THREE MILE ISLAND NUCLEAR STATION UNIT #1 DERGINCY PROCEDURE #1202-29 Pressurizer System Failure h[gg!ThfffG2DW R'M Table of Effcetive Pages Page       Date               Revision                 Pm     Date         D.evision           Page       Date         Revisiotl 1.0       1           73             0                 26.0                                     51.0 2.0       1           73             0                 27.0                                     52.0 3.0       1           73             0                 28.0                               .
THREE MILE ISLAND NUCLEAR STATION UNIT #1 DERGINCY PROCEDURE #1202-29 h[gg!ThfffG2DW Pressurizer System Failure R'M Table of Effcetive Pages Page Date Revision Pm Date D.evision Page Date Revisiotl 1.0 1
53.0 4.0       1           7?             O                 29.0                                     54.0 5.0       1           73             0                 30.0                                     55.0 6.0       1           73             0         -
73 0
31.0                                     56.0 7.0       1           73             0                 32.0                                     57.0 8.0       10         73             0                 33.0         -
26.0 51.0 2.0 1
58.0 9.0                                                   34.0                                     59.0 10.0                                                   35.0                                     60.0 11.0                                                   36.0                                     61.0       -
73 0
12.0                                                   37.0                                     62.0 13.0                                                   38.0                                     63.0
27.0 52.0 3.0 1
* 14.0                                               ' 39.0                                       64.0 15.0                                                   40.0                                     65.0 16.0                                                   41.0                                     66.0 17.0                                                   42.0                                     67.0 18.0                                                   43.0                                   ,
73 0
68.0 19.0                                                   44.0                                     69.0 20.0                                         .        45.0                                     70.0 21.0                                                   46.0                                     71.0' 22.0                                                   47.0                                     72.0 23.0           -
28.0 53.0 4.0 1
48.0                                     73.0 24.0.
7?
49.0                                     74.0 25.0                                                   50.0                                     75.0 Plant Staff Recomends Approval                                               Date Cognizant Dept. Head
O 29.0 54.0 5.0 1
                                                                                                                                            ~
73 0
                                ~ ~
30.0 55.0 6.0 1
                                    ;-        C          D       Approval                                       Date C.g   V i . T       - L- }        i                   S ta tic- Superintendent /
73 0
Assist. Su}. ;rintendent PORC Recomends Approval                .    .
31.0 56.0 7.0 1
Date      /o//6/73 4         n     #
73 0
PORr                     #    '
32.0 57.0 8.0 10 73 0
Approval /                                     Date /d       /     M yeationSuperintendent/                         /     '
33.0 58.0 9.0 34.0 59.0 10.0 35.0 60.0 11.0 36.0 61.0 12.0 37.0 62.0 13.0 38.0 63.0 14.0
Assist. Superintendent PORC coments of IO'         I   M           included.
' 39.0 64.0 15.0 40.0 65.0 16.0 41.0 66.0 17.0 42.0 67.0 18.0 43.0 68.0 19.0 44.0 69.0 20.0 45.0 70.0 21.0 46.0 71.0' 22.0 47.0 72.0 23.0 48.0 73.0 24.0 49.0 74.0 25.0 50.0 75.0 Plant Staff Recomends Approval Date Cognizant Dept. Head
By N. '                            '
~
Date /d           73
L- }
                                                                                                                            /   /
D Approval Date C
8307060573 731018 PDRADOCK05000g9                                                                       g 11156 x ,- -               ___          . - , ,            . .. . - .    ..
C.g
                                                                            .. a.- - --    -..>~-------~~=r'~~~v.
~ ~ ;-
V i
T i
S ta tic-Superintendent /
Assist. Su}. ;rintendent Date
/o//6/73 PORC Recomends Approval 4
n PORr Approval /
Date /d /
M yeationSuperintendent/
/
Assist. Superintendent PORC coments of IO' I
M included.
By N.
Date /d 73
/
/
8307060573 731018 PDRADOCK05000g9 g 11156 x,- -
-..>~-------~~=r'~~~v.
.. a.- - --


