| title = NPDES Noncompliance Notification:On 831102,steam Generator Blowdown Suspended Solid Samples Not Taken.Sys Operated on Normal Running Flash Tank on 831103 When Daily Sampling Resumed.Ltr Dtd 831123 to State of Mi Encl
| title = NPDES Noncompliance Notification:On 831102,steam Generator Blowdown Suspended Solid Samples Not Taken.Sys Operated on Normal Running Flash Tank on 831103 When Daily Sampling Resumed.Ltr to State of Mi Encl
| author name = Smith W
| author name = Smith W
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:. _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _            _
{{#Wiki_filter:. _ _ _ _ _
a                                                                                                                                          b nt /3
b nt /3 a
        - C-~ 6 $
- C-~ 6 $
          , , " , , IN0/ANA A MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLAh7 P.O. Box 454, Bridgman, Michigan 49106 (616) 465-5901 December 13, 1983 Mr. J.G. Keppler, Regional Administrator United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL               60137 Operating License DPR-58/74 i
,, ",, IN0/ANA A MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLAh7 P.O. Box 454, Bridgman, Michigan 49106 (616) 465-5901 December 13, 1983 Mr. J.G. Keppler, Regional Administrator United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58/74 i
Docket No. 50-315/50-316 j      
Docket No. 50-315/50-316 j


==Dear Mr. Keppler:==
==Dear Mr. Keppler:==
Pursuant to the requirements of Appendix B, Part II, l
Pursuant to the requirements of Appendix B, Part II, l
Nonradiological Environmental Protection Plan, Section 3.2, a copy of the report to the Michigan Water Resources Commission notifying them of the failure to take the Steam Generator blowdown suspended solids sample on November 2, 1983, is attached. This report is required by Amendment No. 54 to Facility Operating License No. DPR-58 and Amendment No. 40 to Facility Operating License No. DPR-74 dated May 6, 1982.
Nonradiological Environmental Protection Plan, Section 3.2, a copy of the report to the Michigan Water Resources Commission notifying them of the failure to take the Steam Generator blowdown suspended solids sample on November 2, 1983, is attached.
Sincerely,
This report is required by Amendment No. 54 to Facility Operating License No. DPR-58 and Amendment No. 40 to Facility Operating License No. DPR-74 dated May 6, 1982.
                                      ~
Sincerely, LM w t'
LM           w t' W.G. Smit               r.
~
W.G.
Smit r.
Plant Manager
Plant Manager
        /bab Attachment cc:       John E. Dolan                                       INPO M.P. Alexich                                       Dir., IE (20 copies)
/bab Attachment cc:
R.F. Kroeger                                       Dir., MIPC (2 copies)
John E. Dolan INPO M.P. Alexich Dir., IE (20 copies)
H. Brugger                                         H.R."Denton E.R. Swanson, RO:III R.C. Callen, MPSC G. Charnoff, Esq.
R.F. Kroeger Dir., MIPC (2 copies)
J.M. Hennigan PNSRC J.F. Stietzel E.L. Townley K.R. Baker bbhg R.O. Bruggee, EPRI k
H. Brugger H.R."Denton E.R.
B401050678 831213 t
Swanson, RO:III R.C. Callen, MPSC G.
PDR ADOCK 05000315 S                          PDR TEo/ 2 ii   4
Charnoff, Esq.
J.M. Hennigan PNSRC J.F.
Stietzel E.L. Townley bbhg K.R.
Baker k
R.O.
Bruggee, EPRI B401050678 831213 PDR ADOCK 05000315 TEo/ 2 ii 4
S PDR t


{       {                                                                 \ -
{
Q                                                                                                           -.
{
b*~,n/NDIANA & MICHIGAN ELECTRIC COMPANY oNE SUMMIT SoVARE P.o. Box 60. FORT WAYNE. IN. 46801 Telephone (219) 425-2111 tlovember 23, l983                                                               WILLIAM A. BLACK President Mr. Paul D. Zugger
\\
              ,"        Executive Secretary Michigan Water Resources Commission
Q b*~,n/NDIANA & MICHIGAN ELECTRIC COMPANY oNE SUMMIT SoVARE P.o. Box 60. FORT WAYNE. IN. 46801 Telephone (219) 425-2111 tlovember 23, l983 WILLIAM A. BLACK President Mr. Paul D. Zugger Executive Secretary Michigan Water Resources Commission
                    ' Stevens T. Mason Building Box 30026 Lansing, MI. 48909 3
' Stevens T. Mason Building Box 30026 Lansing, MI. 48909 3
Re: D. C. Cook Nuclear Plant
Re:
                                        '                                          '      NPDES Permit No. M10005827 Steam Generator B!owdown
D. C. Cook Nuclear Plant NPDES Permit No. M10005827 Steam Generator B!owdown


