Commonwealth ECson j             ^ N) One First N;.tional Plaza. Chicago, ilhnois g    C ''
Commonwealth ECson j
                  '(j ) Address   Reply e Chicago,        to.60690 Illinois    Post Office Box 767 January 20, 1984 Mr. C. J. Paperiello, Chief Emergency Preparedness and Program Radiological Safety Branch - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL           60137
^ N) One First N;.tional Plaza. Chicago, ilhnois C ''
'(j ) Address Reply to. Post Office Box 767 g
Chicago, Illinois 60690 e
January 20, 1984 Mr. C.
J. Paperiello, Chief Emergency Preparedness and Program Radiological Safety Branch - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137


==Subject:==
==Subject:==
Quad Cities Station Units 1 and 2 NRC Inspection Report - Open Items 50-254/82-13-03 & 50-265/82-15-03 NRC Docket Nos. 50-254 and 50-265 References (a):               Quad Cities Units 1 and 2, NRC Inspection Report Summary Nos.
Quad Cities Station Units 1 and 2 NRC Inspection Report - Open Items 50-254/82-13-03 & 50-265/82-15-03 NRC Docket Nos. 50-254 and 50-265 References (a):
Quad Cities Units 1 and 2, NRC Inspection Report Summary Nos.
50-254/82-13 and 50-265/82-15.
50-254/82-13 and 50-265/82-15.
(b):       B. Rybak letter to C. J. Paperiello dated February 14, 1983.
(b):
(c):       B. Rybak letter to C. J. Paperiello dated June 13, 1983.
B. Rybak letter to C.
(d):       B. Rybak letter to C. J. Paperiello dated August 25, 1983.
J.
Paperiello dated February 14, 1983.
(c):
B. Rybak letter to C.
J. Paperiello dated June 13, 1983.
(d):
B. Rybak letter to C.
J. Paperiello dated August 25, 1983.


==Dear Mr. Paperiello:==
==Dear Mr. Paperiello:==
Reference (a) cited above lists two Open Items "...to incorpor-ate multiplet analysis into AAIS...".
(0 pen Items 50-254/82-13-03 and 50-265/82-15-03.)
These Open Items are part of a multitask project developed by Commonwealth Edison to enhance the performance of AAIS.
As outlined in the Reference (b), Task 1 " Multiplet Resolution and Peak Classification" addresses these Open Items.
Work on this task is in progress and on schedule.
Task 1 will be completed by July 2, 1984 in accordance with the schedule presented in Reference (d).
Completion of Task 1 will close out the Open Items.
Recognizing the need to improve the analytical sof tware of AAIS, three additional tasks were developed by Commonwealth Edslon to enhance spectral analysis.
Again, these tasks are further improvements which go beyond the concerns raised by the NRC and are presented here only for your information.
As outlined in Reference (c), they are:
Task 2:
Ef ficiency Calibration with Associated Uncertainties.
Completion and Implement by:
July 1, 1985.
.x 8402280302 840224 PDR ADOCK 05000254 6
PDR JAN 2 3 E84


Reference (a) cited above lists two Open Items "...to incorpor-ate multiplet analysis into AAIS...". (0 pen Items 50-254/82-13-03 and 50-265/82-15-03.) These Open Items are part of a multitask project developed by Commonwealth Edison to enhance the performance of AAIS.
,. ~ '
As outlined in the Reference (b), Task 1 " Multiplet Resolution and Peak Classification" addresses these Open Items. Work on this task is in progress and on schedule. Task 1 will be completed by July 2, 1984 in accordance with the schedule presented in Reference (d).                                Completion of Task 1 will close out the Open Items.
T
Recognizing the need to improve the analytical sof tware of AAIS, three additional tasks were developed by Commonwealth Edslon to enhance spectral analysis. Again, these tasks are further improvements which go beyond the concerns raised by the NRC and are presented here only for your information.        As outlined in Reference (c), they are:
/
Task 2:      Ef ficiency Calibration with Associated Uncertainties.
C. J. Paperiello January 20, 1984
Completion and Implement by:                        July 1, 1985.
: Task 3:
.x 8402280302 840224 PDR ADOCK 05000254 6                        PDR JAN 2 3 E84
Lower Limit of Detectability and Uncertainties Related to Activity Determination.
 
