

C. J. Dougherty E. K. Dille

\\

8310120069 831003 PDR ADOCK 05000483 1 0 R

PDR

O PPat Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown, PA 18101
  • 215 1 770 5151 Norman W. Curtir Vice President-Engineering & Construction-Nuclear 215/770-7501 OCT 0 61983 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Bra:r,h No. 2 Division of Licensing U. S. Nuclear Regulatory Ccanission Washington, DC 20555 SUSQUDIANNA STEAM ELECIRIC STATICN FSAR SECTION 7.6 ER 100508 FILE 841-1 PIA-1836 Docket No. 50-388

Dear Mr. Schwencer:

In order to support obtaining an operating license for Susquehanna SES Unit 2, enclosed is a revised Section 7.6 of the Susquehanna SES FSAR. The revisions to this section are as follows:

7.6.la.4.3.8.1 - This section has been revised to show a clarification that a pressure indicator monitors the pressure between the inner and outer head seal ring.

7.6.lb.l.2.4.1 - This section has been revised to add a discussion on the additional non-Class IE tenperature sensors for Unit 2.

Table 7.6-5

- This table has been revised to include the APRM Upscale Thermal Trip.

1 These revisions will be incorporated into the next amendment to the FSAR.

Very truly s,

b) u#

N. E Curtis Vice President-Engineering & Construction-Nuclear Enclosure cc:

R. L. Perch NBC y

1 i

i l

8310120067 831006 PDR ADOCK 05000388 A

PDR

.