ML20085E098: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. _ _ _ . _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ - _ - | {{#Wiki_filter:. _ _ _. _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ - _ - | ||
i VERMONT YANKEE NUCLEAR POWER CORPORATION | i VERMONT YANKEE NUCLEAR POWER CORPORATION 1 | ||
I l | |||
(_.v/ ) | y "i f P O. Box 157. Governor Hunt Road 7 | ||
U.S. Nuclear Regulatory Comisolon | i Vernon. Verrnont 053$& 0157 hj fj (802) 2674 711 Y | ||
October 8, 1991 | |||
(_.v/ ) | |||
SVY # 91-77 U.S. Nuclear Regulatory Comisolon Washington, D.C. | |||
20555 httnt Document ControA Mok | |||
==References:== | ==References:== | ||
a) License No. DPR-28 (Docket No. 50-271) | a) License No. DPR-28 (Docket No. 50-271) | ||
Subjects Revision 3 to the Vermont Yankee Training and Qualification Plan, | Subjects Revision 3 to the Vermont Yankee Training and Qualification Plan, and Revleien 20 to the Vermont Yankee Physical Security Plan Dear Sirs e | ||
The purpose of thi.e letter is to provide you with Revision No. 3 to the Vermont Yankee Training and Qualification Plan, and Revision 20 to the Vermont Yankee Physical Security Plan. | The purpose of thi.e letter is to provide you with Revision No. 3 to the Vermont Yankee Training and Qualification Plan, and Revision 20 to the Vermont Yankee Physical Security Plan. | ||
These revisions reflect enhancemente recently made to our Security Program. These changes were previously incorporated into our implementing procedures and the enclosure-reflects the resultant Plan changes. | These revisions reflect enhancemente recently made to our Security Program. | ||
These changes were previously incorporated into our implementing procedures and the enclosure-reflects the resultant Plan changes. | |||
-We have reviewed this rev/sion and have determined that the changes do not decrease the safeguarda ef fectiveness of: the Plan. | |||
The revinion to our Training fu Qualification Plan is submitted as Attachment A to this letter and the revision ti +,he Physical Security Plan is submitt.ed a,s Attachment B. Both are considered 3AELQ.VMQS IFFOP.MATION which are to be withhold f rom public disclosure in accordance with the provisions of 10 CFR 73.21. | Therefore, prior NRC approval of this rev.sion is not required. | ||
in accordance with 10 CFR 50.54(p), | |||
The revinion to our Training fu Qualification Plan is submitted as Attachment A to this letter and the revision ti +,he Physical Security Plan is submitt.ed a,s Attachment B. | |||
Both are considered 3AELQ.VMQS IFFOP.MATION which are to be withhold f rom public disclosure in accordance with the provisions of 10 CFR 73.21. | |||
We have enclosed our standard Document Custody Form and Change Transmittal Torm for | We have enclosed our standard Document Custody Form and Change Transmittal Torm for | ||
( | ( | ||
I We trust that the enclosed information is deemed acceptable; hcwever, ehould you have | each copy of the Plan revision required by the NRO. | ||
Very truly yours, l | . lease sign and return these forms. | ||
I We trust that the enclosed information is deemed acceptable; hcwever, ehould you have any questions, please contact Mr. John Moriarty, Security thporvisor, at our plant 1 | |||
Warren | site. | ||
ces | Very truly yours, l | ||
VERHO 7 YAWKEE NUCLEAR POWER CORPO% TION w-Y 0 0," l i ', | |||
Warren P 'Hurp y f (i h6 | |||