                                  ~
__.2----
__.2----       gy- 1202729 R vision 0 u     ,
gy-1202729
~
R vision 0 u
THREE MILE ISLAND NUCLEAR STATION - Unit I Plant Emergency Procedures EP 1202 - 29 Pressurizer System Failure
THREE MILE ISLAND NUCLEAR STATION - Unit I Plant Emergency Procedures EP 1202 - 29 Pressurizer System Failure
                                                                                      ~
~
SECTION A Leaking Pilot Operated (electromatic) Relief Valve RC-RV2 29.A.1         Symotoms
SECTION A Leaking Pilot Operated (electromatic) Relief Valve RC-RV2 29.A.1 Symotoms 1.
: 1. Relief valve discharge line temperature exceeding the normal 120 F. Alarms'on computer at 200 F.
Relief valve discharge line temperature exceeding the normal 120 F.
: 2. RC drain tank temperature / pressure above normal on the control room radioactive waste panel.     (pressure alarm at 1.S-2.0'psig.)
Alarms'on computer at 200 F.
: 3. RC system makeup flow above normal for the variable let down flow and RC pump seal in leakage conditions.
2.
29.A.2           Immediate Actions A. Automatic Actio'ns
RC drain tank temperature / pressure above normal on the control room radioactive waste panel.
: 1. None                                                           ,
(pressure alarm at 1.S-2.0'psig.)
B. Manual Actions                                                 2
3.
: 1. Close the electromatic relief BLOCK valve, RC-V2 29.A.3           Follow-uo Action
RC system makeup flow above normal for the variable let down flow and RC pump seal in leakage conditions.
: 1. Repair during next shutdown SECTION   B, Inoperative Pilot Operated (electromatic) Relief Valve, RC-RV2 29.B.1           Sympt 6ms
29.A.2 Immediate Actions A.
: 1. RC System pressure is above 2255 psig and RC-RV2 fails to open
Automatic Actio'ns 1.
: 2. RC System pressure is below 2205 psig and valve fails to close.
None B.
                                                                          'd
Manual Actions 2
1.
Close the electromatic relief BLOCK valve, RC-V2 29.A.3 Follow-uo Action 1.
Repair during next shutdown SECTION B, Inoperative Pilot Operated (electromatic) Relief Valve, RC-RV2 29.B.1 Sympt 6ms 1.
RC System pressure is above 2255 psig and RC-RV2 fails to open 2.
RC System pressure is below 2205 psig and valve fails to close.
'd


m-Scn3                               '
m-Scn3 Revision 0~
Revision 0~
29.B.1 Symotoms (Cont'd) 3.
29.B.1       Symotoms (Cont'd)
RC-RV2 discharge line temperature is above the 200 F alarm.
: 3. RC-RV2 discharge line temperature is above the 200 F alarm.
The RC drain tank temperature / pressure is above ' ambient as indicated on the control room radioactive waste paneli 29.B.2 I= mediate Action A.
The RC drain tank temperature / pressure is above ' ambient as indicated on the control room radioactive waste paneli 29.B.2       I= mediate Action A. Automatic Action                           *
Automatic Action 1.
: 1. For a' failed closed RC-RV2:
For a' failed closed RC-RV2:
: a. Spray valve RC-V1 is open above 2205 psig
a.
: b. Reactor trip occurs at ? s55 p-ig
Spray valve RC-V1 is open above 2205 psig b.
: c. Pressurizer code relief valves open at 2435 psig                           -
Reactor trip occurs at ? s55 p-ig Pressurizer code relief valves open at 2435 psig c.
l                             2. For a' failed open RC-RV-2:
l 2.
: a. All pressurizer heater banks on full belek 2105 psig
For a' failed open RC-RV-2:
: b. Reactor: trips at 1800 psig v
All pressurizer heater banks on full belek 2105 psig a.
                                                                                                    /                     '
b.
: c. High Pressure Injection is actuited. at 15 0 psig
Reactor: trips at 1800 psig v
                                                                        ~
/
B. Manual Action
High Pressure Injection is actuited. at 15 0 psig c.
: 1. For a fsiled closed RC-RV2:
~
Shift spray valve RC-V1 switch on center console to MANUAL and open ,frther for additional spray flow.
B.
: 2. For a failed open RC-RV2:
Manual Action 1.
closa RC-V2 block valve
For a fsiled closed RC-RV2:
* 29.B.3     Follow-un Action                                             /
Shift spray valve RC-V1 switch on center console to MANUAL and open,frther for additional spray flow.
: 1. Retunn system pressure and/:emperature to normal.                                         ,
2.
For a failed open RC-RV2:
closa RC-V2 block valve 29.B.3 Follow-un Action
/
1.
Retunn system pressure and/:emperature to normal.
SECTION C, Leaking Code Relief Valve, RC-RVIA r, RC-RVIB,.
SECTION C, Leaking Code Relief Valve, RC-RVIA r, RC-RVIB,.
29.C.1     Symotons
29.C.1 Symotons 1.
: 1. Code relief valve discharge line temperature (s) exceeding the computer normal 120 T. (Computer alarms at 200 T) 3                       / * :
Code relief valve discharge line temperature (s) exceeding the computer normal 120 T. (Computer alarms at 200 T) 3
e m         / A 2.0                           '
/
W 11156               q
* e m
                                                      ,    ,_,p     e,.       -er     o'o ~     m *      % -
/ A 2.0 W 11156 q
,_,p e,.
-er o'o ~
m


