i LOUISIANA POWER & LIGHT /Waterford 3 SES/P. O. | |||
Regional Administrator, Region IV | Box E/Killona, LA 70066 NSNhYSE October 7, 1983 W3K83-1512 Q-3-A35.07.70 Mr. John T. Collins Regional Administrator, Region IV I | ||
y Arlington, Texas | U. S. Nuclear Regulatory Commission i | ||
OCT I 4 M3 1 | |||
611 Ryan Plaza Drive, Suite 1000 g | |||
. y Arlington, Texas 76012 g | |||
-l | |||
==REFERENCE:== | ==REFERENCE:== | ||
LP&L letter W3183-0305 dated September 9, 1983 | LP&L letter W3183-0305 dated September 9, 1983 | ||
==Dear Mr. Collins:== | ==Dear Mr. Collins:== | ||
==SUBJECT:== | ==SUBJECT:== | ||
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 70 "GE 480-V Trip Coils Do Not Drop Out After Tripping" Fifth Interim Report l | Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 70 "GE 480-V Trip Coils Do Not Drop Out After Tripping" Fifth Interim Report l | ||
The above referenced letter indicated that a Final Report would be submitted to the USNRC by October 11, 1983. | The above referenced letter indicated that a Final Report would be submitted l | ||
to the USNRC by October 11, 1983. | |||
At the present time, only 2 of 86 breakers remain to have the design change installed, and verification of supporting documentation is in progress. The corrective action is expected to be completed in November 1983. | |||
l A Final Report will therefore be submitted to the USNRC on December 21, 1983. | l A Final Report will therefore be submitted to the USNRC on December 21, 1983. | ||
Very truly yours, T. F. oerrets | Very truly yours, D | ||
Quality Assurance Manager TFG:CNH:VBR cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 8310210293 831007 PDR ADOCK 05000382 | T. F. oerrets Quality Assurance Manager TFG:CNH:VBR cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. | ||
20555 8310210293 831007 PDR ADOCK 05000382 1 b-1 S | |||
PDR eO | |||
t-3., | t- | ||
.o 3., | |||
Washington, D.C. 20036 Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 1 | Mr. John T. Collins October 7, 1983 W3K83-1512 Page 2 cc: Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. | ||
20555 Mr. E. L. Blake Shaw, Pittman, Potts, & Trowbridge 1800 M Street, N.W. | |||
Washington, D.C. | |||
20036 Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 1 | |||
1 4 | 1 4 | ||
l}} | l}} | ||
Latest revision as of 03:11, 14 December 2024
| ML20085L168 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 10/07/1983 |
| From: | Gerrets T LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, 70, W3K83-1512, NUDOCS 8310210293 | |
| Download: ML20085L168 (2) | |
Text
_ _ _ _ _ _ _ _ _
i LOUISIANA POWER & LIGHT /Waterford 3 SES/P. O.
Box E/Killona, LA 70066 NSNhYSE October 7, 1983 W3K83-1512 Q-3-A35.07.70 Mr. John T. Collins Regional Administrator, Region IV I
U. S. Nuclear Regulatory Commission i
OCT I 4 M3 1
611 Ryan Plaza Drive, Suite 1000 g
. y Arlington, Texas 76012 g
-l
REFERENCE:
LP&L letter W3183-0305 dated September 9, 1983
Dear Mr. Collins:
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 70 "GE 480-V Trip Coils Do Not Drop Out After Tripping" Fifth Interim Report l
The above referenced letter indicated that a Final Report would be submitted l
to the USNRC by October 11, 1983.
At the present time, only 2 of 86 breakers remain to have the design change installed, and verification of supporting documentation is in progress. The corrective action is expected to be completed in November 1983.
l A Final Report will therefore be submitted to the USNRC on December 21, 1983.
Very truly yours, D
T. F. oerrets Quality Assurance Manager TFG:CNH:VBR cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8310210293 831007 PDR ADOCK 05000382 1 b-1 S
PDR eO
t-
.o 3.,
Mr. John T. Collins October 7, 1983 W3K83-1512 Page 2 cc: Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Mr. E. L. Blake Shaw, Pittman, Potts, & Trowbridge 1800 M Street, N.W.
Washington, D.C.
20036 Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 1