ML20084N896: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:_- | {{#Wiki_filter:_- | ||
;9g' eEcavfu i?C Arizona Public Service Company > | |||
03! l'iY I 4 fi 3: 08 i | |||
03! | May 8,1984 H;iGic;; v i:" | ||
ANPP-29454-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite '210 Walnut ' Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs | ANPP-29454-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite '210 Walnut ' Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs | ||
| Line 30: | Line 30: | ||
==Dear Sir:== | ==Dear Sir:== | ||
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B). | The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B). | ||
At that time, it was estimated that a Final Report would be available by May 18, 1984. | At that time, it was estimated that a Final Report would be available by May 18, 1984. | ||
Due to the extensive investigation and evaluation required, it_is now expected that this information will be finalized by July 20,1984, at which time a complete report will be submitted. | Due to the extensive investigation and evaluation required, it_is now expected that this information will be finalized by July 20,1984, at which time a complete report will be submitted. | ||
There is no new information or change to the Interim Report at | this time. | ||
Very truly yours, | There is no new information or change to the Interim Report at Very truly yours, g | ||
~ | |||
-C. | |||
APS Vice President, Nuclear ANPP Project Director EEVB/TRB:db cc: | CULL M LLL E. E. Van Brunt, Jr. | ||
APS Vice President, Nuclear ANPP Project Director EEVB/TRB:db cc: | |||
See Page Two M 517 275 840!NMB r'un K 05000529 8 | |||
pg 7 | |||
y, i | y, i | ||
:is.. | |||
Mr. T. W. Bishop | Mr. T. W. Bishop | ||
-DER 84-08 Page-Two cc: | |||
Richard.DeYoung, Director | |||
~ | |||
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T.' G. Woods," Jr. | ' Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T.' G. Woods," Jr. | ||
D. B. Karner W. E.'Ide D. B. Fasnacht A. C. Rogers B. S.:Kaplan L. A. Souza D. E. Fowler J. Vorees J. R. Bynum J. M. Allen P. P. Klute A. C. Gehr W. J. Stubblefield | D. B. Karner W. E.'Ide D. B. Fasnacht A. C. Rogers B. S.:Kaplan L. A. Souza D. E. Fowler J. Vorees J. R. Bynum J. M. Allen P. P. Klute A. C. Gehr W. J. Stubblefield | ||
.W. G. Bingham R. | |||
L~. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiore11i S. R. Frost J. Self - | |||
D. Canady Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339}} | D. Canady Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339}} | ||
Latest revision as of 04:15, 14 December 2024
| ML20084N896 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 05/08/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-29454-TDS, DER-84-08, DER-84-8, NUDOCS 8405170275 | |
| Download: ML20084N896 (2) | |
Text
_-
- 9g' eEcavfu i?C Arizona Public Service Company >
03! l'iY I 4 fi 3: 08 i
May 8,1984 H;iGic;; v i:"
ANPP-29454-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite '210 Walnut ' Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
Subject:
Time Extension For Report - DER 84-08 A 50.55(e) Potentially Reportable Deficiency Relating To ITT Barton Model 763 Transmitters Do Not Meet Specifications.
File: 84-019-026; D.4.33.2
Reference:
(A) Telephone conversation between R. Dodds and T. Bradish on February 29, 1984 (B) ANPP-29083, dated March 16, 1984 (Interim Report)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).
At that time, it was estimated that a Final Report would be available by May 18, 1984.
Due to the extensive investigation and evaluation required, it_is now expected that this information will be finalized by July 20,1984, at which time a complete report will be submitted.
this time.
There is no new information or change to the Interim Report at Very truly yours, g
~
-C.
CULL M LLL E. E. Van Brunt, Jr.
APS Vice President, Nuclear ANPP Project Director EEVB/TRB:db cc:
See Page Two M 517 275 840!NMB r'un K 05000529 8
pg 7
y, i
- is..
Mr. T. W. Bishop
-DER 84-08 Page-Two cc:
Richard.DeYoung, Director
~
' Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T.' G. Woods," Jr.
D. B. Karner W. E.'Ide D. B. Fasnacht A. C. Rogers B. S.:Kaplan L. A. Souza D. E. Fowler J. Vorees J. R. Bynum J. M. Allen P. P. Klute A. C. Gehr W. J. Stubblefield
.W. G. Bingham R.
L~. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiore11i S. R. Frost J. Self -
D. Canady Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339