              .EP 1202-29                                                                   10-18-73
.EP 1202-29 10-18-73 Rsvisien 0 29.C.1 Symotoms (cont'd) 2.
  ',',                                                                                      Rsvisien 0 29.C.1           Symotoms (cont'd)
RC drain tank temperature / pressure above normal (ambient) on the control roon radioactive Waste Panel.
: 2. RC drain tank temperature / pressure above normal (ambient) on the control roon radioactive Waste Panel.           (Pressure alarms at 1.5-2.0 psig)
(Pressure alarms at 1.5-2.0 psig) 3.
: 3. RC System increased makeup flow is above norma'l for the
RC System increased makeup flow is above norma'l for the
                                    ~ variable letdown flow (45-140 gpm) and' RC pump seal in leakage conditions.
~ variable letdown flow (45-140 gpm) and' RC pump seal in leakage conditions.
29.C.2           Immediate Action                             -
29.C.2 Immediate Action A.
A. Automatic Action
Automatic Action 1.
: 1. None B. Manual Action
None B.
: 1. Determine RC leakage according to'OP 1303-1.1 (daily surveillance checks)                 ,
Manual Action 1.
29.C.3           Follow-uo Action
Determine RC leakage according to'OP 1303-1.1 (daily surveillance checks) 29.C.3 Follow-uo Action l.
: l. If RC system identified leakage is in excess of 10 gpm, the reactor' plant must be shutdown within 24 hours.
If RC system identified leakage is in excess of 10 gpm, the reactor' plant must be shutdown within 24 hours.
SECTION   D. Inocerative Code Relief valve. RC-RVIA or RC-RVIB v
SECTION D. Inocerative Code Relief valve. RC-RVIA or RC-RVIB v
29.D.1         Symptoms l                               1. Code relief valve (s) fail,to open when above 2435 psig or fails to close.when beicw 2285 psig.
29.D.1 Symptoms l
                                                                  ~
1.
l
Code relief valve (s) fail,to open when above 2435 psig l
!                              2. Turbine trip or gross power run back has occurred with the
or fails to close.when beicw 2285 psig.
.                                      possibility that the spray and electromatic relief valves fail s            <                    to open.
~
i c
2.
                                                      ! i     \
Turbine trip or gross power run back has occurred with the possibility that the spray and electromatic relief valves fail to open.
1     x r
s i
3.0 w 11159
c
                                                                      . . _ _  N.               ,,
! i
\\
1 x
r 3.0 w 11159 N.


=         ..
=
            .'  *;EP- 1202-29                                                         10-18-73 Revision 0 29.D.1     Symotoms             (cont'd)                           '
*;EP-1202-29 10-18-73 Revision 0 29.D.1 Symotoms (cont'd) 3.
: 3.     Relief valve discharge line temperature is above the 200 F alarm, the RC drain tank temperature / pressure is above ambient and the RC System makeup flow is,above normal for the let'down (45-140gpm) and RC pump seal in leakage (approximately 5gpm) 29.D.2     Immediate Action A.       Automatic Action
Relief valve discharge line temperature is above the 200 F alarm, the RC drain tank temperature / pressure is above ambient and the RC System makeup flow is,above normal for the let'down (45-140gpm) and RC pump seal in leakage (approximately 5gpm) 29.D.2 Immediate Action A.
                                                          ?
Automatic Action
: 1. Reactor trip from high or low system pressure. .
?
                  ,                    2. H.P. Injection if valve fails to close.
1.
                                                            ~
Reactor trip from high or low system pressure..
B.       Manual Action
2.
: 1. If code valve (s) fail to open at 2435 psig place spray -
H.P. Injection if valve fails to close.
valve on MANUAL at consolo center and*open. Verify pressurizer heatars are Orr at console right.
~
: 2. If cc31e valves fail to close, turn all heaters ON at console right and isolate let down flow at console center by closing HU-V3.
B.
: 3. Manually initiate H.P. Injection if required to maintain pressurizer level.       ,
Manual Action 1.
29.D.3     Follow-up Action
If code valve (s) fail to open at 2435 psig place spray -
: 1. Hold pressurizer level if possible at or greater than 220 inches with H.P. Injection and begin cooldown.
valve on MANUAL at consolo center and*open.
: 2.     If valve failed to lift, proceed with cooldown.
Verify pressurizer heatars are Orr at console right.
2.
If cc31e valves fail to close, turn all heaters ON at console right and isolate let down flow at console center by closing HU-V3.
3.
Manually initiate H.P. Injection if required to maintain pressurizer level.
29.D.3 Follow-up Action 1.
Hold pressurizer level if possible at or greater than 220 inches with H.P. Injection and begin cooldown.
2.
If valve failed to lift, proceed with cooldown.
4.0 W 11160
4.0 W 11160
      .. .-                    _- ._. -- . - - - - - - - . - _ . = . - . . - - - -               _
. =. -.. - - - -