==Dear Mi7 Zugger:==
==Dear Mi7 Zugger:==
A review of monitoring records indicate the steam generator blowdown suspended solids sample was not taken on November 2,1983. The #1 Nucicar
A review of monitoring records indicate the steam generator blowdown suspended solids sample was not taken on November 2,1983. The #1 Nucicar
                      -Steam Supply System which had been at 48 percent power level for several days, commenced power ascension at 0510 hours on October 31. The unit reached 95 percent reactor power at 1530 hours on November 1. During the next day, November 2, the blowdown system was on the startup blowdown flash tank or out-of-s.ervice,where no sample was available for the majority of the' day., During the brief use of the normal flash tank, sampling did not OCCUR.
-Steam Supply System which had been at 48 percent power level for several days, commenced power ascension at 0510 hours on October 31.
The system operated on the, normal running flash tank November 3 when daily sampling was resumed.                       -
The unit reached 95 percent reactor power at 1530 hours on November 1.
During the next day, November 2, the blowdown system was on the startup blowdown flash tank or out-of-s.ervice,where no sample was available for the majority of the' day., During the brief use of the normal flash tank, sampling did not OCCUR.
The system operated on the, normal running flash tank November 3 when daily sampling was resumed.
Very truly yours',_
Very truly yours',_
                            . 0 W. A. Black President WAB/be cc:         W. G. Smith
0 W. A. Black President WAB/be cc:
              ' -l-certify under penalty'of law that I have personally examined and am familiar
W. G. Smith
                      .with the information submitted in this and all attached documents; and based on my inquiry of those individuals immediately responsible for obtaining the
' -l-certify under penalty'of law that I have personally examined and am familiar
* Informt. tion, I believe the submitted information is true, accurate and
.with the information submitted in this and all attached documents; and based on my inquiry of those individuals immediately responsible for obtaining the Informt. tion, I believe the submitted information is true, accurate and complete.
      ,                complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.
I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.
                  .                                                                            $b 0 1
$b 0 a
a                                W. A. Black s,               s r              N t           Y I
W. A. Black 1
                                    ,b,                           n             -      ---}}
r N
s, s
t Y
I
,b, n
---}}

Latest revision as of 05:53, 14 December 2024

NPDES Noncompliance Notification:On 831102,steam Generator Blowdown Suspended Solid Samples Not Taken.Sys Operated on Normal Running Flash Tank on 831103 When Daily Sampling Resumed.Ltr to State of Mi Encl
ML20083G044
Person / Time
Site: Cook  
Issue date: 12/13/1983
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8401050678
Download: ML20083G044 (2)


Text

. _ _ _ _ _

b nt /3 a

- C-~ 6 $

,, ",, IN0/ANA A MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLAh7 P.O. Box 454, Bridgman, Michigan 49106 (616) 465-5901 December 13, 1983 Mr. J.G. Keppler, Regional Administrator United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58/74 i

Docket No. 50-315/50-316 j

Dear Mr. Keppler:

Pursuant to the requirements of Appendix B, Part II, l

Nonradiological Environmental Protection Plan, Section 3.2, a copy of the report to the Michigan Water Resources Commission notifying them of the failure to take the Steam Generator blowdown suspended solids sample on November 2, 1983, is attached.

This report is required by Amendment No. 54 to Facility Operating License No. DPR-58 and Amendment No. 40 to Facility Operating License No. DPR-74 dated May 6, 1982.

Sincerely, LM w t'

~

W.G.

Smit r.

Plant Manager

/bab Attachment cc:

John E. Dolan INPO M.P. Alexich Dir., IE (20 copies)

R.F. Kroeger Dir., MIPC (2 copies)

H. Brugger H.R."Denton E.R.

Swanson, RO:III R.C. Callen, MPSC G.

Charnoff, Esq.

J.M. Hennigan PNSRC J.F.

Stietzel E.L. Townley bbhg K.R.

Baker k

R.O.

Bruggee, EPRI B401050678 831213 PDR ADOCK 05000315 TEo/ 2 ii 4

S PDR t

{

{

\\

Q b*~,n/NDIANA & MICHIGAN ELECTRIC COMPANY oNE SUMMIT SoVARE P.o. Box 60. FORT WAYNE. IN. 46801 Telephone (219) 425-2111 tlovember 23, l983 WILLIAM A. BLACK President Mr. Paul D. Zugger Executive Secretary Michigan Water Resources Commission

' Stevens T. Mason Building Box 30026 Lansing, MI. 48909 3

Re:

D. C. Cook Nuclear Plant NPDES Permit No. M10005827 Steam Generator B!owdown

Dear Mi7 Zugger:

A review of monitoring records indicate the steam generator blowdown suspended solids sample was not taken on November 2,1983. The #1 Nucicar

-Steam Supply System which had been at 48 percent power level for several days, commenced power ascension at 0510 hours0.0059 days <br />0.142 hours <br />8.43254e-4 weeks <br />1.94055e-4 months <br /> on October 31.

The unit reached 95 percent reactor power at 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> on November 1.

During the next day, November 2, the blowdown system was on the startup blowdown flash tank or out-of-s.ervice,where no sample was available for the majority of the' day., During the brief use of the normal flash tank, sampling did not OCCUR.

The system operated on the, normal running flash tank November 3 when daily sampling was resumed.

Very truly yours',_

0 W. A. Black President WAB/be cc:

W. G. Smith

' -l-certify under penalty'of law that I have personally examined and am familiar

.with the information submitted in this and all attached documents; and based on my inquiry of those individuals immediately responsible for obtaining the Informt. tion, I believe the submitted information is true, accurate and complete.

I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.

$b 0 a

W. A. Black 1

r N

s, s

t Y

I

,b, n

---