ML20084N896: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:_-
{{#Wiki_filter:_-
          ;9g'
;9g' eEcavfu i?C Arizona Public Service Company >
'''                                                                              eEcavfu i?C Arizona Public Service Company >
03! l'iY I 4 fi 3: 08 i
03!i l'iY I 4 fi 3: 08 May 8,1984         H;iGic;; v i:"
May 8,1984 H;iGic;; v i:"
ANPP-29454-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite '210 Walnut ' Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
ANPP-29454-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite '210 Walnut ' Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs


Line 30: Line 30:


==Dear Sir:==
==Dear Sir:==
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).
At that time, it was estimated that a Final Report would be available by May 18, 1984.
At that time, it was estimated that a Final Report would be available by May 18, 1984.
Due to the extensive investigation and evaluation required, it_is now expected that this information will be finalized by July 20,1984, at which time a complete report will be submitted.
Due to the extensive investigation and evaluation required, it_is now expected that this information will be finalized by July 20,1984, at which time a complete report will be submitted.
There is no new information or change to the Interim Report at       this time.
this time.
Very truly yours,                 g
There is no new information or change to the Interim Report at Very truly yours, g
                                                                                                "  ~
~
                                                                -C.     CULL         M LLL E. E. Van Brunt, Jr.
-C.
APS Vice President, Nuclear ANPP Project Director EEVB/TRB:db cc:   See Page Two M
CULL M LLL E. E. Van Brunt, Jr.
r'un 517 275 840!NMB K 05000529 8                   pg                                                               7
APS Vice President, Nuclear ANPP Project Director EEVB/TRB:db cc:
See Page Two M 517 275 840!NMB r'un K 05000529 8
pg 7


y, i   :is ..
y, i
:is..
Mr. T. W. Bishop
Mr. T. W. Bishop
              -DER 84-08 Page-Two cc:           Richard.DeYoung, Director
-DER 84-08 Page-Two cc:
                          ' Of fice of Inspection and Enforcement
Richard.DeYoung, Director
                                                                    ~
~
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T.' G. Woods," Jr.
' Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T.' G. Woods," Jr.
D. B. Karner W. E.'Ide D. B. Fasnacht A. C. Rogers B. S.:Kaplan L. A. Souza D. E. Fowler J. Vorees J. R. Bynum J. M. Allen P. P. Klute A. C. Gehr W. J. Stubblefield
D. B. Karner W. E.'Ide D. B. Fasnacht A. C. Rogers B. S.:Kaplan L. A. Souza D. E. Fowler J. Vorees J. R. Bynum J. M. Allen P. P. Klute A. C. Gehr W. J. Stubblefield
                          .W. G. Bingham R. L~. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiore11i S. R. Frost J. Self -
.W. G. Bingham R.
L~. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiore11i S. R. Frost J. Self -
D. Canady Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339}}
D. Canady Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339}}

Latest revision as of 04:15, 14 December 2024

Interim Deficiency Rept DER 84-08 Re Failure of Itt Barton Model 763 Transmitters to Meet Specs.Initially Reported on 840229.Investigation Incomplete.Next Rept Will Be Submitted on 840720
ML20084N896
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/08/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-29454-TDS, DER-84-08, DER-84-8, NUDOCS 8405170275
Download: ML20084N896 (2)


Text

_-

9g' eEcavfu i?C Arizona Public Service Company >

03! l'iY I 4 fi 3: 08 i

May 8,1984 H;iGic;; v i:"

ANPP-29454-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite '210 Walnut ' Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 84-08 A 50.55(e) Potentially Reportable Deficiency Relating To ITT Barton Model 763 Transmitters Do Not Meet Specifications.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between R. Dodds and T. Bradish on February 29, 1984 (B) ANPP-29083, dated March 16, 1984 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by May 18, 1984.

Due to the extensive investigation and evaluation required, it_is now expected that this information will be finalized by July 20,1984, at which time a complete report will be submitted.

this time.

There is no new information or change to the Interim Report at Very truly yours, g

~

-C.

CULL M LLL E. E. Van Brunt, Jr.

APS Vice President, Nuclear ANPP Project Director EEVB/TRB:db cc:

See Page Two M 517 275 840!NMB r'un K 05000529 8

pg 7

y, i

is..

Mr. T. W. Bishop

-DER 84-08 Page-Two cc:

Richard.DeYoung, Director

~

' Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T.' G. Woods," Jr.

D. B. Karner W. E.'Ide D. B. Fasnacht A. C. Rogers B. S.:Kaplan L. A. Souza D. E. Fowler J. Vorees J. R. Bynum J. M. Allen P. P. Klute A. C. Gehr W. J. Stubblefield

.W. G. Bingham R.

L~. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiore11i S. R. Frost J. Self -

D. Canady Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339