,. . . . mm a .                                       .~~--~
,.... mm a.
                            .    ~._            -
~._
Rsvision 0 SECTION E, Inoperative Pressurizer Heaters 29.E-1       Symptoms
. ~ ~ - - ~
: 1. Heater banks fall to energize or de-energize if RC pressure is at heater bank setpoint.
Rsvision 0 SECTION E, Inoperative Pressurizer Heaters 29.E-1 Symptoms 1.
Bank 1       Bank 2     Bank 3   Bank 4     Bank 5     .
Heater banks fall to energize or de-energize if RC pressure is at heater bank setpoint.
ON <2155         <2155,     2155     21.2(     2105 OTT 2155         ' 2155       2147     2140       2125 NOTE:     Banks 1, 2 & 3 are full on at 2135 psig
Bank 1 Bank 2 Bank 3 Bank 4 Bank 5 ON <2155
: 2. Pressurizer level Lo-Lo alarm at 80 inches.
<2155, 2155 21.2(
: 3. Pressurizer heater power supply ground alarm                 .
2105 OTT 2155
: 4. Abnormal console indicating lights for the heating groups.
' 2155 2147 2140 2125 NOTE:
: 5. High 2255 psig or low 2055 psig pressure alarms.
Banks 1, 2 & 3 are full on at 2135 psig 2.
29.E32       Immediate Action Automatic Action A.                                                       -
Pressurizer level Lo-Lo alarm at 80 inches.
: 1. For energized heaters and rising pressure:
3.
Spray valve RC-V1 opens (red and green console jog button lights)
Pressurizer heater power supply ground alarm 4.
: 2. For loss of heaters and decreasing pressure:
Abnormal console indicating lights for the heating groups.
None B. Manual Action
5.
: 1. Place heater controller in MANUAL control if control malfunction is suspected.
High 2255 psig or low 2055 psig pressure alarms.
: 2.   ?or energized heaters /rlsing pressure, attempt to de-energize all heaters (at console right) except group 1 or 2
29.E32 Immediate Action A.
: 3. For loss of heatees/ decreasing pressure, attempt to energize Backup heaters from console, CL.         If ' nsuccegsfu1 u           7 start reducing unit load.
Automatic Action 1.
For energized heaters and rising pressure:
Spray valve RC-V1 opens (red and green console jog button lights) 2.
For loss of heaters and decreasing pressure:
None B.
Manual Action 1.
Place heater controller in MANUAL control if control malfunction is suspected.
2.
?or energized heaters /rlsing pressure, attempt to de-energize all heaters (at console right) except group 1 or 2 3.
For loss of heatees/ decreasing pressure, attempt to energize If ' nsuccegsfu1 start Backup heaters from console, CL.
u 7
reducing unit load.
1'l161 5.0
1'l161 5.0