Implementation timetable by:
    ,.~'
December 31, 1984 Task 4:
T       .
Background Compensation.
      /
Implementation timetable by:
C. J. Paperiello                                             January 20, 1984
July 1, 1985 The dates presented above define a long term project designed to continually improve the performance of AAIS.
: Task 3: Lower Limit of Detectability and Uncertainties Related to Activity Determination.
The completion of Task 1 xill close out the Open Items 50-254/82-13-03 and 50-265/82-15-03.
Implementation timetable by: December 31, 1984 Task 4:   Background Compensation.
The other tasks will proceed as enhancements as they are identified, evaluated, and incorporated into the analytical software and procedures of AAIS.
Implementation timetable by:     July 1, 1985 The dates presented above define a long term project designed to continually improve the performance of AAIS. The completion of Task 1 xill close out the Open Items 50-254/82-13-03 and 50-265/82-15-03. The other tasks will proceed as enhancements as they are identified, evaluated, and incorporated into the analytical software and procedures of AAIS.
Very truly yours, kt i
Very truly yours, i     kt B. Ryb Nuclear Licensing Ada nistrator 1m cc:   NRC Resident Inspector - Quad Cities 8010N}}
B. Ryb Nuclear Licensing Ada nistrator 1m cc:
NRC Resident Inspector - Quad Cities 8010N}}

Latest revision as of 08:37, 14 December 2024

Responds to NRC Ltr Re Violations Noted in IE Insp Repts 50-254/82-13 & 50-265/82-15.Corrective Actions:Three Addl Tasks Developed to Enhance Spectral Analysis & Improve Performance of Aais
ML20080R478
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 01/20/1984
From: Rybak B
COMMONWEALTH EDISON CO.
To: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20080R462 List:
References
8010N, NUDOCS 8402280302
Download: ML20080R478 (2)


Text

,, /

~'

Commonwealth ECson j

^ N) One First N;.tional Plaza. Chicago, ilhnois C

'(j ) Address Reply to. Post Office Box 767 g

Chicago, Illinois 60690 e

January 20, 1984 Mr. C.

J. Paperiello, Chief Emergency Preparedness and Program Radiological Safety Branch - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Quad Cities Station Units 1 and 2 NRC Inspection Report - Open Items 50-254/82-13-03 & 50-265/82-15-03 NRC Docket Nos. 50-254 and 50-265 References (a):

Quad Cities Units 1 and 2, NRC Inspection Report Summary Nos.

50-254/82-13 and 50-265/82-15.

(b):

B. Rybak letter to C.

J.

Paperiello dated February 14, 1983.

(c):

B. Rybak letter to C.

J. Paperiello dated June 13, 1983.

(d):

B. Rybak letter to C.

J. Paperiello dated August 25, 1983.

Dear Mr. Paperiello:

Reference (a) cited above lists two Open Items "...to incorpor-ate multiplet analysis into AAIS...".

(0 pen Items 50-254/82-13-03 and 50-265/82-15-03.)

These Open Items are part of a multitask project developed by Commonwealth Edison to enhance the performance of AAIS.

As outlined in the Reference (b), Task 1 " Multiplet Resolution and Peak Classification" addresses these Open Items.

Work on this task is in progress and on schedule.

Task 1 will be completed by July 2, 1984 in accordance with the schedule presented in Reference (d).

Completion of Task 1 will close out the Open Items.

Recognizing the need to improve the analytical sof tware of AAIS, three additional tasks were developed by Commonwealth Edslon to enhance spectral analysis.

Again, these tasks are further improvements which go beyond the concerns raised by the NRC and are presented here only for your information.

As outlined in Reference (c), they are:

Task 2:

Ef ficiency Calibration with Associated Uncertainties.

Completion and Implement by:

July 1, 1985.

.x 8402280302 840224 PDR ADOCK 05000254 6

PDR JAN 2 3 E84

,. ~ '

T

/

C. J. Paperiello January 20, 1984

Task 3:

Lower Limit of Detectability and Uncertainties Related to Activity Determination.

Implementation timetable by:

December 31, 1984 Task 4:

Background Compensation.

Implementation timetable by:

July 1, 1985 The dates presented above define a long term project designed to continually improve the performance of AAIS.

The completion of Task 1 xill close out the Open Items 50-254/82-13-03 and 50-265/82-15-03.

The other tasks will proceed as enhancements as they are identified, evaluated, and incorporated into the analytical software and procedures of AAIS.

Very truly yours, kt i

B. Ryb Nuclear Licensing Ada nistrator 1m cc:

NRC Resident Inspector - Quad Cities 8010N