) | / | ||
U.S.N.R.C. Resident Inspector (VYNPS) g | Jtn$'> | ||
5f Mg, | |||
;dg SeniorVfeePres e | |||
d__ | Operation l | ||
ces (Cover letter enly) | |||
M U.S.N.R.C. Region I Administrator | |||
) | |||
U.S.N.R.C. Resident Inspector (VYNPS) | |||
\\ | |||
g U.S.H.R.C. Project Nanager-(VYNPS) | |||
/ | |||
\\ | |||
d__ | |||
Eneloauru | |||
: 1) Attachment A, Egy1Algn 3 tSt.the TrAlalIE klLE11LLEA112n. MAD DCL ti. - | |||
2). Attachment B, Rei.slon 20 to the_Pjtysleal Sen rity Plan DOCUMENT TPANSHITTED HEREWITH WHEN SEPAPATED FROM ENCLOSURES CONTAINS SAFEGUARDS INFORMATION LE THIS DOCUMENT AS DECON' TROLLED I | |||
,%3 v | |||
..e c- | |||
,v- -. | |||
e}} | |||
Latest revision as of 03:38, 14 December 2024
| ML20085E098 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 10/08/1991 |
| From: | Murphy W VERMONT YANKEE NUCLEAR POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| BVY-91-77, NUDOCS 9110180034 | |
| Download: ML20085E098 (1) | |
Text
. _ _ _. _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ - _ -
i VERMONT YANKEE NUCLEAR POWER CORPORATION 1
I l
y "i f P O. Box 157. Governor Hunt Road 7
i Vernon. Verrnont 053$& 0157 hj fj (802) 2674 711 Y
October 8, 1991
(_.v/ )
SVY # 91-77 U.S. Nuclear Regulatory Comisolon Washington, D.C.
20555 httnt Document ControA Mok
References:
a) License No. DPR-28 (Docket No. 50-271)
Subjects Revision 3 to the Vermont Yankee Training and Qualification Plan, and Revleien 20 to the Vermont Yankee Physical Security Plan Dear Sirs e
The purpose of thi.e letter is to provide you with Revision No. 3 to the Vermont Yankee Training and Qualification Plan, and Revision 20 to the Vermont Yankee Physical Security Plan.
These revisions reflect enhancemente recently made to our Security Program.
These changes were previously incorporated into our implementing procedures and the enclosure-reflects the resultant Plan changes.
-We have reviewed this rev/sion and have determined that the changes do not decrease the safeguarda ef fectiveness of: the Plan.
Therefore, prior NRC approval of this rev.sion is not required.
in accordance with 10 CFR 50.54(p),
The revinion to our Training fu Qualification Plan is submitted as Attachment A to this letter and the revision ti +,he Physical Security Plan is submitt.ed a,s Attachment B.
Both are considered 3AELQ.VMQS IFFOP.MATION which are to be withhold f rom public disclosure in accordance with the provisions of 10 CFR 73.21.
We have enclosed our standard Document Custody Form and Change Transmittal Torm for
(
each copy of the Plan revision required by the NRO.
. lease sign and return these forms.
I We trust that the enclosed information is deemed acceptable; hcwever, ehould you have any questions, please contact Mr. John Moriarty, Security thporvisor, at our plant 1
site.
Very truly yours, l
VERHO 7 YAWKEE NUCLEAR POWER CORPO% TION w-Y 0 0," l i ',
Warren P 'Hurp y f (i h6
/
Jtn$'>
5f Mg,
- dg SeniorVfeePres e
Operation l
ces (Cover letter enly)
M U.S.N.R.C. Region I Administrator
)
U.S.N.R.C. Resident Inspector (VYNPS)
\\
g U.S.H.R.C. Project Nanager-(VYNPS)
/
\\
d__
Eneloauru
- 1) Attachment A, Egy1Algn 3 tSt.the TrAlalIE klLE11LLEA112n. MAD DCL ti. -
2). Attachment B, Rei.slon 20 to the_Pjtysleal Sen rity Plan DOCUMENT TPANSHITTED HEREWITH WHEN SEPAPATED FROM ENCLOSURES CONTAINS SAFEGUARDS INFORMATION LE THIS DOCUMENT AS DECON' TROLLED I
,%3 v
..e c-
,v- -.
e