              ~                                                              m
m
    ~ '
~
            .    .                                                            Revisicn 0 29.E.3       Follow-up Action
Revisicn 0
: 1. For energized heaters, open heater breakers in question at the pressurizer Heater Control Centers except for group 1 or 2.
~ '
: 2. Control RC pressure at normal 2155 psig setpoint with RC-V1 spray valve in MANUAL.                       ,
29.E.3 Follow-up Action 1.
: 3. For de-energized heaters, determine cause and if a minimum of one heater group is not operable, continue load reduction to shut down and possibly cooldown ond'ition.
For energized heaters, open heater breakers in question at the pressurizer Heater Control Centers except for group 1 or 2.
SECTION T Malfunction In Pressurizer Level Indication or Control 29F.1       Symotoms
2.
: 1. Disugreement between the console recorder level readouts of more than 12 inches.
Control RC pressure at normal 2155 psig setpoint with RC-V1 spray valve in MANUAL.
: 2. Rapid change in indicated / recorded levei due to loss of com-pensation or loss of power or d/p cell failure or other mal-function.
3.
29P.2       Immediate Action A. Automatic Action 1.- If indication fails low:
For de-energized heaters, determine cause and if a minimum of one heater group is not operable, continue load reduction to shut down and possibly cooldown ond'ition.
SECTION T Malfunction In Pressurizer Level Indication or Control 29F.1 Symotoms 1.
Disugreement between the console recorder level readouts of more than 12 inches.
2.
Rapid change in indicated / recorded levei due to loss of com-pensation or loss of power or d/p cell failure or other mal-function.
29P.2 Immediate Action A.
Automatic Action 1.-
If indication fails low:
Pressurizer heaters trip @ 80 inches makeup valve MU-V17 opens, and RC pressure increases.
Pressurizer heaters trip @ 80 inches makeup valve MU-V17 opens, and RC pressure increases.
: 2. If indication fails high:
2.
If indication fails high:
Makeup valve MU-V17 closes.
Makeup valve MU-V17 closes.
B. Manual Action
B.
: 1. When any two of three console recorder level transmitter readouts disagree by more than 12 inches, take manual 6.0
Manual Action 1.
                                                                        .d 1116Z
When any two of three console recorder level transmitter readouts disagree by more than 12 inches, take manual 6.0 1116Z
.d


      **              * , E'P 1202-29                                                                                                                                                             10-18-73 Revision 0 l
*, E'P 1202-29 10-18-73 Revision 0 l
4 control of level and then select the third transmitter for i
4 control of level and then select the third transmitter for i
indication.
indication.
!                                                                  2.       Re-energize heaters if tripped due to malfunction, i
2.
29.T.3                         Follow-up Action                                                                                                       *
Re-energize heaters if tripped due to malfunction, i
: 1.       If the switching level transmit'ters ha's not rectified the condition, switch to the alternate temperature detector.
29.T.3 Follow-up Action 1.
l
If the switching level transmit'ters ha's not rectified the condition, switch to the alternate temperature detector.
: 2.       If pressurizer level recorder. indication is lost, select another transmitter or use the computer for level indication.
l 2.
SECTION G Pressurizer Spray Valve Failure 29G.1                         Symptoms
If pressurizer level recorder. indication is lost, select another transmitter or use the computer for level indication.
)                                                                 1.       RC-V1 spray valve fails to open when the RC system pressure is
SECTION G Pressurizer Spray Valve Failure 29G.1 Symptoms
}                                                                           greater than 2205 psig.
)
?
1.
: 2.       RC-V1 spray spray valve is open when the RC ' system is less than 2155 psig.
RC-V1 spray valve fails to open when the RC system pressure is
29G.2                           Immedicte Action A.       Automatic Action
}
: 1.           RC system pressure greater tlan 2715 psig. activates RC-RV2 electromatic relief and the high pressure alarm.
greater than 2205 psig.
i
?
: 2.           RC-V1 failing open (in auto) causes RC system prassure to stablize at approximately 2100 psig. with all heaters t
2.
                                                                                        "on".
RC-V1 spray spray valve is open when the RC ' system is less than 2155 psig.
: 3.           Failure when manually opened beyond the automatic limit position causes continued pressure drop and alarm at 2055.
29G.2 Immedicte Action A.
B.     Manual Action
Automatic Action 1.
: 1.           Control RX-V1 opening or closing in MANUAL with jogbuttons.
RC system pressure greater tlan 2715 psig. activates RC-RV2 electromatic relief and the high pressure alarm.
: 2.           If the spray valve gas failed open, control pressure by i
i 2.
RC-V1 failing open (in auto) causes RC system prassure to stablize at approximately 2100 psig. with all heaters "on".
t 3.
Failure when manually opened beyond the automatic limit position causes continued pressure drop and alarm at 2055.
B.
Manual Action 1.
Control RX-V1 opening or closing in MANUAL with jogbuttons.
2.
If the spray valve gas failed open, control pressure by i
closing the spray block valve RC-V3.
closing the spray block valve RC-V3.
7.0                             -"
111 7.0
111
,v.",
        . ~ - , _ - . , . , . . - _ , _ _ . _ . , . . . . _ .                  _ , _ . , , ,    , . . _ , _ , _ , _ , , , , _ , , . _ . _ _ , ,          ,v.", _,_., . _ _ _ _ - _ . _ . , . , , _ , , _ _ _ , _ _ . _ , , . - _ . . _ _ _ _ .
. ~ -, _ -.,.,.. - _, _ _. _.,.... _.


