ML20085E098

From kanterella
Jump to navigation Jump to search
Forwards Rev 3 to Training & Qualification Plan & Rev 20 to Physical Security Plan.Revs Withheld (Ref 10CFR73.21)
ML20085E098
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 10/08/1991
From: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BVY-91-77, NUDOCS 9110180034
Download: ML20085E098 (1)


Text

. _ _ _. _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ - _ -

i VERMONT YANKEE NUCLEAR POWER CORPORATION 1

I l

y "i f P O. Box 157. Governor Hunt Road 7

i Vernon. Verrnont 053$& 0157 hj fj (802) 2674 711 Y

October 8, 1991

(_.v/ )

SVY # 91-77 U.S. Nuclear Regulatory Comisolon Washington, D.C.

20555 httnt Document ControA Mok

References:

a) License No. DPR-28 (Docket No. 50-271)

Subjects Revision 3 to the Vermont Yankee Training and Qualification Plan, and Revleien 20 to the Vermont Yankee Physical Security Plan Dear Sirs e

The purpose of thi.e letter is to provide you with Revision No. 3 to the Vermont Yankee Training and Qualification Plan, and Revision 20 to the Vermont Yankee Physical Security Plan.

These revisions reflect enhancemente recently made to our Security Program.

These changes were previously incorporated into our implementing procedures and the enclosure-reflects the resultant Plan changes.

-We have reviewed this rev/sion and have determined that the changes do not decrease the safeguarda ef fectiveness of: the Plan.

Therefore, prior NRC approval of this rev.sion is not required.

in accordance with 10 CFR 50.54(p),

The revinion to our Training fu Qualification Plan is submitted as Attachment A to this letter and the revision ti +,he Physical Security Plan is submitt.ed a,s Attachment B.

Both are considered 3AELQ.VMQS IFFOP.MATION which are to be withhold f rom public disclosure in accordance with the provisions of 10 CFR 73.21.

We have enclosed our standard Document Custody Form and Change Transmittal Torm for

(

each copy of the Plan revision required by the NRO.

. lease sign and return these forms.

I We trust that the enclosed information is deemed acceptable; hcwever, ehould you have any questions, please contact Mr. John Moriarty, Security thporvisor, at our plant 1

site.

Very truly yours, l

VERHO 7 YAWKEE NUCLEAR POWER CORPO% TION w-Y 0 0," l i ',

Warren P 'Hurp y f (i h6

/

Jtn$'>

5f Mg,

dg SeniorVfeePres e

Operation l

ces (Cover letter enly)

M U.S.N.R.C. Region I Administrator

)

U.S.N.R.C. Resident Inspector (VYNPS)

\\

g U.S.H.R.C. Project Nanager-(VYNPS)

/

\\

d__

Eneloauru

1) Attachment A, Egy1Algn 3 tSt.the TrAlalIE klLE11LLEA112n. MAD DCL ti. -

2). Attachment B, Rei.slon 20 to the_Pjtysleal Sen rity Plan DOCUMENT TPANSHITTED HEREWITH WHEN SEPAPATED FROM ENCLOSURES CONTAINS SAFEGUARDS INFORMATION LE THIS DOCUMENT AS DECON' TROLLED I

,%3 v

..e c-

,v- -.

e