            - p ..
- p..
          ;  E','[E'P1202-29                                                                           10-10-73 Ravision 0 y                                 .
E','[E'P1202-29 10-10-73 Ravision 0 y
NOTE: If the " Block" valve RC-V3 is closed, it must be
NOTE: If the " Block" valve RC-V3 is closed, it must be 1
                                                              .                                                      1 periodically cycled to keep the spray line warm
periodically cycled to keep the spray line warm 3.
: 3. Reduce rate of ICS load change to less than 1% per minute.
Reduce rate of ICS load change to less than 1% per minute.
29G.3                     Follow-up Action
29G.3 Follow-up Action 1.
: 1. Continue plant ,cperation with reduced rate of load change.
Continue plant,cperation with reduced rate of load change.
}
}
9 8.0 i                                                                                   -
9 8.0 i
i
i g 11164 w
    .                                                                                      g 11164
vm-r--r w ee w'=
                    ----g-ww- mwwyv ww w}}
----g-ww-mwwyv ww w
+wwr r P m www azm-5 4'W79m'----TF'v -}}

Latest revision as of 03:53, 14 December 2024

Rev 0 to Plant Emergency Procedure EP 1202-29, Pressurizer Sys Failure
ML20085A571
Person / Time
Site: Crane 
Issue date: 10/18/1973
From: Colitz J
GENERAL PUBLIC UTILITIES CORP.
To:
References
TASK-*, TASK-GB EP-1202-29, GPU-0499, GPU-499, NUDOCS 8307060573
Download: ML20085A571 (9)


Text

P

~

10/18/73

.pyc2-29

.\\/ ASTER COPY

^~*** "

~

DO NOT REMOVE i

THREE MILE ISLAND NUCLEAR STATION UNIT #1 DERGINCY PROCEDURE #1202-29 h[gg!ThfffG2DW Pressurizer System Failure R'M Table of Effcetive Pages Page Date Revision Pm Date D.evision Page Date Revisiotl 1.0 1

73 0

26.0 51.0 2.0 1

73 0

27.0 52.0 3.0 1

73 0

28.0 53.0 4.0 1

7?

O 29.0 54.0 5.0 1

73 0

30.0 55.0 6.0 1

73 0

31.0 56.0 7.0 1

73 0

32.0 57.0 8.0 10 73 0

33.0 58.0 9.0 34.0 59.0 10.0 35.0 60.0 11.0 36.0 61.0 12.0 37.0 62.0 13.0 38.0 63.0 14.0

' 39.0 64.0 15.0 40.0 65.0 16.0 41.0 66.0 17.0 42.0 67.0 18.0 43.0 68.0 19.0 44.0 69.0 20.0 45.0 70.0 21.0 46.0 71.0' 22.0 47.0 72.0 23.0 48.0 73.0 24.0 49.0 74.0 25.0 50.0 75.0 Plant Staff Recomends Approval Date Cognizant Dept. Head

~

L- }

D Approval Date C

C.g

~ ~ ;-

V i

T i

S ta tic-Superintendent /

Assist. Su}. ;rintendent Date

/o//6/73 PORC Recomends Approval 4

n PORr Approval /

Date /d /

M yeationSuperintendent/

/

Assist. Superintendent PORC coments of IO' I

M included.

By N.

Date /d 73

/

/

8307060573 731018 PDRADOCK05000g9 g 11156 x,- -

-..>~-------~~=r'~~~v.

.. a.- - --

__.2----

gy-1202729

~

R vision 0 u

THREE MILE ISLAND NUCLEAR STATION - Unit I Plant Emergency Procedures EP 1202 - 29 Pressurizer System Failure

~

SECTION A Leaking Pilot Operated (electromatic) Relief Valve RC-RV2 29.A.1 Symotoms 1.

Relief valve discharge line temperature exceeding the normal 120 F.

Alarms'on computer at 200 F.

2.

RC drain tank temperature / pressure above normal on the control room radioactive waste panel.

(pressure alarm at 1.S-2.0'psig.)

3.

RC system makeup flow above normal for the variable let down flow and RC pump seal in leakage conditions.

29.A.2 Immediate Actions A.

Automatic Actio'ns 1.

None B.

Manual Actions 2

1.

Close the electromatic relief BLOCK valve, RC-V2 29.A.3 Follow-uo Action 1.

Repair during next shutdown SECTION B, Inoperative Pilot Operated (electromatic) Relief Valve, RC-RV2 29.B.1 Sympt 6ms 1.

RC System pressure is above 2255 psig and RC-RV2 fails to open 2.

RC System pressure is below 2205 psig and valve fails to close.

'd

m-Scn3 Revision 0~

29.B.1 Symotoms (Cont'd) 3.

RC-RV2 discharge line temperature is above the 200 F alarm.

The RC drain tank temperature / pressure is above ' ambient as indicated on the control room radioactive waste paneli 29.B.2 I= mediate Action A.

Automatic Action 1.

For a' failed closed RC-RV2:

a.

Spray valve RC-V1 is open above 2205 psig b.

Reactor trip occurs at ? s55 p-ig Pressurizer code relief valves open at 2435 psig c.

l 2.

For a' failed open RC-RV-2:

All pressurizer heater banks on full belek 2105 psig a.

b.

Reactor: trips at 1800 psig v

/

High Pressure Injection is actuited. at 15 0 psig c.

~

B.

Manual Action 1.

For a fsiled closed RC-RV2:

Shift spray valve RC-V1 switch on center console to MANUAL and open,frther for additional spray flow.

2.

For a failed open RC-RV2:

closa RC-V2 block valve 29.B.3 Follow-un Action

/

1.

Retunn system pressure and/:emperature to normal.

SECTION C, Leaking Code Relief Valve, RC-RVIA r, RC-RVIB,.

29.C.1 Symotons 1.

Code relief valve discharge line temperature (s) exceeding the computer normal 120 T. (Computer alarms at 200 T) 3

/

  • e m

/ A 2.0 W 11156 q

,_,p e,.

-er o'o ~

m

.EP 1202-29 10-18-73 Rsvisien 0 29.C.1 Symotoms (cont'd) 2.

RC drain tank temperature / pressure above normal (ambient) on the control roon radioactive Waste Panel.

(Pressure alarms at 1.5-2.0 psig) 3.

RC System increased makeup flow is above norma'l for the

~ variable letdown flow (45-140 gpm) and' RC pump seal in leakage conditions.

29.C.2 Immediate Action A.

Automatic Action 1.

None B.

Manual Action 1.

Determine RC leakage according to'OP 1303-1.1 (daily surveillance checks) 29.C.3 Follow-uo Action l.

If RC system identified leakage is in excess of 10 gpm, the reactor' plant must be shutdown within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

SECTION D. Inocerative Code Relief valve. RC-RVIA or RC-RVIB v

29.D.1 Symptoms l

1.

Code relief valve (s) fail,to open when above 2435 psig l

or fails to close.when beicw 2285 psig.

~

2.

Turbine trip or gross power run back has occurred with the possibility that the spray and electromatic relief valves fail to open.

s i

c

! i

\\

1 x

r 3.0 w 11159 N.

=

  • EP-1202-29 10-18-73 Revision 0 29.D.1 Symotoms (cont'd) 3.

Relief valve discharge line temperature is above the 200 F alarm, the RC drain tank temperature / pressure is above ambient and the RC System makeup flow is,above normal for the let'down (45-140gpm) and RC pump seal in leakage (approximately 5gpm) 29.D.2 Immediate Action A.

Automatic Action

?

1.

Reactor trip from high or low system pressure..

2.

H.P. Injection if valve fails to close.

~

B.

Manual Action 1.

If code valve (s) fail to open at 2435 psig place spray -

valve on MANUAL at consolo center and*open.

Verify pressurizer heatars are Orr at console right.

2.

If cc31e valves fail to close, turn all heaters ON at console right and isolate let down flow at console center by closing HU-V3.

3.

Manually initiate H.P. Injection if required to maintain pressurizer level.

29.D.3 Follow-up Action 1.

Hold pressurizer level if possible at or greater than 220 inches with H.P. Injection and begin cooldown.

2.

If valve failed to lift, proceed with cooldown.

4.0 W 11160

. =. -.. - - - -

,.... mm a.

~._

. ~ ~ - - ~

Rsvision 0 SECTION E, Inoperative Pressurizer Heaters 29.E-1 Symptoms 1.

Heater banks fall to energize or de-energize if RC pressure is at heater bank setpoint.

Bank 1 Bank 2 Bank 3 Bank 4 Bank 5 ON <2155

<2155, 2155 21.2(

2105 OTT 2155

' 2155 2147 2140 2125 NOTE:

Banks 1, 2 & 3 are full on at 2135 psig 2.

Pressurizer level Lo-Lo alarm at 80 inches.

3.

Pressurizer heater power supply ground alarm 4.

Abnormal console indicating lights for the heating groups.

5.

High 2255 psig or low 2055 psig pressure alarms.

29.E32 Immediate Action A.

Automatic Action 1.

For energized heaters and rising pressure:

Spray valve RC-V1 opens (red and green console jog button lights) 2.

For loss of heaters and decreasing pressure:

None B.

Manual Action 1.

Place heater controller in MANUAL control if control malfunction is suspected.

2.

?or energized heaters /rlsing pressure, attempt to de-energize all heaters (at console right) except group 1 or 2 3.

For loss of heatees/ decreasing pressure, attempt to energize If ' nsuccegsfu1 start Backup heaters from console, CL.

u 7

reducing unit load.

1'l161 5.0

m

~

Revisicn 0

~ '

29.E.3 Follow-up Action 1.

For energized heaters, open heater breakers in question at the pressurizer Heater Control Centers except for group 1 or 2.

2.

Control RC pressure at normal 2155 psig setpoint with RC-V1 spray valve in MANUAL.

3.

For de-energized heaters, determine cause and if a minimum of one heater group is not operable, continue load reduction to shut down and possibly cooldown ond'ition.

SECTION T Malfunction In Pressurizer Level Indication or Control 29F.1 Symotoms 1.

Disugreement between the console recorder level readouts of more than 12 inches.

2.

Rapid change in indicated / recorded levei due to loss of com-pensation or loss of power or d/p cell failure or other mal-function.

29P.2 Immediate Action A.

Automatic Action 1.-

If indication fails low:

Pressurizer heaters trip @ 80 inches makeup valve MU-V17 opens, and RC pressure increases.

2.

If indication fails high:

Makeup valve MU-V17 closes.

B.

Manual Action 1.

When any two of three console recorder level transmitter readouts disagree by more than 12 inches, take manual 6.0 1116Z

.d

  • , E'P 1202-29 10-18-73 Revision 0 l

4 control of level and then select the third transmitter for i

indication.

2.

Re-energize heaters if tripped due to malfunction, i

29.T.3 Follow-up Action 1.

If the switching level transmit'ters ha's not rectified the condition, switch to the alternate temperature detector.

l 2.

If pressurizer level recorder. indication is lost, select another transmitter or use the computer for level indication.

SECTION G Pressurizer Spray Valve Failure 29G.1 Symptoms

)

1.

RC-V1 spray valve fails to open when the RC system pressure is

}

greater than 2205 psig.

?

2.

RC-V1 spray spray valve is open when the RC ' system is less than 2155 psig.

29G.2 Immedicte Action A.

Automatic Action 1.

RC system pressure greater tlan 2715 psig. activates RC-RV2 electromatic relief and the high pressure alarm.

i 2.

RC-V1 failing open (in auto) causes RC system prassure to stablize at approximately 2100 psig. with all heaters "on".

t 3.

Failure when manually opened beyond the automatic limit position causes continued pressure drop and alarm at 2055.

B.

Manual Action 1.

Control RX-V1 opening or closing in MANUAL with jogbuttons.

2.

If the spray valve gas failed open, control pressure by i

closing the spray block valve RC-V3.

111 7.0

,v.",

. ~ -, _ -.,.,.. - _, _ _. _.,.... _.

- p..

E','[E'P1202-29 10-10-73 Ravision 0 y

NOTE: If the " Block" valve RC-V3 is closed, it must be 1

periodically cycled to keep the spray line warm 3.

Reduce rate of ICS load change to less than 1% per minute.

29G.3 Follow-up Action 1.

Continue plant,cperation with reduced rate of load change.

}

9 8.0 i

i g 11164 w

vm-r--r w ee w'=


g-ww-mwwyv ww w

+wwr r P m www azm-5 4'W79m'----TF'v -